COURSE OUTLINE
1. Introduction
2. Investigation for Bridges
- Site Selection
- Data Collection, Span Determination
3. Types of Bridges and their Selection
- Types of Bridges
- Selection of Bridges
4. Bridge Loading
- Types of Loads
- Distribution of Loads According to AASHTO
5. Superstructure
- Reinforced Concrete Superstructures
- Steel Superstructures
- Composite Superstructures
- Arches, Cable stayed, Suspension
6. Substructures
- Piers
- Abutments
- Wing Walls
- Scour Protection
7. Bearings and Railings
8. Culverts and Low Level Water Crossings
Theory of Structures II
Targeted group: Year 5th
Instructor name: Yonas A.
Evaluation:
Attendance and Class Activity10% (90% attendance for all student)
Project .....40% [Min./Max.5 &6 Group]
Mid Exam.20%
Final Exam........30%
1.
Introduction
Bridges are important structures to pass obstacles, such as rivers, gorges, roads and railways.
They are not seen or understand in the same way by everyone. For instance: A simple bridge
over a small river will be viewed differently by different people because the eyes each one sees it
with are unique to that individual.
-
Some one travelling over the bridge everyday while going to work may only realize a
bridge is there because the road way has posts and railing on either side.
Others may remember a time before the bridge was built how far they had to travel to
visit friends and to get the children to school.
Civic leaders see the bridge as a link between neighborhoods and a way to provide fire
and police protection and access to hospital.
In business community, the bridge is seen as opening up new markets and expanding
commerce.
An artist will consider the bridge and its setting as a possible subject for a future painting.
A theologian may see the bridge as symbolic of making a connection between God and
human beings.
While a boater on the river, looking up when passing underneath the bridge, will have a
completely different perspective.
Bridges affect people. People use them and engineers design them and later build and maintain
them. Bridges must be planned and engineered before they can be constructed. Bridge
engineering is one of the fascinating fields in civil engineering calling for expertise in many
areas: structural analysis and design, geotechniques, traffic projection, surveying, runoff
calculation and methods of construction.
Mankind takes lessons from nature to construct bridges
Tree fallen accidentally across a stream was the earliest example of a beam type bridge.
Similarly, the natural rock arch formed by erosion of the loose soil below was the earliest
forebear of arch bridges.
Creeper hanging from tree to tree allowing monkeys to cross from one bank to the other
was the forerunners of suspension bridges.
2. To facilitate the transportation system. This is to say in larges cities there is traffic jam
when two or more roads meet at a point. For such cases bridges, called interchanges are
provided. E.g. Gotera interchange, Addis Ababa
A bridge controls the capacity of the transportation system. For instance: If the strength of the
bridge is unable to carry heavy trucks, loads limits will be posted and heavy trucks will be
rerouted.
Bridges are expensive structures. The cost per meter of a bridge is high in comparison to the
road.
If the bridge fails, the transportation system will not be in a position to give function. Therefore,
bridge designer has control over the
2.
capacity,
cost and
Safety.
For a river crossing it is important to identify the type of river to be crossed. There are two types
of rivers namely alluvial and incised.
Alluvial rivers are winding and they erode their banks and scour their beds; they have flood
plains on either side of the channel and the flow regularly overtops the channel banks to spread
across the flood plain. They are continually active, scouring and depositing materials on the
banks and transporting sediments.
Incised rivers have a relatively stable banks and arc generally narrower and deeper than alluvial
rivers.
Bridge crossing over alluvial rivers nearly always require training works to stabilize the
channel flow with in tile bridge waterway opening.
Data Collection
Once the engineer has identified a likely site for the bridge, he/she needs to obtain field
information on the catchment area and run off, local terrain conditions and water levels,
navigational (like Baro River) and other clearance requirements.
Field reviews shall be made by the designer in order to become familiar with the site. The most
complete survey data cannot adequately depict all site conditions or substitute for personal
inspection by someone experienced in bridge design.
River Survey
Information required by the designer for analysis and design should include all features that can
affect the magnitude and the frequency of the flood flow which will pass the site under study.
These are: Climatologically characteristics, land runoff characteristics, stream gauging records,
high water marks and size and performance of existing structures in the vicinity.
High water marks can be obtained from gauges or from local people. In addition, they can be
identified from small debris, such as grass or twigs caught in tree branches, elephant grass or
similar matted down, mud lines on stones or bridges, are all high water indicators.
The hydrologic characteristics of the basin or watershed of the stream under study are
needed for any predictive methods used to forecast flood flows. Although many of these
characteristics can be found from office studies, some are better found by a field survey of the
basin. The size and configuration of the watershed, the geometry of the stream network, storage
volumes of ponds, lakes, reservoirs, and flood plains, and the general geology and soils of the
basin can be found from maps.
Having determined these basin characteristics, runoff times, infiltration values, storage values,
and runoff coefficients can be found and used in calculating flood flow values using different
methods . Like: Reves formula, rational formula, Area-Velocity formula
Soil Investigation
Once at the site it is easy and of great value to sample for soil, rock, stone, water, etc. in
cooperation with the soil investigators.
Soil investigation is required to get soil profile, engineering property of the foundation material
and foundation level of the abutments and piers for design of the foundation.
This information is obtained by analyzing samples taken from boreholes, test pits or
geophysical surveying.
Samples of at least 2Kg each should be collected marking station number and river name where
the crossing site is fixed.
PROJECT:........................................................
Date: .................
Clear Height: (m) @............; ............m@..............; .............m@ .............; Total water width at HWL:............(m);
(Overflow? Year? Level: +...) .............................................................................................................................................
Sample no: ............. @ STA: .............; Sample no: ............ @ STN: ................; Sample no: ............ @ STA: ................;
REMARKS: ........................................................................................................................................................................
...............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
(please, make simple plan sketch incl. water shores/Road alignment and continue the text on back side of this page, if needed)
Economical Span
Span determination is usually dictated by the hydraulic requirement. However, there are
conditions where lengthen spans are chosen for the sake of road alignment.
Fundamental of Bridge Design
For a given span the most economical span is the length at which superstructure cost equals to
substructure cost.
Hydraulic Requirements
Bridges are designed to accommodate design discharge at design flood. When a river has a wide
flood plain, the economical solution may be using short span bridge with proper scour and
erosion protection for the embankment, abutments and piers.
Piers should be located in such a manner that they can provide the required lineal waterway and
navigational clearance.
The alignment of piers and abutments should, if possible, be set parallel to the direction of flow
during maximum flood.
Free Board
The waterway below the superstructure must be designed to pass the design flood and the
floating debris carried on it.
The free board allows for uncertainty in determining DFL also. The minimum free board above
the design water level is given in table below unless refined hydraulic analyses have been made.
Table: Free Board
Discharge (m3/s)
0 to 3.0
0.3
3.0 to 30.0
0.6
30.0 to 300
0.9
> 300
1.2
These clearance measurements should be increased for backwater effects when the flow is
restricted by short span bridge or when the river has history of unusual large floating items or in
case of navigational requirements.
Grade Requirements
Often in mountainous areas the road way grade is governed by the capacity of heaviest vehicle to
Fundamental of Bridge Design
climb, vertical curve and sight distance. These requirements may increase the span beyond the
hydraulic requirement.
3.
3.1
Road bridge
Railway bridge
Pedestrian bridge
Aqueduct
Viaduct
Equipment bridge
Temporary bridges
Permanent bridges
Semi-permanent bridges
Straight/Normal bridge
Skewed bridge
Curved bridge
(e) Span
-
L 6m (Culvert)
7m < L 15m (Small span bridges)
16 L 50m (Medium span Bridges)
50 L 150m (Large Span Bridges)
L150m (Extra Large Span Bridges)
Simply Supported
Continuous
Cantilever
Slab Bridges
Girder (Deck girder Bridges)
Box Girder
Portal Frame Bridges
Arch Bridges
Truss Bridges
Plate Girder Bridges
Cable Stayed Bridges
Suspension Bridges
Box Cell/ Box culvert
(i) Movements
-
3.2
Movable Bridges
Fixed Bridges
In selection of a bridge type, there is no unique answer. For each span length range there is more
than one bridge type that will satisfy the design criteria. Generally the following factors should
be considered.
Geometric Condition of the Site: The type of bridge selected will often depend on the
horizontal and vertical alignment of the highway route and on the clearances above and below
the road way. E.g. If the alignment is on a curve, box and slab type bridges are best options.
Subsurface Conditions of the Site: The foundation soils at a site will determine whether
abutments and piers can be founded on spread footings, driven piles and etc.
The potential for seismic activity at a site should be a part of the subsurface investigation
because this will change details of the substructure. E.g. an inclined leg rigid frame bridge
requires strong foundation
Functional Requirements: Bridge should serve the present and future traffic.
E.g. If future widening or replacement of bridge decks is a concern girder type bridge is best
option.
Aesthetics: It is necessary to understand what qualities and features of a bridge tend to make
that aesthetics statement a good one. This understanding requires training and time.
-
When a bridge is placed across a relatively shallow valley, the most pleasing
appearance occurs when there are an odd number of spans with span lengths that
decrease going up the side of the valley.
Harmony between the whole structure and its surrounding needed to be addressed.
Repeating similar spans too many times can become monotonous, just as hearing the
same music with a heavy beat that is repeated over and over again can be
uncomfortable.
Moreover, contrast and texture, light and shadow are additional aesthetic parameter in bridge
design.
Economics and ease of maintenance: In comparison of the economics of different bridge
types, the construction cost and maintenance cost should be taken together. A general rule is
that the bridge with minimum number of spans, fewest deck joints and widest spacing of
girders will be the most economical. By reducing the number of spans, the construction cost
of one pier is eliminated.
Deck joints are a high maintenance cost item, so minimizing their number will reduce the life
cycle cost of the bridge,
Generally, concrete structures require less maintenance than steel structures.
Construction and erection considerations: The selection of the bridge type to be built is
often governed by construction and erection considerations. In general, the larger the
prefabricated or precast member, the shorter the construction time. However, the larger the
members, the more difficult they are to transport and lift into place.
The availability of skilled labor and specified materials will also influence the choice of a
particular bridge type.
Legal Considerations: Applicable laws like environmental laws also govern the type of
bridge.
4. Bridge Loadings
4.1
Types of loads
The following permanent and transient loads and forces shall be considered for design of bridges
where applicable. The load provisions may also be applied to the structural evaluation of existing
bridges.
Permanent Loads
DC
DD
DW
EH
EL
ES
EV
=
=
=
=
=
=
=
Transient Loads
BR
CE
CR
CT
EQ
FR
IM
LL
LS
PL
SE
SH
TG
TU
WA
WL
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
10
1
1.20
2
1.0
3
0.85
>3
0.65
11
When the loading condition includes the pedestrian loads combined with one or more lanes of
the vehicular live load, the pedestrian loads shall be taken to be one loaded lane.
Design truck: The weights and spacing of axles and wheels for the design truck shall be as
specified in Figure below.
Plan of Design Truck Load
showing tire contact areas
4.3 m
4.3 9.0 m
1.8 m
3.000 mm
Design Tandem: The design tandem used for Strategic Bridges shall consist of a pair of 110
kN axles spaced 1.2 m apart. The transverse spacing of wheels shall be taken as 1.8 m. See
below.
110 kN
1.2 m
110 kN
1.8 m
12
Design Lane Load: The design lane load shall consist of a load of 9.3 kN/m, uniformly
distributed in the longitudinal direction. Transversely, the design lane load shall be assumed
to be uniformly distributed over a 3.0-m width. The force effects from the design lane load
shall not be subject to a dynamic load allowance.
Retaining walls not subject to vertical reactions from the superstructure, and
Foundation components that are entirely below ground level.
The dynamic load allowance shall not be applied to pedestrian loads or to the design lane load.
The factor to be applied to the static load shall be taken as: (1 + IM/100).
Component
Deck Joints All Limit States
All Other Components
Fatigue and Fracture Limit State
All Other Limit States
IM
75%
15%
33%
13
4.3.3
Centrifugal force is due to inertia force of vehicles on curved bridges at speed. Centrifugal forces
shall be applied horizontally at a distance 1.8 m above the roadway surface.
Centrifugal forces shall be taken as the product of the axle weights of the design truck or tandem
and the factor C, taken as:
C = 4 v2
3 g*R
where: v
g
R
4.3.4
From AASHTO Commentary 3.6.4 Based on energy principles, and assuming uniform
deceleration (retardation), the braking force determined as a fraction "b" of vehicle weight is:
v2
b =
2ga
Where a = the length of uniform deceleration.
From AASHTO Article 3.6.4 Braking forces shall be taken as 25 % of the axle weights of the
design truck or tandem per lane placed in all design lanes headed in the same direction.
These forces shall be assumed to act horizontally at a distance of 1800 mm above the roadway
surface in either longitudinal direction to cause extreme force effects.
4.3.5
Unless protections are provided a horizontal force of 1800KN applied at 1.2m above the ground
should be considered.
14
4.3.7
Static Pressure: Static pressure of water shall be assumed to act perpendicular to the surface
that is retaining the water. Pressure shall be calculated as the product of height of water
above the point of consideration, the density of water, and "g" (the acceleration of gravity =
9.81 m/s2).
p = * g * z * 10-9
Where p = static pressure (Mpa)
= density of water (kg/m3)
z = height of water above the point of consideration (mm)
g = Gravitational acceleration (m/s2)
4.3.8
4.3.9
Stream Pressure
Longitudinal: The longitudinal drag force shall be taken as the product of longitudinal
stream pressure and the projected surface exposed thereto.
p = 5.14*10-4 CDV2
Where: p = pressure of flowing water (MPa)
CD = drag coefficient for piers as specified in Table below
V = design velocity in m/s of water for the design flood in strength and service limit
states and for the check flood in the extreme event limit state
Type
Semicircular-nosed pier
Square-ended pier
Debris lodged against the pier
Wedged-nosed pier with nose angle 90o or less
CD
0.7
1.4
1.4
0.8
15
of flow
and C L
0.0
0.5
0.7
0.9
1.0
The lateral drag force shall be taken as the product of the lateral stream pressure and the surface
exposed thereto.
4.3.10
Wind Loads (WL= Wind on Live load; WS= Wind load on Structure)
Wind Pressure on Structures, (WS): For small and medium sized concrete bridges below
50m length the wind load on structures shall be neglected.
In the absence of more precise data, design wind pressure, PD in kPa, shall be determined as:
16
VDZ
PD = PB
VB
STRUCTURAL COMPONENT
1.2
Not applicable
Not applicable
17
Seismic Single-Span
Zone
Bridges
Multispan Bridges
Other Bridges
Regular Irregular
No Seismic Analysis *
*
Seismic Analysis
SM/UL SM
1-3
4
Essential Bridges
Regular Irregular
*
*
SM/UL MM
Critical Bridges
Regular Irregular
*
*
MM
MM
=
=
=
=
The selection of the method of analysis depends on seismic zone, regularity, and importance of
the bridge.
Essential bridges are generally those that should, as a minimum, be open to emergency vehicles
and for security/defense purposes immediately after the design earthquake, i.e., a 475-year return
period event. However, some bridges must remain open to all traffic after the design earthquake
and be usable by emergency vehicles and for security/defense purposes immediately after a large
earthquake, e.g., a 2500 year return period event. These bridges should be regarded as critical
structures.
4.3.12
Earth Pressure
Walls that can tolerate little or no movement should be designed for at-rest earth pressure. Walls
that can move away from the soil mass should be designed for pressures between active and atrest conditions, depending on the magnitude of the tolerable movements. Movement required to
reach the minimum active pressure or the maximum passive pressure is a function of the wall
height and the soil type. Some typical values of these mobilizing movements, relative to wall
height, are given in Table below:
18
Type of Backfill
Dense sand
Medium-dense sand
Loose sand
Compacted silt
Compacted lean clay
Compacted fat clay
Values of /H
Active
0.001
0.002
0.004
0.002
0.010
0.010
Passive
0.01
0.02
0.04
0.02
0.05
0.05
Where:
= movement of top of wall required to reach minimum active or maximum passive pressure by
tilting or lateral translation (mm)
H = height of wall (mm)
For walls that are backfilled with cohesive materials, the effects of soil creep should be taken
into consideration in estimating the design earth pressures.
Where activity by mechanical compaction equipment is anticipated within a distance of one-half
the height of the wall, taken as the difference in elevation between the point where finished grade
intersects the back of the wall and the base of the wall, the effect of additional earth pressure that
shall be induced by compaction shall be taken into account.
Wherever possible, the development of hydrostatic water pressure on walls should be eliminated
through use of free-draining (rapid-draining) backfill material and/or the use of weep holes and
crushed rock, pipe drains, gravel drains, perforated drains, or geofabric drains that provide
drainage.
Where soils are subject to both saturation and seismic or other cyclic/instantaneous loads, special
consideration should be given to addressing the possibility of soil liquefaction.
EH = Horizontal Earth Pressure
There are two earth pressure theories used. These are Rankin and Coulomb Earth Pressure
Theories.
19
Coulomb theory is recommended by AASHTO for masonry and RC abutment since this theory
holds better for the actual situation.
Basic earth pressure (p, in MPa) shall be assumed to be linearly proportional to the depth of earth
and taken as:
p = k h*s*g*z *10-9
Where: kh = coefficient of lateral earth pressure taken as ko, from table below for walls that do
not deflect or move,
Soil type
Loose sand
Medium Sand
Dense Sand
Silt (ML)
Lean Clay (CL)
Highly Plastic Clay (CH)
OCR = 10
1.60
1.55
1.50
1.60
1.65
1.40
ka =
* sin2 sin ( - )
In which:
2
= 1 + sin (/ + ) sin (/ - )
sin ( - ) sin ( + )
Where: = friction angle between fill and wall
= angle of fill to the horizontal
= angle of backfill of wall to the vertical
/ = effective angle of internal friction ()
20
Notations
s = density of soil (kg/m3)
z = depth below the surface of earth (mm)
g = Gravitational acceleration (m/s2)
ES = Earth Surcharge; LS = Live Load Surcharge
Where a uniform surcharge is present, a constant horizontal earth pressure, p (MPa), shall be
added to the basic earth pressure. This constant earth pressure shall be taken as:
p = ks qs
Where: ks = coefficient of earth pressure due to surcharge
qs = uniform surcharge applied to the upper surface of the active earth wedge (MPa)
live load surcharge shall be applied where vehicular load is expected to act on the surface of the
backfill within a distance equal to the wall height behind the back face of the wall.
The increase in horizontal pressure due to live load surcharge shall be estimated as:
p = k*s*g*heq *10-9
where: p = constant horizontal earth pressure due to uniform surcharge (MPa)
s = density of soil (kg /m3)
k = coefficient of earth pressure
heq = equivalent height of soil for the design truck (mm)
Equivalent heights of soil, heq, for highway loadings shall be taken from Table below. Linear
interpolation shall be used for intermediate wall heights.
Fundamental of Bridge Design
21
The Wall Height shall be taken as the distance between the surface of the backfill and the
bottom of the footing.
heq (mm)
1500
3000
6000
9000
1700
1200
760
610
Equivalent Height of Soil, heq for Different Wall Heights Due to Vehicular Loading
N.B If the vehicular loading is transmitted through a structural slab, which is also supported by
means other than earth, an appropriate reduction in the surcharge loads shall be permitted.
Down Drag (DD):
When soil surrounding piles settle, it applies a downward force. In this case, the force should be
considered.
4.3.13 Force Effects Due to Superimposed Deformations: TU, TG, SH, CR, SE
-
Temperature Gradient, (TG): Temperature rise can differ on the top and bottom
surfaces of abridge because the top surface is subjected to direct solar radiation.
Settlement, (SE): This will cause internal forces in continues structures. Force effects
due to extreme values of differential settlements among substructures and within
individual substructure units shall be considered.
22
And this equation involves both load factors and resistance factor due to this the design method
is called load and resistance factor design method. In AASHTO LRFD bridge design
specification the equation is given by
i Qi Rn
The additional parameter is known as load modifier which is incorporated to consider ductility,
redundancy and operational importance of the bridge.
Under the umbrella of the LRFD the strength limit state, extreme event limit state, service limit
state and fatigue and fracture limit state exist.
Load Factors and Load Combinations:
Fundamental of Bridge Design
23
Q = ii Qi
Where:
i= load modifier
Qi = force effects from loads specified herein
i = load factors specified in Tables B and C below
Rn= is resistance
Components and connections of a bridge shall satisfy the above equation for the applicable
combinations of factored extreme force effects as specified at each of the limit states presented in
Table A:
Table A Limit States
STRENGTH
I
Basic load combination relating to the normal vehicular use of the bridge without wind.
STRENGTH
II
Load combination relating to the use of the bridge by ERA-specified special design or
permit vehicles, without wind.
A reduced value of 0.50, applicable to all strength load combinations, specified for
uniform temperature (TU), creep (CR), and shrinkage (SH), used when calculating force
effects other than displacements at the strength limit state, represents an expected
reduction of these force effects in conjunction with the inelastic response of the
structure. The calculation of displacements for these loads utilizes a factor greater than
1.0 to avoid undersized joints and bearings.
The permit vehicle should not be assumed to be the only vehicle on the bridge unless so
assured by traffic control. Otherwise, the other lanes should be assumed to be occupied
by the vehicular live load as specified herein. For bridges longer than the permit
vehicle, the presence of the design lane load, preceding and following the permit load in
its lane, should be considered.
STRENGTH
III
Load combination relating to the bridge exposed to wind velocity exceeding 90 km/h.
STRENGTH
IV
Load combination relating to very high dead load to live load force effect ratios.
Vehicles become unstable at higher wind velocities. Therefore, high winds prevent the
presence of significant live load on the bridge.
The standard calibration process for the strength limit state consists of trying out
various combinations of load and resistance factors on a number of bridges and their
components. Combinations that yield a safety index close to the target value of = 3.5
are retained for potential application. From these are selected constant load factors
and corresponding resistance factors for each type of structural component reflecting
its use.
This calibration process had been carried out for a large number of bridges with spans
not exceeding 60 m. For the primary components of large bridges, the ratio of dead and
24
live load force effects is rather high, and could result in a set of resistance factors
different from those found acceptable for small- and medium-span bridges. It is
believed to be more practical to investigate one additional load case than to require the
use of two sets of resistance factors with the load factors provided in Strength Load
Combination I, depending on other permanent loads present. For bridges with up to
180 m spans, Load Combination IV will govern where the dead load to live load force
effect ratio exceeds 7.0.
STRENGTH
V
Load combination relating to normal vehicular use of the bridge with wind of 90 km/h
(25 m/s) velocity
EXTREME
EVENT I
SERVICE I
Load combination relating to the normal operational use of the bridge with a 90 km/h
(25 m/s) wind and all loads taken at their nominal values. Also related to deflection
control in buried metal structures, tunnel liner plate, and thermoplastic pipe and to
control crack width in reinforced concrete structures. This load combination should also
be used for the investigation of slope stability.
This limit state includes water loads, WA. The probability of a major flood and an
earthquake occurring at the same time is very small. Therefore, consideration of basing
water loads and scour depths on mean discharges shall be warranted. Live load
coincident with an earthquake is discussed elsewhere in this chapter.
SERVICE II
Load combination intended to control yielding of steel structures and slip of slip
critical connections due to vehicular live load.
This load combination corresponds to the overload provision for steel structures, and it
is applicable only to steel structures. From the point of view of load level, this
combination is approximately halfway between that used for Service I and Strength I
Limit States.
SERVICE III
Load combination relating only to tension in prestressed concrete structures with the
objective of crack control.
The live load specified in these Specifications reflects, among other things, exclusion
weight limits. The statistical significance of the 0.80 factor on live load is that the event
is expected to occur about once a year for bridges with two traffic lanes, less often for
bridges with more than two traffic lanes, and about once a day for bridges with a single
traffic lane.
FATIGUE
Fatigue and fracture load combination relating to repetitive gravitational vehicular live
load and dynamic responses under a single design truck having a constant axle spacing
of 9.0 m between 145 kN axles.
The load factor, applied to a single design truck, reflects a load level found to be
representative of the truck population with respect to a large number of return cycles of
stresses and to their cumulative effects in steel elements, components, and connections.
25
The load factors for various loads comprising a design load combination shall be taken as
specified in Table B. All relevant subsets of the load combinations shall be investigated. For
each load combination, every load that is indicated to be taken into account and that is germane
to the component being designed, including all significant effects due to distortion, shall be
multiplied by the appropriate load factor and multiple presence factor specified in, if applicable..
The factors shall be selected to produce the total extreme factored force effect. For each load
combination, both positive and negative extremes shall be investigated.
In load combinations where one force effect decreases another effect, the minimum value shall
be applied to the load reducing the force effect. For permanent force effects, the load factor that
produces the more critical combination shall be selected from Table C.
Where the permanent load increases the stability or load-carrying capacity of a component or
bridge, the minimum value of the load factor for that permanent load shall also be investigated.
The larger of the two values provided for load factors of Uniform Temperature (TU), Creep
(CR), and Shrinkage (SH) shall be used for deformations and the smaller values for all other
effects.
Table B - Load Combinations and Load Factors
Load
Combination
Limit State
STRENGTH 1
(Unless noted)
STRENGTH II
STRENGTH III
STRENGTH IV
EH, EV, ES, DW
DC ONLY
STRENGTH V
EXTREME
EVENT I
SERVICE I
SERVICE II
SERVICE III
FATIGUE
LL, IM and CE
ONLY
DC
DD
DW
EH
EV
ES
WA
LL
IM
CE
BR
PL
LS
EL
1.75
1.00
1.00
0.50/1.20
TG
SE
p
p
1.35
-
1.00
1.00
1.40
1.00
1.00
0.50/1.20
0.50/1.20
TG
TG
-
SE
SE
-
p
1.5
p
p
1.00
1.00
0.50/1.20
1.35
EQ
1.00
1.00
0.50
-
1.0
-
1.00
1.00
0.50/1.20
-
TG
-
SE
-
1.00
1.00
1.00
1.00
1.30
0.80
1.00
1.00
1.00
0.30
-
1.0
-
1.00
1.00
1.00
1.00/1.20
1.00/1.20
1.00/1.20
TG
TG
0.75
WS
WL
FR
TU
CR
SH
TG
SE
Use one of
these at a
time
EQ
-
CT
-
SE
SE
1.0
0
-
26
FR = friction
IM = vehicular dynamic load allowance
LL = vehicular live load
LS = live load surcharge
PL = pedestrian live load
SE = settlement
SH = shrinkage
TG = temperature gradient
TU = uniform temperature
WA = water load and stream
pressure
WL = wind on live load
WS = wind load on structure
Minimum
0.90
0.45
0.65
0.90
0.90
1.0
N/A
1.00
0.90
0.90
0.90
1.50
0.90
1.50
0.75
For example, at Strength I Limit State where the permanent load reaction is positive and live
load can cause a negative reaction, the load combination would be:
0.9DC + 0.65DW + 1.75(LL+IM)
Fundamental of Bridge Design
27
28
Operational importance: This definition shall apply to the strength and extreme event limit
states only. Some bridges or structural components and connections shall be declared to be of
operational importance.
Such classification should be based on social/survival and/or security/defense requirements.
For the strength limit state:
l
=
1.00
= 0.9
= 1.0
= 0.9
= 0.7
= 0.7
= 0.8
= 1.0
= 1.0
5. Superstructure Types
An efficient design of bridge superstructure is essential to achieve overall economy in the whole
bridge structure in that the superstructure dead weight may form a significant portion of the
gravity load the bridge must sustain and transmit to the foundation. A light superstructure is
economical not _only material requirements of the superstructure but also requires smaller size
for substructure and foundations. A clear understanding of the structural behavior of structural
behavior under loads is essential for efficient design.
A bridge superstructure is an integrated body of various members of reinforced concrete,
prestressed concrete, steel, composite, diaphragms, trusses, arches, etc. Determination of' forces
in theses components is essential for design purposes.
The following types of bridges are discussed as follows.
RC Bridge, Steel Bridge, Arch Bridge, Cable Stayed Bridge and Suspension Bridge
Fundamental of Bridge Design
29
The disadvantage
-
Bridge live loads occupy partial area of the decks unlike live loads in buildings which is taken
uniformly distributed all over the floor area. Live load on bridges can occupy random positions
both longitudinally and transversely, and this affects the live load shared by various beams. This
aspect of live load distribution is one of the primary concerns in the analysis of bridge decks.
Influence lines will be used to determine load position for maximum effect and the magnitude of
these effects.
The following RC bridges will be discussed.
Slab bridge
T-girder bridge
Box girder bridge
Continuous RC bridge
RC rigid frame bridges
Slab Bridge:
Slab Bridge may be in the form
30
Uniform thickness
Voided slab
Slab Bridge normally requires more concrete and reinforced steel than Girder Bridge of the same
span but the formwork is simpler and less expressive, hence they are economical when these cast
factor balance favorably.
The structural configuration of bridge is shown below.
Notch
Slab
Edge beam
Typical Cross-section of Slab Bridge
Slab bridges are most commonly used to span short spans up to 12 meters. The load carrying
mechanism is by plate action, i.e., by bending and twisting due to continuity in all directions.
Application of a load on the portion make the slab deflect into a dish shape locally, causing a
two-dimensional system of bending and twisting moments, the mechanism through which the
load is transferred to the adjacent elements of the deck, which are less severely loaded.
31
Where: E =
L1 =
W1 =
W =
NL =
Where decks span primarily in the direction of traffic, the effective width of a strip, with or
without an edge beam, shall be taken as the sum of the distance between the edge of the deck and
the inside face of the barrier, plus 300 mm, plus one-half of the strip width. The effective width
shall not exceed either the full strip width or 1800 mm.
T-girder Bridge:
T- Girders are used for bridges spanning from about 10meters-25 meters. These usually consist
of equal1y spaced beams (generally with spacing of 1.8-3.6m) spanning longitudinally between
Fundamental of Bridge Design
32
supports. The slab is structural1y continuous across the top. The slab serves dual purpose of
supporting the live load on the bridge and acting as the top flange of the longitudinal beams.
Diaphragms are provided transversely between the beams over the supports and depending on
the span, at midspan and other intermediate locations. The purpose of providing diaphragms is to
ensure lateral distribution of live loads to various adjacent stringers, the magnitude of the share
of each stringer depends on the stiffness of the diaphragms relative to the stringers and on the
method of connectivity.
Design of T- girder bridges consists of deck slab analysis and design, and the T-girder analysis
and design.
Structural analysis of the deck slab involves taking a continuous strip perpendicular to the girders
(AASHTO Art.9.6.1) and analyzing by moment distribution or using design aid given by
AASHTO, ILS for critical position of loads. Extreme positive moment at any point will be taken
to apply to all positive moment regions (Art 4.6.2.1.1). The width of equivalent interior
transverse strip over which the wheel loads can be considered distributed longitudinally in cast in - place concrete decks is given as [Table Art. 4.6.2. I .3-1]
overhang, 11401-0.83lX
positive moment, 660+0.55S
negative moment, 1220+0.25S
Where X is the distance from the wheel load to centerline of support and S is the spacing of' the
T-beams.
In the design of overhang deck slab design forces acting on the post and railings or barrier should
be considered.
Load Distribution Factors for the Girders:
For moment:
-
Interior girders: The live load flexural moment for interior beams with concrete decks
shall be determined by applying the lane fraction specified in Table below
Type of Beams
Concrete Deck on
Wood Beams
Applicable
Cross-section
from Figure
13-2
l
Distribution Factors
Range of
Applicability
S 1800
33
Type of Beams
Applicable
Cross-section
from Figure
13-2
Distribution Factors
Multicell Concrete
Box Beam
Range of
Applicability
S
4300
0.6
S
L
0.2
Kg
Lts3
0.1
1.75 + S
300 0.35
1 0.45
1100
L
Nc
Two or More Design Lanes Loaded:
13
Nc
Steel Grids on Steel
Beams
0.3
S
430
1
L
1100 S4900
110 ts 300
6000L73000
Nb 4
0.25
Nb = 3
2100S4000
18 000 L
73000
Nc 3
If Nc>8
Nc=8
use
S 1800 mm
S 3200 mm
Table Distribution of Live Load per Lane for Moment in Interior Beam
-
Exterior girders: The live load flexural moment for exterior beams shall be determined by
applying the lane fraction, g, specified in Table below
Type of
Superstructure
One Design
Lane
Loaded
Lever Rule
Two or More
Design Lanes
Loaded
Lever Rule
Lever Rule
Lever Rule
N/A
a, e, k and
also i, j if
sufficiently
connected to act as
Lever Rule
g = e ginterior
-300 de 1700
Range of
Applicability
N/A
e = 0.77 + de
2800
34
Concrete T-Beams. T
and Double T Sections
a unit
Nb = 3
Table. Distribution of Live Loads per Lane for Moment in Exterior Longitudinal Beams
For shear:
-
Interior girders: The live load shear for interior beams shall be determined by applying the
lane fractions specified in Table
Type of
Superstructure
Concrete Deck on
Wood Beams
Concrete Deck, Filled
Grid, or Partially
Filled Grid on Steel or
Concrete Beams:
Concrete T-Beams. T
and Double T Sections
Multi-cell Concrete
Box Beams, Box
Sections
Applicable
Cross-section
from Figure
13-2
l
a, e, k and
also i, j if
sufficiently
connected to
act as a unit
One Design
Lane Loaded
Two or More
Design Lanes
Loaded
Lever Rule
Lever Rule
0.36 +
0.2 + S - S 2.0
3600 10700
S
7600
Lever Rule
Lever Rule
d
S
2900
0.6
d
L
0.1
S 0.9 d
2200 L
0.1
Range of
Applicability
N/A
1100 S 4900
6000 L 73000
110 ts 300
4x109 kg 3x1012
Nb 4
Nb = 3
1800 S 4900
6000 L 73000
890 d 2800
Nc 3
Table -Distribution of Live Load per Lane for Shear in Interior Beams
-
Exterior girders: The live load shear for exterior beams shall be determined by applying the
lane fractions specified in Table
Type of
Superstructure
Applicable
Cross-section
from Figure 13-2
One
Design
Lane
Loaded
Lever Rule
a, l
Lever Rule
N/A
a, e, k and
also i, j if
sufficiently
connected to act
as a unit
Lever Rule
g = e ginterior
-300 de 1700
= 0.6 + de .
3000
Lever Rule
Nb = 3
Lever Rule
g = e ginterior
-600 de 1500
Two or More
Design Lanes
Loaded
Range of
Applicability
= 0.64 + de .
3800
35
Type of
Superstructure
Applicable
Cross-section
from Figure 13-2
One
Design
Lane
Loaded
Lever Rule
Two or More
Design Lanes
Loaded
Lever Rule
Range of
Applicability
N/A
Table Distribution of Live Load Per Lane for Shear in Exterior Beams
Where: S = spacing between girders (mm)
L = Length of Girder (mm)
t s = thickness of slab (mm)
The lever rule involves summing moments about one support to find the reaction at another
support by assuming that the supported component is hinged at interior supports.
When using the lever rule on a three-girder bridge, the notional model should be taken as shown
in Figure 13-1. Moments should be taken about the assumed, or notional, hinge in the deck over
the middle girder to find the reaction on the exterior girder.
Figure 13-1 Notional Model for Applying Lever Rule to Three-Girder Bridges
Multiple presence factors shall not be used with the approximate load assignment methods other
than statical moment or lever arm methods because these factors are already incorporated in the
distribution factors.
Box Girder Bridge:
Concrete box girder bridges are economical for spans of above 25 to 45m. They can be
reinforced concrete or prestressed concrete. Longer span than 45m will have to be prestressed.
They are similar to T-beams in configuration except the webs of T-beams are all interconnected
by a common flange resulting in a cellular superstructure. The top slab, webs and bottom slab are
built monolithically to act as a unit, which means that full shear transfer must be provided
between all parts of the section.
Reinforced concrete box girders have high torsional resistance due to their closed shape and are
particularly suitable for structures with significant curvature. This construction also lends itself
to aesthetic treatment.
Concrete box girder bridges have several advantages over other types;
Fundamental of Bridge Design
36
1. The relatively shallow depth of box girders is all advantage where headroom is limited like in
urban overpasses.
2. Monolithic construction of the superstructure and substructure offers structural as well as
aesthetic advantage. The pier caps for continuous box girders can be placed with in the box,
facilitating rigid connection to the pier.
3. They provide space for utilities such as water and gas lines, power, telephone and cable ducts,
storm drains and sewers, which can be placed in the hollow cellular section.
Typical cross section is shown in Fig. below. While the interior webs are all vertical the exterior
webs may be vertical, inclined or curved. When the exterior webs are inclined their slope should
preferably be IH: 2V.
Design Consideration:
The structural behavior of box girders is similar to T-beams. Box girders are essentially T-beams
with transverse bottom flange resulting in a closed, torsionally stiff multi-cell configuration.
The interior webs resist shear and often only a small portion of girder moments. Consequently
they are usually thinner than the webs of T-beams. This is so because, in the case of continuous
T-beams, the webs must resist the negative girder moments as well as all the shear, and contain
all the reinforcement for positive moments.
The bottom slab (soffit) contains reinforcement for the positive moment and also acts as a
compression flange in the negative moment regions of continuous spans. The bottom slab also
affords a superstructure considerably thinner than a T- beam bridge of the same span and permits
even longer spans to be built.
Cross-sections are taken as shown in Fig. below a and b for analysis for exterior and interior
girders respectively. The structural analysis is same as for T-beams. Section analysis is also same
except the compression bottom flange for continuous spans. The entire slab width is assumed
effective for compression.
a. Exterior girder
b. Interior girder
Continuous RC bridge:
Advantages
Fundamental of Bridge Design
37
Less number of bearings than simply supported bridge since one line of bearings is
used over the piers
Reduced width of pier, thus less flow obstruction and less amount of material
Requires less number of expansion joints due to which both the initial cost and
maintenance cost become less. The rigidity quality over the bridge is thus ~proved.
Lesser depth of girder, hence economical supports.
Better architectura1 appearance
Lesser vibration and deflection
Disadvantages
-
38
They can be erected with ease and this minimizing construction costs.
Steel superstructures are usually lighter than concrete superstructures which translate
into reduced substructures costs, which can be significant when soil conditions are
poor.
Steel superstructures can be designed with shallower depth than RC, which is an
important consideration when overhead clearance is required.
Steel bridges are easy and faster to repair than RC.
Steel bridges have some major disadvantages that make then much less favorable than RC or
PSC bridges
-
Arch Bridge:
Arches are generally characterized by the development of inclined rather than vertical reactions
under vertical loads.
Cross-sections are designed for thrust, moment and shear, with magnitudes depending on the
location of the pressure line as shown in Figure below.
39
If the pressure line coincides with the axis of structure, (as in a uniformly loaded parabolic arch),
all cross sections will be subjected to compression, with no moment or shear. If the pressure line
falls with in the kern, there will not be tension. But if shape of structure and pressure line differs
moment may become dominant. Figure below shows parts of arch bridges.
Compared to the girder bridges, arch bridges are economical because the dead load moments in
arch bridges are almost absent when the arch is properly design.
The loads on the arch are carried by the arch ribs mainly through direct axial thrusts, the bending
moment and shear forces being small compared to Girder Bridge which requires larger section.
This is due to the hogging moment which balances the sagging moment created by the horizontal
force, H, at the support.
The main parameter of an arch is the rise to span ratio, r/l (1/6 to 1/10).
From economic point of view it is attempted to coincide the center of pressure of a given load
with center of line of the arch.
Cable Stayed Bridge:
Cable stayed bridges are ideal for spanning natural barriers of wide rivers, deep valleys and for
vehicular and pedestrian bridges crossing wide interstate highways because they can provide
long spans unobstructed by piers.
Span arrangement types:
-
40
The arrangement of the cable stays is one of the fundamental items in the design of cable-stayed
bridges. It influences, in fact not only the structural performance of the bridge but also the
method of erection and economies.
Longitudinal cable arrangement:
-
Radiating (converging)
Harp
Suspension Bridge:
The twin main cables from the tower of a suspension bridge form a catenary from which the
hangers are suspended and fixed to the deck.
Sag ratio for cables should be L/9-L/13
Suspension bridges are economical when the span exceeds 300m. Suspension bridges consist of
one main span and two side spans.
L1/L =0.17100.50
Fundamental of Bridge Design
41
The cables being very flexible do not take any bending moment and arc subjected only to tensile
forces. The stiffening truss stiffens the deck and distributes the live load of the deck on to the
cables. Otherwise the cables would be subjected to local sag due to action of concentrated live
load and thus causes local angle change in the deck system.
The stiffening trusses arc hinged at the towers and suspended at node points from suspenders,
which are usually high tensile cables.
Vertical suspenders have been used in many bridges but diagonal suspenders have the advantage
of increasing the aerodynamic stability
Simple Suspension Bridge
42
43
6. SUBSTRUCTURE
Piers
Piers provide vertical supports for spans at intermediate points and perform two main functions:
Although piers are traditionally designed to resist vertical loads, it is becoming more and more
common to design piers to resist high lateral loads caused by seismic events.
Generally piers are subjected to:
Dead loads
Live loads and impact from the superstructure
Wind loads on the structure and the live loads
Centrifugal force from the superstructure
Longitudinal force from live loads (vehicular braking force)
Drag forces due to the friction at bearings
Earth pressure
Stream flow pressure
Ice pressure
Earthquake forces
Thermal and shrinkage forces
Ship impact forces
Force due to prestressing of the superstructure
Forces due to settlement of foundations
Pier Types
Solid Wall Pier: A solid wall pier (also known as a continuous wall pier) as its name would imply,
consists of a solid wall which extends up from a foundation consisting of a footing or piles. The top
of the wall is equipped with individual pedestals upon which the superstructure rests.
Their slender and streamlined proportions provide a minimal resistance to flood flows. Using solid
wall piers in stream or river crossings is advantageous since they are not as prone to accumulating
debris as multiple column piers.
43
44
Aesthetics
Economy
Superstructure
Design Criteria: In general, the design of a highway bridge pier should address:
Safety against overturning
Safety against sliding
Safety against bearing failure of the soil
Fundamentals of Bridge Design
45
Wingwall
A wingwall is a side wall to the abutment back wall or stem designed to assist in confining earth
behind the abutment backwall.
Backwall
A backwall, sometimes called the stem, is the primary component of the abutment acting as a
retaining structure at each approach.
Abutments
Abutment is component of a bridge
provides the vertical support to the bridge superstructure at the bridge ends
connects the bridge with the approach roadway
retains the roadway base materials
From the view of the relation between the bridge abutment and roadway or water flow that the
bridge overpasses, bridge abutments can be divided into two categories: open-end abutment and
closed-end abutment.
For the open-end abutment, there are slopes between the bridge abutment face and the edge of the
roadway or river canal that the bridge overpasses. Those slopes provide a wide open area for the
traffic flows or water flows under the bridge. It imposes much less impact on the environment and
the traffic flows under the bridge than a closed-end abutment. Also, future widening of the roadway
or water flow canal under the bridge by adjusting the slope ratios is easier. However, the existence of
slopes usually requires longer bridge spans and some extra earthwork.
46
47
Based on the connections between the abutment stem and the bridge superstructure, the abutments
also can be grouped in two categories: the monolithic abutment and the seat type abutment.
The monolithic abutment is monolithically constructed with the bridge superstructure. There is no
relative displacement allowed between the bridge superstructure and abutment.
The seat-type abutment is constructed separately from the bridge superstructure. The bridge
superstructure seats on the abutment stem through bearing.
Figure:
a. Monolithic abutment
b. Seat-type abutment
Figure:
(4)
(1)
(2)
(3)
48
Design:
Length and shape of abutment wingwalls are usually dictated by terrain, height of bridge and level of
HWM.
Length of abutment backwall is governed by width of the superstructure.
Design of abutments is started by providing preliminary dimension then checked for different
design criteria.
Fundamentals of Bridge Design
49
The location of the resultant on the base is determined by balancing moments about the toe
of the wall. Location of resultant X from the toe is:
B/3x2B/3
base on soil
B/4x3B/4
base on rock
s*Frui*Phi
Where:
s=performance factor [used to account for uncertainties in structural properties, soil properties,
variability in workmanship, and inaccuracies in the design equations to estimate the capacity.]
Fru=Nu*tanb+Ca*Be
Nu=factored vertical resultant (force/length)
b=friction angle between base and soils (degrees)
Ca= adhesion (force/length2)
Be=effective length of base in compression (length)
i= load factor force component
Phi=horizontal earth pressure force causing sliding (force/length)
Scour
Scour is the washing away of streambed material by water channel flow. Typically, scour occurs
when the water channel becomes narrowed or constricted. From basic fluid dynamics, we know that
a smaller opening leads to a greater velocity (Q = Av). If constrictions in the channel are significant,
the velocity of the stream can increase such that the substructure footings and/or piles become
undermined. Sharp bends or curves in the water channel also increase velocity which can create
cross-currents and turbulence. Scour can either occur locally at specific substructure components
(local scour) or over the entire structure crossing the channel (general scour).
The removal of material from under a piers foundation, often associated with scour, is known as
undermining or undercutting.
Fundamentals of Bridge Design
50
Scour generally takes place because one or a combination of the following conditions occurs:
Natural conditions in the channel
A constriction in the channel
The bridge itself being a constriction
When scour occurs at a specific localized point in the channel, such as a pier, abutment, drainage
structure, or some other obstruction, it is known as local scour. Local scour is evidenced by
turbulence around piers which erodes material from under the foundation. If scour takes place over
a large area of the channel it is known as general scour. General scour occurs over a long period of
time and is initiated by an alteration in channel flow patterns.
Scour which results from a reduction in the cross-sectional area of a channel due to the placement
of an obstruction such as a highway bridge or drainage structure is known as constriction scour.
The total potential scour at a highway crossing usually comprises the following components:
When natural or human activities cause streambed elevation changes over a long period of time,
aggradation or degradation occurs. Aggradation involves the deposition of material eroded from the
channel or watershed upstream of the bridge, whereas degradation involves the lowering or scouring
of the streambed due to a deficit in sediment supply from upstream.
stream contraction scour:
Contraction scour usually occurs when the flow area of a stream at flood stage is reduced, either by a
natural contraction or contraction of a bridge. The decreased flow area causes an increase in average
Fundamentals of Bridge Design
51
velocity in the stream and bed shear stress through the contraction reach. This in turn triggers an
increase in erosive forces in the contraction. Hence, more bed material is removed from the
contracted reach than is transported into the reach.
local scour:
When upstream flow is obstructed by obstruction such as piers, abutments, and embankments, flow
vortices are formed at their base as shown in Figure below (known as horseshoe vortex). This vortex
action removes bed material from around the base of the obstruction. A scour hole eventually
develops around the base.
Scour Protection:
Scour protection is required when some restriction is made to the flow of the flood.
Riprap:
It is carpet of loose stones, which protects the loose bed material for bed protection and loose bank
or embankment material from erosion by water current. The stone elements must be heavy enough
not to be carried away by water.
52
use when the gabions height and bulk are not needed as in lining river beds and banks. Their
standard size is 6m length, divided in to 6 compartments of 1m width.
Filter Blankets:
If the river bed and bank material are non - cohesive and fine, they may be washed away through the
spaces between the voids in riprap or gabion lining. This can be prevented by using textile filter or
using gravel filter.
Vegetation:
Many plant types can be used to protect river banks against erosion. The most successful ones
are almost always those found growing naturally along the river being bridged.
53
Selection of the type depends on the type of superstructure, type of substructure supports
and the length of the span.
A simply supported span requires fixed bearings at one and expansion joints at the
other.
A continuous girder require fixed bearing at one and expansion bearing on all
other supports
A two span girder will have fixed bearing at the centre support and expansion
bearings at the two abutments
Bearings are important components of bridges and call for care in design, skill in
execution, regular attention in maintenance. Faulty design or malfunctioning bearings due
54
to clogging by debris have often resulted in collapse of bridges due to the high stresses
induced due to restrained motion.
On certain major bridges bearing cost is as high as 10-15% of the total cost. It is worth
designing carefully and inspecting regularly for maintenance.
Types of Bearings
For slab bridges no special bearings are provided because the translational movement is
very small. Edges of supports are beveled to allow for rotation.
The following are the different types of bearings for girder bridges
-
Sliding plate bearing- is the simplest type of bearing. This utilizes one plate
sliding on another. This type is used for bridges up to 30m span. Flat plates were
common but due to freezing and high frictional forces the surface of the upper
plate is slightly curved as shown in Figure below.
55
Roller bearing- in this type rotation is accommodated by the pin and translation
by the use of a roller or a group of rollers. See Figure below. This is used for
spans of moderate length.
Rocker bearing- this is used for longer spans and is used to accommodate large
live load deflections. See Figure below.
In seismic areas suitable guides should be provided to prevent the roller and
rocker components from being displaced off abutments and piers during
earthquakes.
56
This can be reinforced with steel plates, which are usually the case, or may be
unreinforced. This is very strong in compression and relatively week in shear,
thus allowing horizontal displacement. This has shown good weathering
performance and so incurs low maintenance cost. This type is favored for
bearings. This is used for medium to large spans. See Figure below.
Lead Rubber bearing-is an elastomeric bearing equipped with lead core and is
used in highly seismic areas. See Figure below. Under normal loading conditions,
the lead core resists lateral loads. Under seismically induced dynamic loads,
however, the lead core yields and assists the elastomeric material in resisting
loads while at the same time accommodating lateral flexibility.
57
RAILINGS
Railings are provided along edges of bridges for protection of traffic and pedestrian.
There are three types of railings.
1. Traffic railings
2. Pedestrian railings
3. Combination railings
Traffic railings is used when a bridge is for the execution use of highway traffic
A combination railing in conjunction with raised curb and side walk is used on
low-speed highways.
On high speed highways the pedestrian path should have both an out board
pedestrian railing and an inboard combination railing
Aesthetics and freedom of view from passing vehicles should also be taken in to
consideration.
Traffic Railing
The primary purpose of traffic railings is to contain and redirect errant vehicles.
Specifically they serve the purposes of
A traffic railing should provide a smooth and continuous face on the traffic side.
Steel and concrete posts should set back from the face to the rail.
58
Pedestrian Railing
Pedestrian railing can be made from concrete, metal and timber.
A pedestrian walkway should be separated from roadway by a barrier curb, traffic railing
or combination railing.
Combination Railing
Consists of traffic and pedestrian railings
59
60
61
slopes and demonstrates the importance of detailing drainage structures early in the
design of a road. Where an established stream is met at an angle to the road alignment, it
is usually better to follow the line of the stream with a skewed culvert, even though the
construction cost will be increased by the greater length. An abrupt change in the
direction of flow at the inlet and outlet of a square crossing may be accommodated
without problem for most of the year, but when heavy rains cause maximum flow the
change of direction can result in severe erosion or wash-out. It may also be necessary to
stabilize a shifting channel or even move it to improve the geometry where stream and
road interact. The principal objectives here are:
-
Any change of stream channel must be constructed so that there is no possibility of the
stream regaining its original course.
HEADWALLS
Headwalls retain and protect the embankment at the ends of a culvert and help to
counteract the dislocation of jointed pipes due to the spreading forces at the base of large
embankments. They also divert debris from falling into the waterway, reduce seepage of
water into the embankment and prevent small animals from burrowing alongside the
pipe. Where conditions favor erosion, headwalls should incorporate deep curtain walls
and side slope protection in the form of gabions or hand-pitched stone.
Since large headwalls are expensive to build, it is advisable initially to make the culvert
pipe long enough to reach the toe of the embankment. Headwalls are usually made of
masonry or concrete.
CONCRETE RIPE CULVERTS
On most road constructions, sections of concrete pipe are butted together and connected
by mortar, and the embankment material is compacted around them. This is cheap and
often serves for several years. A far better quality culvert is obtained by surrounding the
pipe with concrete. If the sub grade is likely to settle under the weight of the
embankment, the concrete surround should be reinforced to take tensile stresses. All soft
clay material and rock should be excavated from below the pipe to a depth of at least
200mm and replaced with good granular material, well compacted.
FLEXIBLE STEEL CULVERTS
These are made from pre-formed corrugated sections bolted together to form a circular or
elliptical tube. They can accept a certain amount of longitudinal or radial deformation
without sustaining damage and so are better suited to unstable conditions than rigid
concrete structures. They are also easier to transport and faster to construct than the
equivalent size of pre-cast pipe culvert, but require specialist manufacture.
All soft unstable material should be excavated and back filled to foundation level with
Fundamentals of Bridge Design
62
gravel mixture, crushed stone or other suitable material. In the case of rock foundations,
the rock should be excavated to at least 250mm below the foundation level and wide
enough to prevent the pipe resting directly on rock at any point. It should then be back
filled to provide a cushion for the pipe.
Back filling will be made in layers of approximately 200mm, loading each side and
layer evenly and fully compacted before placing the next. The inside shape may need
to be protected by strutting as the fill is built up on each side and eventually above the
pipe.
All the fill material should be of good quality, extending to a distance roughly equal to
the pipe diameter each side and above, or up to the road base if this distance is less.
The degree of protection against corrosion required to extend the working life of a
corrugated steel pipe structure is determined on the basis of:
- The importance of the structure and its required working life
- The corrosive nature of the environment in which it exists.
Durability studies indicate that metal loss associated with corrosion usually originates on
the interior surface of the structure and progresses towards the exterior or buried face.
The conclusion is that protective treatment to the exposed surfaces should generally be
superior to that applied to the buried surfaces. All corrugated steel structures should be
hot-dipped galvanized and hot coated with bitumen on the inside. Bituminous paving to
the invert of the pipe will also help extend the life of the structure.
REINFORCED CONCRETE BOX CULVERTS
Reinforced concrete box culverts may be constructed either as a monolithic box or as a U
section with a simply supported top slab propping the sidewalls. Twin or multiple cell
box culverts are used where the horizontal opening is more than about 4m. These too
may be constructed with monolithic top slab and walls or with a separately cast lid.
Culverts with separately constructed top slabs are simpler to construct because they
require less complicated steel reinforcement and, though containing more material, they
generally offer a more economical form of construction. Owing to reversal of bending
moment in the walls and bottom slab, reinforcement to both faces of these elements is
required but the top slab of a single cell culvert requires only bottom reinforcement.
For a twin box culvert with a separately cast top slab, the outer walls are again
propped apart and the centre wall may be positively located to the top slab by the
provision of dowel bars. The top slab of a twin box culvert is designed as a two span
continuous beam spanning over the central wall and requires top reinforcement in the
region of the central wall.
LOW LEVEL WATER CROSSINGS
In favorable conditions, low level water crossings can provide economical and relatively
simple alternatives to conventional bridges. These are of two basic types:
- fords and bed-level causeways
- vented causeways and submersible bridges
Both types are appropriate for sites where traffic volumes are low or where a reasonably
short detour provides access to an all-weather bridge. For most of the year the maximum
depth of water over the carriage way should be less than 150mm. The success or service
Fundamentals of Bridge Design
63
life of the structure will depend considerably on its hydraulic design. Fords and bed-level
causeways, like conventional bridges, will be constructed so that they cause little
interference with the design flood. Vented causeways and submersible bridges inevitably
disrupt river flow and so are liable to sustain damage or indirectly cause scour to the river
bed or banks which in turn may affect the road approaches to the crossing. Since fords
and bed-level causeways arc overtopped by all water flowing in the river channel there is
no reason to raise the road surface above the stream bed. Vented causeways and
submersible bridges usually present a dry carriage way for ordinary flows and are
overtopped during the design flood. The best location for a low level crossing is similar
to that recommended for a conventional bridge, with the exception that a broad, straight
stretch of river will provide slower and shallower water as well as easier road approaches.
The maximum gradient for motor traffic should be 10 per cent, and for animals 5 per
cent. The change of gradient should be gradual to prevent the underside of vehicles
touching the road and to preserve long sight distances. Equal cut and fill construction of
the approach roads requires less work than the cut and remove spoil, but the placing of
the spoil in the river channel may cause scour problems during a flood. On roads where
speeds are naturally slow and where the horizontal curve on the approach side is clearly
visible, steep approaches may be relieved by a diagonal descent of the river bank. Even
where the road is a single track, it is advisable to make the crossing and its approaches
two lanes in width, so as to allow traffic to pass any vehicle, which breaks down or fails
to mount the gradient.
FORDS
Fords are the simplest form of river crossing at places where the stream is wide,
shallow and slow, the approaches gentle, and the surface firm. The running surface in
the stream can be strengthened and made more even using stones brought in and buried
just below the surface. Alternatively, if stones are carried in the flow, these may be
trapped by barriers made of boulders, gabions or piles.
a. Boulders [fig. a]
Large stones placed across the river bed at the downstream side of the crossing are
claimed to filter the flow of water and retain gravel and sand, which eventually form a
more level and even surface for vehicles.
b. Gabions
A more expensive but durable improvement may be made by replacing the boulders with
gabions to trap river gravel or retain imported material, as shown in Fig b. It is important
that gabions protrude only 150-300mm above the natural bed level of the river,
depending on the nature of the bed material, otherwise they will act as a weir and cause
heavy scour downstream of the crossing.
As an alternative to conventional gabions, tube baskets can be made from a roll of
fencing mesh filled with stone or shingle. During filling, the edges are raised and then
bent over at the top to form a tube and tied; finally a wire rope is attached as shown in Fig
c. After installation, sand and gravel transported by the stream is trapped behind the
baskets and provides a firmer fairly level surface suitable for vehicles.
Fundamentals of Bridge Design
64
c. Piles
Where gabions are unobtainable, timber piles driven into the river bed with or without
stone protection make an acceptable cut-off wall. To be fully effective, timber piles
should have a length of about 2m, and should be placed at no more than 0.6m centers. If
the river is fast a continuous line of piles may be necessary. A curtain wall may be
required on the upstream as well as the downstream side if the roadbed is erodible.
The top of the piles should be no more than 0.3m above bed level.
N.B: All types of ford may require scour protection on the downstream side, as
shown in the Figures.
65
66
If the bed is inerodible the causeway need not be provided with curtain walls, but the bed
on both the upstream and downstream sides of the crossing should be trimmed flat to
reduce turbulence.
Fig (a) Shows a section through a basic bed-level causeway suitable for maximum water
flows below2m/sec and for light traffic. The crossing shown in Fig (b) requires good
concrete technology and may sustain damage to the apron that is difficult to repair. Fig
(c) shows a design employing a practical combination of concrete pavement with flexible
protection that is more suited to routine repair than the rigid concrete curtain wall.
VENTED CAUSEWAYS
Vented causeways are designed to pass an ordinary flood with very little water
overtopping the carriageway, but may still be inundated and unusable for a few days each
year. These structures present a considerable obstacle to the free flow of both normal
flow and the design flood, so they must be built massive enough to withstand water
pressure and debris impact.
67
The vents are usually concrete or corrugated steel pipes from 0.6 to 1.0m diameter, set in
a block of concrete or masonry. Where prefabricated pipes are not available, vaulted
masonry tunnels have proved successful. Concrete or masonry retaining walls and aprons
are required to channel the flow and prevent scour at both entrance and exit.
In order to prevent blockage of the stream by debris or silting, careful attention is
required to setting the pipes level with the stream bed and at the same gradient. No part of
the vents should be narrower than the entrances and wedge-shaped deflector ramps may
be required on the upstream side to; guide large floating debris above the vents.
Alternatively, a grill of posts installed upstream of the causeway will collect tree
branches before they reach the structure. The capacity of the vents is sufficient to pass all
ordinary floods without damage and with no more than 150mm of water over-topping the
structure.
SUBMERSIBLE BRIDGES
Where the traffic is dense enough to justify a dry crossing of a substantial ordinary flood
and the design flood is much greater, a submersible bridge is an alternative to a vented
causeway. Submersible bridges are able to pass a larger flow than the vents of a
causeway of the same height but are more susceptible to damage by the design flood. The
overturning moment at the pier foundations becomes very large unless the piers are kept
short, and the horizontal and vertical forces on the deck require solid restraint. Because of
these difficulties, submersible bridges are not recommended for any foundation other
than rock, and even then a vented causeway or conventional bridge may be a more
durable alternative. Construction is usually of reinforced concrete with continuous
reinforcement between the sub-structures and the deck.