Install the Cabinet.
Remove lifting eyes from the cabinet top and install two waterproof screws.
TP48200A-D12A1 V300R001
Socket wrench
Quick Installation Guide
Issue: 01
Date: 2011-10-28
Install a fix structure at the cabinet top.
Installing the Cabinet on the Wall
fix structure
NOTE
Remove waterproof screws from the cabinet top and then install lifting eyes.
The outputs of the TP48200A can be customized. The picture is for reference only.
Waterproof screw
Cabinet Appearance
NOTE
lifting eye
1.The Weight of theTP48200A: 200 kg (441 lb) (excluding the weight of the PSU and storage batteries) .
2. Cabinet dimensions (height x width x depth) : 1200 mm x 600 mm x 700 mm (47.24 in. x 23.62 in. x 27.56 in.)
3. Dimensions of the chassis (height x width x depth) : 100 mm 600 mm 700 mm (3.94 in. x 23.62 in. x 27.56 in.)
Cabinet
Place the making-off plate on the wall and mark
installation holes by the marker pen.
Install expansion bolts.
Installing Batteries and the Battery Temperature Sensor
Fan unit
Socket wrench
Install the battery Temperature sensor on the
battery terminal.
Installing batteries, pay attention to the positive and negative
pole of the battery. Then connecting cables.
Wall
Power monitor unit (PMU)
PSU
Marker pen
Bolt
Spring washer
Flat washer
16mm
(0.63 in.)
Marking-off plate
52mm~60mm
(2.05 in. ~2.36 in.)
Expansion sleeve
Power distribution unit
M12 x 60 (4pcs)
Installation hole
Front
(Optional) Installing PSUs
Install the wall-mounted bracket.
lift and install the cabinet.
The TP48200A is configured with two PSUs by default. The rated output current of each PSU is 50 A. The number of PSUs
depends on actual capacity requirements for the TP48200A.
Ground busbar
Wall
Cabinet
Heater
Battery temperature sensor
leading-out hole
Wall-mounted bracket
Installing Cables
Installing the Cabinet on the Ground
Cable
Cable Diameter and Color
(g1) Ground cable
Cross-sectional area: 25 mm2 (0.04 in.2)
Color: yellow and green cable
(s1) Dry contact, sensor signal cable
Not provided
(s2) RS485, RS232 or fast Ethernet (FE) cable
Not provided
(d1) DC Power cable to the primary load
Not provided
(d2) DC Power cable to the secondary load
Not provided
(d3) DC Power cable to storage batteries
Cross-sectional area: 25 mm2 (0.04 in.2)
Color: black cable and red cable
(a1) AC input power cable
Single-phase: 220 V
Cross-sectional area: 25 mm2 (0.04 in. 2)
Color: black jacket; brown and blue core wires (two core wires with
equal cross-sectional areas)
Open the cabinet door, remove the cover inside the cabinet, and then, secure the cabinet with six screws.
Installing expansion bolts.
Fix the installation hole
Wall or platform edge
Socket wrench
Ground
60mm
(2.36 in.)
606.6mm
(23.88 in.)
16mm
(0.63 in.)
52mm~60mm
(2.05 in. ~2.36 in.)
Bolt
Spring washer
Flat washer
Cover
Expansion sleeve
M12 x 60 (4pcs)
540mm(21.26 in.)
Front
Installation hole
Connect cables in the following sequence: g1s1 , s2 d1 , d2 d3 a1.
CAUTION
NOTE
1. Before installation, Switch all circuit breakers to the OFF position and flip the battery switch to the Normal position.
(The battery circuit breakers must be both OFF.
2. Before installing Power cables for storage batteries , remove one copper bar from each battery string.
3. Do not reverse the L and N conductors or the SPD will be damaged.
4. Do not bind the ground cable, AC power cables, DC power cables, signal cables, and communications cable together.
(Optional) Installing Dry Contact, Sensor and SPD Signal Cables
1.Press the white contact plates slightly using a flat-head screwdriver. Then, insert the two wires on the other end of the
signal cable into the corresponding ports, and pull out the screwdriver to fasten the dry contact signal cable.
Second-Level Menu
Third-Level Menu
Settings
System Settings
Date
2001-01-01
Time
00:00
IP Address
192.168.0.1
Subnet Mask
255.255.254.0
White
Contact
plate
S1,S2
Circuit breaker
of the heater
Circuit breaker
of the Socket
Main Menu
Gateway
Batt Settings
Dry contact
Batt Selection
2. Connect the sensor cable and SPD signal cable to the corresponding ports on the monitoring user interface module.
Installing the FE Cable
Connect the COM_ 485/232 port on the UIM to the communications equipment over a cable with an RJ45 connector.
Maintenance
socket
Forth-Level Menu
Default Value
10.70.199.1
Batt string
Cap 1
400 Ah
Cap 2
0 Ah
Powering On the TP48200A
CAUTION
a1
Verifying the Installation
L
SN
d1
Battery circuit
breakers
Check Item
To avoid damaging storage batteries, connect mains to the TP48200A only after correctly setting the storage battery
parameters on the PMU.
Check whether the voltage between the RTN+ busbar and the -48 V copper bar are the same as the storage battery
voltage and the voltage displayed on the monitoring unit. If not, ask professionals to rectify the fault.
The TP48200A is installed properly on the rack and the cables are connected properly. (Cables fastened
by screws are not easily removable.)
Cables are arranged neatly and bound properly by using cable ties.
The storage battery is connected properly.
Take fireproof clay out of the package box that accommodates the base of the cabinet, and then seal the
cabling holes using the fireproof clay. After that, insert rubber stoppers into the idle cabling holes.
Switch the LLVD and BLVD branches to the ON positions , Measure whether the voltage between RTN+ and the 48 V
check points. The voltage must range from 43.2 V to 57.6 V. The rated voltage is 53.5 V. Check whether the loads work
normally. If the loads work abnormally, rectify the fault according to the relevant user guides.
Check for short circuits between live wires, between the live wires and the ground cable, between the live
wires and the neutral wire, between the RTN+ and the 48 V copper bar. Rectify short circuits before
powering on the TP48200A.
Switch the circuit breakers for the Maintenance socket, AC input, battery route, primary load, and secondary load as required.
d2
Switch the AC input circuit breaker to the ON position, measure the voltage between the live wiring and the N wiring
terminal. The voltage must range from 210 V to 230 V. The rated voltage is 220 V.
Check that the battery switch is in the Normal position.
g1
d3
d3
Sensor
Element
management
system (EMS)
Switch the fan runs normally without abnormal noises in the cabinet.
Powering On and Commissioning the TP48200A
ACDB
s1,s2
a1
d2
d1
Secondary load
Site ground bar
Primary load
Port Type
Silkscreen
Description
Sensor port
TEM_HUM
Port for detecting the ambient humidity/temperature
WATER
Port for detecting water immersion
TEM_BAT
Port for detecting battery temperature
GATE
Port for detecting the door status
SMOKE
Port for detecting smoke
AIN
Port for detecting the standby analog value (0 V to 5 V)
DIN1
Input port 1 for Boolean value
DIN2
Input port 2 for Boolean value
DIN3
Input port 7 for Boolean value
Status1
Port 1 for detecting the D.G. status
Status2
Input port 6 for Boolean value
ALM1
Port for detecting the AC power failure alarm
ALM2
Port for detecting the DC undervoltage alarm
ALM3
PSU fault
ALM4
SPD failure alarm
ALM5
Fuse burn-out alarm
ALM6
Temperature control unit fault
AC_SPD
Port for detecting the AC SPD alarm
DC_SPD
Port for detecting the DC SPD alarm
COM_485/232
Port for communicating with the main equipment
Dry contact output
port
SPD detection port
Communications port
Observe the operation of the power system for 15 minutes. If no alarms are generated, and current/voltage parameters
of the storage battery and loads are set properly, then re-install the cover of the distribution unit, lock the door to the
cabinet, give the key of the cabinet door to the customer, and clean the site before leaving.
Switch the storage battery circuit breakers in the PDU to the ON positions. (The battery circuit breakers must be both ON.
Troubleshooting
NOTE
g1
Boolean value
detection port
Connecting the Battery Route and Setting Parameters on the PMU
Reinstall the removed serial connection copper bar of the storage battery.
Check whether the EMS can receive the information from the power system. If not, check whether the IP address is set
correctly .
If the battery circuit breakers are switched to the ON position but the LCD on the PMU panel remains blank, flip the battery
switch to the BAT ON position. After 2 minutes, flip the battery switch to the Normal position to avoid battery over discharge.
If the battery voltage remains low and the PMU is disconnected again after you flip the battery switch to the Normal position,
flip the battery switch to the BAT ON position for 2 minutes after the systems connects to the mains.
Trouble Symptoms
Cause and Solution
Communication fail
1. Make sure the communication cable is connected successfully.
2. Make sure the communication parameters is set right, for example IP or host
address.
3. Make sure the communication loop between the host and the PMU is normal.
4. After above 3 steps , the trouble still exist, plug the PMU out then Plug in to
restart the PMU
5. After above 4 steps , the trouble still exist, change a new one.
The PMU generator an alarm
Query the real time alarm information or refer to the User Manual.
The PSU is not power on, the
running indicator is off
1. Make sure the AC input circuit breaker is on.
2. Make sure the AC input voltage is in the range of the PSU working space.
3. After above 2 steps, the trouble still exist, plug the PSU out then Plug in to restart
the PSU.
4. After above 3 steps , the trouble still exist, change a new one.
BAT ON
Setting parameters on the PMU.
NOTE
Button
or
Description
Allows you to view menu items and set the value of a menu item by pressing or .
Cancel
Returns to the previous menu without saving the settings of the current menu item.
Enter
Enters the main menu from the standby screen, enters a submenu from the main
menu, or saves the settings of a submenu item.
1. The default customer password is 0 #.
2.The main screen is displayed when the LCD is left unattended for five minutes and no alarm is generated.
The screen goes dark when the LCD is left unattended for eight minutes.
HUAWEI TECHNOLOGIES CO., LTD.
1. Set the system type as TP48200A.
2. Set the number of battery string, capacity, Install Date, time, date to actual conditions.
3. If the customer requires in-band NMS management of the power system, and there are more than on power system, please
set device Address.