Check List For Installation of Ahus, Fcus and Fans
Check List For Installation of Ahus, Fcus and Fans
Check List For Installation of Ahus, Fcus and Fans
SECTION OF WORK
:
Level
N/A
S/N
1
Date:
23/8/2015
Vamed Emirates LLC/Vamed Engineering
Gmbh & Co KG
Al Shifaa Hospital, Khalifa City, Abu
Dhabi
Date
:
Checklist N: MAP/CL-003
LOCATIO
ITP
No
: MAP/ITP-003
N:
Item
Installation Checks For (FCUs/AHUs)
1.1
1.2
1.3
1.4
1.5
1.6
1.7
2
2.1
2.2
2.3
Material Checks
1. FAN COIL UNITS
1
Manufacturer
1.1 Cooling Capacity
1.2 Temp. Range/flow
1.3 Kw/hz/ph
1.4 Pressure drop
1.5 Type/shape/Wt
1.6 Dimension
1.7 Serial No./location
1.8 Drawing No.
2. AIR HANDLING UNITS
2.1 Manufacturer
2.2 Cooling Capacity
2.3 Temp. Range/flow
2.4 Kw/hz/ph
2.5 Pressure drop
2.6 Type/shape/Wt
2.7 Dimension
2.8 Serial No./location
Page 1 of 2
2.9
3.
3.1
3.2
3.3
3.4
3.5
Drawing No.
FANS
Motor Power input
Motor Power input
Manufacturer
Serial No./location
Drawing No.
Remarks
Accompanying Documents
Contractor
Mapco QA/QC
Main Contractor
Name
Signature
Date
Page 2 of 2
Client
Engineer(Consultant)