100% found this document useful (1 vote)
2K views1 page

Letter of Intent For Deployment

The university thanks the librarian for allowing them to develop a computer system for their company. The system was successfully defended last semester. The university is now ready to deploy the software to ensure requirements are met and the librarian can use it. The deployment team will assist with infrastructure, installation, testing, training and support over two months. The project adviser will communicate regularly with the librarian and visit once deployment is complete.

Uploaded by

Pamela Bondoc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views1 page

Letter of Intent For Deployment

The university thanks the librarian for allowing them to develop a computer system for their company. The system was successfully defended last semester. The university is now ready to deploy the software to ensure requirements are met and the librarian can use it. The deployment team will assist with infrastructure, installation, testing, training and support over two months. The project adviser will communicate regularly with the librarian and visit once deployment is complete.

Uploaded by

Pamela Bondoc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

UNIVERSITY OF THE EAST

Manila
OFFICE OF THE DEAN
College of Computer Studies and Systems (CCSS)
<<Date>>
MS. RHEALYN R. NIMER
Librarian
University of Rizal System Cainta

Cainta Rizal, Karangalan Dr, Cainta, Metro Manila


Dear Ms. Nimer:
First of all, we would like to thank you for accommodating and allowing us to develop a computerized
system for your company. The system was defended successfully last semester.
As part of our commitment to your company, we are now ready to deploy the software. The aim of the
deployment is to ensure that your requirements have been met and you will be able to use the software
depending on your discretion. The team will assist you in infrastructure selection, hardware and software
installation, testing, training, and technical support. We are expected to complete these tasks within two
months. To track the progress of our deployment, Prof. Reynalyn T. Elon, our project adviser, will make a
constant communication with you. Also, she will visit your company once the deployment of the software
is completed.
Again, thank you very much for your support and we hope that our system will help your business more
profitable.
If you have any concerns, please let us know.
Sincerely yours,
CONFORME
ESTUARIA, MELVIN C.
MANALO, EDUARDO N.

_________________________________
SIGNATURE OVER PRINTED NAME

POTUECO, DARYL KIM PAUL A.


_________________________________
DATE
Noted by:
PROF. ELON, REYNALYN T.
Capstone Project Adviser
PROF. ARNE R. BANA
Chair, Department of Information Technology

You might also like