ThyssenKrupp Elevators (Manufacturing China) Engineering Center


Installation Manual S200 Landing
Door System
Installation Manual
Version: ab No.: R000000251

ThyssenKrupp Elevator (China)


Installation Manual No.: R000000251

Warning

The elevator installation personnel should be those who have been trained by Labor and Social
Security Bureau and got the operation certificates. Before installation, please read this installation
manual carefully. All the installation personnel of elevator components should comply with relevant
specifications. Maximum guarantee of elevator performance and passengers safety will be provided
by installation personnel strictly abiding by this manual. ThyssenKrupp Elevator will not be liable for
any loss caused by your operation without compliance with the requirements of this manual and by
your modification or refit of the elevator.

All rights of this manual belong to ThyssenKrupp Elevator. No one can in any forms or by any means
use, copy or distribute any part of the manual for any other purposes without prior written permission
from ThyssenKrupp Elevator. ThyssenKrupp Elevator has the right to change the contents of the
written material without asking for suggestions or prior notification. If have any questions about the
manual, please contact ThyssenKrupp Elevator promptly.

ThyssenKrupp Elevator (China)


Installation Manual No.: R000000251

Table of Contents

Chapter I General drawing for S200 landing door system ................................................................. 2


Chapter II Installation of S200 landing door system .......................................................................... 6
2.1 General................................................................................................................................................6
2.2 Safety specifications..........................................................................................................................6
2.3 Preparation of installation tools........................................................................................................7
2.4 Main parameters of S200 landing door system.............................................................................8
2.5 Preparation before S200 landing door installation......................................................................10
2.6 Installation of S200 landing door sill..............................................................................................13
2.7 Installation of landing door hanging components........................................................................22
2.8 Installation of landing door board and slider................................................................................27
Chapter III Maintenance Precautions ............................................................................................... 33
3.1 Wipe the guide rail of the landing door during each time of maintenance, check wear extent
of the door pulley and replacement should be made immediately if it exceeds 1.5mm........33
3.2 Check tension degree of the steel wire rope during each time of maintenance
as shown in figure 3-1.....................................................................................................................33
3.3 Degree of tightness of standard parts should be checked during each
time of maintenance........................................................................................................................33
3.4 Smoothness of the landing door lock actions should be checked during each time of
maintenance.....................................................................................................................................33
3.5 Correct application method of the triangle key............................................................................33
Chapter IV Consumables of S200 Landing Door ............................................................................. 35
Chapter V Appendix ......................................................................................................................... 37
Installation checklist of landing door...........................................................................................................37
5.1 Overall installation confirmation of parts of landing door...........................................................37
5.2 Installation confirmation of landing door on each floor...............................................................38

Installation Manual No.: R000000251

Chapter I General Drawing for S200 Landing Door System

Figure 1-1 S200 landing door system (center-opening double-leaf)

ThyssenKrupp Elevator (China) 2


Installation Manual No.: R000000251

Figure 1-2 S200 landing door system (side-opening double-leaf)

ThyssenKrupp Elevator (China) 3


Installation Manual No.: R000000251

Upper installation Landing door hanging


support components

Hanger door bolt kit

Door jamb and lintel


Link

Landing door board

Upright side
installation support

Door slider components

Door jamb upright

Lower installation support


Landing door apron

Landing door sill

Figure 1-3 Structure diagram of S200 landing door system (center-opening double-leaf)

ThyssenKrupp Elevator (China) 4


Installation Manual No.: R000000251

Landing door hanging


components

Upper installation support

Hanger door bolt kit

Door jamb upright


components

Door closing side upright


installation support Upright installation
support

Landing door board

Door slider
components

Landing door sill

Landing door apron

Lower installation
support

Figure 1-4 Structure diagram of S200 landing door system (side-opening double-leaf)

ThyssenKrupp Elevator (China) 5


Installation Manual No.: R000000251

Chapter II Installation of S200 Landing Door System


2.1 General
This manual applies to the installation of S200 landing door system.

The installation method described in the manual is the general installation method of our company
at present and relatively detailed explanation of relevant specific requirements of installation has
been provided in the manual. When the situation of elevator hoist-way is different from the elevator
installation hoist-way arrangement drawing, please consult with our relevant technicians
immediately and apply special installation method.

Installation has a very close relation with clients. In order to carry out the work and improve
efficiency successfully, installation personnel should keep good communication with clients. And
they should try their best to get the strong support of clients to the installation.

2.2 Safety specifications


2.2.1 Explanation of safety identifications

The signs below are used as safety identifications in the manual

Danger sign

When you see this sign, you must be careful because grave danger of personal injury may occur.
Please obey the explanations of this sign.

Electric shock risk sign

When you see this sign, you must be careful because grave danger of personal injury caused by
electric shock may occur.

Warning sign

When you see this sign, you must be careful. Personal injury or property loss may occur if you
dont comply with the explanations of the sign. Please obey the warning sign.

Caution sign

ThyssenKrupp Elevator (China) 6


Installation Manual No.: R000000251

You should pay attention to this sign because important operation directions are included in the
explanations of this sign. Damage to the elevator and its failure may be caused if don't obey the
explanations.

Check sign

Attention should be paid to this sign because the explanations of this sign include the information
of check order. You must carry out strictly in any situations, or personal injury or property loss may
be caused.

2.2.2 Safety measures applied in emergency situations

Emergency unlock

Only professional personnel who know elevator safety specifications very well and
have been trained can open the landing door and car door manually.

2.3 Preparation of installation tools


Tools of S200 landing door system are mainly as following.

Name: wrench Name: circlip pliers Name: leveling rod


Specification: 13~24mm Specification: 175m Specification: 500mm

Name: plumb Name: socket wrench Name: hex wrench


Specification: steel 1kg Specification: 13/16/18/24 Specification: 10/13/16

Name: feeler gauge Name: cross screw driver


(attraction-type)
Specification: 100A21 Specification: 75~200mm

ThyssenKrupp Elevator (China) 7


Installation Manual No.: R000000251

2.4 Main parameters of S200 landing door system

Figure 2-1 Main parameters of S200 landing door system (center-opening double-leaf)

ThyssenKrupp Elevator (China) 8


Installation Manual No.: R000000251

Figure 2-2 Main parameters of S200 landing door system (side-opening double-leaf)

ThyssenKrupp Elevator (China) 9


Installation Manual No.: R000000251

Table 2-2 Main parameters of S200 landing door system (center-opening double-leaf)

Clear door opening width


(mm) 700 800 900 1000 1100 1200 1300
C(mm) 1500 1700 1900 2100 2300 2500 2700
A(mm) 300 350 267 300 300 275 300
S (number of sill support
channel) 3 3 4 4 4 5 5
T (total number of upper
and lower support) 5 5 6 6 8 9 9

Table 2-3 Main parameters of S200 landing door system (side-opening double-leaf)

Clear door opening width


(mm) 700 800 900 1000 1100 1200 1300
C(mm) 1150 1300 1450 1600 1750 1900 2050
A(mm) 330 380 287 320 353.333 290 315
E(mm) 370 420 470 520 579 620 670
S (number of sill support
channels) 3 3 4 4 4 5 5
T (total number of upper
and lower supports) 5 5 6 6 8 9 9

2.5 Preparation before S200 landing door installation


2.5.1 Determine the elevation line of sill surface
Designate the elevation of each floor according to the installation manual of preparation before
installation as figure 2-3 shows
Distance between elevation

((provided by owner)
line and decoration
completion line

Elevation line The distance is different


(provided by owner) with the change of each
floor levelness and
decoration thickness

Decoration
completion line
(provided by owner)

Figure 2-3 Schematic drawing of floor elevation line

Based on the elevation line, draw the sill support channel expansion bolt installation line and landing
door header support expansion bolt installation line on the front side wall of hoist-way of hole preserved
entrance as shown in figure 2-4.

ThyssenKrupp Elevator (China) 10


Installation Manual No.: R000000251

Landing door
header support
expansion bolt
installation line

Clear door opening height + 255


Clear door opening height
Elevation line
(provided by owner)

Decoration
completion line
(provided by owner)
Sill surface

Sill support channel


expansion bolt
installation line

Figure 2-4 Schematic drawing of expansion bolt installation lines of floor sill support channel and
landing door header support

2.5.2 Expansion bolt installation for landing door installation


Attention: Expansion bolt installation lines of landing door header support and
landing door sill support channel must be installed on the concrete wall
structure or weld the landing door header support and landing door sill support
channel with built-in ring beam directly.
Drill the hole of expansion bolt according to the expansion bolt installation lines of sill support channel
and landing door upper installation support and the fixed position of expansion bolt for specific landing
door installation as shown in figure 2-5. The specification of fixed expansion bolts on landing door lower
and upper installation support is M12100 and bolt hole is 16mm. The specification of fixed expansion
bolt on upright installation support is M665 and bolt hole is 10mm.

ThyssenKrupp Elevator (China) 11


Installation Manual No.: R000000251

M12100 expansion bolt Clear door opening width + 250


Landing door upper
Clear door opening width installation support

M665 expansion bolt

Clear door opening


height + 255
Upright installation
support

Sill surface
Decoration
completion surface

M12100 expansion Landing door lower


bolt installation support

Figure 2-5 Drawing of fixed expansion bolt positions of


center-opening double-leaf landing door system

Table 2-4 Dimensions of fixed expansion bolts of


center-opening double-leaf S200 landing door system

Clear door
opening
700 800 900 1000 1100 1200 1300
width
(mm)
E(mm) (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2
A(mm) 300 350 267 300 300 275 300
Number of
2 2 3 3 3 4 4
A

ThyssenKrupp Elevator (China) 12


Installation Manual No.: R000000251

Landing door upper


M12100 expansion bolt
installation support

Clear door opening height + 255


M665 expansion bolt

Upright installation
support

Decoration completion
surface of sill surface

Door closing side upright


installation support

M12100 expansion bolt Landing door lower


installation support

Figure 2-6 Drawing of fixed expansion bolt positions of


side-opening double-leaf landing door system

Table 2-5 Dimensions of fixed expansion bolts


of side-opening double-leaf S200 landing door system

Clear door
opening
700 800 900 1000 1100 1200 1300
width
(mm)
B(mm) (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2
A(mm) 330 380 287 320 353 290 315
Number of
2 2 3 3 3 4 4
A

2.6 Installation of S200 landing door sill


2.6.1 Fix the landing door lower installation support
Fix the lower installation support according to 2.5.2 lower installation support expansion bolt position.
The center-opening double-leaf landing door is made as the example and the installation of side-
opening double-leaf landing door can be carried out with referring to the installation of center-opening
double-leaf landing door as shown in figure 2-7.

ThyssenKrupp Elevator (China) 13


Installation Manual No.: R000000251

Decoration
completion surface
of sill surface

Landing door lower


installation support

Door opening centerline

Figure 2-7 Drawing of floor sill support channel installation

2.6.2 Connect landing door sill with sill carrier as figure 2-8 and 2-9 show.
Hex bolt M816 (center-opening
Sill double-leaf)

Hex bolt M1020 (side-opening


double-leaf)

Sill support
channel

Hex flange nut M8 (center-


opening double-leaf)

Hex flange nut M10 (side-opening


double-leaf)
Figure 2-8 Drawing of connecting sill with sill carrier

6 bolts in total

Figure 2-9 Drawing of connecting sill with sill carrier

ThyssenKrupp Elevator (China) 14


Installation Manual No.: R000000251

2.6.3 Install sill carrier on landing door lower installation support as shown in figure 2-10
Sill and sill carrier

Landing door lower


installation support

Sill carrier groove slider


(including hex bolt
M12X30)

Hex nut M12, spring washer


12, flat washer 12

Figure 2-10 Sill carrier is installed on landing door lower installation support

2.6.4 Correct sill


a) Adjust the levelness of one end of sill according to elevation offered by owner at first,
namely put one end of 1/600 leveling rod on the sill surface and the other end on the
decoration completion surface (provided by owner) and then measure the levelness in the
longitudinal direction. Levelness is required 1/600. Lock the bolt of landing door lower
installation support on the segment firmly as figure 2-10 shows.
b) Then put the leveling rod in the middle of sill in horizontal direction, adjust the height of
other end of support and make the whole sill level. The levelness of entire sill is required
1/600. Lock other bolts of landing door lower installation support firmly as shown in figure
2-11.
Bolts of landing door
lower installation Sill door opening
width line
support

Lofting plumb
line of door
opening width

Figure 2-11 Drawing of fixing landing 2-12 Alignment of center of sill door opening width line
door lower installation support and center of door opening width lofting plumb line
c) Adjust the left and right direction to make the center of sill door opening width and center
of door opening width lofting plumb lines which lie at each end of sill surface coincident as
figure 2-12 shows. Lock sill carrier groove slider bolts that connect sill support channel
and sill carrier firmly.
d) Adjust the distances between sill surface and the center of door opening lofting plumb
lines at two ends both to be 30 0+2 mm as shown in figure 2-13. Lock the bolts that
connected sill with sill carrier firmly.

ThyssenKrupp Elevator (China) 15


Installation Manual No.: R000000251

Door opening
width lofting
Elevation plumb line Door opening width
offered by lofting plumb line
owner Door opening width
lofting plumb line

Decoration
completion surface Sill surface
Sill surface

Figure 2-13 Positions of sill and lofting plumb line

e) After adjusting, lock all fixed bolts firmly again and weld two points at the upper and lower
position between the big flat washer and support of expansion bolt. The overlap surface of
two supports needs to be welded also. Then weld the overlap part of sill carrier and lower
installation support. After welding finished, remove weld slag and brush rust-proofing paint
(paint no.: RAL7046) as shown in figure 2-14.

Sill carrier Sill

Landing door lower


installation support

Figure 2-14 Schematic drawing of welding sill support channel

2.6.5 Install landing door apron as figure 2-15 shows.

ThyssenKrupp Elevator (China) 16


Installation Manual No.: R000000251

Cross recessed
countersunk head
Bolt M510

U-nut M5

Figure 2-15 Drawing of landing door apron installation

ThyssenKrupp Elevator (China) 17


Installation Manual No.: R000000251

2.6.6 Install landing door jamb


Install the landing door jamb as figure 2-16 and 2-17.show.

Door lintel
Hexagon
socket head
bolt M8X16

Internal serrated
Right upright lock washer 8

Hexagon
socket head
Left bolt M8X16
Internal
upright
serrated lock
washer 8

Sill carrier

Figure 2-16 Schematic drawing of landing door jamb (center-opening double-leaf) installation

ThyssenKrupp Elevator (China) 18


Installation Manual No.: R000000251

Door
Door
closing link

Light
barrier

Hexagon socket
head bolt M8X20 Link
Cross recessed
pan head tapping
Internal serrated
screw
ST3.5X9.5 lock washer 8 Door closing
upright

Flat washer 4
Upright

Hex bolt
M10X20

Hex flange Sill carrier


nut M10

Figure 2-17 Schematic drawing of landing door jamb (side-opening double-leaf) installation

2.6.7 Fix landing door jamb with wall as shown in figure 2-18.

ThyssenKrupp Elevator (China) 19


Installation Manual No.: R000000251

M665
expansion
Hex bolt M616,
bolt
nut M6, flat
washer 6

Figure 2-18 Schematic drawing of installing landing door jamb


(center-opening double-leaf) with wall

2.6.8 Connect integrated pressure plate and link with bolts. Dont press the link with integrated
pressure plate tightly at first and keep 2~3mm clearance as figure 2-19 shows.

Integrated Link
pressure plate

Hexagon socket
head cap bolt
M816

Figure 2-19 Schematic drawing of installing integrated pressure plate with link

ThyssenKrupp Elevator (China) 20


Installation Manual No.: R000000251

2.6.9 Check landing door triangular lock, hexagon socket head cap bolt M510 and big nut M20 of
triangular lock and fasten them. Then install the landing door device because if you install
landing door device first, you cant fasten it. See figure 2-20.

Hexagon socket
head bolt M510
Triangular lock
releasing rod support
Internal serrated lock
Triangular lock spring washer 5

Flat washer 5
Triangular lock big nut

Triangular lock shaft sleeve

Triangular lock core

Right side opening and


Right side opening
center-opening double-leaf

Figure 2-20 Schematic drawing of landing door triangular lock installation

2.6.10 Adjust landing door jamb


When installation is finished, the error of diagonals of door jamb A and B is 1.0mm and error of
upright front and back verticality C and D is not more than 2.0mm as figure 2-21 shows.

Figure 2-21 Schematic drawing of adjusting landing door jamb

ThyssenKrupp Elevator (China) 21


Installation Manual No.: R000000251

2.7 Installation of landing door hanging components


At this time, adjusting the door guide rail levelness and straightness on the landing door hanging
components is the key element of installation quality. Ensuring that the door guide rail is parallel to sill is
the key element of landing door well operating. Therefore the adjustment must be accurate.
2.7.1 Install landing door upper installation support
Fix landing door upper installation support based on 2.5.2 landing door upper installation support
expansion bolt position as figure 2-22 shows.

Clear door opening


height + 255
Figure 2-22 Schematic drawing of installing landing door upper installation support

2.7.2 Install landing door hanging components


Hoist landing door hanging components into hoist-way and connect the components with upper
installation support as shown in figure 2-23.

Hex bolt
M820

Figure 2-23 Drawing of landing door hanging components installation

2.7.3 Install landing door hanging components with door jamb


a) Hang integrated guide rail groove of landing door hanging components on the door
jamb integrated pressure plate as figure 2-24 shows.

ThyssenKrupp Elevator (China) 22


Installation Manual No.: R000000251

Guide rail groove of


Integrated landing door hanging
pressure plate components

Integrated
pressure plate
Figure 2-24 Drawing of installing landing door hanging
components with door jamb integrated pressure plate

b) Fix landing door hanging components with door jamb as figure 2-25 and 2-26 show.

Fasten bolt
with hex
wrench

Internal Hex bolt


serrated lock M816
washer 8

Figure 2-25 Drawing of installing landing door hanging components with door jamb
(center-opening double-leaf)

ThyssenKrupp Elevator (China) 23


Installation Manual No.: R000000251

Hex bolt
M816

Internal
serrated lock
washer 8

Special hex thin


bolt M8 25

Figure 2-26 Drawing of installing landing door hanging components with door jamb
(side-opening double-leaf)

2.7.4 Adjust landing door hanging components


a) When landing door hanging components installation is finished, see figure 2-27.

ThyssenKrupp Elevator (China) 24


Installation Manual No.: R000000251

Landing door upper


installation support

Landing door
hanging components

Door jamb

Sill

Door opening
width plumb line

Landing door lower


installation support Door opening
width plumb line

Figure 2-27 Drawing of landing door hanging components installation


(center-opening double-leaf)

ThyssenKrupp Elevator (China) 25


Installation Manual No.: R000000251

b) Adjust the left and right direction of landing door hanging components and make the
center of door opening width and door opening width lofting plumb lines which at each end
of landing door hanging components align with each other as figure 2-28 shows.

Door opening width lines at


two ends of landing door
hanging components

Door opening
width lofting
plumb line

Figure 2-28 Drawing of connecting landing door Figure 2-29 Drawing of connecting landing door
hanging components with door jamb hanging components with door jamb

c) Adjust the distance between landing door hanging components guide rail and the center
of door opening width lofting plumb lines at two ends. The distance of center-opening
double-leaf landing door is A = 66.8 1mm and the distance of side-opening double-leaf
landing door is A = 66 1mm as figure 2-29 shows.
d) Adjust the distance between the bottom surface of landing door hanging components
guide rail and sill surface which is B = C = (clear door opening height + 60) 1mm as
shown in figure 2-30.

Figure 2-30 Drawing II of connecting landing door device with door jamb

ThyssenKrupp Elevator (China) 26


Installation Manual No.: R000000251

2.8 Installation of landing door board and slider


2.8.1 For installation of landing door board and slider, refer to figure 2-31.

Special cup head


square neck bolt
M8 x 20

Hanger door bolts

Hex flange
nut M8

Square washer

Hex flange nut


M10

Hex bolt
M8 x 20

Standard spring
washer 8
Big flat washer

Door slider

Figure 2-31 Installation of landing door board and slider

2.8.2 Adjust landing door board


a) Leftward and rightward adjustment: position of the door board can be adjusted by
loosening four M8 flange hex nuts of the hanger door bolt kit as shown in figure 2-32.

ThyssenKrupp Elevator (China) 27


Installation Manual No.: R000000251

Leftward and rightward adjustment

Figure 2-32 Leftward and rightward adjustment of landing door board

b) upward and downward and clearance adjustment: position of the door board can be
adjusted by loosening four M10 flange hex nuts of the hanger door bolt kit as shown in
figure 2-33.

Clearance adjustment between


door board and door pocket
Upward and downward
adjustment

Horizontal adjustment

Figure 2-33 Upward and downward adjustment of landing door board

c) Refer to figure 2-34 for door board requirement after adjustment.

ThyssenKrupp Elevator (China) 28


Installation Manual No.: R000000251

Landing
door board

Door
pocket

Door board eccentricity Door board inclination


< 1mm < 1mm

Figure 2-34 Adjustment requirements for landing door board

2.8.3 Adjust eccentric wheel


Usually, clearance between the pulley and guide rail has been adjusted before delivery of the
pulley. If the clearance is found to be too large or too small during operations, it can be adjusted
by regulating the lower pulley (eccentric wheel).Correct adjustment: adjust the clearance
between the lower pulley (eccentric wheel) and the guide rail to be within 0.20.5mm, and then
lock M10 bolts. See figure M10.

Guide rail

The lower pulley


(eccentric wheel)

Figure 2-35 Adjustment of the eccentric wheel

2.8.4 Adjust verticality of door hanging board


After door board installation on the spot, if the door hanging board is found to be out of plumb, door
hanging board adjustment washers can be used appropriately to adjust verticality of the door
hanging board. See figure 2-36

ThyssenKrupp Elevator (China) 29


Installation Manual No.: R000000251

Door hanging board


adjustment washers

Figure 2-36 Adjustment of the eccentric wheel

2.8.5 Adjust landing door lock


a) Loosen two M8 nuts on the limit rubber support and move the support gently to adjust the
center of the revolution axis to be 100mm away from the edge of the door hanging
board.Lock the nut as shown in figure 2-37.
Landing door lock
point
Resolution axis Door holder installation support

Nut M8

Figure 2-37 Adjustment diagram of landing door lock

b) Loosen two M6 (A, B) nuts on the limit rubber and rotate slowly the limit rubber screw M6
(A) to ensure that the engagement between the lock point and the contact switch support
is not less than 7mm when the door lock is closed completely, then lock nut M6 (A).Adjust
limit rubber screw M6 (B) and leave enough space to ensure that the lock point can be
release when the door is opened, then lock M6 (B) as shown in figure 2-38.

ThyssenKrupp Elevator (China) 30


Installation Manual No.: R000000251

Door holder Cup head square neck


Contact switch Contact switch installation support bolt M6 x 16

Limit rubber M6 (A)

Limit rubber M6 (B)


Nut M6

Figure 2-38 Adjustment diagram of landing door lock (two)

c) Loosen two M6 nuts on the door holder fixing plate and move the fixing plate gently to
ensure that the center line of the two door holders is 145mm away from the edge of the
door hanging board.Lock the nut as shown in figure 2-39.
Door holder installation support

Door holder Nut M6


Nut M6 installation support

Door holder

Door hanging board

Door hanging
board

Figure 2-39 Adjustment diagram of landing door lock (three)

2.8.6 Position of landing door in closed state


Figure 2-40 Position of two side-opening landing doors in closed state.

ThyssenKrupp Elevator (China) 31


Installation Manual No.: R000000251

Door closing
upright
Aluminum sill Landing door board

Landing
door board

Figure 2-40 Position of two side-opening landing Figure 2-40 Position of two side-opening landing
doors in closed state (figure one) doors in closed state (figure two)
Figure 2-41 Position of two center-opening landing doors in closed state.
Car landing door in closed state

Car

DoorDoor
widthWidth

Figure 2-41 Position diagram of two center-opening landing doors in closed state

Figure 2-42 Position of two center-opening landing doors in open state.

Car landing door in open state


Car

Door width

Figure 2-42 Position diagram of two center-opening landing doors in open state

ThyssenKrupp Elevator (China) 32


Installation Manual No.: R000000251

Chapter III Maintenance Precautions


3.1 Wipe the guide rail of the landing door during each time of maintenance, check
wear extent of the door pulley and replacement should be made immediately if it
exceeds 1.5mm.
3.2 Check tension degree of the steel wire rope during each time of maintenance as
shown in figure 3-1.

Attention: When the compression length of the steel tensioning spring is checked to
exceed 171mm, first loosen two hex flange nuts M8, and then adjust the tensioning spring to be
171mm in length.

Steel wire rope Steel wire rope


Steel wire fixing plate tensioning plate

Tensioning
Tensioning bolt
spring
Steel wire rope wheel
Hex flange nut M8

Figure 3-1 Schematic diagram of steel wire rope tension adjustment

3.3 Degree of tightness of standard parts should be checked during each time of
maintenance.
3.4 Smoothness of the landing door lock actions should be checked during each time
of maintenance.
3.5 Correct application method of the triangle key.

Attention: Unlocking of the triangle lock of the landing door should comply with
the following procedures.

3.5.1 After opening the landing door, first determine the position of the car to prevent missing
your foot and causing falling accidents in case that the car is not in this floor;

3.5.2 Open the lighting at the landing doorway, clear all kinds of sundries and note that there
should be irrelevant personnel around;

3.5.3 Insert the triangle key into the unlocking hole and determine the unlocking direction;

3.5.4 The operating personnel should stand to keep the body center and then unlock slowly in the
unlocking direction;

3.5.5 After unlocking, push open the landing door to a seam of about 100mm, then take back the
triangle key and observe conditions in the well. Special attention should be paid that at the

ThyssenKrupp Elevator (China) 33


Installation Manual No.: R000000251

moment the landing door cannot be pushed too open;

3.5.6 After completion of unlocking, the operating personnel should confirm that the landing door
has been locked securely.

ThyssenKrupp Elevator (China) 34


Installation Manual No.: R000000251

Chapter IV Consumables of S200 Landing Door

Steel wire rope

Interlock switch

Door holder

Door hanging wheel

Door contact

Eccentric
wheel

Door slider
assembly

Figure 4-1 Schematic diagram of consumables of S200 landing door

ThyssenKrupp Elevator (China) 35


Installation Manual No.: R000000251

Table 4-1 Table of consumables


Name Usage Remarks
Door hanging wheel 48 Landing door
Door slider assembly Landing door
Auxiliary contact of
Door contact AZ05(06)
landing door
Door opening type and door
Steel wire rope Landing door
width should be indicated
Eccentric wheel Landing door
Door holder Landing door
Main contact of landing
Interlock switch (socket/plug)
door

ThyssenKrupp Elevator (China) 36


Installation Manual No.: R000000251

Chapter V Appendix
Installation checklist of landing door
Contract unit: Project name:
Contract No.: Factory order No.:
Elevator model: Elevator No.:
GAD No.: Installation date:

5.1 Overall installation confirmation of parts of landing door

Serial Actual
Requirements Solutions
No. conditions
1 Expansion bolts are fixed and locked
It is required that the site welding positions be welded
2
and painted after welding slag being removed

ThyssenKrupp Elevator (China) 37


removal

38
Protective film
Connecting parts
Right

Project manager
door board 3-6mm
Door pocket

Clearance with landing


Left

2mm
Longitudinal verticality
2mm
Horizontal verticality

Signature:
5.2 Installation confirmation of landing door on each floor

lock roller and car sill 8-10mm

Date:
Distance between door
board and sill 3-6mm
Clearance between door
Landing door

and door pocket 3-6mm


No.: R000000251

Clearance between door board


boards 2mm
Clearance between two door

Inspector
1/600
Longitudinal verticality
1/600
Horizontal verticality
8-10mm
Distance from car gateway

Signature:
2mm
Deviation from car center

Date:
Landing door sill

Difference value
Right

ThyssenKrupp Elevator (China)


0~2mm
width is 30mm

Leader of installation team


vertical line of door
Clearance with lofting

Left
Installation Manual

1-2mm
Height over the ground
1/600
levelness

requirements

Signature:
Standard
Floor

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
1
2
3
4
5
6
7
8
9

Date:

You might also like