6326-365-3907clmd & Load Scheduale
6326-365-3907clmd & Load Scheduale
6326-365-3907clmd & Load Scheduale
(SHEET 1 OF 1)
RATING AMPS
DB NO.
TP
ISO
MCCB
PLOT NO.
AREA
PVC/
DUTY
XLPE
KA
SWA/
2/4 X
PVC
IC mm2
F/S
SP
FAULT
CIRCUIT
FEEDER
MCB
CABLE SIZE
ECC
CONNECTED LOAD KW
: 365-3907
REMARKS
SIZE
R-PH
Y-PH
B-PH
I-PH
3-PH
3-PH
CT
2/3/4C
IC
KW
KW
KW
(1)
(2)
(3)
(4)
mm2
mm2
162.97
163.54
163.49
TOTAL .
2x1C,95
55.00
55.00
55.00
165.00
STORAGE-01
ACB
INCOMER
TP
SUMMARY
MCCB
OUTGOING
MDB - 01
TP
300
35
BY DEWA
MDB - 02
TP
300
35
BY DEWA
2x1C,95
55.06
54.97
54.97
165.00
STORAGE-02
MDB - 03
TP
400
45
BY DEWA
2X1C,150
52.91
53.57
53.52
160.00
ELECTRICAL ROOM
TOTAL=490KW
162.97
MAX DEMAND 3 (PH)457. KW AT 1/0.90DIVERSITY
163.54
163.49
490.00 KW
1 OF 4
PLOT NO.
MDB - 01
AREA
(SHEET 1 OF 1)
RATING AMPS
FAULT
PVC/
DUTY
XLPE
KA
SWA/
2/4 X
PVC
IC mm2
CIRCUIT
FEEDER
DB NO.
F/S
SP
TP
ISO
MCCB
MCB
CABLE SIZE
ECC
CONNECTED LOAD KW
: 365-3907
REMARKS
SIZE
R-PH
Y-PH
B-PH
I-PH
3-PH
3-PH
CT
2/3/4C
IC
KW
KW
KW
(1)
(2)
(3)
(4)
mm2
mm2
ACB
INCOMER
TP
300
MCCB
TP
100
OUTGOING
DB -01
1
TO 300A TP ISOLATOR AT MDB - 01 - 1x4C,185sq.mm XLPE/SWA/PVC. CU + 1C,95 sq.mm CU/Y/G PVC(ECC) FROM CT METER- 01
25
XLPE/SWA/PVC
4C,35
1C,16
16.00
16.00
16.00
48.00
STORAGE- 01
SPARE
TP
80
25
13.00
13.00
13.00
39.00
SPARE
TP
80
25
13.00
13.00
13.00
39.00
13.00
13.00
13.00
39.00
XLPE/SWA/PVC
4C,35
1C,16
SPARE
TP
80
25
CAPACITOR BANK-01
TP
100
25
ELECTRICAL ROOM
SPARE LOAD WILL BE FOR FUTURE LIGHTING AND SMALL POWER LOAD ONLY.
ASSUMING A P.F 0.78 FOR 165 KW, TO ACHIEVE 0.9 P.F LAGGING WE REQUIRE 165 x 0.31 = 51.15 KVAR
WE PROPOSED 4 STEPS (5+10+10+20) 45 KVAR AUTOMATIC CAPACITOR BANK
55.00
55.00
55.00
TOTAL=165KW
165.00 KW
2 OF 4
PLOT NO.
MDB - 02
AREA
(SHEET 1 OF 1)
RATING AMPS
FAULT
PVC/
DUTY
XLPE
KA
SWA/
2/4 X
PVC
IC mm2
CIRCUIT
FEEDER
DB NO.
F/S
SP
TP
ISO
MCCB
MCB
CABLE SIZE
ECC
CONNECTED LOAD KW
: 365-3907
REMARKS
SIZE
R-PH
Y-PH
B-PH
I-PH
3-PH
3-PH
CT
2/3/4C
IC
KW
KW
KW
(1)
(2)
(3)
(4)
mm2
mm2
ACB
INCOMER
TP
300
MCCB
TP
80
OUTGOING
DB -02
1
TO 300A TP ISOLATOR AT MDB - 02 - 1x4C,185sq.mm XLPE/SWA/PVC. CU + 1C,95 sq.mm CU/Y/G PVC(ECC) FROM CT METER- 02
25
XLPE/SWA/PVC
4C,35
1C,16
13.40
13.30
13.30
40.00
STORAGE- 02
SPARE
TP
100
25
15.00
15.00
15.00
45.00
SPARE
TP
100
25
15.00
15.00
15.00
45.00
11.66
11.67
11.67
35.00
XLPE/SWA/PVC
4C,35
1C,16
SPARE
TP
80
25
CAPACITOR BANK-02
TP
100
25
ELECTRICAL ROOM
SPARE LOAD WILL BE FOR FUTURE LIGHTING AND SMALL POWER LOAD ONLY.
ASSUMING A P.F 0.78 FOR 165 KW, TO ACHIEVE 0.9 P.F LAGGING WE REQUIRE 165 x 0.31 = 51.15 KVAR
WE PROPOSED 4 STEPS (5+10+10+20) 45 KVAR AUTOMATIC CAPACITOR BANK
55.06
54.97
54.97
TOTAL=165KW
165.00 KW
3 OF 4
PLOT NO.
MDB - 03
AREA
(SHEET 1 OF 1)
RATING AMPS
CIRCUIT
FEEDER
DB NO.
F/S
SP
TP
ISO
MCCB
FAULT
PVC/
DUTY
XLPE
KA
SWA/
2/4 X
PVC
IC mm2
MCB
CABLE SIZE
ECC
CONNECTED LOAD KW
: 365-3907
REMARKS
SIZE
R-PH
Y-PH
B-PH
I-PH
3-PH
3-PH
CT
2/3/4C
IC
KW
KW
KW
(1)
(2)
(3)
(4)
mm2
mm2
ACB
400/5A 0.2S C.T MAIN METER
2x1C,150
45
BY DEWA
52.91
53.57
53.52
TOTAL
1
TO 400A TP ISOLATOR AT MDB - 03 - 1x4C,300sq.mm XLPE/SWA/PVC. CU + 1C,150 sq.mm Y/G PVC CU. AS ECC FROM METER BOX - 03
TP
400
MCCB
FIRE PUMP
TP
300
35
XLPE/SWA/PVC
4C, 185
1C,95
36.66
36.67
36.67
110.00
DB - PR
TP
40
25
XLPE/SWA/PVC
4C,10
1C,10
5.65
5.70
5.65
17.00
DB - TR
TP
40
25
XLPE/SWA/PVC
4C,10
1C,10
5.10
5.70
5.70
16.50
TELEPHONE ROOM
DB - EL
TP
40
25
XLPE/SWA/PVC
4C,10
1C,10
5.50
5.50
5.50
16.50
ELECTRICAL ROOM
CAPACITOR BANK-03
TP
160
35
XLPE/SWA/PVC
4C,70
1C,35
INCOMER
OUTGOING
100mA ELS+ALARM
INSIDE OF PUMP ISO
PUMP ROOM
ELECTRICAL ROOM
ASSUMING A P.F 0.78 FOR 160 KW, TO ACHIEVE 0.9 P.F LAGGING WE REQUIRE 160 x 0.31 = 49.6 KVAR
WE PROPOSED 5 STEPS (5+10+10+20+20) 65 KVAR AUTOMATIC CAPACITOR BANK
52.91
53.57
53.52
TOTAL=160KW
160.00 KW
4 OF 4