This document summarizes a proposed reconstruction project along East 177th Street and Devoe Avenue in the Bronx. The project aims to complete a section of the Bronx River Greenway trail, improve pedestrian safety at intersections, and upgrade infrastructure. Specifically, it would redesign three complex intersections to reduce pedestrian crossing distances and add refuge medians. This is intended to improve organization of pedestrian and vehicle movements and reduce conflicts. The proposed reconstruction would link two sections of the greenway trail and enhance access to nearby parks, cultural sites, and transit.

Uploaded by

David Meyer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
523 views17 pages

2016.11.15 Project Update Presentation (HWXP2007)

This document summarizes a proposed reconstruction project along East 177th Street and Devoe Avenue in the Bronx. The project aims to complete a section of the Bronx River Greenway trail, improve pedestrian safety at intersections, and upgrade infrastructure. Specifically, it would redesign three complex intersections to reduce pedestrian crossing distances and add refuge medians. This is intended to improve organization of pedestrian and vehicle movements and reduce conflicts. The proposed reconstruction would link two sections of the greenway trail and enhance access to nearby parks, cultural sites, and transit.

Uploaded by

David Meyer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

th

Reconstruction of East 177

Street / Devoe Avenue


Project id: HWXP2007
Borough of the Bronx

November15,2016

TABLE OF CONTENTS
PROJECT CONTEXT
PROJECT LOCATION
PROJECT GOALS
MAJOR DESTINATIONS
EXISTING CONDITIONS
DESIGN ISSUES
PROPOSED SOLUTION
QUESTIONS

Project Context
Bronx River Alliance - Greenway
Master Plan
23 mile Trail (8 miles in the Bronx
from mouth at East River to border of
Westchester County)
Divided into 5 Segments
Segment B Bruckner Boulevard to
East Tremont Avenue includes

Starlight Park

This project connects Segment B to


Segment C.
Segment C Bronx River Park

NYCDDC PROJECT AREA

Project location

Project Goals
Complete a component of the Bronx
River Greenway
Improve Pedestrian Facilities
Improve intersection safety
Upgrade street lighting, signals and
signage
Install new water distribution mains
Rehabilitate Sewers
Maintain or improve existing Vehicle
Level of Service

Major Destinations
Bronx Zoo

Parks
Starlight Park
Bronx Road Park
Bronx Zoo

Cultural / Government
Post Office
Bronx River Arts Center
School

Commercial
Carwash
McDonalds

Vehicular

Arthur
Sheridan
Expressway

MTA Bus Depot


Arthur Sheridan Expressway
Bronx River Parkway

OTHER

Bronx River
Parkway

Subway
|

Design Issues
East Tremont Ave / Boston Road / West Farms Road

Complexfivelegintersectionwithlongpedestriancrossings
Pedestriancrossingsmisalignedwithdesirelines
Highvolumepedestriancrossings
Pedestrian/motoristconflict
|

Design Issues
East Tremont Ave / Devoe Ave / East 177th St

Complexfivelegintersectionwithlongpedestriancrossings

Unnecessarypedestrian/motoristconflict

Poorsiteofpedestrians
Unnecessarypedestrian/motoristconflict
Nopedestrianrefugeareas
|

Design Issues
Sheridan Expressway / Devoe Ave / East 177th St

Complexintersectionwithlongpedestriancrossings
Highspeedtrafficalwaysusingonelegortheother

Unnecessarypedestrian/motoristconflict
Nopedestrianrefugeareas

Proposed Solution

Overview of the
Proposed Solution
Organized Pedestrian / Vehicle
Movements
Shorter pedestrian crossings with
refuge medians
Bronx River Greenway Connection
complete between Starlight Park
and Bronx River Park
Upgrade infrastructure (street
lighting, signals, water main,
sewers and signage)

10

Proposed Solution
East Tremont Ave / Boston Rd/ West Farms Rd

ExistingConditions

ProposedConditions

Combined

11

Proposed Solution
East Tremont Ave / Boston Rd/ West Farms Rd

12

Proposed Solution
East Tremont Ave / Devoe Ave / East 177th St

ExistingConditions

ProposedConditions

Combined

13

Proposed Solution
East Tremont Ave / Devoe Ave / East 177th St

14

Proposed Solution
Sheridan Expressway / Devoe Ave / East 177th St

ExistingConditions

ProposedConditions

Combined

15

Proposed Solution
Sheridan Expressway / Devoe Ave / East 177th St