The purpose of this document is to provide information to prospective bidders. This
is NOT a part of invitation for Expression of Interest for Architectural Consultancy
firm (ACF) for rendering comprehensive Architectural and Project Management
Consultancy Services (PMC) etc. for the proposed construction of a multi-storey
building having about 2,00,000 sq ft Built Up Area at GIFT CITY, Gandhinagar
(Gujarat). Bidders should NOT enclose any part of this document with technical bid.
Nothing in this document brings any obligation, contractual or otherwise, on State
Bank of India.
Full page image of Block 53 is also available at our Banks website along with RFP
document. You are advised to download it from there. We recommend you to visit the site.
For any assistance in this regard, you can contact officials of GIFT-CL.
2. Schedule of events
Event
Date
Announcement of RFP in Banks website
30 January 2015
Last date of submission of tender documents
19th February 2015 ; 5:00 PM
Opening of tender documents
20th February 2015; 3:30 PM
Declaration of names of bidders shortlisted for 27th February 2015
design competition
Design competition
12th March 2015
Opening of financial bids
14th March 2015; 4:30 PM
Declaration of name of successful bidders
16th March 2015
The bank has right to change date scheduled for any event. The revised date will be put up
at Banks website.
3. Points to remember while applying
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
mail address and CC to secondary e-mail address. Please ensure that these e-mail
addresses are functional during RFP process and mail send to these mail boxes
should not get bounced. Similarly you have to mention name and telephone
number of a contact person in your firm. Please mention name of a responsible
person from your firm for this purpose who knows the background of task of
bidding and can resolve queries raised by Bank in time bound manner.
The maximum height of the building prescribed by the GIFTCL is 60 mtr. However, this
height may be revised by GIFTCL. If it happens we shall advise this on our web site.
(All lengths are in feet and all areas are in square feet)
For size of plot, Built up Area, maximum permissible height please refer section 1.2 of this
document. Currently the building will be used by around 600 persons. In future number of
persons may increase gradually and this number may reach to maximum persons allowed by
National Building Code for 2,00,000 Sq Ft BUA.
Specifications of cabins
Type
To be used by
Area of
room
Area of
Ante Room
600
150
Area of
attached
toilet
80-100
600
150
80-100
General Manager
350
100
70
250
None
60
120
None
None
Area of
cubicle
100
Remark
Cubicles
Type
To be used by
Chief Manager
Remark
Wood
panelled
Wood
panelled
Wood
panelled
Wood
panelled
Glass
panelled
Work stations
Type
To be used by
Officers/ Assistant
Size of work
station
5x5
Remark
Total space will be 50 sq ft
including storage
Basements
3 numbers
B3 and B2 will be used for parking of cars. B1 will be used for parking of two wheelers and
utilities like transformers, chilling plants etc. Size of basement will be equal to maximum
area permissible (which is given in section 1.2 of this document). The basement will be
designed as per bye laws of GIFT authority. Basement area is free of FSI.
Ground floor
Ground floor will have two distinct areas with different entry areas. There will be a retail
branch having 3000 sq ft area. The branch will have following amenities and the layout will
be as per guidelines of the Business Process Reengineering viz. 70% area for customers and
30% for staff.
Amenity
Branch Manager Cabin
Locker room
Cash safe room
Server room/UPS
Record room
Gents Toilet
Ladies Toilet
Toilets for physically
challenged persons
Area
100-150
150-200
60-70
100-120
150-200
100-120
60-70
70
Remark
Besides the Branch Manager and public space in banking hall, the area to other staff shall be
provided as under
(a) Service Manager (1 no.)- 70 sq ft ,
(b) Case Manager ( 2 no)- 50 sq ft each
(c) CRO(2 no)- 70 sq ft each
(d) SWO(15 no) 30 sq ft each
(e) GrahakMitra (1 no)- 25 sq ft.
The area for other offices will be as under by a separate entry at ground floor.
Office
Dispensary
Size
800
Library
Office-one
Office-two
Office -three
Hall one
Hall two
Hall three
Telephone Exchange
400
300
900
150
1200
1200
500
120
Remark
Will have clinical cabins for 4
doctors, pharmacists counter,
waiting space for patients
2 E-type cabins
2 E-type cabins
2 E-type cabins
The entry of the retail branch will be from the side of the e-lobby. Size of e-lobby should be
700-800 Sq ft. There would be a lift and stair case to go to first floor, which will house CAG
branch. This lift and stair case will not lead to any other floor and first floor will not have any
other passage to connect with other floors of the building (except emergency fire exit).
The other area of ground floor will belong to LHO and entry to those areas will be from side
of e-lobby.
At the main entrance of the building there would be a reception area (800-1000 sq ft) and
office of security officer (150 sqft ), X-ray machine, equipment of biometric entry barriers
etc.
From reception visitors can go to lift lobby only. There should not be any access to other
portion of Ground Floor from there. Beyond entry area there will be a set of four lifts
(including lift for firefighting) and one VIP lift. VIP lift will not be adjacent to other lifts.
The lift shaft will be designed as per the requirement of National Building Code (NBC),
however, the lift cars will be installed as per our present need to serve around 600
employees. The speed and capacity of the lift will be decided in the beginning of the project.
First Floor
Entire first floor will be occupied by CAG Branch. The branch will have following
cabins/cubicles/WS
Type
C
D
E
F
G
Number
1
4
6
12
60
Additional requirement
Room
Audit room
Conference Hall-1
Conference Hall- 2
Area
100-120
200
400
Pantry
Visitors lobby
Record Room
Gents Toilet
Ladies Toilet
Toilets for physically
challenged persons
100
150-200
1500
120-180
70-80
70
Remark
Second floor
Second floor will have following amenities
Room
Officers canteen
Employees canteen
Recreation room
Ladies room
Area
2500
4500
500
150
Remark
Gents Toilet
Ladies Toilet
Toilets for physically
challenged persons
200
100
70
Number
4
8
15
60
Room
Conference Room
Record room
Gents Toilet
Ladies Toilet
Toilets for physically challenged persons
Area
150-200
300
200
70-80
70
Remarks
Number
2
2
6
6
20
Room
Conference Room
Record room
Gents Toilet
Ladies Toilet
Toilets for physically challenged persons
Area
300
400
150-200
70-80
70
Remarks
Eleventh floor
VERY SPECIAL FLOOR
This floor will house office of Chief General Manager and transit offices of Chairman and
Managing Director.
Type of cabin/cub./WS
A
B
Number
1
2
In vicinity to CGM cabin there should be space for his PS and secretarial staff (5 in number)
and Board Room (of 20 capacities).
This floor will also have a main conferencehall (of total 70 capacity whereas around 35
persons can sit in oval shape table and 35 on back rows) and a VIP Dining Hall of 25
capacity in seat in position and 75 capacity in buffet arrangement. It should be ensured in
design that the food smell should not reach other portion of the floor.
Room
Gents Toilet
Ladies Toilet
Toilets for physically challenged persons
Area
150-200
70-80
70
Remarks
Twelfth floor
This floor will have an auditorium (Multipurpose Hall).The auditorium will have the flat
floor so in case of need it can be utilised as multipurpose hall. Apart from auditorium there
would be a lobby for catering, ladies , gents and physically challenged persons toilets. The
size of these should be commensurate with the capacity of auditorium. The capacity of
auditorium must be maximum possible. The auditorium will have a stage, two projection
screens and control room for controlling audio visual facilities.
Apart from these there should be a system of fire exit stair cases, service lift in separate area
and provision of dumping of waste at each floor. Electrical room (80sq.ft. ) each floor, Space
for data room ( 80-100 sq. ft.) at each floor, BMS room 500 sq. Ft. at GF, provision of driver
rest room/ change room (150-200 sq. Ft.) , provision of maintenance room 200 sq. ft. and
house keeping room 200 sq. ft. may be made in the basement ( B-I).
5. Frequently Asked Questions
Following are some queries raised by prospective bidders in banks earlier RFP. We
are furnishing Banks response on those queries.
S.No.
1
Banks response
Design time will be given to the ACF
as per standard guidelines of the Bank
and execution time of the project will
be decided in consultation with the
appointed ACF at the time of
tendering.
The approximate cost for all works
like civil, plumbing, electrical, AC,
fire, lift, cabling/networking, interior
/furniture, green building works,
parking,
Building
Management
System, etc has to be worked out by
the ACF as per prevailing market
rates.
Testing charges of materials, testing
of soil, surveying of plot, proof
checking of drawing, fees to the GIFT
4
5
08
09
10
11
12
13
14
15
SBI
is
requested
to
set
minimum/maximum number of trades
(jobs) for which tender will be invited.
16
17
12
13