Boiler CI Karti

Download as pdf or txt
Download as pdf or txt
You are on page 1of 127

Boiler Controls & Instrumentation

K Karthikeyan
K thik
Manager
Controls & Instrumentation
BHEL, Tiruchirappalli
Mail : [email protected]
Boiler C&I

PART I - BOILER BASICS

PART 2 - INSTRUMENTATION

PART 3 - CONTROLS

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BOILER BASICS

K Karthikeyan
Manager/C&I
a age /C&
BHEL Trichy

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BOILER CLASSIFICATION

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BHEL BOILERS

Power Boilers
Up to 600 MW rating(Coal, oil and gas fired - Subcritical)
Up to 800 MW - Supercritical

Nuclear steam generators


Up to 235 MW rating

Industrial boilers
Up to 450 Tonnes/hour rating
Fertilisers,, Petrochemical,, Steel & Paper
p industries
Wide range of fuels- Oil, Gas, BFG, Bagasse, Black liquor.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Bharat Heavy Electricals Limited - Tiruchirappalli


Schematic of a boiler
Boiler C&I

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

UTILITY BOILERS - ESSENTIAL COMPONENTS

Furnace & Circulation system


S
Superheaters
h t
Reheaters
Economiser
Airheaters
Fans
Pulverisers
Raw coal feeders
Fuel firing system
Sootblowers

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
CIRCULATION SYSTEMS
Natural circulation
Controlled circulation
Once
O through
h h

Circulation ratio :
Mass rate of water fed to the steam generating tubes
to the mass rate of steam generated.

Natural circulation 6
Controlled circ 4
Once through 1

Bharat Heavy Electricals Limited - Tiruchirappalli


BOILER CIRCULATION SYSTEMS

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Fans

Types

- Centrifugal fans (Radial Flow fans)


Air enters parallel to axis and
leaves perpendicular to axis

- Axial flow fans


Air enters parallel to axis and
leaves parallel to axis

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Fans

1. Axial
Impulse type - IGV Control.
Reaction type - Blade pitch Control.

2. Radial
Inlet damper control, Variable speed control;
Variable speed control by two speed motor,
Hydraulic coupling or Variable frequency drive.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

RADIAL FANS - SPEED CONTROL

- Flow proportional to Speed


- Flow proportional to cube of (Impeller Dia)

- Head proportional to Square (Speed)


- Head proportional to Square (Impeller Dia)

Hence Variation in speed alters the performance

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FANS IN BOILER - SCOPE

Primary air fans - Dries & transports Pulverised coal

Forced draft fans - Supplies Combustion air

Induced draft fans - Sucks Flue gas out of furnace

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

MILL - GRINDS COAL

Slow speed mills (Tube mills - 15 to 25 RPM)

Medium speed mills (Bowl mill, Ball and race mill

etc.-
t 50 tto 100 RPM)

High speed mills (hammer mills directly coupled

to motor - 750 to 1000 RPM)

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

RAW COAL FEEDERS

Scope : CONVEY RAW COAL TO MILL

Types : Volumetric - Rotary and drag link,

Gravimetric Endless belt type

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

AIRHEATER

H t recovery equipment
Heat i t
Extract heat from Flue gas to heat primary & secy. Air

Types :

Regenerative type ( Rotating drive )

Tubular type

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
SOOTBLOWERS

Remove ash & slag from pressure part tubes

Types

Long retractable sootblowers - traverse & rotary motors


Half retractable sootblowers- traverse & rotary motors
Rotary blowers - rotary motor
Wall blowers - traverse & rotary motors
Furnace temperature probe - Used during boiler start up

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Tangential Firing
Assembly
sse b y
Windbox

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

C l Pi
Coal Pipes
From Mills
to Windbox

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Coal burner

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Oil burner

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Windbox in shop

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Burner tilt lever

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Radial Fan

Axial Fan

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Pulveriser

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Pulveriser

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Gravimetric coal feeder

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BOILER CONTROLS

K Karthikeyan
y
Manager/C&I
BHEL Trichy
Mail: [email protected]

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BOILER CONTROLS

Continuous control :

Objective
Enabling
E bli Automatic
A t ti Operation.
O ti
Optimising operating performance.

On-Off control :

Objective
Supervise process operation for safety
P
Prevent
t process from
f entering
t i hazardous
h d region.
i

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BOILER CONTROLS

Auto control system

Boiler A
Auxiliaries
iliaries interlocks & protection s
system
stem

Furnace safeguard supervisory system (FSSS)

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Auto control system.


system

Master demand

Combustion and draft control

Feed-water control

Steam
Steam-temperature
temperature control

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Master demand

'Master demand' controls the boiler operation.

Steam is generated by burning fuel.

Master demand sets burners firing at a rate


required for steam production.

Firing rate requires FD fans to deliver adequate air


for combusting
g the fuel.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Master demand

Air input requires products of combustion to be expelled


from furnace (by ID fans)
fans).

Water
W t mustt be
b fed
f d into
i t boiler
b il to
t match
t h steam
t production.
d ti

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Master demand

Air input requires products of combustion to be expelled


from furnace (by ID fans)
fans).

Water must be fed into boiler to match steam production.

Boiler is a complex, multivariable, interactive process.

Each of the above parameters affects/ is affected by


all of the others.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Master demand

Functions of Master
Master demand
demand :

Sets the firing rate

Regulates quantity of combustion air to match fuel input

Regulates quantity of feed water to match steam


production

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Master demand

Design of the master system :

Power Demand.

..Fed primarily to turbine (Boiler-following control)

..Fed directly
y to boiler ((Turbine-following
g control))

...Fed to both (Co-ordinated unit control).

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Combustion and draft control

Air Flow Control

Fuel Flow control

Coal mill control

Objective :
Fuel is consumed at a rate that exactly matches the
Steam demand.

Fuel is consumed safely, so that the energy is


released without risk to plant
plant, personnel or environment

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Combustion and draft control


Boiler Master demand provides the common demand for
both fuel and air control.

Total unit fuel demand is obtained with lesser of the


actual air flow or the Boiler master demand as set value

Unit air flow demand is obtained with greater of the


actual fuelflow or the boiler master demand as set value

Unit air flow demand is adjusted in response to


measured flue gas 02 and CO

ota co
Total corrected
ected Fuel
ue flow
o s signal
g a is
s obta
obtained
ed by su
summing
g
up individual fuel flow signals
Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I

Combustion and draft control

Coal mill control


Objective :

To maintain adequate Primary Air velocity while


transporting coal from mill to furnace.

To regulate PA temperature to "dry"


dry coal as it is
transported to furnace.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
Feedwater control
Objective :

To supply enough water to the boiler to match the


evaporation rate.

Water level in the drum p


provides an immediate
indication of water contained by the boiler

Actual Steam Flow is a useful feedback to correct for


required feedwater during transient conditions when
level may not be accurate.

Difference between Actual steam flow and Actual


Feedwater Flow is added to the level error to form the
Feedwater demand.
Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I
Steam temperature control

As the steam flow increases, steam temperature in


radiant zone decreases where as steam temperature
p
in convection zone increases.

Radiant zone tubes

The increasing fluid flow takes away more heat that


f ll on the
falls h metal.l

So steam-temperature/steam-flow
p profile for radiant
p
zone shows a decline as steam flow increases.
Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I
Steam temperature control

Convection pass tubes:

Steam temperature in convection pass increases


with steam flow increase.

Higher heat transfer by increased flow of gases


increases the steam temperature
temperature.

Steam temperature/ Steam-flow profile for


convection
ti pass shows
h a rise
i ini temperature
t t as the
th
flow increases.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

St
Steam t
temperature
t control
t l

Attemperation is to pump a fine spray of comparatively


cool water droplets into the vapour to reduce steam
temperature.

Intermixing of hot steam and cold water causes the


coolant to evaporate.

Final mixture is an increased volume of steam at a


temperature lower than that prior to the water injection
point.

This cooling function is achieved in the attemperator.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

St
Steam t
temperature
t control
t l

Fireball can be moved to a higher


g or lower level in
the furnace.

This is achieved by tilting burners upwards or


downwards with respect to a midpoint.

Fireball repositioning changes the heat transfer


f
pattern in tube banks.

Controlling steam temperature by use of tilt is


predominantly used for RH Steam temp control.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BOILER AUXILIARIES INTERLOCKS AND PROTECTION SYSTEM

Scope :
Sequence control of starting and Protection &
interlocking of boiler auxiliaries like
FD fans,
ID ffans,
PA fans,
Airheaters,
Dampers,
Valves, etc.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

CONDITIONS EXISTING WHEN THE UNIT IS SHUT DOWN AND


PRIOR TO STARTING OF ID FANS.

ID fan 'A' and ID fan 'B' off.


Regulating vanes of fans A & B fully open
Inlet dampers of ID fans A & B open
Outlet dampers of ID fans A & B open
The regulating vanes will be on manual control
during shutdown,
shutdown and signal from furnace draft
control to regulating vanes of ID fans disconnected.
Lube oil pumps off(if applicable)

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Starting ID Fan 'A'


A (ID fan 'B'
B off)
ID fan 'A' shall be prohibited from starting till the following
conditions are satisfied:

Regulating vanes of ID Fan-A in minimum position.


Outlet damper of ID Fan-A closed.
Inlet damper of ID Fan
Fan-A
A closed
Lube oil pressure to the ID fan-A bearing adequate
(lube oil pressure adequate lamp indication shall be
provided on the control on the control desk)) if FOLS is
p
applicable.
ID Fan and Fan motor bearing temperature not very
high.
One of the airpreheaters running.
Motor winding temperature not very high.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Wh ID fan
When f 'A' is
i started
t t d (ID Fan
F B is i off),
ff) impulses
i l shall
h ll be
b
given for:

Opening the inlet damper and outlet damper of ID fan A


after the motor reaches rated speed.
Connecting g the regulating
g g vanes/scoop p tube control of
ID fan A to the auto control.
Opening the interconnecting dampers (if applicable)
Closingg the inlet g
gate and the outlet g
gate of ID fan B and
bringing the regulating vanes/scoop tube control to
minimum position.
Permission to start either FD Fan A or FD Fan B.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Tripping of ID Fan A (ID Fan B is off)- ID fan 'A' shall trip


automatically under following conditions.

ID fan A bearing temperature too high (prior to this, ID fan A


bearing temperature high shall be annunciated in UCB)
ID fan A motor bearing/winding
g g temp.
p too high
g (p(prior to this, ID
fan 'A' motor bearing/winding temperature high shall be
annunciated in UCB)
Lube oil pressure is very low and very low condition remain
for certain fixed time 10 secs (if FOLS is applicable)
Post purge fan trip from FSSS
Vibration level of fan or motor very high (high to be alarmed)
ID fan A motor protection acted.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

When ID fan A trips (ID fan B is off) impulses shall be given for:

Opening the outlet damper of ID fan B


Opening the inlet damper of ID fan B to wide open
position.
Disconnecting the impulse from auto control system
(output from A/M station)
Opening the regulating vanes/scoop control of ID fan A to
wide open position.
Tripping
pp g the working g FD fans.
Boiler tripping.
To keep the inlet gate and outlet gate of ID fan A open

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Tripping of FD fan A (FD fan B is off)- FD fan A shall trip


automatically under the following conditions:

FD fan A bearing temperature too high (prior to this, FD


f A bearing
fan b i t
temperature
t hi h will
high ill be
b annunciated
i t d in
i UCB)
FD fan A motor bearing/winding temperature too high (prior
to this, FD fan A motor temperature high will be
annunciated in UCB)
Both ID fans trip
Vibration level of fan or motor very high (high to be
alarmed)

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

When FD Fan A trips (FD fan B is off) impulses shall be given for:

Disconnecting the impeller control drive from auto control


system
t ( t t signal
(output i l from
f A/M station)
t ti )
Bringing the impeller of Fan A to the maximum position
Bringing the impeller of FD fan B to the maximum position
Opening the outlet damper of FD fan B
To open the emergency scanner air damper
Boiler tripping
The outlet damper of FD fan A shall remain open

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Starting PA fan A (PA fan B off)- PA fan A shall be prohibited from


starting until the following conditions are satisfied:

Regulating vanes of PA Fan A in the minimum position


Outlet damper
p of PA fan A in closed p position
Anyone FD fan is on
Purge complete

PA fan and fan motor bearing temperature not very high

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Wh PA fan
When f A is
i started
t t d (PA fan
f B is i off),
ff) iimpulses
l shall
h ll be
b
given for:

Opening the outlet damper of PA Fan A after the motor


reaches rated speed
Connecting the regulating vanes of PA fan A to auto control
Bringing the regulating vanes of PA fan B to the minimum
p
position
Closing the outlet damper of PA fan B
Permission to start any three mills through FSSS.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

PA fan
f A shall
h ll trip
t i (PA fan
f B isi off)
ff) under
d ththe ffollowing
ll i
conditions:

PA fan A bearing temperature too high (prior to this bearing


temperature high shall be annunciated in UCB)
PA fan A motor bearing/winding temperature too high (prior to s,
this motor bearing/winding temperature high shall be annunciated
in UCB)
Boiler trips
Vibration level of fan or motor very high (high to be alarmed)

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

When PA fan A trips (PA fan B is off), impulses shall be given for:

Disconnecting the regulating vanes of PA fan A from auto control


Bringing the regulating vanes of PA fan A to minimum position
Closing the outlet damper of PA fan A
Bringing the regulating vane PA fan B to minimum position
Closing the outlet damper of PA fan B
Tripping all the operating mills (done through FSSS)

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

When PA fan B trips


p (PA
( fan A is on),
), impulses
p shall be given
g for:

Disconnecting the regulating vanes of PA fan B from auto control


Bringing the regulating vanes of PA fan B to minimum position
Closing the outlet damper of PA fan B
Energisation of partial load relay (load to be limited to 60%)
Tripping mills in excess of three through FSSS

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Starting AH A (AH B is off):

AH A electric motor is started if the sump


p oil temperature
p of the
bearings measured through RTD is less than 70
Whenever AH A electric motor trips impulses shall be given for
starting AH A air motor by de-energising the solenoid provided
th sump oil
the il temperature
t t off support/guide
t/ id bearing
b i off AH A isi less
l
than 70
Impulse shall be given for closing of the inlet and outlet dampers
of AH B which is off

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Tripping of AH A (AH B is off)

Whenever the sump oil temperature of support/guide bearing is


greater than 70 c an alarm shall be initiated through RTD to alert
the operator. The operator shall check the circulation pump
operation and the coolant flow at local to bring down the sump oil
temperature. In case if the temperature of sump oil is unable to be
brought down AH electric motor/air motor shall be tripped
manually.
Air motor shall trip automatically when AH A electric motor
starts.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Both AHs are working when AH A trips & AH B continues to run:

The gas inlet damper, the secondary air outlet damper and primary
air outlet damper of the tripped AH shall automatically closed.
The gas outlet damper, the secondary air inlet damper and PA fan
inlet damper (if provided) of the tripped AH need not be closed.
However, if the operator wants to manually close these dampers
they can be closed.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BOTH AHS ARE TRIPPED:

If both AHs A & B trip the operator may try for restarting the AHs.

If anyone of the AH is not started within 5 minutes the operator


shall
h ll manually
ll trip
t i the
th boiler.
b il Conditions
C diti before
b f start
t t up off AH

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

INTERLOCKS FOR OIL CIRCULATION PUMPS OF SUPPORT


BEARING OF AIR HEATER: FOLLOWING INTERLOCKS SHALL
BE PROVIDED FOR OIL CIRCULATION PUMPS.

Whenever the sump oil temperature of support bearing of air


heater A is high (40 ) impulse shall be given to start the main oil
circulation
The standby oil circulation pump shall start when the main oil
circulation pump fails to start or trips (This is applicable where 2
x 100% oil circulation pumps are provided)
The main oil circulation pump/stand-by oil circulation pump shall
trip when the temperature of the support bearing falls below a
p ( o C).
preset value (40 )
Manual operation of the lube oil pumps shall be prohibited when
the ambient temperature is too low. Since viscosity of the oil will
be high so that the pump couldn't be started

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BLOW DOWN VALVE INTERLOCKS

When drum water level rises to 125mm above normal water level
an annunciation
i ti 'D
'Drum l
level
l high
hi h shall
h ll be
b given
i i UCB.
in UCB
When drum level rises to 125mm above normal water level, blow
down valves BD-8 and BD-9 shall open and this condition shall be
annunciated.
Blow down valves shall close automatically when the water level
falls down to NWL. One de-interlock switch shall be provided for
both the valves for manual operation
operation.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FD fan lube oil/control oil system interlocks:

Pump A will start automatically if pump B trips provided A/M switch is in


auto position
Pump A will start automatically with a time delay of 0-60 seconds if lube
oil pressure falls below a set value and the pump B is working provided
A/M switch is in auto position.
Pump B will start automatically if pump A trips/has not started provided
A/M switch is in auto position.
Pump B will start automatically with a time delay of 0-60 seconds if lube
oil pressure falls below a set value and the pump A is working provided
A/M
Pump p A or p
pump p B can be started/tripped
pp byyp pressing
g the respective
p push
p
button provided on LCP(local panel) only when A/M switch is in manual
position.
FD fan A shall be prohibited from starting until the control oil pressure is
adequate.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

REHEATER PROTECTION LOGIC

Boiler shall be tripped


pp after 10 seconds,, when any
y of the following
g
conditions occur:

1) When Boiler is working and if


(i) Both generator circuit breakers open and
(ii) HP Bypass or LP Bypass valves remain closed less than 2%

2) When Boiler is working and if


(i) Turbine trips and

(ii) HP Bypass
B or LP Bypass
B valves
l remain
i closed
l d less
l th 2%
than

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FURNACE SAFEGUARD SUPERVISORY SYSTEM


( FSSS )

This system takes care of interlocks required for


starting, supervising the operating and safe shut
down of the equipments connected with fuel
firing system.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Tangential Windbox

Bharat Heavy Electricals Limited - Tiruchirappalli


FURNACE PLAN CORNER
DESIGNATION

NDARY AIR
NDARY AIR

SECON
SECON

FRONT WATER WALL


Boiler C&I
Fireball Tangential Firing

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

CAUSES OF FURNACE EXPLOSIONS


An interruption of the fuel or air supply or ignition energy to the
burners, sufficient to result in momentary loss of flames,
followed by restoration and delayed reignition of an
accumulation.
Fuel leakage in to an idle furnace and the ignition of the
accumulation by a spark or other source of ignition.
Repeated unsuccessful attempts to light-off without appropriate
purging,
i resulting
lti ini the
th accumulation
l ti off an explosive
l i mixture.
i t
The accumulation of an explosive mixture of fuel and air as a
result of loss of flame or incomplete combustion at one or more
burners in the presence of other burners operating normally or
during lighting of additional burners.
The accumulation of an explosive mixture of fuel and air as a
result of a complete furnace flameout and the ignition of the
accumulation by a spark or other ignition source, such as could
occur where attempting to light a burner(s).
Purging with an airflow that is too high, which stirs up
combustibles smoldering in hoppers.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

CAUSES OF FURNACE IMPLOSIONS

A mal-operation of the equipment regulating the boiler gas flow,


including air supply and flue gas removal, resulting in furnace
exposure to excessive induced draft fan head assembly.

The rapid decay of furnace gas temperatures and pressure


resulting from either a rapid reduction in fuel input or a master
fuel trip.
trip

A combination of the two conditions indicated in a, b above has


resulted in the most severe furnace implosion incidents.
incidents

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FUNCTIONS OF FSSS

A prefiring purge of furnace


Establishment of appropriate permissives for firing the ignition
fuel.(i.e. purge complete, fuel pressure within limits)
Establishment of the appropriate permissives including ignition
permissives, for the main fuel.
Continuous monitoring of firing conditions and other key
operating
ti parameters.
t
Emergency shutdown of portions or all of the firing equipment
when required.
A post firing purge of the steam generator.
generator

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
FSSS

F - FURNACE
S - SAFEGUARD
S - SUPERVISORY
S - -SYSTEM

FSSS ENSURES SAFE FURNACE OPERATING CONDITIONS DURING

START UP
LOW LOAD OPERATION
SHUT DOWN.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

SOME OF THE PRECAUTIONARY MEASURES TO ACHIEVE SAFE


AND RELIABLE OPERATION

FURNACE SHOULD BE PURGED BEFORE


LIGHT UP
ADEQUATE IGNITION ENERGY TO EACH
BURNER
ADEQUATE AIR SUPPLY TO EACH BURNER TO
AVOID FLAME OUT
OPTIMUM FURNACE PRESSURE
CORRECT AIR TO FUEL RATIO

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

FUNCTIONAL DIVISION OF LOGICS

UNIT LOGIC

ELEVATION LOGIC

CORNER LOGIC

Bharat Heavy Electricals Limited - Tiruchirappalli


ELEVATION C LOGIC CORNER 1 LOGIC
FSSS CONTROL
CONTROL
COMPUTE

COMPUTE MONITOR

UNIT LOGIC MONITOR


CORNER 2 LOGIC
CONTROL
ELEVATION B LOGIC
CONTROL COMPUTE
CONTROL
UNIT MONITOR CORNER
FIELD FIELD
COMPUTE COMPUTE DEVICES
DEVI CORNER 3 LOGIC
CES
MONITOR CONTROL

MONITOR COMPUTE
ELEVATION A LOGIC
MONITOR
CONTROL
CORNER 4 LOGIC
COMPUTE CONTROL
COMPUTE
MONITOR
MONITOR

ORGANIZATION OF FSSS LOGIC FIG. - 1


Boiler C&I

FSSS
UNIT LOGIC

Scope :
SUPERVISION OF OVERALL FURNACE CONDITIONS

MONITORING CRITICAL PARAMETERS OF FUEL FIRING


SYSTEM

SUPERVISION OF FURNACE PURGE OPERATION

CONTINUOUS MONITORING CRITICAL FEED BACK TO


ENSURE MAXIMUM SAFETY DURING OPERATION

TRIPPING ALL FUEL IF DANGEROUS CONDITIONS BUILD


UP

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

ELEVATION LOGIC

RECEIVES COMMAND FROM UNIT LOGIC


OR OPERATOR FOR START,, SHUTDOWN,, OR TRIP THE
ELEVATION .

ISSUES FEEDBACK TO UNIT LOGIC ON ACTION TAKEN


BY ELEVATION LOGIC

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
CORNER LOGIC

RECIEVES ELEVATION LOGIC COMMANDS


FOR INITIATION OF ACTION APPLICABLE TO CORNER

EMERGENCY TRIP SIGNALS ORIGINATING IN UNIT


LOGIC AND TRANSMITTED VIA ELEVATION LOGIC
BYPASS CORNER LOGIC PERMISSIVES AND CAUSE
IMMEDIATE CLOSURE OF FUEL VALVES

CORNER LOGIC IS NOT APPLICABLE TO COAL


ELEVATIONS SINCE STARTING ONE MILL WILL
SHUTDOWN PARTICULAR ELEVATION AS NO INDIVIDUAL
CORNER SHUT OFF DEVICES ARE PROVIDED.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

ARRANGEMENT OF SYSTEM

FSSS - MAJOR PARTS

LOGIC CABINET
CONSOLE INSERT
SECONDARY AIR DAMPER PANEL
MILL PANEL
FIELD EQUIPMENTS
CUSTOMER SUPPLIED INTERFACE
EQUIPMENT.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

FSSS NET
CABI
LO GIC
Y
RELA

L
PANE
ES MILL
CABL THER MENT
S
UG-I
N TO O QUIP
ATED PL FIEL
D E
BRIC
. FA AIR
PREE SEC.
ANEL

OM
ROL P

RO
CO NT

L
RO
NT
CO

D
EL
OLE

FI
CONS RT
IN E
S
LOCAL GUN MAINT.
SWITCH

ARRANGEMENT OF
FURNACE SAGEGUARD SUPERVISORY SYSTEM

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
BOILER TRIP COMMAND IS INITIATED BY

LOW OR HIGH DRUM WATER LEVEL


BOTH I.D OR F.D ARE OFF
LOW OR HIGH FURNACE PRESSURE
REHEATER PROTECTION TRIP
TURBINE
LOSS OF ALL FUEL TRIP
LOSS OF UNIT D.C POWER
LESS THAN FIRE BALL AND LOSS OF AC AT
ANY ELEVATION
MANUAL TRIP
UNIT FLAME FAILURE TRIP
INSUFFICIENT PRIMARY AIR

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
BOILER TRIP COMMAND RESULTS IN

STOPPAGE OF ALL FUEL INPUTS BY TRIPPING

1. ALL PULVERIZERS
2
2. ALL FEEDERS
3. ALL OIL GUNS
4. ALL IGNITORS

IT CLOSES
1. IGNITOR
2. LIGHT OIL
3. HEAVY OIL
TRIP VALVES

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

PULVERIZER SHUT DOWN SEQUENCE

{ START ASSOCIATED OIL ELEVATION


{ REDUCE FEEDER SPEED TO MINIMUM
{ CLOSE HOT AIR GATE
< PULVERIZER OUTLET TEMPERATURE IS 120F
{ STOP FEEDER
< WAIT FOR 2 MINUTES
{ STOP PULVERIZER
< FURNACE STABILIZES
{ ASSOCIATED OIL LEVEL SHUT DOWN.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

MILL OUTLET TEMPERATURE CONTROL

A HIGH PULVERIZER OUTLET TEMPERATURE

( ABOVE 200F ) WILL OPEN COLD AIR DAMPER

AND CLOSE THE HOT AIR GATE.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

FEEDER CONTROL

A. FEEDER RUNS AT MINIMUM SPEED UNTIL


INITIATING CONDITION IS CORRECTED, AT
WHICH TIME THE FEEDER WILL BE RETURNED
TO CONTROL.
A. PULVERIZER BOWL DIFFERENTIAL HIGH.
B. PULVERIZER AMPS. ABOVE MAXIMUM SET POINT.

B. LOSS OF COAL FLOW AND LOW PULVERIZER


CURRENT WILL TRIP THE FEEDER, OPEN COLD AIR
DAMPER AND CLOSE HOT AIR GATE
GATE.
AFTER CORRECTIVE ACTION THE HOT AIR GATE IS
OPENED AND FEEDER IS RESTARTED.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

CONDITIONS FOR A PULVERIZER TRIP

PULVERIZER DISCHARGE VALVE NOT OPEN

LOSS OF UNIT DC POWER (FOR MORE THAN 2 SECONDS)

PULVERIZER IGNITION PERMIT NOT SATISFIED AND SUPPORT


IGNITION IS REQUIRED.

BOILER TRIP

PRIMARY AIR FAN TRIP

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
PULVERIZER STARTING PROCEDURE

} START
< PULVERIZER ON LIGHT
} OPEN HOT AIR GATE
< WAIT TILL PULVERIZER COMES TO TEMPERATURE
( 140F )
} START FEEDER ( AT MINIMUM FEEDER SPEED )
< COAL FLOW INDICATOR OR PULVERIZER AMPERE (
( WITH IN 5 SECONDS )
< FIFTY SECONDS
} FEEDER SPEED RELEASED TO AUTOMATIC CONTROL
FUEL AIR DAMPER OPENED
FUEL AIR DAMPER MODULATED TO AUTOMATIC
CONTROL.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
PULVERIZER START REQUIREMENTS

A IGNITION ENERGY AVAILABLE

B. ADEQUATE PRIMARY AIR

C. D.C POWER AVAILABLE

D. LOCAL PULVERIZER CONDITION SATISFACTORY

E. IF NO OTHER FEEDER IS WORKING FUEL AND AIR


NOZZLE TILTS PLACED IN HORIZONDAL
CONDITION.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
CONDITIONS ( LOCAL ) TO BE SATISFIED TO START
RESPECTIVE PULVERIZER

A. DISCHARGE VALVE OPEN

B. SEAL AIR VALVE OPEN

C. COLD AIR DAMPER OPEN

D. PULVERIZER DAMPER OUTLET LESS THAN 200F

E. FEEDER INLET GATE OPEN

F. TRAMP IRON HOPPER VALVE OPEN.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

AIR REQUIREMENTS FOR PULVERIZER STARTING

AIR FLOW ADJUSTED BETWEEN 30% AND 40%


FULL LOAD

AIR FLOW ADEQUATE PRIMARY AIR WITH ONE P.A FAN


WORKING ONLY HALF OF THE MILLS CAN BE OPERATED

FOR ADDITIONS MILLS BOTH P.A FANS SHOULD


WORK.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS

PULVERIZER IGNITION ENERGY AVAILABLE

A MINIMUM OF 3 OF THE 4 LIGHT OIL OR HEAVY OIL


NOZZLE VALVE OF THE ELEVATION JUST ABOVE OR
BELOW ARE OPEN
BELOW,

OR

BOILER LOADING IS GREATER THAN 30% AND


PULVERIZER JUST ABOVE OR BELOW IS IN SERVICE AT
GREATER THAN 50% LOADING.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
FUNCTIONS OF FURNACE SAFEGUARD SUPERVISORY SYSTEMS

1. FURNACE PURGE SUPERVISION


1
2. SECONDARY AIR DAMPER MODULATION AND ON-OFF CONTROL
AND SUPERVISION
3 IGNITOR ON-OFF
3. ON OFF CONTROL AND SUPERVISION
4. LIGHT OIL ON-OFF CONTROL AND SUPERVISION
5. HEAVY OIL ON-OFF CONTROL AND SUPERVISION
6. PULVERIZER AND FEEDER ON-OFF CONTROL AND SUPERVISION
7. FLAME SCANNER INTELLIGENCE AND CHECKING
8. BOILER TRIP PROTECTION.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
NO COAL FLOW ALARM SYSTEM

1 PICKUP UNIT
1.
a) SOUNDING ROD
b)) RUBBER MOUNTING
c) MICRO PHONE

2 SOLID STATE SIGNAL EVALUATION UNIT


2.
a) AMPLIFIER
b) SIGNAL CONDITIONER
c) SOLID STATE TIMER
d) OUTPUT RELAY.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS
PULVERIZER SHUT DOWN

} START ASSOCIATED OIL ELEVATION


} REDUCE FEEDER SPEED TO MINIMUM
} CLOSE HOT AIR GATE
< PULVERIZER TEMPERATURE IS 120F
} STOP FEEDER
< TWO MINUTES
} STOP PULVERIZER
< FURNACE STABILIZES
} SHUT OFF ASSOCIATED OIL ELEVATION.
ELEVATION

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

FSSS Oil system

HFO RECIRCULATION :
3 HEAVY FUEL OIL (HFO) RECIRCULATION DONE TO HEAT HFO TO
REQUIRED TEMPERATURE BEFORE FIRING IN BOILER.
3 HFO RECIRC. VALVE CAN BE OPENED WHEN ALL HFO NOZZLE
VALVES ARE CLOSED.
3 HFO RECIRC. VALVE AUTOMATICALLY CLOSES IF ANY HFO NOZZLE
VALVE IS OPENED.

HFO TRIP VALVE


OPEN PERMISSIVES
3 PURGE COMPLETE (NO MFT)
3 HFO SUPPLY TEMPERATURE ADEQUATE. OR HFO RECIRC.
3 HFO SUPPLY PRESSURE ADEQUATE VALVE OPEN.
3 ALL HONV CLOSED
CLOSED.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
CLOSE CONDITION
1
1. HFO HEADER PRESSURE VERY LOW >2 SEC.
SEC & ANY HFO NOZZLE
VALVE IS OPEN.
2. HFO HEADER TEMPERATURE VERY LOW >2 SEC. & ANY HFO
NOZZLE VALVE IS OPEN.
3. ATOMISING STEAM HEADER PRESSURE V.LOW >2 SEC. AFTER ANY
PAIR START/STOP COMMAND.
4. MASTER FUEL TRIP.
5. LOSS OF UNIT 220V DC POWER OR LOSS OF UNIT CRITICAL
POWER.

HFO ELEVATION START (PAIR MODE)


(A)PAIR 1-3 START COMMAND INITIATES FOLLOWING :
1 A 70 SEC.
1. SEC TIMER STARTS MONITORING PAIR START
SEQUENCE.
2. CORNER-1 GETS START COMMAND IMMEDIATELY.
3 CORNER
3. CORNER-33 GETS START COMMAND AFTER 15 SECS
SECS.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

NOTE : THIS DELAY IS APPROVED TO AVOID TOO MUCH OF HFO


HEADER PR. FLUCTUATION. (PAIR 2-4 STARTING IS
SIMILAR TO PAIR 1-3.)
((B).
) WHEN CORNER-1 GETS START COMMAND,, FOLLOWING EVENTS
TAKEPLACE PROVIDED THERE IS NO CORNER TRIP COMMAND.
1. ATOMISING STEAM NOZZLE VALVE GETS OPEN COMMAND.
2. HEA IGNITOR GETS ADVANCE COMMAND.
WHEN ATOM. NOZZLE VALVE IS FULLY OPEN.
3. HFO NOZZLE VALVE GETS OPEN COMMAND.
4 HEA IGNITOR GETS COMMAND TO SPARK.
4. SPARK
(C). HEA GIVE SPARKS FOR 10 SECS. WITHIN THIS TIME FLAME HAS
TO BE DETECTED BY THE RESPECTIVE SCANNER. OTHERWISE, HFO
NOZZLE VALVE WILL CLOSE AUTOMATICALLY. IF FLAME IS
DETECTED THE BURNER WILL CONTINUE TO BE IN SERVICE.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

CORNER TRIP

THE BURNER IN SERVICE TRIPS IF ANY ONE OF THE CONDITION


EXISTS.
1. OIL GUN NOT ENGAGED.
2. HFO MANUAL ISOLATION VALVE CLOSED.
3. STEAM MANUAL ISOLATION VALVE CLOSED.
4. NO FLAME.
5. LOCAL MAINTENANCE SWITCH NOT IN REMOTE POSITION.

ELEVATION TRIP :

FOLLOWING CONDITIONS TRIPS THE ENTIRE ELEVATION IN


SERVICE.
1. MFT.
2 HFO TRIP VALVE CLOSED
2. CLOSED.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I
HFO ELEVATION START (ELEVATION MODE)
ELEV MODE OPERATION IS AUTOMATICALLY SELECTED
ELEV.
IF ANY FEEDER ADJACENT TO THE OIL ELEV. IS IN
SERVICE FOR >50 SECS.
START COMMAND OF ANY ONE PAIR OF BURNERS CAUSES

1. STARTING OF CORNER-1.
2 STARTING OF CORNER-3 AFTER 15 SECS.
2. SECS DELAY.
DELAY
3. STARTING OF CORNER-2 AFTER 25 SECS. DELAY.
4. STARTING OF CORNER-4 AFTER 40 SECS. DELAY.
AN UNSUCCESSFULL START ALARM IS GIVEN AND THE BURNERS IN
SERVICE WILL BE SHUT DOWN IF AFTER THE EXPIRY OF START TIME
IS ATLEAST 3 BURNERS ARE NOT IN SERVICE.

HFO ELEV. SHUT DOWN


PAIR 1-3 SHUT DOWN
PAIR 1-3 STOP COMMAND INITIATES THE FOLLOWING
1. A 355 SECS. STOP TIME MONITORING TIMER IS STARTED.
2. CORNER-1 RECEIVES STOP COMMAND.
Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I

3 CORNER-3
3. CORNER 3 RECEIVES STOP COMMAND 15 SECS.
SECS LATER.
LATER
PAIR 2-4 SHUT DOWN SEQUENCE IS SIMILAR TO PAIR 1-3 SHUT
DOWN SEQUENCE.

CORNER-1 SHUT DOWN\


CORNER-1 STOP COMMAND INITIATES FOLLOWING.
1. HFO NOZZLE VALVE GETS CLOSE COMMAND.
2. WHEN HFO NOZZLE VALVE FULLY CLOSES,
SCAVENGE VALVE GETS OPEN COMMAND &
HEA IGNITOR GETS ADVANCE COMMAND.
3. HEA IGNITOR ADVANCES,SPARKS FOR 15 SECS & THEN RETRACTS
4. AFTER 300 SECS. OF SCAVENGING SCAVENGE VALVE & ATOM .
VALVE GET CLOSE COMMAND.
A BACK UP TRIP IS GENERATED 340 SECS. AFTER BOTH THE
PAIRS ARE STOPPED. THIS SIGNAL WILL GENERATE A
CORNER TRIP. AFTER 355 SECS. STOP TIME IF ANY HFO
NOZZLE VALVE IS STILL OPEN, ELEV. UNSUCCESSFUL SHUT
DOWN ALARM IS GENERATED.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

HFO ELEV. SHUT DOWN

HFO ELEV. MODE SHUT DOWN IS AUTOMATICALLY SELECTED IF


ANY FEEDER IS IN SERVICE FOR >70 SECS.

THIS IS DONE IN SIMILAR LINE TO HFO ELEV. START UP (ELEV. MODE)


DESCRIBED EARLIER.
EARLIER

HFO ELEV. PAIR MODE IS AUTOMATICALLY SELECTED WHEN ALL


FEEDERS ARE OFF.
OFF

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

TYPICAL CONDITIONS FOR FURNACE PURGE ARE


AS FOLLOWS:

Heavy fuel oil trip valve All pulverisers off.


closed. All feeders off.
Heavy fuel oil nozzle Pulveriser outlet ggates
valves closed. closed.
Light fuel oil trip valve All hot air gates closed.
closed. All cold air dampers not
Light
Li ht fuel
f l oil
il nozzlel valves
l greater than 5 open.
closed. Both PA fans off.
Flame scanners on each No boiler trip existing.
elevation indicate no
flame. All auxiliary air dampers
modulating.
Air flow greater than 30%
and less than 40%

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

TYPICAL CONDITIONS THAT WOULD CAUSE AN


EMERGENCY SHUTDOWN ARE AS FOLLOWS:
Loss of AC at any
Loss of all FD fans. elevation in service and
Loss of all ID fans.
fans l
less than
th fire
fi ball.
b ll
Loss of all fuel. Loss of DC.
Reheater Protection Both emergency trip push
acted. buttons pushed.
Air flow less than 30% Heavy fuel oil trip valve
Loss of flame. closed.
Furnace pressure very Heavy fuel oil nozzle
hi h
high. valves
l closed.
l d
Furnace pressure very Light fuel oil trip valve
low. closed.
Drum level very high. Light fuel oil nozzle valves
Drum level very low. closed.
Air flow greater than Flame scanners on each
30% and less than elevation indicate no
40% flame
flame.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

BOILER
INSTRUMENTATION

K Karthikeyan
M
Manager/C&I
/C&I
BHEL Trichy
Mail: [email protected]

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Why
h Instruments?
To measure the actual values of
different p
parameters for which the
boiler is designed.
Safe working range of the different
parameters are maintained.
To monitor one or more variables at
a time and provide input for
automatic control.
control
Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I

Why Instruments?
In case of operator failure to take
p
remedial action for an upset
condition, it protects the boiler by
pp g
alarms and trippings.
To provide data on operating
conditions before failure of the
equipment for analysing the failure.

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Boiler measurements
Pressure Flue gas analysis(O2,
Differential
ff pressure CO, SOx, NOx,
Temperature Opacity)
Differential SWAS(Conductivity,
SWAS(Conductivity
temperature(heat flux) pH, Silica, Dissilved
Flow O2, Hydazine)
Level Image
I sensing(CCTV)
i (CCTV)
Vibration (rotating
Sound(steam leak)
device)
S
Speed d (rotating
( t ti Viscosity (fuel oil)
device) Calorific value
Position
Weight

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Instrumentation
representation- ISA
First letter Succeeding letters
A- Alarm
P-Pressure
I Indicate
I-
T-temperature
R- Record
F- Flow
g
Q- Integrate
A- Analytical C- Control
S- Switch
T tansmitter
T- t itt
E- Element
P- Pocket
P
W- Well
Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I

Kraftwerk Kennzeichen system(KKS)


y ( )
HA Pressure system HF- Bunker, feeder and
HAC-
HAC economiser pulveriser
p
HFA- Bunker
HAD- evaporator
HFB- Feeder
HAG
HAG- circulation
HFC-
HFC pulveriser
l i
HAH- HP superheater including classifier
HAJ- reheater HFD- Fluegas
g return
HCB- Steam HFE- Mill air
sootblowing HFG- temp
storage(indirect firing)
HFW- sealing fluid

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Kraftwerk Kennzeichen system(KKS)

HH- Main firing HHL- Combustion


system air supply system
HHA main burners HHM- Atomising
HHB- Retarded steam
combustion grate HHN- Atomising air
HHE- PC bin
forwarding and
distribution system

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Kraftwerk Kennzeichen system(KKS)

HJ- Ignition firing system


HJA Ignition burners
HJF- Oil temp storage-pump and distribution
system
HJL- Combustion air supply system
HJM- Atomising steam
HJN- Altomising g air
HJQ- Cooling air
HJT- Heating steam

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Kraftwerk Kennzeichen system(KKS)

HL- Combustion air HN- Flue gas


system)PY, SY and
Ducting)
HNA- ducting g
HLA- ducting HNC- ID Fan
HLB
HLB- fan system-
system FD HNE- Stack
HLC- extermnal air HNF- Fluegas
heating recirculation
HLD- AH flue gas
HQ- ESP
heated
Q ESP system
HQA- y

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Kraftwerk Kennzeichen system(KKS)

LAB- FW piping
LAC-BFP
LAD- HP heater
p y
LAE- HP DESH spray
LAF- IP DESH spray
LBA- MS piping
LBA
LBB-HRH piping
LBC-CRH Piping

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

TO SHH1
TO DRUM LEVEL TO DRUM LEVEL
CONTROL CONTROL

16 PORT PRESSURE VESSEL

16 PORT PRESSURE VESSEL


ND FIREMANS FLOOR

OR
D FIREMANS FLOO
EWLI

DWLG
DWLG

EWLI
AT UCB AND
AT UCB AN

CHEMICAL DOSING

TO SAMPLE
COOLER

FROM ECONOMISER

TO SUCTION MANIFOLD

TO CBDT

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

TO DRUM TO DRUM

ECONOMISER OUTLET HEADER

ECONOMISER

ECONOMISER INLET HEADER


ECO RECIRCULATION LINE

FROM WATER WALL

BLANKED STUB FOR ACID WASH CONNECTION

TO DRAIN HEADER

TO SAMPLE COOLER

FEED CONTROL
STATION

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

( LEFT )
MAIN STEAM LINE

( RIGHT )
MAIN STEAM LINE

SH OUTLET HDR

SH PLATEN INLET HDR

FROM DIVISION TO DRAIN HEADER


PANEL

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Bharat Heavy Electricals Limited - Tiruchirappalli


Boiler C&I

Bharat Heavy Electricals Limited - Tiruchirappalli


THANK YOU

You might also like