02 Hidrogeotermalna Elektronska Final PDF
02 Hidrogeotermalna Elektronska Final PDF
02 Hidrogeotermalna Elektronska Final PDF
IZGRADNJA POSTROJENJA I
PROIZVODNJA ELEKTRINE/TOPLOTNE
ENERGIJE IZ HIDROGEOTERMALNIH IZVORA
U REPUBLICI SRBIJI VODI ZA INVESTITORE
Dr Branislava Lepoti Kovaevi, dipl.prav.
Stanislav Milosavljevi, dipl.rud.in.
Bojan Lazarevi, dipl.el.in.
ENGLISH
SERBIAN
Introduction
Energy from Geothermal Resources
Hydrogeothermal Energy
Power Plants for Electricity/Heat Generation from Hydrogeothermal Sources
Investors Rights
Relevant Legislation
Competent Institutions
From an Idea to Exploitation
7
7
8
8
9
9
10
10
11
I-1
I-1
I-1
I-1
I-2
I-2
I-2
I-3
I-4
Geological Surveys
Approval of Geological Surveys
Feasibility Study of Geological Surveys - Contents
Feasibility Study of Ground Water Reserves
Exploitation of Hydrogeothermal Energy
Approval for Exploitation of Mineral Resources
Approval to Carry Out Mining Works
Mining Facilities
Exploitation of Hydrogeothermal Energy
II-1 Location Selection, Perusal of Valid Planning Documents and the Information on Location
13
II-2
14
II-2
14
II-3
15
II-3
15
II-3
16
II-3
16
II-3
17
II-4
17
II-4
18
II-4
18
II-4
19
19
II-4
20 II-4
20 II-4
21
II-5
21
II-5
22 II-5
Energy Permit
Obtaining the Energy Permit
Location Permit
Requirements for Connection to the Electricity/District Heating Network
Forming the Building Plot
Water requirements
Obtaining the Location Permit
Building Permit
Environmental Impact Assessment (1)
Environmental Impact Assessment (2)
Environmental Impact Assessment (3)
Technical Documentation
Water Approval and Technical Supervision of the Design
Construction Permit, Attachments to the Request
Obtaining the Construction Permit
Operating Permit
Construction of a Facility
Technical Inspection and the Operating Permit
24
24
25
25
26
26
27
27
28
28
29
29
30
BACK TO CONTENT
A key activity has been to create definitive guides to the renewable energy
licensing process aimed at encouraging investors and other market actors
to become active in the sector. Representatives of the Ministry of Mining and
Energy, Ministry of Environment and Spatial Planning and Ministry of
Agriculture, Forestry and Water Management together with the GTZ experts
have created four such roadmaps, which explain the licensing process for
developing projects in geothermal water, small hydro power, wind power and
biomass subsectors. The USAID Competitiveness Project has supported
GTZ SLS in the creation of investor roadmaps as part of its activities to
encourage investment in the sector by providing technical assistance to
prospective investors.
Each roadmap is created as a detailed document, which describes administrative
procedures and identifies relevant institutions and necessary planning and
design documents needed for investors. The roadmaps navigate the
legislative and regulatory framework and should be utilized as a baseline for
further legislative and regulatory reform. GTZ SLS has also prepared short
versions of roadmaps, which are executive summaries that investors can use
for fact finding.
We hope that this effort will be a vehicle to facilitate dialogue between the private sector and the Government to identify and address barriers to the growth
and financial viability of the sector.
BACK TO CONTENT
Energy from
Geothermal
Resources
Hydrogeothermal
Energy
Investors
rights
BACK TO CONTENT
Relevant
Legislation
Competent
Institutions
-
-
-
-
-
-
-
-
-
-
From an Idea to
Exploitation
BACK TO CONTENT
BACK TO CONTENT
I-1
Geological
Surveys
I-1
Approval of
Geological
Surveys
Deadline:
30 days
(maximum
60 days)
Approval of the survey (defines
deadlines for commencement
and completion of the survey)
BACK TO CONTENT
I-1
Feasibility
Study of
Geological
Surveys
- Contents -
I-1
Feasibility
Study of
Ground Water
Reserves
BACK TO CONTENT
I-2
Approval for
Exploitation
Exploitation
of Hydrogeothermal
Energy
Approval to Carry
Out Mining Works
EXPLOITATION
PERMIT
Inspection
Certificate for
Mining Facilities
Request for
the Approval
for
Exploitation
Water Permit
I-2
Approval for
Exploitation
of Mineral
Resources
BACK TO CONTENT
I-2
Approval to
Carry out
Mining Works
I-3
Mining
Facilities
BACK TO CONTENT
10
Direct exploitation
I-4
Exploitation
of Hydrogeothermal
Energy
11
BACK TO CONTENT
II
BACK TO CONTENT
12
II-1
No
Yes
II
Location
Selection,
Perusal of
Valid Planning
Documents,
and the
Information
on Location
The information
on location
II-2
Energy
Permit
Construction
feasibility study
ENERGY
PERMIT
Bank statement
showing bank readiness to
support the Investor in
the financing
13
BACK TO CONTENT
II
II-2
Obtaining
the Energy
Permit
Electricity generating
power plant
(Ministry of Mining
and Energy)
> 10 MW
Yes
No
Heat-and-power co-generating
plant(Ministry of Mining and
Energy + a local self-government
unit)
Heat generating
power plant
(a local selfgovernment unit)
Yes
No
Request for the energy
permit (Form O-1)
II-3
Location
Permit
BACK TO CONTENT
Request
for the
energy
permit
(Form
O-10)
14
LOCATION
PERMIT
Requirements
for designing
collected
II-3
Request for the requirements for connection to the system (to the energy entity to
which the producers facility will be connected)
Issuing of the
requirements for connection
Forming the
Building Plot
Deadline: 3 days
Complaint to the city/
town/municipal council
Requirements
for Connection
to the Electricity/District
Heating
Network
II-3
II
The plan is in
accordance with
the valid planning
document
Deadline:
10 days
Yes
The competent
authority verifies the plan
15
BACK TO CONTENT
II
II-3
Water
Requirements
The Request for the Water requirements (to the Ministry of Agriculture,
Forestry and Water Management)
Yes
No
The facility
is in the
territory
of a spa
No
Yes
II-3
Obtaining the
Location
Permit
The Request for the location permit (10 MW, to the Ministry of Environment and Spatial Planning or to the Autonomous Province, <10 MW, to the local self-government unit)
Complete documentation
No, within
8 days
Yes
Checking the planning document (to make certain it contains all the requirements and data for
preparation of the technical documentation)
BACK TO CONTENT
16
Deadline:
30 days
After completing the the technical supervision of the main design and the positive report on a completed technical supervision, the Request for the Building Permit must be submitted
to the competent authority at the local self-government unit
The design
documentation
(the preliminary design,
the main design)
BUILDING
PERMIT
Technical
supervision of
the design
documentation
Power plant
power > 1 MW
Yes
Power plant
power > 50 MW
Yes
The Environmental Impact
Assessment
Study is
mandatory
II
II-4
Building
Permit
The
Environmental
Impact Assessment
Study
II-4
No
No
Environmental
Impact
Assessment
(1)
Notification to
the investor and
to the public
about the
decision
The Environmental
Impact Assessment
Study is required
Deadline: 10 days
17
BACK TO CONTENT
II
II-4
The Environmental
Impact Assessment
Study is required
Environmental
Impact
Assessment
(2)
No
The decision
defines the scope and
contents of the Study
Yes
Deadline: 15 days
Interested members of the public submit an opinion
Deadline: 10 days
Making the
Environmental
Impact Assessment Study
II-4
Environmental
Impact
Assessment
(3)
Deadline: 10 days
Deadline: 7 days
Notification to the interested members of the public
Deadline: 20 days
Public insight, presentation, and public
debate on the study
The report on evaluation of the Environmental Impact Assessment Study and a proposed decision
The decision whether to accept or reject of the Request for the consent
on the Environmental Impact Assessment Study (valid for 2 years within
which time the project owner MUST start the construction)
BACK TO CONTENT
18
Deadline:
10 days
II
Technical
Documentation
Feasibility study with the preliminary design (containing the layout plan)
Feasibility study with the preliminary design (containing the layout plan)
No
Yes
Subject to review (expert supervision) by the committee (the review committee)
Deadline: 30 days
The review committee submits, to the investor, the report containing
measures that must be applied when preparing the Main Design
II-4
Obtaining the approval from the Ministry of Environment and Spatial Planning
on the Main Design
Water
Approval and
Technical
Supervision of
the Design
19
BACK TO CONTENT
II
II-4
Construction
Permit* Attachments
to the
Request
II-4
Technical supervision
of the Main Design
Obtaining the
Construction
Permit
The request for the Construction Permit (10 MW, to the Ministry of Environment
and Spatial Planning or to the Autonomous Province, <10 MW, to the local
self-government unit)
BACK TO CONTENT
20
No, within 8
days
II-5
II
Operating
Permit
As-built
design
OPERATING
PERMIT
Technical
inspection of
the constructed
facility
Water Permit
II-5
No
Construction
of a Facility
Yes
Registration of the commencement of construction of the facility
21
BACK TO CONTENT
II
II-5
As-built design of
the facility
Technical
Inspection
and Operating
Permit
Construction of the
facility
Technical inspection
Yes
BACK TO CONTENT
22
The Operating
Permit
III
23
BACK TO CONTENT
III
III-1
The Right to
Electricity
Generation
- Acquisition
Method
1. Investment in
affiliated companies
of a public
company
or
2. Assigning the
right to engage in
an activity of public
interest
or
3. Granting
concessions
III-1
Assigning the
Engagement
in an Activity
of Public
Interest
BACK TO CONTENT
24
Electricity generation
The Republic activity of public
interest (competence: the
Ministry of Mining and Energy)
Heat generation
A public utility service
(competence: a local
self-government unit)
III
III-1
- Adequate technical prerequisites (the ownership right or the right to use the power
plant, which has been constructed in accordance with the law, technical and other
regulations)
- Staff capacity (that persons working in the power plant have the necessary
qualifications and other prescribed skills)
- Implementation of the prescribed safety at work
- Implementation of the prescribed requirements and method of protection and
improvement of the environment
The Assignment
Agreement Requirements
to be met
III-1
- Operation and business of the economic operator to whom this activity is assigned
- Obligations of the economic operator to provide the conditions for continuous,
proper, and quality needs of the users of products and services
- Mutual rights and obligations of the parties to the Agreement in cases where
economic and other conditions for pursuing the activity of public interest are
not provided
- Rights and obligations in case of a disruption in the economic operators business
operation
- Other rights, obligations and important issues to protect the public interest
The Assignment
Agreement
Assigning the
Activity Contents/
Provisions
25
BACK TO CONTENT
III
III-2
Proposal for
granting a concession
Concession
Concession Agreement
III-2
Concession
- Contents of
a Concession
Agreement
BACK TO CONTENT
- The parties to the Agreement, the subject matter of the concession, including the
description of the facility and equipment
- Duration of the concession period and conditions under which such terms may be
extended
- Manner of and deadlines for securing the funds for financing the concession
business (the financial plan) and the time line of their employment, the amount and
method of providing guarantees for fulfillment of the concessionary obligation
- The requirements for conducting the concessionary business
- Standards of products and services, technology transfer
- Criteria for setting the end-user prices-tariffs for products and services
- The concession fee (the amount, deadlines, conditions, and the method of payment)
- Rights and obligations concerning the undertaking of measures to ensure general
safety, protection of health and protection of the environment as well as liabilities for
compensation of damage caused by jeopardizing general safety and protection of
the environment
- The rights to transfer the concession
- The time and method of handing over the immovables, the facility, equipment or
plants and the condition in which they must be handed over
- Conditions for amendments or termination of the agreement and their consequences,
changed circumstances and force majeure
- The method of settling disputes and enforcement of applicable law, control, etc.
26
III-2
The Assignment
Agreement vs.
Concession Main
Differences
III-3
III
License
- Acquiring
the License
No
Yes
Acquiring the License
is not required
27
BACK TO CONTENT
III
III-4
Approval
for the
Connection to
the Electricity
Network
Electricity
generating power
plant
CHP plant
The decision on approval of the connection (valid for 2 years, appealable within
15 days to the Energy Agency)
III-4
Approval
for the
Connection
to the District
Heating
Network
CHP plant
BACK TO CONTENT
28
III
III-5
The Status of
a Privileged
Producer
Up to 0,2 MW
Co=10,4
from 0,2 MW to 2 MW
Co=10,667-1,333*P
from 2 MW to 10 MW
Co=8,2
from 2 MW to 10 MW
Co=8,5
Electricity
generating power
plant
Heat-and-power
co-generating plant
III-5
Heat generating
power plant
Acquiring
the Status of
a Privileged
Producer
29
BACK TO CONTENT
III
III-6
Power
Purchase
Agreement
BACK TO CONTENT
EPS
30
IZGRADNJA POSTROJENJA I
PROIZVODNJA ELEKTRINE/TOPLOTNE
ENERGIJE IZ HIDROGEOTERMALNIH
IZVORA U REPUBLICI SRBIJI VODI ZA INVESTITORE
32
34
34
34
34
35
35
35
36
Uvodna re
Energija iz geotermalnih izvora
Hidrogeotermalna energija
Elektrane za proizvodnju energije iz hidrogeotermalnih izvora
Prava investitora
Izvori prava
Nadlene institucije
Od ideje do korienja
Osnovni koraci od ideje do korienja (I)
36
37
37
38
38
39
39
40
40
41
43 II-2
44 II-2
44 II-3
45 II-3
45 II-3
46 II-3
46 II-3
47 II-4
47 II-4
48 II-4
48 II-4
49
49 II-4
50 II-4
50 II-4
51
II-5
51
II-5
52 II-5
Energetska dozvola
Pribavljanje energetske dozvole
Lokacijska dozvola
Uslovi za prikljuenje na elektroenergetsku i/ili mreu daljinskog grejanja
Formiranje graevinske parcele
Vodni uslovi
Dobijanje lokacijske dozvole
Graevinska dozvola
Procena uticaja na ivotnu sredinu (1)
Procena uticaja na ivotnu sredinu (2)
Procena uticaja na ivotnu sredinu (3)
Tehnika dokumentacija
Vodna saglasnost i tehnika kontrola projekta
Graevinska dozvola, prilozi uz zahtev
Dobijanje graevinske dozvole
Upotrebna dozvola
Izgradnja objekta
Tehniki pregled i upotrebna dozvola
54
54
55
55
56
56
57
57
58
58
59
59
60
31
IDI NA SADRAJ
32
33
IDI NA SADRAJ
Energija iz
geotermalnih
izvora
Hidrogeotermalna
energija
Prava
investitora
IDI NA SADRAJ
34
Izvori prava
Nadlene
institucije
-
-
-
-
-
-
-
-
-
-
Od ideje
do korienja
35
IDI NA SADRAJ
Osnovni koraci
od ideje do korienja (I)
IDI NA SADRAJ
36
I-1
Geoloka
istraivanja
Elaborat o rezultatima
geolokih istraivanja
I-1
Odobrenje
za geoloka
istraivanja
Rok je
30 dana
(najkasnije
60 dana)
Odobrenje za istraivanje
(definie rokove za zapoinjanje
i zavravanje istraivanje)
37
IDI NA SADRAJ
I-1
Elaborat o
geolokim
istraivanjima
- Sadraj -
I-1
Elaborat o
rezervama
podzemnih
voda
IDI NA SADRAJ
38
I-2
Eksploatacija
hidrogeotermalne
energije
Odobrenje za
izvoenje rudarskih
radova
Odobrenje za
eksploataciju
EKSPLOATACIJA
Upotrebna dozvole
za rudarske objekte
Zahtev za
izdavanje
odobrenja za
eksploataciju
Vodna dozvola
I-2
Odobrenje za
eksploataciju
mineralnih
sirovina
39
IDI NA SADRAJ
I-2
Odobrenje
za izvoenje
rudarskih
radova
I-3
Rudarski
objekti
IDI NA SADRAJ
40
Direktno korienje
Korienje za proizvodnju
elektrine i/ili toplotne
energije
Sticanje prava na
obavljanje delatnosti
proizvodnje elektrine i/ili
toplotne energije
Korienje
hidrogeotermalne
energije
41
IDI NA SADRAJ
Osnovni koraci
od ideje do korienja (II)
II
IDI NA SADRAJ
42
II-1
Izbor lokacije
Ne
II
Da
Kopija parcele, Lista vlasnika
parcele (Sluba za katastar
nepokretnosti optine)
Izbor lokacije,
uvid u vaee
planske
dokumente i
informacija o
lokaciji
II-2
Informacija o
lokaciji
Miljenje operatera
distributivnog sistema
o mogunostima
prikljuenja
Energetska
dozvola
Elaborat
o izgradnji
ENERGETSKA
DOZVOLA
Izjava banke o spremnosti
da prati investitora
u finansiranju
43
IDI NA SADRAJ
II
II-2
Pribavljanje
energetske
dozvole
Elektrana za
proizvodnju
elektrine energije
(Ministarstvo
energetike i
rudarstva)
> 10 MW
Da
Ne
Nije potrebna
energetska dozvola
Elektrana za kombinovanu
proizvodnju elektrine i
toplotne energije
(Ministarstvo energetike i
rudarstva + jedinica lokalne
samouprave)
Elektrana
za proizvodnju
toplotne energije
(jedinica lokalne
samouprave)
Da
Ne
Zahtev za izdavanje energetske dozvole (Obrazac O-1)
II-3
Lokacijska
dozvola
Izvreno formiranje
graevinske parcele
(parcelacija/
preparcelacija)
IDI NA SADRAJ
Zahtev za
izdavanje
energetske
dozvole
(Obrazac
O-10)
44
ENERGETSKA
DOZVOLA
Prikupljeni uslovi
za projektovanje
Tehnika dokumentacija
za objekat elektrane na biomasu/
biogas (podaci o objektu/
generalni projekat)
II-3
II
Uslovi za
prikljuenje
na elektroenergetsku i/
ili mreu za
daljinsko
grejanje
Reenje o formiranju
katastarske(ih) parcele(a)
Projekat
je u skladu sa
vaeim planskim
dokumentom
II-3
Rok je
10 dana
Da
Nadleni organ
potvruje projekat
Formiranje
graevinske
parcele
45
IDI NA SADRAJ
II
II-3
Vodni uslovi
Potrebno je pribavljanje
posebnog miljenja
Zahtev za dobijanje miljenja javnog
vodoprivrednog preduzea (JVP
Srbija vode/JVP Vode Vojvodine)
Rok je 30 dana (najkasnije 60 dana)
Miljenje javnog vodoprivrednog
preduzea
Da
Ne
Pribavljanje miljenja
(Ministarstvo ivotne
sredine i prostornog
planiranja i/ili specijalizovana nauna institucija)
Pribavljanje miljenja
(Ministarstvo nadleno
za poslove turizma)
Objekat je
na teritoriji
banjskog
mesta
Ne
Da
II-3
Pribavljanje
lokacijske
dozvole
Ne, u
roku od 8 dana
Potpuna dokumentacija
Da
Provera planskog dokumenta (da li
sadri sve uslove i podatke za izradu
tehnike dokumentacije)
IDI NA SADRAJ
46
Snaga elektrane
> 1 MW
Da
Snaga elektrane
> 50 MW
GRAEVINSKA
DOZVOLA
II
II-4
Graevinska
dozvola
Studija o proceni
uticaja na
ivotnu sredinu
Saglasnosti na
projektnu dokumentaciju
i studiju uticaja
II-4
Ne
Ne
Da
Procena
uticaja na
ivotnu
sredinu (1)
Obavezna izrada
studije uticaja na
ivotnu sredinu
rok 10 dana
Obavetavanje zainteresovanih organa i javnosti
rok 10 dana
Obavetavanje
investitora i
javnosti o odluci
Potrebna je izrada
studije uticaja na
ivotnu sredinu
rok
3 dana
47
IDI NA SADRAJ
II
II-4
Potrebna je izrada
studije uticaja na
ivotnu sredinu
Procena
uticaja na
ivotnu
sredinu (2)
Ne
U odluci je definisan
obim i sadraj studije
Da
Izrada studije o
proceni uticaja na
ivotnu sredinu
II-4
Procena
uticaja na
ivotnu
sredinu (3)
rok 3 dana
Obavetavanje investitora i javnosti o odluci
rok 7 dana
rok 10 dana
Odluka o davanju saglasnosti ili odbijanju zahteva za davanje saglasnosti na studiju o proceni
uticaja (rok vaenja je 2 godine za koje vreme nosilac projekta MORA da otpone izgradnju)
IDI NA SADRAJ
48
II
Tehnika
dokumentacija
Objekat iz lana 133. stav 2. taka 5), 9) i 20) Zakona o planiranju i izgradnji
Ne
Da
Podlee reviziji (strunoj kontroli) komisije (reviziona komisija)
rok 30 dana
Reviziona komisija dostavlja investitoru izvetaj sa merama koje se
obavezno primenjuju pri izradi glavnog projekta
Glavni projekat
II-4
Glavni projekat
Vodna
saglasnost
i tehnika
kontrola
projekta
Pribavljanje saglasnosti
Ministarstva zdravlja na
glavni projekat
49
IDI NA SADRAJ
II
II-4
Graevinska
dozvola* prilozi uz
zahtev
- Lokacijska dozvola
- Glavni projekat u tri primerka sa izvetajem o izvrenoj tehnikoj kontroli i
potvrdom o ispravnosti
- Dokaz o pravu svojine, odnosno pravu zakupa na graevinskom zemljitu
(priloeno i za lokacijsku dozvolu)
- Dokaz o ureivanju odnosa u pogledu plaanja naknade za ureivanje
graevinskog zemljita
- Dokaz o uplati administrativne takse
- Energetska dozvola (ako je snaga elektrane vea od 1 MW).
* Za objekte za koje graevinsku dozvolu izdaje Ministarstvo, odnosno autonomna
pokrajina, uz zahtev se podnosi i izvetaj revizione komisije.
II-4
Pribavljanje
graevinske
dozvole
Tehnika kontrola
glavnog projekta
Reenje o
graevinskoj dozvoli
IDI NA SADRAJ
50
Ne, u roku
od 8 dana
Obavetavanje investitora
da u roku od 30 dana uskladi
projekat
Ne, u roku od 8 dana
Zahtev za izdavanje
graevinske dozvole se odbija
Ne, u roku
od 8 dana
II
II-5
Upotrebna
dozvola
Projekat
izvedenog
stanja
Izgradnja
objekta
UPOTREBNA
DOZVOLA
Tehniki pregled
izgraenog
objekta
Vodna dozvola
II-5
Glavni projekat
i Reenje o
graevinskoj dozvoli
Ne
Izgradnja
objekta
Izvoaki projekat
Da
Prijava poetka graenja objekta
51
IDI NA SADRAJ
II
II-5
Projekat izvedenog
objekta
Tehniki
pregled i
upotrebna
dozvola
Izgradnja objekta
Tehniki pregled
Da
Potrebno
utvrivanje podobnosti
objekta za upotrebu
Ne
Reenje o odobravanju
putanja objekta u probni rad
Izvetaj/Nalaz komisije za
tehniki pregled
IDI NA SADRAJ
52
Upotrebna dozvola
Osnovni koraci
od ideje do korienja (III)
III
Sticanje prava na
obavljanje proizvodnje
elektrine/toplotne energije
III-1 Sticanje prava na obavljanja delatnosti od opteg interesa
III-2 Koncesija
III-3 Licenca
III-4 Odobrenje za prikljuenje
III-5 Sticanje statusa povlaenog proizvoaa
III-6 Obavljanje delatnosti proizvodnje elektrine/toplotne energije
53
IDI NA SADRAJ
III
III-1
Pravo na
obavljanje
proizvodnje
elektrine
energije
- nain
sticanja
1. Ulaganje u
zavisna drutva
javnog
preduzea
Ili
2. Poveravanje
prava obavljanja
delatnosti od
opteg interesa
Ili
3. Dodeljivanje
koncesija
III-1
Poveravanje
obavljanja
delatnosti od
opteg
interesa
IDI NA SADRAJ
54
Proizvodnja elektrine
energije republika delatnost od
opteg interesa
(nadlenost: Ministarstvo
rudarstva i energetike)
Zakljuenje Ugovora o
poveravanju delatnosti od
opteg interesa proizvodnje
elektrine energije
Zakljuenje Ugovora o
poveravanju obavljanja
komunalnih delatnosti
(proizvodnja toplotne energije)
III
III-1
Ugovor o
poveravanju
delatnosti
- uslovi koji
moraju biti
ispunjeni
55
III-1
Ugovor o
poveravanju
delatnosti
- sadraj/
odredbe
IDI NA SADRAJ
III
III-2
Predlog za davanje
koncesije
Koncesija
Predlog za donoenje
koncesionog akta
Koncesioni akt
Javni tender
Izvetaj Komisije o
sprovoenju javnog tendera
Ugovor o koncesiji
Osnivanje koncesionog
preduzea
III-2
Koncesija sadraj
ugovora o
koncesiji
IDI NA SADRAJ
56
III-2
Ugovor o
poveravanju
u odnosu
na koncesiju osnovne
razlike
III-3
Obavljanje proizvodnje
toplotne ili elektrine energije za sopstvene potrebe ili za proizvodnju elektrine
energije u elektranama do 1 MW
III
Licenca
- Pribavljanje
licence
Ne
Da
Nije potrebno
pribavljanje licence
57
IDI NA SADRAJ
III
III-4
Odobrenje za
prikljuenje
elektrane ne
elektroenergetsku mreu
Elektrana za kombinovanu
proizvodnju elektrine i toplotne
energije
III-4
Odobrenje za
prikljuenje
elektrane na
mreu za
distribuciju
toplotne
energije
IDI NA SADRAJ
Elektrana za kombinovanu
proizvodnju elektrine i
toplotne energije
Ugovor o otkupu
Elektrana za proizvodnju
toplotne energije
58
- Pravo prioriteta na organizovanom tritu u odnosu na druge proizvoae koji nude energiju pod jednakim uslovima
- Pravo na subvencije (poreske, carinske i druge olakice)
Mere podsticaja - Feed-in tarife:
Vrsta elektrane
na geotermalnu energiju
III-5
Status
povlaenog
proizvoaa
sa kombinovanom
proizvodnjom na fosilna
goriva
do 0,2 MW
Co=10,4
sa kombinovanom
proizvodnjom na fosilna
goriva
od 0,2 MW do 2 MW
Co=10,667-1,333*P
sa kombinovanom
proizvodnjom na fosilna
goriva
od 2 MW do 10 MW
Co=8,2
sa kombinovanom
proizvodnjom na fosilna
goriva
od 2 MW do 10 MW
Co=8,5
Elektrana za
proizvodnju
elektrine energije
III
Elektrana za kombinovanu
proizvodnju elektrine i
toplotne energije
III-5
Elektrana za
proizvodnju
toplotne energije
Sticanje
statusa
povlaenog
proizvoaa
59
IDI NA SADRAJ
III
III-6
Ugovor o
otkupu
elektrine
energije
IDI NA SADRAJ
EPS
60
See the detailed text of the Guide for Investors at the web site of the Ministry of Mining and Energy
Detaljno uputstvo za investitore moete pronai na web sajtu Ministarstva rudarstva i energetike
www.mre.gov.rs
This publication is made possible by the support of the American people through the United States Agency
for International Development (USAID) in cooperation with the German Development Agency (GTZ),
supported by the Ministry of Mining and Energy and the Ministry of Environment and Spatial Planning, and
does not necessarily reflect the views of USAID or the United States Government nor the views of GTZ or the
Government of Federal Republic of Germany
Izrada ove publikacija omoguena je podrkom amerikog naroda kroz Ameriku agenciju za
meunarodni razvoj (USAID) u saradnji sa Nemakom organizacijom za tehniku saradnju (GTZ), a podrali
su je Ministarstvo rudarstva i energetike i Ministarstvo ivotne sredine i prostornog planiranja, i ona
ne mora nuno da odraava stavove USAID ili Vlade Sjedinjenih amerikih drava, niti GTZ ili Vlade Savezne
Republike Nemake