Installation Manual - S200 Landing Door System
Installation Manual - S200 Landing Door System
Installation Manual - S200 Landing Door System
(Version ab )
Warning
The elevator installation personnel should be those who have been trained by Labor and Social
Security Bureau and got the operation certificates. Before installation, please read this installation
manual carefully. All the installation personnel of elevator components should comply with relevant
specifications. Maximum guarantee of elevator performance and passengers safety will be provided
by installation personnel strictly abiding by this manual. ThyssenKrupp Elevator will not be liable for
any loss caused by your operation without compliance with the requirements of this manual and by
your modification or refit of the elevator.
All rights of this manual belong to ThyssenKrupp Elevator. No one can in any forms or by any means
use, copy or distribute any part of the manual for any other purposes without prior written permission
from ThyssenKrupp Elevator. ThyssenKrupp Elevator has the right to change the contents of the
written material without asking for suggestions or prior notification. If have any questions about the
manual, please contact ThyssenKrupp Elevator promptly.
Table of Contents
Upright side
installation support
Figure 1-3 Structure diagram of S200 landing door system (center-opening double-leaf)
Door slider
components
Lower installation
support
Figure 1-4 Structure diagram of S200 landing door system (side-opening double-leaf)
The installation method described in the manual is the general installation method of our company
at present and relatively detailed explanation of relevant specific requirements of installation has
been provided in the manual. When the situation of elevator hoist-way is different from the elevator
installation hoist-way arrangement drawing, please consult with our relevant technicians
immediately and apply special installation method.
Installation has a very close relation with clients. In order to carry out the work and improve
efficiency successfully, installation personnel should keep good communication with clients. And
they should try their best to get the strong support of clients to the installation.
Danger sign
When you see this sign, you must be careful because grave danger of personal injury may occur.
Please obey the explanations of this sign.
When you see this sign, you must be careful because grave danger of personal injury caused by
electric shock may occur.
Warning sign
When you see this sign, you must be careful. Personal injury or property loss may occur if you
dont comply with the explanations of the sign. Please obey the warning sign.
Caution sign
You should pay attention to this sign because important operation directions are included in the
explanations of this sign. Damage to the elevator and its failure may be caused if don't obey the
explanations.
Check sign
Attention should be paid to this sign because the explanations of this sign include the information
of check order. You must carry out strictly in any situations, or personal injury or property loss may
be caused.
Emergency unlock
Only professional personnel who know elevator safety specifications very well and
have been trained can open the landing door and car door manually.
Figure 2-1 Main parameters of S200 landing door system (center-opening double-leaf)
Figure 2-2 Main parameters of S200 landing door system (side-opening double-leaf)
Table 2-2 Main parameters of S200 landing door system (center-opening double-leaf)
Table 2-3 Main parameters of S200 landing door system (side-opening double-leaf)
((provided by owner)
line and decoration
completion line
Decoration
completion line
(provided by owner)
Based on the elevation line, draw the sill support channel expansion bolt installation line and landing
door header support expansion bolt installation line on the front side wall of hoist-way of hole preserved
entrance as shown in figure 2-4.
Landing door
header support
expansion bolt
installation line
Decoration
completion line
(provided by owner)
Sill surface
Figure 2-4 Schematic drawing of expansion bolt installation lines of floor sill support channel and
landing door header support
Sill surface
Decoration
completion surface
Clear door
opening
700 800 900 1000 1100 1200 1300
width
(mm)
E(mm) (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2
A(mm) 300 350 267 300 300 275 300
Number of
2 2 3 3 3 4 4
A
Upright installation
support
Decoration completion
surface of sill surface
Clear door
opening
700 800 900 1000 1100 1200 1300
width
(mm)
B(mm) (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2 (CH-300)/2
A(mm) 330 380 287 320 353 290 315
Number of
2 2 3 3 3 4 4
A
Decoration
completion surface
of sill surface
2.6.2 Connect landing door sill with sill carrier as figure 2-8 and 2-9 show.
Hex bolt M816 (center-opening
Sill double-leaf)
Sill support
channel
6 bolts in total
2.6.3 Install sill carrier on landing door lower installation support as shown in figure 2-10
Sill and sill carrier
Figure 2-10 Sill carrier is installed on landing door lower installation support
Lofting plumb
line of door
opening width
Figure 2-11 Drawing of fixing landing 2-12 Alignment of center of sill door opening width line
door lower installation support and center of door opening width lofting plumb line
c) Adjust the left and right direction to make the center of sill door opening width and center
of door opening width lofting plumb lines which lie at each end of sill surface coincident as
figure 2-12 shows. Lock sill carrier groove slider bolts that connect sill support channel
and sill carrier firmly.
d) Adjust the distances between sill surface and the center of door opening lofting plumb
lines at two ends both to be 30 0+2 mm as shown in figure 2-13. Lock the bolts that
connected sill with sill carrier firmly.
Door opening
width lofting
Elevation plumb line Door opening width
offered by lofting plumb line
owner Door opening width
lofting plumb line
Decoration
completion surface Sill surface
Sill surface
e) After adjusting, lock all fixed bolts firmly again and weld two points at the upper and lower
position between the big flat washer and support of expansion bolt. The overlap surface of
two supports needs to be welded also. Then weld the overlap part of sill carrier and lower
installation support. After welding finished, remove weld slag and brush rust-proofing paint
(paint no.: RAL7046) as shown in figure 2-14.
Cross recessed
countersunk head
Bolt M510
U-nut M5
Door lintel
Hexagon
socket head
bolt M8X16
Internal serrated
Right upright lock washer 8
Hexagon
socket head
Left bolt M8X16
Internal
upright
serrated lock
washer 8
Sill carrier
Figure 2-16 Schematic drawing of landing door jamb (center-opening double-leaf) installation
Door
Door
closing link
Light
barrier
Hexagon socket
head bolt M8X20 Link
Cross recessed
pan head tapping
Internal serrated
screw
ST3.5X9.5 lock washer 8 Door closing
upright
Flat washer 4
Upright
Hex bolt
M10X20
Figure 2-17 Schematic drawing of landing door jamb (side-opening double-leaf) installation
2.6.7 Fix landing door jamb with wall as shown in figure 2-18.
M665
expansion
Hex bolt M616,
bolt
nut M6, flat
washer 6
2.6.8 Connect integrated pressure plate and link with bolts. Dont press the link with integrated
pressure plate tightly at first and keep 2~3mm clearance as figure 2-19 shows.
Integrated Link
pressure plate
Hexagon socket
head cap bolt
M816
Figure 2-19 Schematic drawing of installing integrated pressure plate with link
2.6.9 Check landing door triangular lock, hexagon socket head cap bolt M510 and big nut M20 of
triangular lock and fasten them. Then install the landing door device because if you install
landing door device first, you cant fasten it. See figure 2-20.
Hexagon socket
head bolt M510
Triangular lock
releasing rod support
Internal serrated lock
Triangular lock spring washer 5
Flat washer 5
Triangular lock big nut
Hex bolt
M820
Integrated
pressure plate
Figure 2-24 Drawing of installing landing door hanging
components with door jamb integrated pressure plate
b) Fix landing door hanging components with door jamb as figure 2-25 and 2-26 show.
Fasten bolt
with hex
wrench
Figure 2-25 Drawing of installing landing door hanging components with door jamb
(center-opening double-leaf)
Hex bolt
M816
Internal
serrated lock
washer 8
Figure 2-26 Drawing of installing landing door hanging components with door jamb
(side-opening double-leaf)
Landing door
hanging components
Door jamb
Sill
Door opening
width plumb line
b) Adjust the left and right direction of landing door hanging components and make the
center of door opening width and door opening width lofting plumb lines which at each end
of landing door hanging components align with each other as figure 2-28 shows.
Door opening
width lofting
plumb line
Figure 2-28 Drawing of connecting landing door Figure 2-29 Drawing of connecting landing door
hanging components with door jamb hanging components with door jamb
c) Adjust the distance between landing door hanging components guide rail and the center
of door opening width lofting plumb lines at two ends. The distance of center-opening
double-leaf landing door is A = 66.8 1mm and the distance of side-opening double-leaf
landing door is A = 66 1mm as figure 2-29 shows.
d) Adjust the distance between the bottom surface of landing door hanging components
guide rail and sill surface which is B = C = (clear door opening height + 60) 1mm as
shown in figure 2-30.
Figure 2-30 Drawing II of connecting landing door device with door jamb
Hex flange
nut M8
Square washer
Hex bolt
M8 x 20
Standard spring
washer 8
Big flat washer
Door slider
b) upward and downward and clearance adjustment: position of the door board can be
adjusted by loosening four M10 flange hex nuts of the hanger door bolt kit as shown in
figure 2-33.
Horizontal adjustment
Landing
door board
Door
pocket
Guide rail
Nut M8
b) Loosen two M6 (A, B) nuts on the limit rubber and rotate slowly the limit rubber screw M6
(A) to ensure that the engagement between the lock point and the contact switch support
is not less than 7mm when the door lock is closed completely, then lock nut M6 (A).Adjust
limit rubber screw M6 (B) and leave enough space to ensure that the lock point can be
release when the door is opened, then lock M6 (B) as shown in figure 2-38.
c) Loosen two M6 nuts on the door holder fixing plate and move the fixing plate gently to
ensure that the center line of the two door holders is 145mm away from the edge of the
door hanging board.Lock the nut as shown in figure 2-39.
Door holder installation support
Door holder
Door hanging
board
Door closing
upright
Aluminum sill Landing door board
Landing
door board
Figure 2-40 Position of two side-opening landing Figure 2-40 Position of two side-opening landing
doors in closed state (figure one) doors in closed state (figure two)
Figure 2-41 Position of two center-opening landing doors in closed state.
Car landing door in closed state
Car
DoorDoor
widthWidth
Figure 2-41 Position diagram of two center-opening landing doors in closed state
Door width
Figure 2-42 Position diagram of two center-opening landing doors in open state
Attention: When the compression length of the steel tensioning spring is checked to
exceed 171mm, first loosen two hex flange nuts M8, and then adjust the tensioning spring to be
171mm in length.
Tensioning
Tensioning bolt
spring
Steel wire rope wheel
Hex flange nut M8
3.3 Degree of tightness of standard parts should be checked during each time of
maintenance.
3.4 Smoothness of the landing door lock actions should be checked during each time
of maintenance.
3.5 Correct application method of the triangle key.
Attention: Unlocking of the triangle lock of the landing door should comply with
the following procedures.
3.5.1 After opening the landing door, first determine the position of the car to prevent missing
your foot and causing falling accidents in case that the car is not in this floor;
3.5.2 Open the lighting at the landing doorway, clear all kinds of sundries and note that there
should be irrelevant personnel around;
3.5.3 Insert the triangle key into the unlocking hole and determine the unlocking direction;
3.5.4 The operating personnel should stand to keep the body center and then unlock slowly in the
unlocking direction;
3.5.5 After unlocking, push open the landing door to a seam of about 100mm, then take back the
triangle key and observe conditions in the well. Special attention should be paid that at the
3.5.6 After completion of unlocking, the operating personnel should confirm that the landing door
has been locked securely.
Interlock switch
Door holder
Door contact
Eccentric
wheel
Door slider
assembly
Chapter V Appendix
Installation checklist of landing door
Contract unit: Project name:
Contract No.: Factory order No.:
Elevator model: Elevator No.:
GAD No.: Installation date:
Serial Actual
Requirements Solutions
No. conditions
1 Expansion bolts are fixed and locked
It is required that the site welding positions be welded
2
and painted after welding slag being removed
38
Protective film
Connecting parts
Right
Project manager
door board 3-6mm
Door pocket
2mm
Longitudinal verticality
2mm
Horizontal verticality
Signature:
5.2 Installation confirmation of landing door on each floor
Date:
Distance between door
board and sill 3-6mm
Clearance between door
Landing door
Inspector
1/600
Longitudinal verticality
1/600
Horizontal verticality
8-10mm
Distance from car gateway
Signature:
2mm
Deviation from car center
Date:
Landing door sill
Difference value
Right
Left
Installation Manual
1-2mm
Height over the ground
1/600
levelness
requirements
Signature:
Standard
Floor
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
1
2
3
4
5
6
7
8
9
Date: