Invitation to Bid
Bid No:
Bid Name:
Bids Due:
BID-SJR-03-2016
HVAC Maintenance Services for St.
Johns River State College
Wednesday, April 6, 2015
1
Note: Original bid must be marked ORIGINAL and must have original signatures. Please label the USB
drive with the Colleges name, bid number, and your companys name. (i.e. Copy Acme Bid, BID-SJR03-2016). It is the bidders responsibility to guarantee the USB drive is 100% identical to your original
hard copy bid. In the event of a discrepancy, your original hard copy will prevail.
PLACE FOR RECEIVING BIDS
Bids may be mailed or hand delivered to:
St. Johns River State College
c/o Purchasing Coordinator
Office of Business Affairs, Building A
5001 St. Johns Ave
Palatka, Florida 32177
All bids must arrive and be date/time stamped by a Purchasing Department representative prior to the
specified bid due date/time. Bids received after that time will not be accepted. Bids cannot be faxed or
emailed. The College will not be responsible for Postal or other delivery service delays that cause a bid to
arrive at the Business Office, Building A, Room A0029 after the designated bid due date/time.
PUBLIC BID OPENING
St. Johns River State College will conduct a Public bid/proposal opening at 2:30pm on 04/06/2016 at the Colleges
Administrative Offices Bldg. Room # A-154, 5001 St. Johns Ave, Palatka FL 32177. Sealed bids, proposals, or
replies received by the College pursuant to this solicitation will remain confidential and are exempt from
Floridas Public Records Act (Ch. 119, Florida Statutes) until such time as the College provides notice of an
intended decision or until 30 days after opening the bids, proposals, or final replies, whichever is earlier.
Thereafter, by submitting a response to this solicitation, the proposer acknowledges that all documents and
information submitted to the College, including pricing information, is considered a public record under
Floridas Public Records Act and may be disclosed to third parties upon request notwithstanding any
confidentiality clauses or labels contained in such documents. Please direct any inquires to the College
contact listed below.
BID PACKAGE
Interested bidders may obtain a Bid Package from Julianne Young, Purchasing Coordinator for St. Johns River
State College by any of the following methods.
By email: [email protected]
By download, available at : http://sjrstate.edu/032016
ADVERTISING
In submitting a proposal, Proposer agrees not to use the results there from as a part of any commercial
advertising unless permission in writing is granted by the College. Violation of this stipulation may be subject
to the action covered by ARTICLE 30 of these General Conditions.
APPLICABLE LAW
The bidder shall comply with all federal, state, and local laws, rules, ordinances and regulations (Laws)
applicable to the Bidders response to the ITB, the contract executed in connection with the ITB, and the
provision of services under the ITB and the contract. The term Laws as used in this provision shall be
deemed to include all laws which are specifically applicable to the College, as a political subdivision of the
State of Florida and an educational institution. This ITB and the contract to be executed in connection with the
award of this ITB must be modified in accordance with any statutory requirement of the State of Florida. Lack
of knowledge by the Bidder will in no way be cause for relief from responsibility.
Venue
The contract, when entered into and any disputes hereunder, shall be construed in accordance with
the laws of the State of Florida and enforced in the courts of the State of Florida. College and firm
hereby agree that venue shall be in Putnam County, FL.
ASSIGNMENT
Any purchase order issued pursuant to this solicitation and any monies which may become due there under are
not assignable except with the prior written approval of the College.
AWARD
As the best interest of St. Johns River State College may require, the right is reserved to reject any and all
proposals, or any portion of ITBs, to waive any informality in proposals received, or to accept any item or
group of items unless qualified by the Proposer. The College reserves the right to reject any portion or all bids,
to resolicit bids or not and to waive informalities as deemed in the best interest of the College. If this proposal
requests prices for multiple items. The College reserves the right to award the proposal, by item, to the
Bidder(s) which, in the sole discretion of the College, is the most responsive and responsible Bidder(s), price,
qualifications and other factors considered for that item. The issuance of a purchase order constitutes a
binding contract.
BRAND NAME OR EQUAL
(As used in this paragraph, the term "brand name" includes identification of supplies by make and model.) If
the items called for herein have been identified in the Schedule by a "brand name or equal" description, such
identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics
of products that will be satisfactory if they meet the listed essential requirements. Proposals offering "equal"
products will be considered for award, if allowed by the proposals/Special Conditions and if such products are
clearly identified and are determined by the college to be equal in all material respects to the brand name
products listed in the specifications. Unless the Proposer indicates in his proposal that he is offering an "equal"
product, his proposal shall be considered as offering a brand name product identified in the specifications.
by virtue of this RFP/Bid and subsequent agreement. This cooperative purchase agreement in no way restricts
or interferes with the right of any State of Florida agency to re-bid any or all items or services.
DEFINITIONS
College, SJR State or St. Johns River State College refers to The St. Johns River State College. The college is a
political subdivision of the State of Florida.
Firm, vendor, business, proposer, contractor or bidder in this document refers to respondents to this
invitation to bid.
ELIGIBLE BIDDERS
Eligible bidders are defined as those bidders who are not excluded from bidding according to the Federal
Governments Excluded Parties List (www.epls.gov) or by Section 287.133, Florida Statute.
EXCEPTIONS TO THE CONTRACT
Not all items cataloged by the successful Proposer will be purchased under the ensuing contract. Some office
supply, equipment or furniture purchases will be made from other sources as required by law or regulation, for
example, purchases from state contract vendors, Florida Association of Rehabilitation Facilities (RESPECT) or
Florida Prison Industries (PRIDE). For more detailed information on state contracts, or items marketed by
RESPECT or PRIDE, contact the purchasing office of this solicitation.
PAYMENT
If awarded, the annual lump sum fee for basic services will be divided into twelve equal payments and
invoiced monthly in arrears. Payment will be made by the College after the items have been received,
inspected, and found to comply with the specifications, are free of damage or defect, and have been properly
invoiced. Discounts will be taken if payment is made within the discount period. All invoices shall bear the
College purchase order number.
PERSONNEL
Contractor agrees each of its employees will be properly qualified and will use reasonable care in the
performance of Services. If the College, in the Colleges sole opinion, determines, for any reason, that the
qualifications, actions or conduct of any particular Contractor employee has violated the Agreement by
performing unsatisfactory services, interfering with operation of property, bothering or annoying any
occupants, other contractors or subcontractors at Property, or that such actions or conduct is otherwise
detrimental to the College, then upon the Colleges written notice, Contractor shall immediately provide
qualified replacement. Contractor employees shall report to designated personnel upon arrival and departure
from property in the performance of services. Contractors employees are expected to adhere to all college
policies and procedures including but not limited to maintaining a tobacco free campus.
PROTEST OF ITB DOCUMENT
All firms are required to thoroughly review the ITB document within a reasonable time after receipt. Any
concerns or comments relating to the ITB documents shall be brought to the attention of the Colleges
Purchasing Coordinator: Julianne Young, in writing, promptly after receipt. However, if the Firms desires to
protest the ITB document, or any of the specifications, requirements, or procedures thereof, the Firms will be
required to comply with the St. Johns River State Colleges ITB Protest Procedures, a copy of which is available
7
from the Purchasing Coordinator at St. Johns River State College within seventy-two (72) hours after receipt of
the proposal document. Failure to comply with this procedure will constitute a waiver by the Firms of any right
to later protest on the basis of the form, content and substance, including without limitation, the
specifications, requirements or procedures, of the ITB documents.
PUBLIC RECORDS
Any material or documentation submitted in response to this solicitation will be a public document pursuant to
Section 119.07 Florida Statutes. This includes material which the responding bidder or proposer might consider
to be confidential or a trade secret. Any claim of confidentiality is waived upon submission effective after
public opening pursuant to FS 119.07.
SAFETY STANDARDS
All manufactured items and fabricated assemblies shall comply with applicable requirements of the
Occupational Safety and Health Act (OSHA), Federal EPA, Florida DER and any standards otherwise stipulated in
the solicitation.
SAFETY REQUIREMENTS
The Contractor by submitting a proposal response agrees that it shall be solely responsible for supervising its
employees, that it shall comply with all rules, regulations, orders, standards and interpretations promulgated
pursuant to Occupational Safety and Health Act of 1970, including but not limited to training, recordkeeping,
providing personal protective equipment, lockout/tag out procedures, Material Safety Data Sheets and labeling
as required by the right to now standard, 29 CFR 1910.1200.
SOVEREIGN IMMUNITY
The parties hereto acknowledge and agree that St. Johns River State College is a political subdivision of the
State of Florida. As such, pursuant to Florida Statute 768.28, the College's performance under any resulting
agreement and any amendments thereto or attachments connected there with, shall at all times be subject to
any and all state laws, state regulations and College District Board of Trustee Rules which are applicable to the
College's operations, commitments and/or activities in furtherance of any terms specified herein.
TAXES
The College does not pay federal, excise or state sales taxes. The applicable tax exemption numbers are:
Florida Sales Tax: 85-8013170533C-4
Federal Identification Number: 59-1033399
WITHDRAWAL OF PROPOSAL
Proposal may be withdrawn by written or telegraphic notice prior to solicitation public opening. Withdrawals
received after the time set for opening of solicitation will not be considered.
Automobile Liability
$1,000,000 Combined Single Limit Each Accident
Policy:
Coverage:
10
5.0 Specifications
Scope of work
ERRORS AND OMMISSIONS
Bidders are expected to comply with the true intent of these bid specifications taken as a whole and shall not
avail themselves of any errors or omissions to the detriment of the services. Should any bidder suspect any
error, omission, or discrepancy in the specifications or instructions, the bidder shall immediately notify the
Purchasing Coordinator in writing who will issue written instructions to be followed. Bidders are responsible
for the contents of their proposal and for satisfying the requirements set forth in the bid specifications.
EQUIPMENT/MATERIALS/LABOR
IT WILL BE THE RESPONSIBILITY OF THE SUCCESSFUL PROPOSER TO SUPPLY ALL MATERIALS, TOOLS,
NECESSARY LABOR, ETC. FOR THE WORK TO BE PERFORMED AS SPECIFIED.
Section Definitions: For the purpose of this technical specifications document, when the terms
highlighted in this section are encountered, the definitions below shall be assumed. The contractor shall
request clarification of any term he considers unclear or ambiguous.
Furnish: create, purchase, or otherwise legally acquire a new item or, with owners permission, a
refurbished item and deliver it to the appropriate location in good working order and appearance.
Provide: furnish all parts and install or, in the case of services, perform, using technicians trained to
accomplish such tasks. It is expected that all warrantees on newly furnished and existing equipment shall
remain intact following the provision of any item.
Verify: assure equipment or components proper operation, full functionality, and/or working condition
including the provision of all maintenance tasks, repairs, or replacement as necessary.
Justify: furnish for owners consideration and, where appropriate, approval written documentation
describing an action, assessment, decision, etc.
3.0 Equipment Identification:
Equipment considered to be within the scope of this contract is identified in Appendix 1 Equipment
Lists:
Schedule A Palatka Campus Equipment Lists,
Schedule B Orange Park Campus Equipment Lists, and
Schedule C St. Augustine Campus Equipment Lists.
Every reasonable effort has been made to assure the completeness of these lists. Additions to or deletions
from these lists for example, those discovered during the initial inspection and reporting period
described below, or new equipment that comes on line during the contract period shall be made by
mutual agreement between the owner and the contractor. Rates shall be adjusted accordingly.
3.1 General Requirements:
3.1.0. Contractor shall check in with the Security Office upon arrival to and departure from the campus
where any service or duties are to be performed. The Security Office may assign Contractor keys for
access to HVAC equipment for the performance of duties upon check in. All keys signed out by Contractor
must be returned, and signed in, to the Security Office prior to Contractor departing campus. UNDER NO
CIRCUMSTANCES, INCLUDING SHORT TRIPS OFF CAMPUS, SHALL ASSIGNED SJR STATE KEYS
LEAVE CAMPUS GROUNDS.
3.1.1. All work shall be performed during regular college business hours. Regular business hours for all
campuses occur Monday through Friday between 8 a.m. to 5 p.m. during the fall, winter, and spring
sessions, and Monday through Thursday between 7:30 a.m. to 5:30 p.m. during summer A and B
sessions. (Current session schedules are available on the College web page at http://www.SJR State.edu.)
11
12
13
14
Filters in units serving the Thrasher-Horne Center for the Arts and the Orange Park
Health Sciences Building shall receive new filters at each service visit four (4) times per
annum;
Replacement filters shall be 40% efficiency, pleated, disposable devices, sized for onefor-one replacement of existing filters;
xiii. Heating and cooling water coils:
All heating and cooling coils shall be inspected and cleaned properly and thoroughly at
least once during the first year, then inspected and maintained in prime condition for the
duration of the contract. Existing deficiencies shall be justified.
Inspect coils, associated piping, connections, valves for leaks;
Note the condition of coil fins and report significant deficiencies to the owner;
Verify that coils are free from debris;
Disassemble and thoroughly clean associated strainers as needed; Repair or replace
damaged or missing insulation;
Identify and immediate report to owner any and all deficiencies related to coils or
associated piping and specialties that have the potential to cause water damage to
owner property or structures;
xiv. Electrically powered heating elements:
Verify the proper operation of electrically powered heating elements including the
operation of all associated components (circuit breakers, switches, etc.) that affect
heater operation;
Verify that the air path (including any filters, grilles, and the fan itself) is clear of debris;
xv. Readouts and gages:
Verify the function of all existing analog and digital monitors associated with all
equipment. Monitors include temperature and pressure gages, flow readouts, state
indicators, etc. intended to be read by an individual located within sight of the device.
Sensors utilized by the energy management system for automatic control purposes are
specifically excluded;
Replace or repair any such sensors found to be damaged or out of calibration. Verify
functionality and calibrate new sensors;
The owner will furnish, for contractor to install, one time replacements for any missing
or not fully functional readouts and gages during the initial inspection. Installation shall
occur within two (2) weeks of receipt of owner furnished devices. After the initial
inspection period, all readouts and gages become the responsibility of the contractor.
3.4.2 Periodic Preventative Maintenance DX Equipment
A. The specific periodic maintenance tasks enumerated below pertain to all DX systems within the scope
of this contract. In general, the service contractor shall be responsible for the proper operation of the
equipment and all associated components from the load side of the electrical service disconnect on the
indoor unit to the load side of the disconnect on the condenser unit, as well as the controlling
thermostat and associated thermostat wiring.
B. The contractor is expected to perform exactly those tasks applicable to each unit. For example, drive
belts replacement might be necessary in air handlers but not in condenser units while motor
performance applies to both. The contractor shall furnish all labor, parts, tools, and materials
necessary to the performance the tasks.
C. Work shall be performed in a manner that maintains the integrity of any existing equipment
warranties. Warranted equipment is identified in Appendix 1 Equipment Lists. The contractor shall
turn over to the owner any and all warranty documentation pertaining to newly installed replacement
equipment or parts.
D. All indoor airside equipment associated with a DX system covered by this contract shall be maintained
according to the requirements put forth in Section 3.4.1 Periodic Preventative Maintenance Airside
Equipment.
15
16
17
18
Inspect piping for signs of deterioration including all supports, sleeves, and joints.
Repair or replace as needed;
Solder repairs to piping are acceptable if performed using current best practice methods
and materials;
Inspect piping insulation for degradation or damage along its entire length including
extended piping runs, seams, joints, and points of contact with supports or other
objects. Replace defective sections as necessary;
3.5.2 Annual Maintenance Waterside Equipment
A. For the waterside equipment covered by this contract, the following annual maintenance tasks shall be
performed:
i. Verify the general condition and function of each unit;
ii. Chillers:
Document entering and leaving fluid flow rates;
Document condenser and chilled water heat transfer;
Verify the condition of sight glasses;
Repair or replace damaged or missing insulation.
iii. Refrigerant leak test:
Perform a refrigerant leak test;
Top off refrigerant charge as needed;
Locate and repair all leaks;
Inspect equipment and associated piping for potential points of weakness or failure;
Furnish owner with documentation of test results including, if applicable, an accounting
of the type and quantity of charge lost as well as a description of the measures taken to
assure the future integrity of the system.
iv. Oil system:
Change low pressure refrigerant compressor oil and furnish owner with documentation of
oil lab analysis;
19
v. Motor:
Document motor winding resistance;
For open motors:
o verify the integrity of coupling and seals,
o lubricate motor,
o verify the proper functioning of drive package including sheave condition and
alignment, as applicable,
o Clean or replace contactors as required, retighten power wiring, and verify
contactor operation,
o Furnish owner with documentation of motor condition, deficiencies, and actions
taken to correct deficiencies.
vi. Motor starter:
Inspect contacts for signs of wear or heat associated defects;
Verify linkage function;
Change solid state starter fluid;
Tighten all power connections;
Replace air filter, as applicable;
Verify starter operation;
vii. Control Panel:
Run diagnostic check of panel;
Verify safety shut down sequence;
Tighten all controls and power wiring terminals;
Verify that all sensors and displays are functional and calibrated;
Verify the proper operation of all relays, internal controls, interlocks, and internal
safeties, including repair, replacement, and/or recalibration, as applicable;
viii. Purge unit:
Verify the proper operation of the purge system including all its subsidiary components;
Change the filter dryer;
Verify that the liquid feed line is clean and clear of debris;
Clean solenoid valves and verify their proper operation;
Verify the proper operation of the float valve;
Document pressure control set point;
ix. Condenser:
Prior to any mechanical or chemical cleaning, inspect tube sheets and heat transfer
tubes for signs of dirt, scale, or debris. A water treatment service technician shall be
present at this inspection and shall furnish the owner with a written report of tube
condition;
Verify proper operation of the flow switch;
Disassemble condenser head and inspect end sheets;
Brush clean condenser water tubes using nylon bristle brushes only;
Inspect head gaskets and replace as needed;
x. Cooler:
Verify flow and flow switch operation;
Document refrigerant level;
Furnish owner with documentation of chiller condition, critical performance values,
deficiencies, and actions taken to correct deficiencies.
20
21
22
suffered by the College Indemnities or any of them arising directly or indirectly from, in connection with, or as
a result of (a) any false or inaccurate representation or warranty made by or on behalf of the Contractor in or
pursuant to this ITB and the Agreement; (b) any disputes, actions, or other Liabilities arising with respect to, or
in connection with, compliance by the College with any Public Records laws (as hereinafter defined) with
respect to the Contractors documents and materials; (c) any dispute, actions, or other liabilities arising in
connection with the Contractor, the Contractors subcontractors, or their respective agents or employees or
representatives otherwise sustained or incurred on or about the Premises; (d) any act or omission of, or
default or breach in the performance of any of the covenants or agreements made by the Contractor in or
pursuant to this ITB or the Contract executed in connection with this ITB; and (e) any services provided by the
Contractor, its employees, agents, or authorized representatives in connection with the performance of the
Contract executed for this ITB. This indemnification shall survive termination of the ITB and the contract
executed in connection with the ITB. The Contractor must acknowledge acceptance of the entire
Indemnification Agreement.
REFERENCES
Provide a list of clients, preferably public or governmental organizations, for which you have provided a similar
service. List should include reference name, address, telephone number, contact person, and a description of
the service provided. In addition, the College reserves the right to contact current or former clients of the
proposer not provided as part of the proposal. Please provide a minimum of three references and a maximum
of five.
LEGAL ISSUSE
The proposer must indicate if there are any:
A. Suits or proceedings pending, or to the knowledge of the proposer, threatened in any court or before any
regulatory commission or other administrative governmental agency against or affecting the proposer or
the instructors to be used in providing the Services, which, if adversely determined, will have a material
adverse effect on the ability of the proposer or any of its instructors to perform their obligations as stated
in their response.
B. The proposer is not in default under any instrument or agreement to which it is a party or by
which it or any of its properties or assets may be bound, or in violation of any applicable laws, which
default or violation may reasonably be expected to have a material adverse effect on the financial
condition of the proposer.
If there are no issues in these areas, please respond that there are no pending or threatened suits or defaults.
ADDITIONAL INFORMATION OR SERVICES
In addition to the required information, the Proposer may include any additional information which may be
helpful to the College in analyzing the Proposer's ability to provide the desired service, as noted in this ITB.
24
PROPOSALS CHECKLIST
THIS CHECKLIST IS FOR THE CONVENIENCE OF THE COMPANY SUBMITTING A PROPOSAL
AND MAY BE USED TO ENSURE THAT SECTIONS OF THE ITB/RFP/PROPOSAL ARE
PROPERLY COMPLETED AND RETURNED. THIS FORM (PROPOSERS CHECKLIST) IS FOR
YOUR USE AND IS NOT REQUIRED.
Required ONE (1) original and THREE (3) duplicate copies of each of the following:
____ Proposal Cover Sheet
____ Pricing Proposal Form
____ Vendor Business Profile
____ IRS Form W-9
____ Non-Discrimination in Employment Form
____ Addendum Acknowledgement
____ Public Entity Crimes Form
____ Drug-Free Work Place Certification
____ Hold Harmless and Indemnification Agreement
____ References
____ Legal Issues
____ Copy of License to do business in the State of Florida
____ *Proof of Minority / Women Business Enterprise Number (M/WBE) if applicable
____ *Additional information if applicable
25
_____________________________________________
TAX ID NUMBER:
_____________________________________________
_____________________________________________
MAILING ADDRESS:
_____________________________________________
_____________________________________________
TELEPHONE NUMBER:
_____________________________________________
_____________________________________________
_____________________________________________
TITLE:
_____________________________________________
PHONE NO:
_____________________________________________
FAX NO.:
_____________________________________________
_____________________________________________
26
Contractor Name:
___________________________________________
Authorizing Signature:
___________________________________________
The contractor shall complete the form below identifying the cost at which, for a single annual term period of
the contract, the SJR State may be billed for work as described in the scope of the HVAC Maintenance Services
for St. Johns River State College, as described in the ITB, BID-SJR-03-2016
Base Bid
Contractor
Name
Alternate 1
Out Of Scope Repairs
Call-Out Rates
Alternate 2
Additional HVAC Services
Call-Out Rates
Category
Rate
Category
Rate
Standard Rate / HR
Standard Rate / HR
Holiday Rate / HR
Holiday Rate / HR
Please provide a single hourly rate for regular time, overtime, and holiday time as well as a mark-up
percentage for materials.
27
Phone Number:
Fax Number:
Remit to Address:
Email Address:
Web Address:
Contact Information:
Name:
Phone Number:
Title:
Email Address:
Vendor Information:
4. Is the vendor at least 51% owned, controlled and actively managed by a minority person?
If yes to #4, submit the State of Florida MBE/WBE Certification Number
If yes to #4, list the appropriate minority classification: (African American, Hispanic, Asian American, Native
American, American Woman, Service Disabled Veteran)
5. Conflicts of Interest: List any state employee who owns, directly or indirectly, an interest of
five percent or greater in the firm or any of its branches
Name/Title
6. List the officers of the corporation, partners or principal members of the firm and
their titles
Name/Title
Name/Title
Name/Title
It is the sole responsibility of the vendor to promptly notify SJR State College with any and all changes to this application.
Certification: I certify that the information supplied herein (including all attachments) is correct to the best of my knowledge. I further certify that in doing business with
the State of Florida, my firm is in compliance with Chapter 112, Florida Statutes, conflicts of interest and that I have disclosed the name of any state employee who
owns, directly or indirectly, an interest of five percent or greater in the above firm or any of its branches.
All vendors are required to complete this form in its entirety. The vendor is required to submit a valid tax form (W-9) along with the completed Vendor Business
Profile Form to the purchasing department.
Date:
28
IRS W-9
INSTRUCTIONS FOR W-9 FORM:
Contractors can obtain the W-9 Form and Instructions by visiting: http://www.irs.gov/pub/irs-pdf/fw9.pdf
The W-9 form is requested to be completed and returned with your ITB proposal submittal:
29
Acknowledgement of Addenda
Name of Bidder: _________________________________
Acknowledgement of receipt of addenda:
The undersigned, hereby acknowledges the receipt of the following addenda:
Dated: __________________
Dated: __________________
Dated: __________________
Dated: __________________
Dated: __________________
Dated: __________________
Dated: __________________
Dated: __________________
___________________________________
Signature
__________________________________
Title
___________________________________
Printed Name
__________________________________
Date
31
Notary Seal
32
Inform employees about the dangers of drug abuse in the work place, the business's policy of
maintaining a Drug-Free Work Place, any available drug counseling, rehabilitation, and employee
assistance programs, and the penalties that may be imposed upon employees for drug abuse
violations.
3.)
Give each employee engaged in providing the commodities or contractual services that are under bid
a copy of the statement specified in subsection (1).
4.)
In the statement specified in subsection (1), notify the employees that, as a condition of working on
the commodities or contractual services that are under bid, the employee will abide by the terms of
the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to,
any violation of Chapter 893 or of any controlled substance law of the United States or any state, for a
violation occurring in the work place no later than five (5) days after such conviction.
5.)
Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or
rehabilitation program if such is available in the employee's community, by any employee who is so
convicted.
6.)
Make a good faith effort to continue to maintain a drug-free work place through implementation of
this section.
AS THE PERSON AUTHORIZED TO SIGN THE STATEMENT, I CERTIFY THAT THIS FIRM COMPLIES FULLY WITH THE
ABOVE REQUIREMENTS.
___________________________________
Signature
__________________________________
Title
___________________________________
Printed Name
__________________________________
Date
33
______________________________
Notary Public Signature
References
Reference 1:
Name of Business or Public Entity: ____________________________________________________
Address: _________________________________________________________________________
City, State, Zip: ____________________________________________________________________
Contact Persons Name: ____________________________________________________________
Contact Persons Phone Number & e-mail:_______________________________________________
Date of Services performed: __________________________________________________________
Reference 2:
Name of Business or Public Entity: ____________________________________________________
Address: _________________________________________________________________________
City, State, Zip: ____________________________________________________________________
Contact Persons Name: ____________________________________________________________
Contact Persons Phone Number & e-mail:_______________________________________________
Date of Services performed: __________________________________________________________
Reference 3:
Name of Business or Public Entity: ____________________________________________________
Address: _________________________________________________________________________
City, State, Zip: ____________________________________________________________________
Contact Persons Name: ____________________________________________________________
Contact Persons Phone Number & e-mail:_______________________________________________
Date of Services performed: __________________________________________________________
35
Legal Issues
The proposer must indicate if there are any:
A. Suits or proceedings pending, or to the knowledge of the proposer, threatened in any court or before any
regulatory commission or other administrative governmental agency against or affecting the proposer or
the instructors to be used in providing the Services, which, if adversely determined, will have a material
adverse effect on the ability of the proposer or any of its instructors to perform their obligations as stated
in their response.
If there are no issues in these areas, please respond that there are no pending or threatened suits or defaults.
Pending Litigation: (please attach additional documentation if needed)
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
B. The proposer is not in default under any instrument or agreement to which it is a party or by
which it or any of its properties or assets may be bound, or in violation of any applicable laws, which
default or violation may reasonably be expected to have a material adverse effect on the financial
condition of the proposer.
If there are no issues in these areas, please respond that there are no pending or threatened suits or defaults.
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
___________________________________
Signature
__________________________________
Title
___________________________________
Printed Name
__________________________________
Date
36
Reason(s):
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
Signature:
____________________________________________________________
Title:
____________________________________________________________
Name of Firm:
____________________________________________________________
Telephone:
____________________________________________________________
37
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page1of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusFloArts
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
Serial
WestArts
WestDance
WestOffices
WestExercise
GraphicDesign
EastOffices
EastPiano
EastBlackBox
EastDance
F204
F204
F204
F204
F204
F211
F211
F211
F211
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
York
York
York
York
York
York
York
York
York
XTI072X033BAEA046A
XTI072X036BAFA046A
XTI060X027BAEA046A
XTI060X027BAEA046A
XTI066X033BAEA046A
XTI060X027BADA046A
XTI060X027BADA046A
XTI084X039BAGA046A
XTI078X036BAFA046A
AHU1
AHU2
F041
F041
AirHandler
AirHandler
York
York
AHU3
F041
AirHandler
AHU1
AHU2
F043
F043
FCU1
FCU2
Motor
Belt
Filters
Quan
4
4
2
2
2
2
2
4
4
Size
12x24x2
12x24x2
16x20x2
16x20x2
16x20x2
16x20x2
16x20x2
20x24x2
12x24x2
1
1
1
1
24x24x2
24x24x2
24x24x2
12x24x2
A89
A89
8
8
1
1
[Note1]
[Note1]
[Note1]
[Note1]
1
1
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
78.4/61.2
28.0
28.0
208
208
208
208
3
3
3
3
N/A
N/A
N/A
N/A
23.9
23.9
230
230
3
3
N/A
N/A
14.4
208
CFPMXT0165
CFPMXT0166
CFPMXT0168
CFPMXT0167
CFPMXT0164
CFPMXT0162
CFPMXT0163
CFPMXT0159
CFPMXT0161
HP
1 1/2
2
1 1/2
1 1/2
1 1/2
1
1
3
2
FLA
2.1
2.8
2.1
2.1
2.1
3.1
3.1
8.7
5.9
Volts
208
208
208
208
208
208
208
208
208
Ph
3
3
3
3
3
3
3
3
3
Quan.
1
1
1
1
1
1
1
1
1
Size
4L480
AX45
A40
A0
AX44
AX39
AX38
4L540
AX48
AP35
AP35
CGLM12528D
CGLM12529D
2
2
7.1
7.1
200
200
3
3
1
1
A45
AX45
York
AP60
CGLM12530D
16.1
200
4L560
AirHandler
AirHandler
York
York
AP215
AP215
CGKM065224D
CGKM065225D
30
30
208
208
3
3
1
1
F043
F043
FanCoil
FanCoil
York
York
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
FCU3
FCU4
F213
F213
FanCoil
FanCoil
York
York
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
[Note1]
FCU5
F213
FanCoil
York
[Note1]
[Note1]
[Note1]
[Note1]
FCU6
F213
FanCoil
York
[Note1]
[Note1]
[Note1]
Tower
CH1
CP1
CP2
TowerRoom
ChillerRoom
ChillerRm
ChillerRm
CHP1
CHP2
ChillerRm
ChillerRm
CHWPump
CHWPump
Aurora
Aurora
[Note4]
[Note4]
[Note4]
[Note4]
Boiler
ChillerRm
Boiler
WeilMcLane
LGB7
CP4331909
HP1
ChillerRm
HeatingPump
B&G
1510BF8.251.5BC
16F053
Notes:
1
2
3
4
5
6
7
CoolilngTower TowerTech
Chiller
York
Cond.Pump Bell&Gossett
Cond.Pump Bell&Gossett
EF84319
YCWL0118HE17XACSDT
80BF8.54X9.5
80BF8.54X9.5
1294090102
5x2
11531D53682264
N/A
10
1AF016LFB51
1AF016LFL41
10
Noinformationprovidedonequipment.
Coolingtoweristwocelltype.Motorinformationwasnotavailableatthetimeofthesurvey.
[email protected]
Dataisunavailable.Pumpandassociatedpipingiscoveredbysealedinsulation.
BoilerinputBTUHis780,000.
HeatingHotWaterPump100gpm@70fthead.
Hotwaterreheat.
10
10
N/A
5
Heating
Coils
kW
[Note7] [Note7]
[Note7] [Note7]
[Note7] [Note7]
[Note7] [Note7]
[Note7] [Note7]
[Note7] [Note7]
[Note7] [Note7]
[Note7] [Note7]
[Note7] [Note7]
Notes
20x20x4
20x20x4
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
1
1
26x14x1
26x14x1
[Note7]
[Note7]
[Note7]
[Note7]
1
1
1
1
1
1
373/4x13x1
[Note7]
[Note7]
373/4x13x1 [Note7]
24x10x1 [Note7]
373/4x13x1 [Note7]
24x10x1 [Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
[Note7]
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
373/4x13x1
2
3
3
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page2of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusGym
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
(S)NOA6765548
(S)NOA6770548
(S)NAO6765549
(S)NOA6765550
HP
5
5
5
5
Motor
FLA Volts
20.9 208
20.9 208
20.9 208
20.9 208
Ph
3
3
3
3
Quan.
1
1
1
1
NOA6748089
NOA6766659
NOA6739143
NOA6729144
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3.5
3.5
208
208
3
3
1
1
B45
B45
4
4
16x20x2
16x20x4
Tag
Location
Description
Maker
Model
Serial
NorthA
NorthB
SouthA
SouthB
MechRm1
MechRm1
MechRm2
MechRm2
AirHandler
AirHandler
AirHandler
AirHandler
York
York
York
York
LB240C00A6AAA1A
LB240C00A6AAA1A
LB240C00A6AAA1A
LB240C00A6AAA1A
NorthA
NorthB
SouthA
SouthB
Outdoors
Outdoors
Outdoors
Outdoors
Condenser
Condenser
Condenser
Condenser
York
York
York
York
HB240C00A2AAA1B
HB240C00A2AAA1B
HB240C00A2AAA1B
HB240C00A2AAA1B
AC1
AC2
Men'sLockerRoof
PackageUnit
PackageUnit
AAON
AAON
Men'sLockerRoof
AC3
EF1
EF2
GirlsLockerRoof
B1
P1
LockerBoilerRm
Men'sLockerRoof
Men'sLockerRoof
LockerBoilerRm
PackageUnit
ExhaustFan
ExhaustFan
AAON
PennBarry
PennBarry
Boiler
Pump
WeilMcClane
Aurora
RNA0480EA09EHN 200901AMWD03361
RNA0580BA01EJL 200901AMWE03362
RN00880EB093K9 201512ANGH49749
DX11R
L08JZ31790
DX11R
L08JZ31757
LGBSeries2
344ABF
Notes:
1 Condenserunitsareassociatedwiththeairhandlerofthesamename.
2 Hotwaterreheat.
3 Equipmentin12monthwarrantyperiod.March2016thruMarch2017
CP4331908
9711614
1
1
1/7
1/7
N/A
2
Belt
Size
A63
A63
A63
A63
Filters
Quan
Size
5
20x25x2
5
20x25x2
5
20x25x2
5
20x25x2
7.5
N/G
N/G
208
115
115
3
1
1
N/A
N/A
Direct
Direct
4
each
N/A
N/A
N/A
7.2
N/A
200
N/A
3
N/A
N/A
N/A
N/A
N/A
N/A
Heating
Notes
Coils kW
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
[Note2] [Note2]
[Note2] [Note2]
Gas
16x20x2 Furnac
e
16x20x4
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page3of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusLRC
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Chiller1
Outdoors
Chiller
York
P1&2
1stFlrMech
CHWPumps
B&G
Boiler
1stFlrMech
Boiler
WeilMcLain
HWPump
1stFlrMech
HWPump
P1
P2
L0124
L0124
AHU1
AHU2
AHU3
AHU4
AHU5
AHU6
AHU7
AHU8
AHU9
AHU10
AHU18
AHUOA
Model
Serial
HP
Motor
FLA Volts
Belt
Size
Ph
Quan.
N/A
N/A
57.7
YLAA0101HE17XFBSDTX 11531C53570935
Filters
Quan
Size
Heating
Coils kW
N/A
N/A
N/A
N/A
1BF070B80
7 1/2
26.4
208
N/A
N/A
N/A
N/A
N/A
N/A
LGB9WSeries2
BP3936565
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Aurora
00220840
[Note3]
6.7
208
N/A
N/A
N/A
N/A
N/A
N/A
CHWPump
CHWPump
Aurora
Aurora
FE1507
FE1507
[Note3]
[Note3]
71/2 19.4
71/2 19.4
208
208
3
3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
L124B
L111
L111A
L132
L127
L112
L114
L119
L105
L127
L116
2ndFlr
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
Carrier
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
Carrier
40RMS010301HC
48SHW6C2RH
36SHW6B2RH
36SHW6C2RH
24SHW4A2RH
48CHW6C2RH
36SHW4C2RH
24SHW4A2RH
24SHW4A2RH
36SHW6C2RH
60CHW6D2RH
39TVADKAB61139AB
1308U08814
R03A665930
R03A665929
R03A665927
R03A665924
R03A665931
R03A665926
R03A665925
R03A665924
R03A665928
208
120
120
120
120
120
120
120
120
120
120
208
3
1
1
1
1
1
1
1
1
1
1
3
1
1
1
1
1
1
1
1
1
1
1
2
A39
5L410
5L380
5L370
5L380
5L410
5L380
[Note16]
[Note16]
B34
A41
A27
3
2
2
2
1
2
2
1
1
2
2
4
Mixed
16x20x2
16x16x2
16x16x2
16x25x2
16x20x2
16x16x2
16x25x2
16x25x2
16x16x2
20x20x1
16x25x2
[Note17] [Note17]
FCU1
FCU2
FCU3
FCU4
FCU5
FCU6
FCU7
FCU8
FCU9
FCU10
FCU11
FCU12
FCU13
FCU14
FCU15
FCU16
FCU17
L222
L213
L212
L211
L219
L229
L224
L223
L202
L200
L235
L219
L219
L219
L219B
L219B
L220
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
90CHW4R
60CHW6D
60CHW6D
60CHW6D2RH
24CHW4A
24CHW4A
60CHW6D
[Note4]
[Note4]
[Note3]
36CHW2B
[Note3]
48CHW6D2RH
[Note3]
120CHW6N2RH
120CHW6N2RH
24CHW4A
FC161474CA0314020414
208
208
208
208
208
208
208
120
120
120
208
120
120
120
120
120
120
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
[Note16]
[Note16]
A41
[Note16]
[Note16]
[Note4]
[Note4]
[Note4]
[Note4]
[Note3]
[Note16]
[Note3]
[Note16]
[Note3]
[Note3]
[Note16]
[Note16]
2
2
2
1
2
1
2
1
1
1
1
1
2
1
2
1
1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
20x20x1
[Note17] [Note17]
EF1
Roof
ExhaustFan
Soler&Palau
DB11MH1S
115
[Note16]
N/A
N/A
1510BF7.752.5BB
3100F20782
2.4
3/4
1/2
1/2
1/4
3/4
1/2
1/4
1/4
1/2
71/2 15.5
FC161463CA0314020401
1/2
1/2
3/4
1/2
1/4
1/2
1/2
1/4
1/5
1/3
3/4
1/4
1/4
1/4
1/4
1/3
3/4
B57506
1/4
FC161471CA0314020410
161471CA0314020411
FC161471CA0314020411
FC161463CA0314020398
[Note4]
[Note4]
[Note4]
[Note4]
[Note3]
FC161465CA0314020403
[Note3]
FC161469CA0314020407
[Note3]
[Note3]
FC161509CA0314000415
5.0
13.0
8.7
8.7
4.4
13
8.7
4.4
4.4
8.7
6.3
6.3
7.3
6.3
5.3
6.3
6.3
5.3
2.6
4.2
7.3
5.3
5.3
5.3
5.3
4.2
7.3
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
Notes
1,6
1
1
1,5
1
1
1
1
1
1
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
2
2
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
2
2
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
[Note17] [Note17]
N/A
N/A
2
2
2
2
2
2
2
2
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page4of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusLRC
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
Serial
HP
Motor
FLA Volts
Ph
Quan.
Belt
Size
Filters
Quan
Size
Heating
Coils kW
Notes:
1
2
3
4
5
6
7
Locatedinthefirstfloorceiling.
Locatedinthesecondfloorceiling.
Noinformationvisible.
Unitinstalledabovedrywallceiling.
Unitnotenergized.Breakerfoundtripped.
MixedFilters112x24x2,116x24x2,120x24x2.
HWPumpData:
MotorData:
Type: 382ABF
HP:
Size: 2x2x9A
FLA:
GPM: 60
Volts:
Head: 50
Hz:
Ph:
Rpm:
Frame:
8 CHWPumpData:
MotorData:
Type: 1BF070B80
HP:
FLA:
Volts:
Hz:
Ph:
Rpm:
Frame:
9 BoilerinputBTU
1,040,000
10 AHU1MoterData:
HP: 20
FLA: 54
Volts: 208/8.89
Hz: 60
Ph: 3
Rpm: 1765/1165
Frame: F284T
2
200
60
3
1735
145J
7.5
208
60
3
1760
213T
11 AHU2MotorData:
HP: 11/2
FLA:
Volts: 200
Hz: 60
Ph: 3
Rpm: 1725
Frame: 145T90
12 AHU3MotorData:
HP: 2
FLA: 6.4
Volts: 208
Hz: 60
Ph: 3
Rpm: 1720
Frame: 145T
13 AHU4MotorData:
HP: 3
FLA: 10.2
Volts: 208
Hz: 60
Ph: 3
Rpm: 1755
Frame: 182T
14 AHU5MotorData:
HP: 3/4
FLA:
Volts: 208
Hz: 60
Ph: 3
Rpm:
Frame:
15 AHU6MotorData:
HP: 2
FLA: 60004
Volts: 208
Hz: 60
Ph: 3
Rpm: 1720
Frame: 145T
16 Beltsizestobedeterminedinfield.
17 Hotwaterreheat.
Notes
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page5of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusScience
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
HP
Motor
FLA Volts
Ph
Quan.
10
25.8
230
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
208
115
3
1
1/2
3/4
1/2
1/8
1.5
1.5
7.5
11.0
11.0
1.7
115
115
115
115
115
115
1179R13392SJRCC
1179R13392SJRCC
3/4
3/4
11.0
11.0
FC430971CA0290003591
1
1/2
1/2
1/2
1/2
1/2
3/4
3/4
1/2
1/2
1/2
13.2
8.7
8.7
8.7
8.7
8.7
13.2
13.2
8.7
8.7
8.7
Tag
Location
Description
Maker
Model
AHUS1
MechRm
AirHandler
York
XTI051X069PAK028A
DHS
S101A
DuctHeater
N/A
N/A
EFS1
EFS2
S103A
S102A
ExhaustFan
ExhaustFan
Greenheck
Greenheck
BSQ180HP
SQ85D
EF1
EF2
EF3
EF4B
EF5B
EF6
Roof
Roof
Roof
Roof
Roof
Roof
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
PVD
PVD
LorenCook
LorenCook
LorenCook
LorenCook
XR82
XR82
135CPS
135CPS
120CPS
90R15DH
1179R13392SJRCC
1179R13392SJRCC
1179R13392SJRCC
1179R13392SJRCC
SF1A
SF1B
Roof
Roof
ExhaustFan
ExhaustFan
LorenCook
LorenCook
90ASP
90ASP
S21
S22
S23
S24
S25
S26
S27
S29
S210
S211
S212
S201
S202
S203
S203
S205
S206
S207
BreakRm
S210
S212
Corridor
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
60CHW6E2RH
36CHW6C2RH
36CHW6C2RH
36CHW6C2RH
36CHW6C2RH
36CHW6C2RH
36CHW6D2RH
48CHW6D2RH
36CHW6C2RH
36CHW6C2RH
36CHW6C2RH
Notes:
1
2
3
4
5
Dualpathinlet,directdrivefan.
Inlineheater.24"x30".10.3gpm.
'TrueFlex'modelbelt.
Equipmenttagismissing.
Hotwatercoillocatedinoutsideairduct
Serial
N/A
3/4
1/12
1/20
1 1/20
FC430957CA0290003581
FC430957CA0290003577
FC430955CA0290003567
FC430955CA0290003570
FC430955CA0290003571
FC430959CA0290003584
FC430965CA0290003586
FC430955CA0290003572
FC430957CA0290003576
FC430955CA0290003574
Belt
Size
Filters
Quan
Size
6
20x20x2
4
16x20x2
2
20x24x2
Heating
Coils kW
Notes
[Note5}
N/A
N/A
N/A
N/A
N/A
Direct
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
1
1
Direct
Direct
1
AP29
1
AP29
1
AP29
Direct
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
4
4
115
115
1
1
1
1
AP32
AP32
4
4
20x10x1
20x10x1
N/A
N/A
N/A
N/A
3
3
115
115
115
115
115
115
115
115
115
115
115
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2420
4L350
4L350
4L350
4L360
4L350
4L350
2400
2350
4L350
4L350
2
2
2
2
2
2
1
2
2
2
2
20x20x1
16x16x1
16x16x1
16x16x1
16x16x1
16x16x1
16x16x1
16x20x2
16x16x1
16x16x1
16x16x1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page6of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusTech
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
Serial
AHUT1
MechRm
AirHandler
York
XTI051X0660PAKA028A
CEWMXT0164
DHT
T125
DuctHeater
N/A
N/A
N/A
EF1
EFT1
EFT2
EFT3
Roof
T127
T124
T106
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
PVD
Greenheck
Greenheck
Greenheck
XR82
BSQ160HP
SQ85D
SQC50
EF
T210
AcidSinkExhaust
Vortex
VTX1000
CUT1
FCUT1
T206
T21
T22
T23
T24A
T24B
T25
T26
T27
T28
T29
T210
T211
Notes:
1
2
3
4
T0115
T0115
T206
T201
T202
T203
T204
T204
Corridor
T206
T207
T208
T209
T210
T211
SplitSystem
SplitSystem
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
York
York
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
YCJD1884151A
AHX18B3XH21A
48CHW6C2RH
60CHW6E2RH
36CHW6D2RH
36CHW6D
36CHW6
36CHW6C2RH
36CHW6B2RH
60CHW6D2RH
36CHW6C2RH
36CHW6B2RH
36CHW6C2RH
36CHW6C2RH
Dualpathairhandlerwithdirectdrivefan.
Inlineheater.24"x36".9.1gpm.
Manufacturerandmodeltakenfromdesigndrawings(basisofdesign).
DXfancoilunit.
1010B51
WOC9655904
WIC0715885
FC430957CA0290009562
FCU430963CA0290003588
FCU430971CA0290003950
FC430959CA0290003583
P01A418003
P01A418002
FCU430957CA0290003978
Y04FC430953CAO290003562
Y04FC430969CAO290003564
Y04FC430955CAO290003565
Y04FC430953CAO290003563
Y04FC430955CAO290003564
FC430957CA0290003579
Motor
FLA Volts
25.8 208
Ph
3
Quan.
N/A
N/A
N/A
N/A
N/A
2.4
1/2
1/12
1/20
208
208
120
120
3
3
3
3
1
NA
NA
260Watt
115
N/A
7.6
208
2.8 208
120
8.7
120
13.2 120
13.2 120
120
120
8.7
120
6.7
208
13.2 208
8.7
208
8.7
208
8.7
208
8.7
208
1
1
1
1
1
1
1
1
1
3
1
1
1
1
1
HP
10
N/A
1/2
1/3
1/4
3/4
1/2
1/4
1/4
Belt
Size
N/A
Filters
Heating
Notes
Quan
Size
Coils kW
2
16x20x2 [Note5 N/A
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3
3
3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Direct
NA
N/A
N/A N/A
1
4L350
1
2350
1
4L350
1
4L350
1
4L350
1
4L350
1
4L350
1
4L380
1
4L420
1
4L350
1
4L380
1
2350
1
AL350
N/A
N/A
note6 note6
2
16x16x1
2
16x16x1
2
20x20x1
2
16x16x1
2
16x16x1
2
16x16x1
2
16x16x1
2
16x16x1
2
20x20x1
2
16x16x1
2
16x16x1
2
16x16x1
2
16x16x1
1/2
1/3
3/4
1/2
1/2
1/2
1/2
Note:
5 Hotwatercoillocatedinoutsideairduct
6 Fieldverifyreturnairfilter
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
[Note5] [Note5]
4,6
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page7of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusViking
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Motor
FLA Volts
13.2 115
8.7
115
10.2 208
6.7
115
115
5.3
6.7
115
8.7
115
6.7
115
6.7
115
6.7
115
13.2 115
Ph
1
1
3
1
1
1
1
1
1
1
1
Quan.
1
1
1
1
1
1
1
1
1
1
1
208
208
208
208
1
1
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
NOTE9
NOTE9
NOTE9
NOTE9
7.6
200
N/A
N/A
N/A
N/A
N/A
5
1/2
3
14.4
1.9
8.8
208
208
208
3
3
3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
CP4331907
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2FTB001007
136.8
208
N/A
N/A
N/A
N/A
N/A
N/A
Tag
Location
Description
Maker
Model
Serial
AHU1
AHU2
AHU3
AHU4
AHU5
AHU6
AHU7
AHU8
AHU9
AHU10
AHU11
1stFlrMech
1stFlrMech
1stFlrMech
1stFlrMech
2ndFlr
2ndFlr
2ndFlr
2ndFlr
2ndFlr
2ndFlr
V0136
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
FirstCo.
48YSVW6D2RH
36YSVW6C2RH
180YSVW6P2RH
24YSVW4B2RH
24YSHW4A2RH
24YSHW6B2RH
36YSHW6C2RH
24YSHW6B2RH
24YSHW4B2RH
24YSHW4B2RH
485VW4D
R05A710076
R05A710075
R05A711553
R05A710074
R05A710068
R05A710071
R05A710073
R05A710072
R05A710069
R05A710070
88F048V4
FCUV01
FCUV02
FCUV03
FCUV04
V0101
V0101
V0104
V0105
FanCoilUnit
FanCoilUnit
FanCoilUnit
FanCoilUnit
Trane
Trane
Trane
Trane
N/A
N/A
FCDB0402CAHF0
FCDB0402DAHF0
N/A
N/A
T14C10473
T14C10474
Tower
Outdoors
CoolingTower
Evapco
ICT476
8335221
CW1
HW1
CHW1&2
Outdoors
1stFlrMech
1stFlrMech
CWPump
HWPump
CHWPump
B&G
B&G
B&G
1510BF72.5AB
35xTJ00
1510BF71.5AC
1BF019E80
105089
1BF180E80
Boiler
1stFlrMech
Boiler
WeilMcLain
LGB
Chiller
1stFlrMech
Chiller
York
YCWL0056SE17XAASDT
HP
3/4
1/2
3
1/3
1/4
1/3
1/2
1/3
1/3
1/3
3/4
Belt
Size
5L460
B35
BX59
B36
B34
B32
5L360
B32
B32
B32
5L460
Filters
Quan
Size
2
16x20x1
2
16x16x1
3
20x36x1
1
16x25x1
1
16x25x1
1
16x25x1
2
16x16x1
1
16x25x1
1
16x25x1
1
16x25x1
2
16x20x1
Heating
Coils kW
[Note3] [Note3]
[Note3] [Note3]
[Note3] [Note3]
[Note3] [Note3]
[Note3] [Note3]
[Note3] [Note3]
[Note3] [Note3]
[Note3] [Note3]
[Note3] [Note3]
[Note3] [Note3]
Notes
1
1
1
1
2
2
2
2
2
2
[Note3] [Note3]
9
9
9
9
4
5
6
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page8of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusViking
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Notes:
1
2
3
4
Description
Maker
Locatedin1stFloormechanicalroom.
Locatedin2ndFloorcorridor.
Hotwaterreheat.
HWPumpData:
MotorData:
Type:
HP:
Size: 1510BF72.5AB
FLA:
GPM: N/G
Volts:
Head:
Hz:
Ph:
rpm:
Frame:
5 HWPumpData:
Type: 35xTJ00
Size:
GPM:
Head:
MotorData:
HP:
FLA:
Volts:
Hz:
Ph:
rpm:
Frame:
Model
Serial
HP
7 AC1MotorData
5
208230/460
60
3
1750
184T
1/2
208
60
3
1750
HP:
FLA:
Volts:
Hz:
Ph:
rpm:
Frame:
10
28
208
60
3
1770
S256T
8 V103MotorData:
HP:
FLA:
Volts:
Hz:
Ph:
rpm:
Frame:
2
9
208
60
3
1725
R56HZ
9 Fieldverifyfiltersize
6 CHWPumpData:
MotorData:
Type:
HP:
Size: 1510BF71.5AC
FLA:
GPM:
Volts:
Head:
Hz:
Ph:
rpm:
Frame:
3
208
60
1760
183T
Motor
FLA Volts
Ph
Quan.
Belt
Size
Filters
Quan
Size
Heating
Coils kW
Notes
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page9of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusChillerPlant
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
Serial
CH1
CH2
CHWPlant
CHWPlant
Chiller
Chiller
York
York
CGAM080
CGAM080
2EWM006381
2EWM006382
CHWPump
CHWPump
B&G
B&G
3G
3G
[Note1]
[Note1]
CHWP1 CHWPlant
CHWP2 CHWPlant
Notes:
1 Pumpencasedininsulation.
Motor
HP
FLA Volts
N/A 307.8 208
N/A 307.8 208
Ph
3
3
Quan.
NA
NA
15
15
3
3
NA
NA
39.8
39.8
208
208
Belt
Size
N/A
N/A
N/A
N/A
Filters
Quan
Size
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Heating
Notes
Coils kW
3
N/A N/A
3
N/A N/A
N/A
N/A
N/A
N/A
3
3
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
3/9/2016
Page10of10
Appendix1EquipmentList:
ScheduleAPalatkaCampusBoilerBldg
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location Description
Maker
B1
B2
S0116
S0116
HWBoiler WeilMcLain
HWBoiler WeilMcLain
HHWP1
HHWP2
S0116
S0116
HWPump
HWPump
B&G
B&G
HP
N/A
N/A
FLA
N/A
N/A
Volts
N/A
N/A
Ph
N/A
N/A
Quan.
N/A
N/A
Size
N/A
N/A
Filters
Quan
Size
N/A
N/A
N/A
N/A
Heating
Coils
kW
N/A
N/A
N/A
N/A
20.6
20.6
208
208
3
3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Model
Serial
LGB7
LGB7
CP4331910
CP4264210
Motor
Notes:
1 Naturalgasboiler.780,000inputBTU.135.5gpm.
2 [email protected]"impellor.
Belt
N/A
N/A
N/A
N/A
Notes
1
1
2
2
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Appendix1EquipmentList:
ScheduleBOrangeParkCampusDBuilding
92826371A
HP
15.0
Motor
FLA Volts
18.8 480
Ph
3
Quan.
2
CSI50SH10X10FCCL1
920826471B
5.0
6.2
480
B52
XD1207
SRC6328023
1/6
1/20
1/12
115
115
115
1
1
1
N/A
N/A
N/A
N/A
N/A
N/A
Tag
Location
Description
Maker
Model
Serial
AHU1
MechRm
AirHandler
York
CSI270SV22X0FCCL1
AHU2
Mezz
AirHandler
York
EF1
EF2
EF3
Restroom ExhaustFan
D14
ExhaustFan CentriMaster
D9
ExhaustFan
Notes:
1 Directdriveexhaustfan
3/9/2016
Page1of10
Belt
Size
B55
Filters
Heating
Quan
20
2
2
Size
20x20x2
16x20x2
16x25x2
Coils
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
kW
67
Notes
6.5
N/A
N/A
N/A
1
1
1
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Appendix1EquipmentList:
ScheduleBOrangeParkCampusEBuilding
Tag
Location
Description
Maker
Model
Serial
Chiller1
Chiller2
CT1
CT2
MechRm
MechRm
Outdoors
Outdoors
Chiller
Chiller
CoolingTower
CoolingTower
York
York
BAC
Evapco
YKGKGLP9CTF
YTG1A2C3CKJ
15385
AT9BI1
KOR028
DLR027
U070051702
T030835
ChillerRm
ChillerRm
ChillerRm
FanCoil
FanCoil
ExhuastFan
Firstco
Firstco
LorenCook
36SHW6D
36SHW6D
SDB120
N06A292631
RDM800
ChillerRm
Refrig.Monitor
Bacharach
RDM800
810407500
3/9/2016
Page2of10
Motor
HP
FLA Volts
503 565.0 460
351 380 460
20 29.8 480
30 34.0 460
Ph
3
3
3
3
3/4 13.7
3/4 13.7
1/3
1
1
1
Notes:
1 R134Arefrigerant.
2 R123refrigerant.
3 Dedicatedrefrigerantpurgefanservingthechillerplant.Itisnormallynotenergized.Periodictestingisrequired.
115
115
120
Belt
Filters
Quan.
Size
Quan
Size
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
3RB115 N/A
N/A
1
48154 N/A
N/A
1
1
1
B34
B34
4L390
2
2
N/A
16x16x1
16x16x1
N/A
Heating
Coils kW
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A
N/A
Notes
1
2
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
AHU11 1stFlrE
AHU12 1stFlrW
AHU21 2ndFlrE
AHU22 2ndFlrW
RF1
MechRm
RF2
MechRm
AirHandler
AirHandler
AirHandler
AirHandler
ReturnFan
ReturnFan
York
York
York
York
Cook
Cook
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
CMKPlastics
CMKPlastics
Cook
Cook
EF1
EF2
EF3
EF4
Roof
Roof
Roof
Roof
Notes:
1 FiltersassociatedwithAHU11:
316x20x2
316x20x4
320x20x2
320x20x4
120x24x2
120x24x4
124x24x2
124x24x4
2 FiltersassociatedwithAHU12:
316x20x2
316x20x4
320x20x2
320x20x4
120x24x2
120x24x4
124x24x2
124x24x4
3 FiltersassociatedwithAHU21:
1220x24x2
1220x24x4
420x20x2
420x20x4
312x24x2
312x24x4
112x20x2
112x20x4
Appendix1EquipmentList:
ScheduleBOrangeParkCampusHealthSciences
Model
Serial
AXJTFSW3000
AXJTFSW3000
150150C3B
135ACE135C3B
CFM/PCM12200
CFM/PCM12200
HP
XTI48x072FALA046A CASMXT0115
15
XTI045x072FALA046A CASMXT0122
15
XTI102x102FAPA046A CBSMXT0325
30
XTI042x072FALA046A CASMXT0124
15
150SON150SONB 049S93003200/5/0 1/4
150SON150SONB 049S94003200/5/0 1/4
049S03003200/0000701
049S03003200/0001801
3/9/2016
Page3of10
Motor
FLA Volts
20.5 460
20.3 460
36.0 460
20.3 460
6.4 115
6.4 115
Ph
3
3
3
3
1
1
Quan.
2
2
2
2
1
1
460
460
115
115
3
3
1
1
N/A
N/A
1
1
20
20
1/4
1/4
4 FiltersassociatedwithAHU22:
816x20x2
5 RF2servesAHU11.
6 RF2servesAHU12.
816x20x4
Belt
Size
BX43
BX50
BX84
A47
A43
A43
N/A
N/A
4L230
4L220
Filters
Quan
Size
[Note1]
[Note2]
[Note3]
[Note4]
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Heating
Notes
Coils kW
23
30
14
200
N/A N/A
5
N/A N/A
6
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Appendix1EquipmentList:
ScheduleBOrangeParkCampusLRC
Location
Description
Maker
Model
Serial
AHU2 Men'sRm
AHU1 Men'sRm
AHULOA S.Mech
AirHandler
AirHandler
AirHandler
Carrier
Carrier
Carrier
39BA060B12
39ED11
39ED13
881737896
1888T08304
1888T08395
BCUL111
BCUL112
BCUL113
BCUL114
BCUL116
BCUL121
L111
L112
L113
L114
L116
L121
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
Carrier
Carrier
Carrier
Carrier
Carrier
Carrier
42BH12
42BH12
42BH12
42BH12
42BH12
42BH12
EFL1
EFL08
Men'sRm
L08
ExhaustFan
ExhaustFan
Cook
Cook
Gemini615
Gemini415
Notes:
3/9/2016
Page4of10
Motor
FLA Volts
460
3.0 460
6.2 460
Ph
3
3
3
Quan.
1
1
1
1/2
1/2
1/2
1/2
1/2
1/2
115
115
115
115
115
115
1
1
1
1
1
1
1
1
1
1
1
1
A29
A29
A29
A29
A29
A29
1
1
1
1
1
1
16x16x1
16x16x1
16x16x1
16x16x1
16x16x1
16x16x1
1/4
35W
115
115
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
HP
3/4
Belt
Size
A55
B35
A33
Filters
Heating
Notes
Quan
Size
Coils kW
2
20x25x2
10
3
24x24x2
30
3
24x24x2
8
6
8
8
8
8
N/A
N/A
N/A
N/A
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Appendix1EquipmentList:
ScheduleBOrangeParkCampusTBuilding
HP
Motor
FLA Volts
Ph
Quan.
25
29.4
480
PKA24A
PKA24A
0.33
0.33
208
208
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Mitsubishi
Mitsubishi
PUY24
PUY24
14
14
208
208
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
ExhaustFan
Greenheck
SQ95D
1/8
1.7
115
N/A
N/A
N/A
N/A
N/A
N/A
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
VAVw/Reheat
FirstC
Titus
Titus
Titus
Titus
Titus
Titus
Titus
Titus
Titus
Titus
Titus
Titus
DESV14
DESV14
DESV14
DESV05
DESV16
DESV12
DESV12
DESV12
DESV10
DESV06
DESV06
DESV06
DESV08
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3
3
3
1
3
2
2
2
2
1
1
1
N/A
11
11
11
1.5
12
9
9
8
6
2
1.5
2
N/A
Tag
Location
Description
Maker
Model
Serial
AHUT1
MechRm
AirHandler
York
XTI90X72KANA046A
CFYMXT0217
AC1
AC2
MechRm
T103
SplitSystem
SplitSystem
Mitsubishi
Mitsubishi
CU1
CU2
Outdoors
Outdoors
Condenser
Condenser
EFT1
RestRms
VAVT11
T116
VAVT12
T115
VAVT13
T114
VAVT14
T112
T120
VAVT15
VAVT16
T105
VAVT17
T104
VAVT18
T102
T106
VAVT19
VAVT110 T101E
VAVT111 T101D
VAVT112 T101A
VAVT113 MechRm
3/9/2016
Page5of10
Notes:
1 VAVheatingcoilsonlytobecoveredundermaintenancecontract.
2 CondenserunitratingisRLAratherthanFLA.
3 BiPolarionizationequipmentshallbeincludedincontract
127560291202
Belt
Size
Filters
Heating
Notes
Quan
Size
Coils kW
12 20x20x2
5VX470
3
12 20x20x4
2
2
1
1
1
1
1
1
1
1
1
1
1
1
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Appendix1EquipmentList:
ScheduleBOrangeParkCampusThrasher
3/9/2016
Page6of10
HP
Motor
FLA Volts
Ph
Quan.
MCCA100
40
51.0
460
5VX1030
Trane
MCCB021
10
13.3
460
5VX710
AirHandler
Trane
MCCB006
2.8
460
BX44
MechRm
AirHandler
Trane
MCCB017
7.5
9.6
460
5VX560
AHU5
AHU6
AHU7
AHU8
AHU9
AHU10
AHU11
AHU12
AHU13
AHU14
AHU15
AHU16
AHU17
AHU18
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
MechRm
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
AirHandler
MagicAire
Trane
MagicAire
MagicAire
MagicAire
MagicAire
MagicAire
MagicAire
MagicAire
MagicAire
MagicAire
MagicAire
MagicAire
MagicAire
60BVWB
MCCB010
24HBAW4
90BVW
90BVW
90BVW
90BVW
120BVW
60BVWB
60BVWB
48BVWB
48BVWB
60BVWB
90BVWBXVA
1.5
5
0.25
1
1
1.5
1.5
2
0.75
0.75
0.75
0.75
1
1
2.8
7.0
2.6
1.9
1.9
2.8
2.8
3.0
1.5
1.5
1.5
1.5
1.9
1.9
460
460
230
460
460
460
460
460
460
460
460
460
460
460
3
3
1
3
3
3
3
3
3
3
3
3
3
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EF1
EF2
EF3
EF4
EF5
EF6
EF7
EF8
EF9
EF10
EF11
EF12
EF13
EF14
EF15
EF16
EF17
EF18
EF19
EF20
EF21
EF22
G149
G148
G145
G
G135
G
G142
G141
G
G
G123
G127
G124
G
G125
G181
G178
G179
G196
G195
G104
G105
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
GC160
GC160
GC160
GC160
GC160
GC160
GC160
GC160
GC420
GC420
GC140
GC140
GC160
GC160
GC140
GC140
GC620
GC620
GC140
GC140
GC180
GC740
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.5
1.5
0.6
0.6
1.7
1.7
0.6
0.6
4.3
4.3
0.6
0.6
2.7
3.6
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
1220
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Tag
Location
Description
Maker
Model
AHU1
MechRm
AirHandler
Trane
AHU2
MechRm
AirHandler
AHU3
MechRm
AHU4
Serial
1/23
1/23
1/12
1/12
1/4
Belt
Size
Filters
Heating
Size
20x20x2
20x25x2
16x20x2
16x25x2
16x20x2
16x20x2
16x25x2
16x25x2
20x25x2
16X25X2
16X25X2
16X25X2
16X25X2
16X25X2
16X25X2
16X25X2
16X25X2
22X22X2
22X22X2
16X25X2
16X24X2
Coils
A44
BX38
A37
B57
B57
B58
B60
B61
A44
A43
A44
A44
A44
B57
Quan
8
40
4
8
4
8
4
2
4
1
3
3
3
3
3
2
2
1
1
2
3
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
kW
119
30
17
40
5
9
1.5
9
7.5
9
7
12
7
5
4
4
7
5
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Notes
1
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
EF23
EF24
EF25
EF26
EF27
EF28
EF29
EF30
EF31
EF32
EF33
G110
G110
LM213
LM204
LM204
LM212
LM212
LM309
G208
G220
G221
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
Cook
GC740
GC740
GC140
GC420
GC420
GC420
GC420
GC140
GC140
GC420
GC420
Notes:
1 AHU#1isequippedwithastandby40H.P.motor.
Appendix1EquipmentList:
ScheduleBOrangeParkCampusThrasher
Serial
HP
1/4
1/4
1/23
1/23
1/23
1/23
1/23
1/23
Motor
FLA Volts
3.6 1220
3.6 1220
0.6 120
1.5 120
1.5 120
1.5 120
1.5 120
0.6 120
0.6 120
1.5 120
1.5 120
Ph
1
1
1
1
1
1
1
1
1
1
1
Belt
Quan.
Size
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
DirectDrive
3/9/2016
Page7of10
Filters
Quan
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Heating
Size
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Coils
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
kW
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Notes
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Appendix1EquipmentList:
ScheduleBOrangeParkCampusViking
Model
Serial
3/9/2016
Page8of10
Motor
HP
FLA
Volts
Ph
Belt
Quan.
Size
Filters
Quan
6
4
2
2
Heating
Size
Coils kW
16x20x2
3
34
20x25x2
16x25x2
3
18
20x25x2
Notes
3
AHUV1
Mezz
AirHandler
Carrier
39MNID0215EQ33XFS
2412U26036
71/2 9.7
460
B45
AHUVOA
Mezz
AirHandler
Carrier
39MN03D0215ER23XES
2412U26038
3.9
460
A28
BCUV002
BCUV006
BCUV011
BCUV12
BCUV20
BCUV22
V102
V106
V111
V112
Mezzanine
Mezzanine
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
FirstCompany
FirstCompany
FirstCompany
FirstCompany
FirstCompany
FirstCompany
48SHW6
24SWH6
36SHW6
24SHW6B
60SHW6D
24SWH6
V05B266982
V05B263884
V05B263817
V05B263884
V05B266982
V05B263882
3/4 11.4
1/3 6.6
1/2 8.7
1/3 6.7
3/4 11.4
1/3 6.6
115
115
115
115
115
115
1
1
1
1
1
1
1
1
1
1
1
1
5L430
5L350
5l360
5L350
5L430
5L350
2
1
2
1
2
1
16x20x1
16x25x1
16x16x1
16x25x1
20x20x1
16X25X1
2
2
2
2
3
2
13
6
10
7
15
6
3
3
3
3
3
3
AC1
AC2
Mezzanine
Mezzanine
DX
DX
Carrier
Carrier
40GXQ024
40GXQ024
1111V01788
1111V01815
0.41
0.41
208
208
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1,2
1,2,
EFV1
EFV12
EFV13
EFV26
EFV27
Mezzanine
V112
V113
Toilet
Toilet
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
Cook
Cook
Cook
Cook
Cook
Gemini820
Gemini415
Gemini610
Gemini415
Gemini415
115
115
115
115
115
1
1
1
1
1
1
N/A
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Notes:
1 Beltsizestobedeterminedinthefield.
2 Filtersizesandquantitiestobedeterminedinthefield.
3 BiPolarionizationequipmentshallbeincludedinthecontract.
1/3
35W
1/12
35W
35W
0.4
0.4
N/A
N/A
N/A
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Appendix1EquipmentList:
ScheduleBOrangeParkCampusXBuilding
Location
Description
Maker
Model
Serial
SCHWP1 PumpRm
SCHWP2 PumpRm
CHLR1CWP1 PumpRm
CHLR1CWP2 PumpRm
CHLR2CWP1 PumpRm
CHLR2CWP2 PumpRm
CHLR1CHWP1 PumpRm
CHLR2CHWP2 PumpRm
CHLR2CHWP2A PumpRm
CHWPump
CHWPump
CWPump
CWPump
CWPump
CWPump
CHWPump
CHWPump
CHWPump
B&G
B&G
B&G
B&G
TACO
TACO
B&G
B&G
B&G
VSC6x8x13.5_RHR
VSC6x8x13.5_RHR
1510BFE12.258GS
1510BFE12.258GS
FI5009E2HAJ1L0A
FI5009E2HAJ1L0A
1510BF8.375G3C
1510BF7.755BC
1510BF
C04119601F70
C04119602F70
C04119301F70
C04119302F70
2724227/34
2724227/34
C04119501E70
C04119401E70
C15289303G21
Notes:
1 SCHWP1PumpData:
MotorData:
Type:
HP: 125
FLA: 140
Size: VSXVSC13.1256x8x13.5_RHR
GPM: 2400
Volts: 460
Head: 140
Hz: 60
Ph: 3
Rpm: 1780
Frame: 405TS
2 SCHWP2PumpData:
MotorData:
Type:
HP: 125
Size: VSXVSC13.1256x8x13.5_RHR
FLA: 140
GPM: 2400
Volts: 460
Head: 140
Hz: 60
Ph: 3
Rpm: 1780
Frame: 405TS
5 CHLR2CWP1PumpData: MotorData:
Type:
HP: 15
Size:
FLA: 20.3
GPM: 800
Volts: 460
Head: 45
Hz: 60
Ph: 3
rpm: 1760
Frame: 254T
7 CHLR1CHWP1PumpData MotorData:
Type:
HP: 40
Size: 1510BF8.375G3C
FLA: 50
GPM: 1680
Volts: 460
Head: 30
Hz: 60
Ph: 3
rrm: 1185
Frame: 364T
Motor
HP
FLA Volts
125 140.0 460
125 140.0 460
40 50.0 460
40 50.0 460
15 20.3 460
15 20.3 460
30 35.4 460
30 35.4 460
15 18.5 460
3/9/2016
Page9of10
Ph
3
3
3
3
3
3
3
3
3
Quan.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Belt
Size
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Filters
Quan
Size
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3 CHLR1CWP1PumpData: MotorData:
Type:
HP: 40
Size: 1510BFE12.258GS
FLA: 50
GPM: 2100
Volts: 460
Head: 50
Hz: 60
Ph: 3
Rpm: 1185
Frame: 364T
4 CHLR1CWP1PumpData: MotorData:
Type:
HP: 40
Size: 1510BFE12.258GS
FLA: 50
GPM: 2100
Volts: 460
Head: 50
Hz: 60
Ph: 3
Rpm: 1185
Frame: 364T
6 CHLR2CWP2PumpData:
MotorData:
Type:
HP: 15
Size:
FLA: 20.3
GPM: 800
Volts: 460
Head: 45
Hz: 60
Ph: 3
Rpm: 1760
Frame: 254T
8 CHLR2CHWP2PumpData:
MotorData:
Type:
HP: 15
Size: BF7.755BC
FLA: 50
GPM: 720
Volts: 460
Head: 45
Hz: 60
Ph: 3
rrm: 1185
Frame: 364T
Heating
Notes
Coils kW
N/A N/A
1
N/A N/A
2
N/A N/A
3
N/A N/A
4
5
N/A N/A
6
N/A N/A
7
N/A N/A
8
N/A N/A
9
N/A N/A
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Appendix1EquipmentList:
ScheduleBOrangeParkCampusXBuilding
Maker
9 CHLR2CHWP2APumpDatMotorData:
Type:
HP:
1510BF
Size:
FLA:
GPM:
Volts:
Head:
Hz:
Ph:
rrm:
Frame:
Model
15
18.5
460
60
3
1760
254T
Serial
HP
Motor
FLA Volts
3/9/2016
Page10of10
Ph
Quan.
Belt
Size
Filters
Quan
Size
Heating
Notes
Coils kW
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
3/9/2016
Page1of8
Appendix1EquipmentList:
ScheduleCSt.AugustineCampusAdmin
Tag
Location
Description
Maker
Model
Serial
AHUA0
A128
AirHandler
DunhamBush
HCL03MF4434401
4434401A95D
AHUA1
A121
AirHandler
DunhamBush
HCS08LF4436502
4436502A95D
EFA1
EF
EF
A121
A100
A102
ExhaustFan
ExhaustFan
ExhaustFan
LorenCook
90SQI
BCUA08
BCUA09
BCUA12
BCUA16
BCUA17
BCUA27
A107
Corridor
Corridor
A116
Corridor
Corridor
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
24BHW6A
24BHW6A
24BHW6A
24BHW6A
36BHW6A
24BHW6A
VAV01
VAV014
VAV020
VAV021
A101
Mezz
Mezz
Mezz
VAV
VAV
VAV
VAV
Carnes
Carnes
Carnes
Carnes
ASEDL42NS1NT6YM
ASEDL12NS1NT6YM
ASEDL12NS1NT6YM
ASEDL12NS1NT6YM
Motor
FLA Volts
Ph
Quan.
4.4
460
B37
4.4
460
A54
115
115
115
1
1
1
1
Direct
Direct
AP32
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
HP
1/6
1/20
1/20
950216800
950321927
950321893
950321892
950321914
950112636
Belt
Size
Filters
Quan
Size
1
12X24X2
1
24X24X2
2
16X25X2
2
16X20X2
Heating
Coils Volts kW
N/A
N/A
N/A
480
12
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1/4
1/3
1/4
1/4
1/3
1/4
4.9
6.0
4.9
4.9
6.0
4.9
115
115
115
115
115
115
1
1
1
1
1
1
1
1
1
1
1
1
4L390
4L410
4L390
4L390
4L420
4L390
1
1
1
1
1
1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
480
480
480
480
480
480
2
7
4
5
7
3
1/4
1/6
1/6
1/6
1.7
1.0
1.0
1.0
277
277
277
277
1
1
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
1034X277/8X1
480
480
480
480
12
4
3
3
Notes:
1 AHUiscontrolledbyanABBvariablefrequencydrive(Model:ACH401600432,Serial:2032500854).
1034X277/8X1
1034X277/8X1
1034X277/8X1
Notes
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
AHUC0
Mezz
AirHandler
DunhamBush
HCL14MF4434407
AHUC1
AHUC2
Mezz
Mezz
AirHandler
AirHandler
DuhamBush
DuhamBush
HC503LF4436504
HC503LF4436504
Mezz
ExhaustFan
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BCUC01
BCUC02
BCUC05
BCUC09
BCUC12
BCUC15
BCUC28
BCUC31
BCUC32
BCUC33
BCUC34
BCUC36
BCUC41
BCUC44
Notes:
Motor
FLA Volts
Ph
Quan.
4434407A95D 7 1/2
9.3
460
BX61
4436504A95D
4436504B95D
2.9
2.9
460
460
3
3
1
1
B29
B30
Filters
Heating
Quan
Size
Coils Volts kW
3
12X24X2
480
60
3
24X24X2
1
21X21X1
480
8
1
21X21X1
480
8
115
1A39
N/A
N/A
115
115
115
115
115
115
115
115
115
115
115
115
115
115
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4L390
4L390
4L420
4L430
4L390
4L390
4L380
4L380
4L390
4L390
4L390
4L390
4L390
4L410
1
1
1
1
1
1
1
1
1
1
1
1
1
1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
Serial
135SQ5
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
3/9/2016
Page2of8
Appendix1EquipmentList:
ScheduleCSt.AugustineCampusCBuilding
36BHW6A
36BHW6A
36BHW6A
36BHW6A
36BHW6A
36BHW6A
36BHW6A
36BHW6A
36BHW6A
36BHW6A
36BHW6A
24BHW6A
36BHW6A
36BHW6A
HP
2
2
1/4
950631987
950632036
950632039
950632037
950631986
950631984
950631988
950632047
950632035
950631988
950632034
950321928
950632049
950632045
1/3
1/3
1/3
1/3
1/3
1/3
1/3
1/3
1/3
1/3
1/3
0.21/35
1/3
1/3
5.9
5.9
5.9
5.9
6.7
5.9
5.9
5.9
5.9
5.9
5.9
6.0
5.9
5.9
Belt
Size
N/A
N/A
N/A
480
480
480
480
480
480
480
480
480
480
480
480
480
480
6
7
6
6
7
7
7
7
15
7
7
6
7
7
Notes
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
AHU1
AHU2
AHU3
AHU4
AHU5
AHU6
AHU7
AHU8
AHU9
AHU10
AHU11
AHU12
AHU13
AHU14
AHU15
AHU16
AHU17
AHU18
Lobby
J101
J106
J109
J109
J110
J149B
J114
J115
J121
J125
J131
J132
J145
J149A
J114
J131
J132
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
AirHander
SplitSysAHU
SplitSysAHU
SplitSysAHU
SplitSysAHU
York
York
York
York
York
York
York
York
York
York
York
York
York
York
York
York
York
York
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN2_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
CS_H_FAN1_R
KE34180A33A
K4EU090A33A
N1AHB1246A
N1AHD2046A
OAU1
Outdoors
Energy
RecoveryUnit
Greenheck
ERCH4S30LCW1601
1395673614L
CU1
CU2
CU3
CU4
CU5
Outdoors
Outdoors
Outdoors
Outdoors
Outdoors
Condenser
Condenser
Condenser
Condenser
Condenser
Carrier
York
York
York
York
38QR018C331
H1CE150A46C
EA090C00A4AAA1A
H4DB036S46A
H4DB06046A
1403X64977
(S)NBMM915243
NOC9626891
WMLM015463
WMLM015322
Notes:
1 Filtersizeandquantitytobedetermineinfield.
3/9/2016
Page3of8
Appendix1EquipmentList:
ScheduleCSt.AugustineCampusCriminalJustice
Serial
HP
1
3/4
1
3/4
3/4
3/4
2
1 1/2
1/2
3/4
3/4
3/4
1
3/4
NBM500085 3
(S)NMBS000873 1 1/2
1/2
XBMS039129
3/4
XBMS039255
5
5
Motor
FLA Volts
1.6
460
1.5
460
1.6
460
1.5
460
1.5
460
1.5
460
2.8
460
2.1
460
1.1
460
1.5
460
1.5
460
1.5
460
1.6
460
1.5
460
4.8 460Q
2.6
460
1.6
460
2.4
460
Ph
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Quan.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
6.6
6.6
480
480
3
3
10.50 460
13.6 460
16.0 460
6.6
460
8.8
460
1
3
3
3
3
N/A
N/A
N/A
N/A
N/A
Belt
Size
A40
A41
A42
A38
A37
A37
A42
A42
A37
A37
A37
A37
A41
A37
A57
A36
Filters
Heating
Quan
Size
Coils Volts kW
1
480 11.5
16X25X2
1
480
6.5
16X25X2
1
480
5
16X25X2
1
480
5
16X25X2
1
480
4.5
16X25X2
1
480
5
16X25X2
1
480 17.5
16X25X2
1
21X21X1
480
7
480
3
1
21X21X1
1
480
4.5
21X21X1
1
480
6
21X21X1
1
480
4.5
21X21X1
1
480
7
16X25X2
1
480 11.5
16X25X2
1
20x20x1 N/A N/A N/A
4
16x25x1 N/A N/A N/A
1
20x20x1 N/A N/A N/A
1
20x20x1 N/A N/A N/A
Natur
460
alGas
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
10
N/A
N/A
N/A
N/A
N/A
Notes
1,SupplySide
1,ExhaustSide
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
HP
Motor
FLA Volts
Ph
Quan.
CFYMXT0216
15
17.7
480
AX40
XTI030X042BAGA046A
CFYMXT0215
4.3
480
5VX460
24SHW6A
24SHW6B
24SHW6A
24SHW6B
24SHW6B
24SHW6B
36SHW6C
36SHW6C
36SHW6C
36SHW6C
V05B263880
V05B263876
V05B263881
V05B263879
V05B263877
V05B263878
V05B263871
V05B263874
V05B263872
V05B263873
1/4
1/3
1/4
3/4
1/3
1/3
3/4
1/2
1/2
1/2
5.3
6.7
5.1
6.7
6.7
6.7
13.2
8.7
8.7
8.7
115
115
115
115
115
115
115
115
115
115
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4L420
B32
4L420
B32
B32
B32
B32
B32
B32
B32
1
1
1
1
1
1
1
1
1
1
21x21x1
21x21x1
21x21x1
21x21x1
21x21x1
21x21x1
21x21x1
21x21x1
21x21x1
21x21x1
9
5
8
8
5
9
15
14
12
12
180R7BPF532
5ADE12BA
180R7BPF528
VKH16A20X
180CPV180CPVCLI
180R7BPF
180R7BPF
5
049S500005006950015
1 3.4/1.5 230/460
1/4
2.3
115
1 3.4/1.5 230/460
3
1
3
3
115
1 3.4/1.5 230/460
1 3.4/1.5 230/460
1/3 4.0
115
1
3
3
1
1
1
1
1
1
1
1
A23
[Note4]
A23
[Note4]
[Note4]
A23
A23
[Note4]
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Tag
Location
Description
Maker
Model
Serial
AHUS0
Mezz
AirHandler
York
XTI045063FALA046A
AHUS1
Mezz
AirHandler
York
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
FirstCompany
FirstCompany
FirstCompany
FirstCompany
FirstCompany
FirstCompany
FirstCompany
FirstCompany
FirstCompany
FirstCompany
BCUS105
S105
BCUS106 Corridor
BCUS109
S109
BCUS114
S114
BCUS116 Corridor
BCUS118
S118
BCUS124
S124
BCUS128
S128
BCUS129
S129
BCUS132
S130
Fan1
Fan2
Fan3
Fan4
Fan5
Fan6
Fan7
Fan8
Fan9
Notes:
1
2
3
4
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
PurgeFan
PurgeFan
PurgeFan
PurgeFan
PurgeFan
PurgeFan
PurgeFan
PurgeFan
RestRooms?
3/9/2016
Page4of8
Appendix1EquipmentList:
ScheduleCSt.AugustineCampusSBuilding
Fantech
Greenheck
Cook
Fantech
AHUiscontrolledbyvariablefrequencydrive.
UVfilterinstalled.
Filterbackedgrille.
Beltsizetobedeterminedinthefield.
049S500005006950014
128644071206
049S989947000000701
049S500005006950013
049S500005006950012
5DDU12CA
Belt
Size
Filters
Heating
Notes
Quan
Size
kW Amps Volts
2
12x24x2
2
2x24x2
5.4
6.5
480
1,2
2
12x24x4
2
24x24x4
2
16X20X2
19.5 23.18 480
1,2
2
16X20X4
10.08
6.7
9.6
9.6
6.2
10.84
18.86
16.86
14.45
14.45
480
480
480
480
480
480
480
480
480
480
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3
3
3
3
3
3
3
3
3
3
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
Serial
AHUL0
Mezz
AirHandler
DunhamBush
HCS08MF4434405
4434405A95D
AHUL1
Mezz
AirHandler
DunhamBush
HCL10LF4436501
4436501A95D
EFL0
Mezz
ExhaustFan
LorenCook
90SQI
BCUL12
BCUL19
BCUL23
BCUL24
BCUL25
BCUL26
BCUL28
BCUL31
BCUL32
L112
L119
L123
L124
L125
L127
L131
L131
L132
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
MagicAir
36BHW6A
24BHW6A
48BHW6A
48BHW6A
60BHW6A
24BHW6A
24BHW6A
48BHW6A
48BHW6A
VAV
VAV
VAV
VAV
VAV
VAV
Carnes
Carnes
Carnes
Carnes
Carnes
Carnes
ASEDL42NS1NT6YM
ASEDL42NS1NT6YM
ASEDL12NS1NT6YM
ASEDL12NS1NT6YM
ASEDL12NS1NT6YM
ASEDL12NS1NT6YM
VAVL02
VAVL05
VAVL06
VAVL14
VAVL21
VAVL23
3/9/2016
Page5of8
Appendix1EquipmentList:
ScheduleCSt.AugustineCampusLRC
Motor
FLA Volts
Ph
Quan.
6.7
460
B36
6.7
460
B58
115
N/A
N/A
N/A
N/A
HP
1/6
950632044
950321894
940898906
940898920
950217568
950112631
950112635
940898016
941106920
Filters
Heating
Notes
Quan
Size
Coils Volts kW
2
12X12X2
480
36
1
2
24X24X2
4
16X20X2
N/A N/A
2
2
16X16X2
N/A
N/A
N/A
1/2
1/3
1/2
1/2
1/2
1/4
1/4
1/2
1/2
8.8
6.0
8.8
8.8
8.8
4.9
4.9
8.8
8.8
115
115
115
115
115
115
115
115
115
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A41
A44
A43
A43
A46
4L390
4L390
A43
A43
2
1
2
2
2
1
1
1
2
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
480
480
480
480
480
480
480
480
480
9
6
12
12
15
3
2
12
12
1/4
1/4
1/6
1/6
1/6
1/6
1.7
1.7
1.0
1.0
1.0
1.0
277
277
277
277
277
277
1
1
1
1
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
1
1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
21X21X1
480
480
480
480
480
480
9
9
5
2
2
2
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Corridor SplitSysAHU
ATTRoom SplitSysAHU
Rheem
Sanyo
RHSLHM3017JA
M290904075
1/4
2.5
208
1
1
Outdoors
Outdoors
Rheem
Sanyo
RANL030JAZ
CO911
7386M230810209
1/6
14.1
8.0
208
208
1
1
N/A
N/A
Condenser
Condenser
Belt
Size
Notes:
1 AHUiscontrolledbyanABBvariablefrequencydrive(Model:ACH501005400P2,Serial:115928).
2 AHUiscontrolledbyanABBvariablefrequencydrive(Model:ACH401600532,Serial:2994400003).
1
1
N/A
N/A
N/A
N/A
N/A
N/A
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
3/9/2016
Page6of8
Appendix1EquipmentList:
ScheduleCSt.AugustineCampusViking
Tag
Location
Description
Maker
Model
Serial
AHUV0
AHUV1
MechRm
Mezz
OAHandler
AirHandler
DunhamBush
DunhamBush
HCL06MF4434402
HCS08LF4436503
4434402A95D
4436503A95D
EFV0
EFV1
Mezz
Mezz
ExhaustFan
ExhaustFan
LorenCook
LorenCook
90SQI
135SQI
BCUV02
BCUV12
BCUV19
BCUV20
OpenArea
V112
Mezz
Mezz
BlowerCoil
BlowerCoil
BlowerCoil
BlowerCoil
MagicAir
MagicAir
MagicAir
MagicAir
24BHW6A
36BHW6A
24BHW6A
24BHW6A
VAV01
VAV03
VAV05
VAV18
OpenArea
OpenArea
OpenArea
V112
VAV
VAV
VAV
VAV
Carnes
Carnes
Carnes
Carnes
ASEDL42ND1NT6YM
ASEDL22NS1NT6YM
ASEDL22NS1NT6YM
ASEDL22NS1NT6YM
SplitSysAHU
Mitsubishi
MSYA15NA
6000740
Condenser
Mitsubishi
MUYA15NA
6003480T
950216778
950632033
950321891
950112629
HP
3
3
Motor
FLA Volts
4.4
460
4.4
460
Ph
3
3
Quan.
1
1
1/6
1/4
115
115
1
1
1
1
AP32
A38
N/A
N/A
N/A
N/A
115
115
115
115
1
1
1
1
1
1
1
1
4L390
38
A37
A37
1
1
1
1
277
277
277
277
1
1
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
0.8
208
N/A
N/A
10.6
208
N/A
N/A
5.0
8.8
6.0
5.0
1/4
1/2
1/3
1/4
1/4
1/4
1/4
1/4
Notes:
1 AHUiscontrolledbyanABBvariablefrequencydrive(Model:ACH501003400P2,Serial:146459).
2 AHUiscontrolledbyaMitsubishivariablefrequencydrive(Model:FRE740060NA,Serial:146459).
3 Filtersizetobedeterminedinthefield.
Belt
Size
B46
AP52
Filters
Heating
Quan
Size
Coils Volts kW
2
24X24X2
480
20
2
[Note3]
N/A N/A
N/A
N/A
N/A
N/A
N/A
21X21X1
21X21X1
21X21X1
21X21X1
480
480
480
480
5
12
7
5
21X21X1
21X21X1
21X21X1
21X21X1
480
480
480
480
15
3
5
5
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Notes
1
2
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Description
Maker
Model
Serial
AHU1
AHU2
AHU3
AHU4
1stFlrS
1stFlrN
2ndFlrS
2ndFlrN
AirHandler
AirHandler
AirHandler
AirHandler
York
York
York
York
XTI057X063FALA046A
XTI057X060FALA046A
XTI057X060FALA046A
XTI057X060FALA046A
CBWMXT0283
CBWMXT0281
CBWMXT0283
CBWMXT0283
ERV1
Roof
EnergyRecovery
Sempco
FV5000H
ERV2
Roof
EnergyRecovery
Sempco
FV5000H
EF1
EF2
EF3
EF4
EF5
EF6
EF7
EF8
EF9
H109D
Roof
Roof
Roof
Roof
Roof
Roof
H116
H116
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
ExhaustFan
Breidert
Breidert
Breidert
Breidert
Breidert
Breidert
Breidert
Breidert
Breidert
FF200S
RED1250S
RED1250S
RED6CS
RED6CS
RED1550S
RED6CS
FF500S
FF200S
Boiler1
Boiler2
1stFlrN
1stFlrN
P1
P2
H120
H120
HWCircPump
HWCircPump
P3
1stFlrN
HHWPump
UH
H120
UnitHeater
Mr.Slim
H113
Evaporator
Mitsubishi
PKAA30KA4
15M00710
AC1
Roof
Condenser
Mitsubishi
PUYA30NHA4
12U02379B
Notes:
1
2
3
4
5
6
HeatingBoiler LochinvarKnightXL
HeatingBoiler LochinvarKnightXL
KBN400
KBN400
1549102302717
3815102009175
ZXM101010A
ZXM101010A
TACO
3/9/2016
Page7of8
Appendix1EquipmentList:
ScheduleCSt.AugustineCampusHealthSciences
CI1506E2HABB8610
HP
15
15
10
10
Motor
FLA Volts
20.3 460
20.3 460
14.0 460
14.0 460
Ph
3
3
3
3
Quan.
2
2
2
2
1/2
3/4
1/2
3/4
460
460
460
460
3
3
3
3
1
1
1
1
1/8
1/3
1/3
1/25
1/25
3/8
1/25
3/16
1/8
115
115
115
115
115
115
115
115
115
1
1
1
1
1
1
1
1
1
Belt
Size
BX50
BX50
BX50
BX50
Filters
Quan
Size
12 24x12x2
12 24x12x2
12 24x12x2
12 20x16x2
Heating
Coils Volts
N/A N/A
N/A N/A
N/A N/A
N/A N/A
kW
N/A
N/A
N/A
N/A
[Note2]
[Note2]
[Note2]
[Note2]
4
N/A
4
N/A
20x16x2
N/A
20x16x2
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Direct
Direct
Direct
Direct
Direct
Direct
Direct
Direct
Direct
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Notes
1
1
1
1
2
2
2
2
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3
3
1/10
1/10
1.4
1.4
115
115
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
4
4
1.4
460
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
HF3315TRP
208
0.4
10.2
208
N/A
N/A
N/A
N/A
N/A
N/A
N/A
0.4/12 208
N/A
N/A
N/A
N/A
N/A
N/A
N/A
AHUisequippedwithaUVsectionforwhichthecontractorisresponsible.Followallrequiredsafetyprocedureswhenservicing
Beltsizetobedeterminedinthefield.
400,000BTU/Hrheatinghotwaterboiler.
Heatinghotwatercirculatingpump.
Heatinghotwaterpump80gpm@25fthead.
ITsplitsystemsusesR410Arefrigerant.
St.JohnsRiverStateCollege
BidNo:BIDSJR032016
BidName:HVACMaintenanceServicesforSt.JohnsRiverStateCollege
Tag
Location
Chiller1 OldPlant
Chiller2 OldPlant
CH3
ChillerRm
3/9/2016
Page8of8
Appendix1EquipmentList:
ScheduleCSt.AugustineCampusMaintenance
Description
Maker
Model
Chiller
Chiller
Chiller
DunhamBush
DunhamBush
Smardt
WCHX12AR
WCHX12AR
SWA1253HG522N
Motor
HP
FLA Volts
4435901A95E
N/A 125.0 480
4435901B95E
N/A 125.0 480
FF0010F078Q0570 N/A 311.0 460
Serial
Ph
3
3
3
Quan.
N/A
N/A
N/A
Belt
Size
N/A
N/A
N/A
Filters
Quan
Size
N/A
N/A
N/A
N/A
N/A
N/A
Heating
Coils Volts
N/A N/A
N/A N/A
N/A N/A
kW
N/A
N/A
N/A
Notes
1,2
1,2
3,4
Pump1
Pump2
PP3
PP4
OldPlant
CHWPump
OldPlant
CHWPump
ChillerRm PrimaryCHW
ChillerRm PrimaryCHW
Armstrong
Armstrong
TACO
TACO
KGEXNA
5RS184AC205B
CI4011E2LAA30060
CI4011E2LAA30060
R337X12M
300252027
EC73871
N/A
5
5
10
10
6.3
6.7
15.5
15.5
480
480
460
460
3
3
3
3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PP1
PP2
ChillerRm SecondaryCHW
ChillerRm SecondaryCHW
TACO
TACO
CI5011
CI5011
Z1002030036
Z1002030031
25
25
30.5
30.5
460
460
3
3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PC1
PC2
PC3
PC4
OldPlant
OldPlant
ChillerRm
ChillerRm
Armstrong
Armstrong
TACO
TACO
4x3x84030
4x3x84030
CI5095E2LAAB7239
CI5095E2LAAB7230
39588
493519
20903031956
20903031971
7 1/2
10.0
9.5
17.7
17.7
480
480
460
460
3
3
3
3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
TowerTech
Evapco
TTMT108219
USS19914
480
460
3
3
N/A
1
N/A
B173
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
MagicAir
Trane
Williams
24BHW6A
BCHC072E1
AH030W2B507R000
115
480
460
1
3
3
1
1
1
A37
A43
A51
1
3
1
24X24X1 N/A
16x20x2 N/A
271/2x23 N/A
N/A
N/A
N/A
N/A
N/A
N/A
CWPump
CWPump
CWPump
CWPump
Tower
Tower
Outdoors CoolingTower
Outdoors CoolingTower
FCU1
FCU1
FCU3
Office
OldPlant
ChillerRm
Notes:
1
2
3
4
BlowerCoil
BlowerCoil
FanCoilUnit
950112628
T04A49322
3443501
7 1/2
15
15
1/4
1 1/2
1 1/2
2.5
2.2
R22Refrigerant
ChillercompressorHP1212NHF6W4K
R134ARefrigerant
Chillercontains3TT400'Turbocor'magneticbearingcompressorsat110ampseach.Compressorareidentifiedas:
093415060
093415080
100485090
5 17x4400multisheavebelt