0% found this document useful (0 votes)
71 views2 pages

ICS Form 215

The document is an operational planning worksheet for responding to a flood over 18 days from September 27th to October 15th. It divides response operations into 4 divisions conducting search and rescue, evacuation, and relief distribution. It lists resources requested, available, and needed by type for each division.

Uploaded by

eagan rubio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views2 pages

ICS Form 215

The document is an operational planning worksheet for responding to a flood over 18 days from September 27th to October 15th. It divides response operations into 4 divisions conducting search and rescue, evacuation, and relief distribution. It lists resources requested, available, and needed by type for each division.

Uploaded by

eagan rubio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

ICS Form 215

1. Incident Name

2. Date Prepared

3. Operational Period (Date/Time)

FLOOD IN

27 SEPT.

18 DAYS
27 SEPT. TO 15
OCT.1200,2011

4.

5.

Division/Group or
Other Location

Work Assignments

DIVISION A

SEARCH AND
RESCUE/EVACUATION/REL
IEF DISTRIBUTION

HEL RB

DIVISION C

DIVISION D

SEARCH AND
RESCUE/EVACUATION/REL
IEF DISTRIBUTION

SEARCH AND
RESCUE/EVACUATION/REL
IEF DISTRIBUTION

SEARCH AND
RESCUE/EVACUATION/REL
IEF DISTRIBUTION

9.

0700H 27 SEPT.

6.

Resource by Type
(Show Strike Team as ST)

DT E

FW 6X6 E MS

SAR FT

16

10

20

10

Req

10

Have

Need

10

10

10

10

Req

Have

Need

10

10

10

Req

10

Have

Need

10

10

10

10

Have

7.
Reporting Location

Req

Need

DIVISION B

Time Prepared

CAL
UM
PIT

OPERATIONAL PLANNING WORKSHEET

MALOLOS CAPITOL
COMPOUND (A)

27 SEPT. 1200,
2011

APALIT

27 SEPT. 1200,
2011

PULILAN (D)

27 SEPT. 1200,
2011

Have
Need
Req

Have

27 SEPT. 1200,
2011

HAGONOY (B)

Req

Total Resources - Single

Requested
Arrival Time

Prepared by (Name and Position)

Total Resources - Strike Teams

Need

You might also like