Material Submittal - Consultant
Material Submittal - Consultant
Material Submittal - Consultant
CLIENT:RTA
CONTRACTOR:GHANTOOT
Trial
trench
SUBMITTAL NUMBER
GRC/52-2015/SD-001
GRC/52-2015/OAM/SD/TT001 ,SHEET 1 OF 02
GRC/52-2015/OAM/SD/TT002,SHEET 02 OF 02
22-Mar-16
23-Mar-16
27-Mar-16
GRC/52-2015/OAM/SD/TT001 ,SHEET 1 OF 02
GRC/52-2015/OAM/SD/TT002,SHEET 02 OF 02
28-Mar-16
29-Mar-16
30-Mar-16
Approved as Noted
Ok,proceed accordingly and size and depth as per site
conditions ,as we agree before
22-Mar-16
23-Mar-16
27-Mar-16
Trial
trench
GRC/52-2015/SD-001
Re-submittal
Existing
Site
GRC/52-2015/SD-002
New
Submittal
DRAWING/SKETCH
NUMBER
DRAWING TITLE
New
Submittal
350746
COMMENTS
REV SUBMITTA
L TYPE
0
Project No:
STATUS
DETAILS OF SUBMITAL
SCOPE
1-Jan-17
Status:
A - Approved
B - Approved as Noted
SL.N
O
DATE:
2-Apr-16
2-Apr-16
6-Apr-16
Approved as Noted
Noted ,please coordinate with the owner of villas to
remove the fence which coning inside the R.O.W,if no
reponse inform us in order to coordinate with RTA to send
DM for removal
22-Mar-16
23-Mar-16
27-Mar-16
Approved as Noted
Proceed accordingly except the area clouded in the
Drawing
GRC/52-2015/OAM/SD/SOE001,SHEET 1 OF 1
27-Mar-16
28-Mar-16
30-Mar-16
GRC/52-2015/OAM/SD/SOE001,SHEET 1 OF 1
29-Mar-16
30-Mar-16
31-Mar-16
Approved as Noted
Subjected to Comments
Existing
Site
GRC/52-2015/SD-002
Re-submittal
General
clearance
GRC/52-2015/SD-003
New
Submittal
GRC/52-2015/OAM/SD/GC001,SHEET 1 OF 1
Site office
Entrance
&Exit
GRC/52-2015/SD-004
New
Submittal
Site office
Entrance
&Exit
GRC/52-2015/SD-004
Re-submittal
Page 1
341446539.xls
CONTRACTOR:GHANTOOT
DATE:
1-Jan-17
Project No:
350746
Status:
A - Approved
B - Approved as Noted
STATUS
DETAILS OF SUBMITAL
COMMENTS
27-Mar-16
28-Mar-16
30-Mar-16
Approved
As per [Part-B]OGLand also as per jointly surveyed by both
contractor and consultant at site
12-Apr-16
16-Apr-16
6-Apr-16
30-Mar-16
30-Mar-16
4-Apr-16
Approved
as per jointly surveyed by both contractor and consultant at site
and verified[Part A]
New
Submittal
GRC/52-2015/OAM/SD/FEN001,SHEET 1 OF 1
31-Mar-16
2-Apr-16
4-Apr-16
Approved as Noted
Subjected to Comments
4-Apr-16
5-Apr-16
11-Apr-16
Approved as Noted
Ok ,log as per RTA & MRHE ,However arrange joint
survey between your surveyor and our surveyor to check
before erecting the Hoarding at site.
SL.N
O
SCOPE
SUBMITTAL NUMBER
OGL
GRC/52-2015/SD-005
New
Submittal
Control
Point
GRC/52-2015/SD-006
New
Submittal
OGL
GRC/52-2015/SD-007
New
Submittal
Fence
GRC/52-2015/SD-008
REV SUBMITTA
L TYPE
DRAWING/SKETCH
NUMBER
DRAWING TITLE
8
Fence
GRC/52-2015/SD-008
Re-submittal
GRC/52-2015/OAM/SD/FEN001,SHEET 1 OF 1
Sign Board
GRC/52-2015/SD-009
New
Submittal
GRC/52-2015/OAM/SD/PSB001,SHEET 1 OF 1
2-Apr-16
2-Apr-16
3-Apr-16
Approved
We have checked and found comply with the sketch approved
from RTA ,so go ahead
Sign Board
location
GRC/52-2015/SD-010
New
Submittal
GRC/522015/OAM/SD/PSB/LAC-01
,SHEET 1 OF 1
5-Apr-16
5-Apr-16
11-Apr-16
Sign Board
location
GRC/52-2015/SD-010
Re-submittal
GRC/522015/OAM/SD/PSB/LAC-01
,SHEET 1 OF 1
12-Apr-16
12-Apr-16
16-Apr-16
Approved as Noted
Subjected to Comments
11
Road
Profile
GRC/52-2015/SD-011
New
Submittal
16-Apr-16
16-Apr-16
OPEN
12
Road
Profile
GRC/52-2015/SD-012
New
Submittal
GTGC/52-2015/OAM/SD/RPR- Proposed
Road
002 SHEET 1 OF 1
B03,B04,B09,B11 and B14]
18-Apr-16
18-Apr-16
OPEN
10
Page 2
Profile[Road
341446539.xls
CONTRACTOR:GHANTOOT
SCOPE
SUBMITTAL NUMBER
REV SUBMITTA
L TYPE
DRAWING/SKETCH
NUMBER
DRAWING TITLE
Page 3
STATUS
SL.N
O
1-Jan-17
Project No:
350746
Status:
A - Approved
B - Approved as Noted
DETAILS OF SUBMITAL
DATE:
COMMENTS
341446539.xls
CONTRACTOR:GHANTOOT
SCOPE
SUBMITTAL NUMBER
REV SUBMITTA
L TYPE
DRAWING/SKETCH
NUMBER
DRAWING TITLE
Page 4
STATUS
SL.N
O
1-Jan-17
Project No:
350746
Status:
A - Approved
B - Approved as Noted
DETAILS OF SUBMITAL
DATE:
COMMENTS
341446539.xls
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
S.
No.
TO:
KCE
Engineer's
Instruction No.
AKGIE-PE087/EI/001
RE
V
Contract tiltle
Date of
Contract
4-Jun-15
Contractor'
Date of
s Response
issue
Date
12-Dec-15
14-12-15
REMARKS
Subject of Instruction
KCE
AKGIE-PE087/EI/002
4-Jun-15
12-Dec-15
14-12-16
KCE
AKGIE-PE087/EI/003
4-Jun-15
20-Dec-15
21-Dec-15
KCE
AKGIE-PE087/EI/004
4-Jun-15
3-Jan-16
4-Jan-16
KCE
AKGIE-PE087/EI/005
4-Jun-15
5-Jan-16
7-Jan-16
KCE
AKGIE-PE087/EI/006
4-Jun-15
18-Jan-16
24-Jan-16
KCE
AKGIE-PE087/EI/007
4-Jun-15
24-Jan-16
24-Jan-16
KCE
AKGIE-PE087/EI/008
4-Jun-15
4-Jan-16
4-Jan-16
KCE
AKGIE-PE087/EI/009
4-Jun-15
27-Jan-16
20-Feb-16
10
KCE
AKGIE-PE087/EI/010
Page 5
STATUS
RETURNED BY KCE
WITH PROJECT
MANAGER
SIGNATURE,FILED
RETURNED BY KCE
WITH PROJECT
MANAGER
SIGNATURE,FILED
RETURNED
BY KCE
WITH PROJECT
MANAGER
SIGNATURE,FILED
RETURNED
BY KCE
WITH PROJECT
MANAGER
RETURNED
BY KCE
SIGNATURE,FILED
WITH PROJECT
MANAGER
SIGNATURE,FILED
RETURNED BY KCE
WITH PROJECT
MANAGER
RETURNED
BY KCE
SIGNATURE,FILED
WITH PROJECT
MANAGER
SIGNATURE,AFTER
RETURNED BY KCE
-EMAILED TO BOTH
CLIENT AND
KCE,FILED
RETURNED BY KCE
WITH PROJECT
MANAGER SIGNATURE
RETURNED BY KCE
WITH PROJECT
MANAGER SIGNATURE
R
R
R
R
R
EI
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
Engineer's
Instruction No.
RE
V
TO:
11
KCE
AKGIE-PE087/EI/011
12
KCE
AKGIE-PE087/EI/012
4-Jun-15
24-Feb-16
24-Feb-16
13
KCE
AKGIE-PE087/EI/013
4-Jun-15
29-Feb-16
29-Feb-16
14
KCE
AKGIE-PE087/EI/014
4-Jun-15
29-Feb-16
29-Feb-16
15
KCE
AKGIE-PE087/EI/015
4-Jun-15
6-Mar-16
7-Mar-16
16
KCE
AKGIE-PE087/EI/016
4-Jun-15
10-Mar-16
12-Mar-16
17
KCE
AKGIE-PE087/EI/017
4-Jun-15
5-Apr-16
5-Apr-16
Contract tiltle
Date of
Contract
Contractor'
Date of
s Response
issue
Date
S.
No.
REMARKS
STATUS
RETURNED BY KCE
WITH PROJECT
MANAGER SIGNATURE
RETURNED BY KCE
WITH PROJECT
MANAGER SIGNATURE
RETURNED BY KCE
Supply and Installation of Decorative Aluminium fence WITH PROJECT
MANAGER SIGNATURE
RETURNED BY KCE
WITH PROJECT
MANAGER SIGNATURE
RETURNED BY KCE
Additional Interlock paving up to the RTA Road Limits WITH PROJECT
MANAGER SIGNATURE
RETURNED BY KCE
WITH PROJECT
MANAGER SIGNATURE
Subject of Instruction
18
19
20
Page 6
EI
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
S.
No.
TO:
Engineer's
Instruction No.
RE
V
Contract tiltle
Date of
Contract
Contractor'
Date of
s Response
issue
Date
REMARKS
STATUS
Subject of Instruction
21
22
23
24
25
26
27
28
29
30
31
Page 7
EI
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
S.
No.
TO:
Engineer's
Instruction No.
RE
V
Contract tiltle
Date of
Contract
Contractor'
Date of
s Response
issue
Date
REMARKS
STATUS
Subject of Instruction
32
33
34
35
36
37
38
39
Page 8
EI
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
S.
No.
TO:
Engineer's
Instruction No.
RE
V
Contract tiltle
Date of
Contract
Contractor'
Date of
s Response
issue
Date
REMARKS
STATUS
Subject of Instruction
40
41
42
43
44
45
46
47
48
49
Page 9
EI
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
S.
No.
TO:
Engineer's
Instruction No.
RE
V
Contract tiltle
Date of
Contract
Contractor'
Date of
s Response
issue
Date
REMARKS
STATUS
Subject of Instruction
50
51
52
53
54
55
56
57
58
Page 10
EI
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
S.
No.
TO:
Engineer's
Instruction No.
RE
V
Contract tiltle
Date of
Contract
Contractor'
Date of
s Response
issue
Date
REMARKS
STATUS
Subject of Instruction
59
60
61
62
63
64
65
66
67
Page 11
EI
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
S.
No.
TO:
Engineer's
Instruction No.
RE
V
Contract tiltle
Date of
Contract
Contractor'
Date of
s Response
issue
Date
REMARKS
STATUS
Subject of Instruction
68
69
70
71
72
Page 12
EI
CONTRACTOR:
ENGINEER'S INSTRUCTION
1-Jan-17
CONTRACTAL KHAIL GATE
350696
SUBMITTAL DETAILS
S.
No.
TO:
Engineer's
Instruction No.
RE
V
Contract tiltle
Date of
Contract
Contractor'
Date of
s Response
issue
Date
Page 13
REMARKS
STATUS
Subject of Instruction
EI
S.
No.
Scope
RD
KR502/MS/
RD
KR502/MS/
RD
RD
RD
RD
Reference No.
REV.
Material Description
0001
Khansaheb Civil
Engineering LLC
0002
Khansaheb Civil
Engineering LLC
KR502/MS/ 0003
KR502/MS/ 0004
KR502/MS/
0006
Bahrain Petroleum
Company
RTA
KR502/MS/
0007
ED
KR502/MS/
0008
Geotextile fabric
Detectable warning tape for sewer, drainage and Kangaroo Plastic Middle
irrigation
East LLC, Dubai
KR502/MS/
0012
KR502/MS/ 0013
BASF Construction
Chemicals LLC, UAE
BASF Construction
Chemicals LLC, UAE
BASF Construction
Chemicals LLC, UAE
KR502/MS/
SERVICES KR502/MS/
10
SERVICES
11
DU
12
WD
13
SERVICES
14
SERVICES KR502/MS/
15
SERVICES
0005
0009
KR502/MS/
0010
KR502/MS/
KR502/MS/
0015
0011
0014
Page 14
Mattex Geosynthesis,
K.S.A
LIST OF MS
S.
No.
Scope
Reference No.
16
ED, SL,
RTA
KR502/MS/
0016
17
SERVICES
KR502/MS/
0017
BASF Construction
Chemicals LLC, UAE
18
SERVICES
KR502/MS/
0018
19
DR
KR502/MS/
0019
BASF Construction
Chemicals LLC, UAE
20
DR
KR502/MS/
0020
BASF Construction
Chemicals LLC, UAE
21
SL
KR502/MS/
0021
22
SL
KR502/MS/
0022
REV.
Material Description
23
SL
KR502/MS/
0023
24
SL
KR502/MS/
0024
25
RD
KR502/MS/
0025
Precast Concrete Kerbstones (Upstand Kerb150*305mm, Heel Kerb - 75*150mm, Drop Kerb 150*305mm & Flush Kerb - 225*150mm)
26
RD
KR502/MS/
0026
27
RD
KR502/MS/
0027
M/s SCHREDER,ITALY
28
SERVICES
KR502/MS/
0028
29
SERVICES
KR502/MS/0028A
Page 15
LIST OF MS
S.
No.
Scope
Reference No.
REV.
30
SERVICES
KR502/MS/
0029
31
SERVICES
KR502/MS/
0030
32
SERVICES KR502/MS/0030A
33
SERVICES
KR502/MS/
0031
34
SERVICES
KR502/MS/
0032
35
CM
KR502/MS/
0033
CONCRETE MIXTURES
36
SL
KR502/MS/
0034
M/s CONNECT
SWITCHGEAR ASSEMBLY
LLC,SHARJAH
37
DR &
SW
WORKS
KR502/MS/
0035
38
DR
KR502/MS/
0036
39
ED, SL,
RTA
KR502/MS/
0037
40
ED, SL,
RTA
KR502/MS/0037A
Material Description
Page 16
M/s SAHARA
ALUMINIUM ,DUBAI
LIST OF MS
S.
No.
Scope
Reference No.
REV.
41
CM
KR502/MS/
0033 Rev.01
CONCRETE MIXTURES
42
ROAD
LIGHTING
WORKS
KR502/MS/
0038
EARTHING SYSTEM
43
RD
KR502/MS/
0039
GRANULAR SUB-BASE
44
SL
KR502/MS/
0040
45
RD
KR502/MS/
0041
46
RD
KR502/MS/
0042
47
SERVICES
KR502/MS/0043
48
RD &
PAVINGS
KR502/MS/0044
AL KAWTHER
CRUSHER,SIJI
49
POTABLE
WATER
WORKS
KR502/MS/0045
50
POTABLE
WATER
SERVICE
KR502/MS/0046
BELGICAST
INTERNATIONAL,SPAIN
51
POTABLE
WATER
WORKS
KR502/MS/0047
MODERN EAST
FABRICATION AND
ENGINEERING,UAE
KR502/MS/0048
52
Material Description
Page 17
M/s.SCIENTECHNIC L.L.C
LIST OF MS
S.
No.
Scope
Reference No.
REV.
53
TELECOM
DUCT
WORKS
KR502/MS/0049
KR502/MS/0050
54
Material Description
Page 18
M/s KANGAROO
PLASTICS ,DUBAI,U.A.E
M/s POLYFAB PLASTIC
INDUSTRY LLC
LIST OF MS
Manufacturer
Scope
Reference No.
REV.
Material Description
Page 19
LIST OF MS
SEAS LIMITED,DUBAI
L SUBMITTAL LISTS
Supplier
Khansaheb Civil
Engineering LLC
Khansaheb Civil
Engineering LLC
Khansaheb Civil
Engineering LLC
Oasis Grease and
Lubricants Ind. LLC,
Sharjah
Gulf Petrochem, Sharjah
ENOC Commercial and
Distribution
Dutcotenant LLC, Dubai
Page 20
LIST OF MS
SEAS LIMITED,DUBAI
L SUBMITTAL LISTS
Supplier
Page 21
LIST OF MS
SEAS LIMITED,DUBAI
L SUBMITTAL LISTS
Supplier
Page 22
LIST OF MS
SEAS LIMITED,DUBAI
L SUBMITTAL LISTS
Supplier
SAHAR GENERAL
TRANSPORT LLC
MODERN EAST
FABRICATION AND
ENGINEERING,UAE
AS PER ATTACHED
MATERIAL LIST
Page 23
LIST OF MS
SEAS LIMITED,DUBAI
L SUBMITTAL LISTS
Supplier
M/s.DUTCOTENNANT
LLC,DUBAI,U.A.E
M/s POLYFAB PLASTIC
INDUSTRY LLC
Page 24
LIST OF MS
SEAS LIMITED,DUBAI
L SUBMITTAL LISTS
Supplier
Page 25
LIST OF MS
Summary
Approved / Approved as Noted
37
35
8
TOTAL SUBMISSIONS
80
Date:
1-Jan-17
Reference Details
Details of Submittals
MC/0003
(Supplier 3)
500V/TD/PR/HN/
AP/0032
23
MC-0005
(Supplier 5)
500V/MRHE/P/TN
/IF/0378
34
MC-009
500V/TD/PR/HN/
AP/0014
35
MC-009 (I)
500V/TD/PR/HN/
AP/0084
Stat
us
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
Remarks / Notes:
22-Jun
25-Jun-16
20-Jul-16
21-Sep
24-Sep-16
25-Sep-16
14-Jun
18-Jun-16
11-Jul-16
23
20-Jul
24-Jul-16
3-Aug-16
10
15-Jun
18-Jun-16
11-Jul-16
23
14-Jun
18-Jun-16
19-Jun-16
37
MC-010
500V/TD/PR/HN/
AP/0016
Mould Release Agent (Water Base) Spec Clean Strike EF: Emulsified
blend containing chemically reacting
release agent used as a surface
treatment for concrete, formwork,
white liquid, clean or drying.
45
MC-012
500H/MRHE/TD/T
N/IF/0015
Page 26
25
CIVIL
500H/MRHE/TD/T
N/IF/0017
46
74
Details of Submittals
A
Joint sealant (SpECseal PU 25):
Polyurethane Construction Sealant
MC-012 (i)
MC-027(i)
(Supplier 1)
500H/MRHE/TD/T
N/IF/0039
500V/TD/PR/SJ/J
R/0678
Stat
us
Reference Details
Remarks / Notes:
15-Jun
18-Jun-16
20-Jun-16
26-Jun
29-Jun-16
20-Jul-16
21
17-Oct
18-Oct-16
27-Oct-16
Page 27
CIVIL
11
4
1
16
TOTAL SUBMISSIONS
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
Details of Submittals
S.
No.
Submittal
No.
Transmittal No.
Rev
SC/001
500V/TD/PR/HN/
AP/0006
500V/TD/PR/HN/
AP/0024
SC/002
500V/TD/PR/HN/
AP/0085
Manufacturer
Supplier
Duration of
Response
Status
Reference Details
Remarks / Notes:
Document Date
Outgoing Date
Response
Received Date
28-May
28-May-16
13-Jun-16
21-Jun
23-Jun-16
26-Jul-16
21-Jul
25-Jul-16
8-Aug-16
SC/002
500V/TD/PR/HN/
AP/0172
16-Aug
18-Aug-16
1-Sep-16
SC/003
500H/MRHE/P/TN
/IF/0028
M/s. AL Ghurair
Construction Readymix LLC
26-Jun
26-Jun-16
14-Jul-16
500H/MRHE/P/TN
/IF/0030
28-Jun
29-Jun-16
4-Jul-16
500H/MRHE/P/TN
/IF/0035 (S/S)
9-Jul
9-Jul-16
13-Jul-16
SC/003
(Supplier 2)
Subcontractor
S.
No.
Submittal
No.
SC/003
(Supplier 2)
SC/003
(Supplier 3)
SC/003
(Supplier 4)
SC/003
(Supplier 5)
Transmittal No.
Details of Submittals
Rev
500H/MRHE/P/TN
/IF/0517
500V/TD/HN/JR/
0698
500H/MRHE/P/TN
/IF/0049
500H/MRHE/P/TN
/IF/0516
500H/MRHE/P/TN
/IF/0658
500H/MRHE/P/TN
/IF/0645
500H/MRHE/P/TN
/IF/0050
SC/004
500H/MRHE/P/TN
/IF/0089
Manufacturer
Supplier
Duration of
Response
Status
Reference Details
Remarks / Notes:
Document Date
Outgoing Date
Response
Received Date
29-Sep
4-Oct-16
10-Oct-16
23-Oct
25-Oct-16
5-Nov-16
3-Jul
9-Jul-16
13-Jul-16
29-Sep
4-Oct-16
10-Oct-16
13-Oct
17-Oct-16
31-Oct-16
12-Oct
15-Oct-16
19-Oct-16
3-Jul
9-Jul-16
10-Jul-16
21-Jul
24-Jul-16
25-Jul-16
10
SC/004
(Subcon 2)
500H/MRHE/P/TN
/IF/0142
4-Aug
7-Aug-16
25-Aug-16
11
SC/005
500H/MRHE/P/TN
/IF/0278
7-Sep
10-Sep-16
18-Sep-16
12
SC/005
(Subcon 2)
500V/TD/HN/JR/
466
20-Oct
22-Oct-16
13
SC/006
500H/MRHE/P/TN
/IF/0270
7-Sep
8-Sep-16
27-Sep-16
14
SC/007
500H/MRHE/P/TN
/IF/0538
1-Oct
4-Oct-16
27-Oct-16
15
SC/008
500H/MRHE/P/TN
/IF/0611
9-Oct
11-Oct-16
23-Oct-16
16
MEP/SC-001
500H/MRHE/P/TN
/BS/0464
11-Oct
11-Oct-16
3-Nov-16
Page 29
Subcontractor
Summary
Approved / Approved as Noted
12
5
1
18
TOTAL SUBMISSIONS
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
S.
No.
Submittal
No.
ME/0001
ME/0002
ME/0002
(Supplier 2)
Details of Submittals
Outgoing Date
Response
Received Date
5-Jul
5-Jul-16
9-Jul-16
17-Jul
19-Jul-16
21-Jul-16
25-Jul
26-Jul-16
1-Aug-16
500H/MRHE/P/TN
/IF/0075
30-Jul
30-Jul-16
1-Aug-16
500H/MRHE/P/TN
/IF/0298
8-Sep
10-Sep-16
17-Sep-16
500H/MRHE/P/TN
/IF/0330
18-Sep
19-Sep-16
20-Sep-16
500H/MRHE/P/TN
/IF/0361
28-Sep
1-Oct-16
3-Oct-16
500H/MRHE/P/TN
/BS/0531
24-Oct
24-Oct-16
2-Nov-16
Rev
500H/MRHE/P/TN
/IF/0041
500H/MRHE/P/TN
/IF/0056
500H/MRHE/P/TN
/IF/0065
Manufacturer
M/s. Al Fanar
GI Box
Supplier
Kopex - UK
M/s. Al Hathboor
Page 30
Duration of
Response
Remarks / Notes:
Document Date
Transmittal No.
Reference Details
MEP - Electrical
Summary
Approved / Approved as Noted
12
5
1
18
TOTAL SUBMISSIONS
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
Details of Submittals
S.
No.
Submittal
No.
Transmittal No.
Rev
ME/0003
500H/MRHE/P/TN
/IF/0048
Atlas
ME/0003
(Supplier 2)
500H/MRHE/P/TN
/IF/0059
Hepworth PME
500H/MRHE/P/TN
/IF/0051
500H/MRHE/P/TN
/IF/0060
500H/MRHE/P/TN
/IF/0217
500H/MRHE/P/TN
/IF/0208
500H/MRHE/P/TN
/IF/0261
500H/MRHE/P/TN
/IF/0209
ME/0004
ME/0005
ME/0006
Manufacturer
Marshal Tufflex
Ducab
Belcon
Document Date
Outgoing Date
Response
Received Date
11-Jul
16-Jul-16
20-Jul-16
22-Jul
23-Jul-16
1-Aug-16
11-Jul
17-Jul-16
21-Jul-16
24-Jul
25-Jul-16
30-Jul-16
23-Aug
24-Aug-16
5-Sep-16
18-Aug
21-Aug-16
27-Aug-16
29-Aug
30-Aug-16
5-Sep-16
20-Aug
22-Aug-16
10-Sep-16
Supplier
Duration of
Response
Status
Reference Details
M/s. Ducab
Page 31
MEP - Electrical
Summary
Approved / Approved as Noted
12
5
1
18
TOTAL SUBMISSIONS
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
S.
No.
10
11
12
Submittal
No.
Details of Submittals
Transmittal No.
Rev
500H/MRHE/P/TN
/IF/0359
0
Structured Cabling System
-Components
ME/0006 - A
500H/MRHE/P/TN
/BS/0563
500H/MRHE/P/TN
/IF/0360
0
Structured Cabling System
-Networking Cabinets
ME/0006 - B
Manufacturer
Belcon
Rexton
Supplier
Duration of
Response
Remarks / Notes:
Document Date
Outgoing Date
Response
Received Date
28-Sep
1-Oct-16
17-Oct-16
3-Nov
3-Nov-16
28-Sep
1-Oct-16
9-Oct-16
26-Oct
27-Oct-16
30-Oct-16
20-Aug
22-Aug-16
5-Sep-16
500H/MRHE/P/TN
/BS/0544
500H/MRHE/P/TN
/IF/0210
500H/MRHE/P/TN
/IF/0299
8-Sep
10-Sep-16
27-Sep-16
500H/MRHE/P/TN
/IF/0229
23-Aug
25-Aug-16
29-Aug-16
- ###
ME/0007
ME/0008
Reference Details
Isolator
Elektra
Firecel
"B"
Page 32
MEP - Electrical
Summary
Approved / Approved as Noted
12
5
1
18
TOTAL SUBMISSIONS
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
S.
No.
Submittal
No.
12
ME/0008
Transmittal No.
Details of Submittals
Rev
Manufacturer
Firecel
Supplier
Duration of
Response
Remarks / Notes:
Status
Reference Details
Document Date
Outgoing Date
Response
Received Date
8-Sep
10-Sep-16
26-Sep-16
13
ME/0009
500H/MRHE/P/TN
/IF/0294
Belden
7-Sep
8-Sep-16
15-Sep-16
14
ME/0010
500H/MRHE/P/TN
/IF/0295
Flexible Cable
Ducab
8-Sep
10-Sep-16
26-Sep-16
14-Sep
14-Sep-16
17-Sep-16
ME/0011
500H/MRHE/P/TN
/IF/0304
15
500H/MRHE/P/TN
/IF/0433
(AICO/EI)
M/s. Naffco
9-Oct
10-Oct-16
17-Oct-16
500H/MRHE/P/TN
/BS/0394
3-Oct
4-Oct-16
9-Oct-16
13-Oct
15-Oct-16
17-Oct-16
12-Oct
18-Oct-16
25-Oct-16
16
17
ME/0012
ME/0013
500H/MRHE/P/TN
/BS/0471
500H/MRHE/P/TN
/BS/0470
BICC
Legrand
M/s. Hathboor
Page 33
MEP - Electrical
Summary
Approved / Approved as Noted
12
5
1
18
TOTAL SUBMISSIONS
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
Details of Submittals
S.
No.
Submittal
No.
Transmittal No.
Rev
18
ME/0014
500H/MRHE/P/TN
/BS/0494
Wiring Accessories
Manufacturer
MK-UK
Supplier
Page 34
Document Date
Outgoing Date
Response
Received Date
19-Oct
20-Oct-16
23-Oct-16
Duration of
Response
Remarks / Notes:
Status
Reference Details
MEP - Electrical
Summary
Approved / Approved as Noted
16
13
3
TOTAL SUBMISSIONS
32
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
Details of Submittals
S.
No.
Submittal
No.
Transmittal No.
Rev
MM/0001
500H/MRHE/P/TN
/IF/0047
Flowtech
MM/0001
(Supplier 2)
500H/MRHE/P/TN
/IF/0132
MM/0002
500H/MRHE/P/TN
/IF/0046
MM/0002
(Supplier 2)
500H/MRHE/P/TN
/IF/0133
MM/0003
MM/0003
(Supplier 2)
Status
Reference Details
Document Date
Outgoing Date
Response
Received Date
Duration of
Response
11-Jul
17-Jul-16
19-Jul-16
14-Aug
15-Aug-16
23-Aug-16
Flowtech
14-Aug
17-Jul-16
19-Jul-16
14-Aug
15-Aug-16
23-Aug-16
500H/MRHE/P/TN
/IF/0052
Flowtech
11-Jul
17-Jul-16
19-Jul-16
500H/MRHE/P/TN
/IF/0059
14-Aug
15-Aug-16
22-Aug-16
Hepworth PME
Manufacturer
Supplier
Page 35
MEP - Mechanical
Summary
Approved / Approved as Noted
16
13
3
TOTAL SUBMISSIONS
32
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
S.
No.
Submittal
No.
MM/0003
(Supplier 2)
MM/0004
MM/0004
(Supplier 2)
MM/0005
Transmittal No.
Details of Submittals
Rev
500H/MRHE/P/TN
/IF/0214
500H/MRHE/P/TN
/IF/0275
500H/MRHE/P/TN
/IF/0342
500H/MRHE/P/TN
/IF/0226
500H/MRHE/P/TN
/IF/0263
Manufacturer
Hepworth PME
Supplier
Polypie (Terrain)
Unidelta
Document Date
Outgoing Date
Response
Received Date
Duration of
Response
23-Aug
24-Aug-16
5-Sep-16
12
20-Aug
22-Aug-16
24-Aug-16
4-Sep
6-Sep-16
14-Sep-16
25-Sep
25-Sep-16
8-Oct-16
13
23-Aug
24-Aug-16
28-Aug-16
- ###
30-Aug
31-Aug-16
5-Sep-16
17
Remarks / Notes:
Status
Reference Details
10
MM/0006
500H/MRHE/P/TN
/IF/0293
Water Tanks
Polycon
7-Sep
8-Sep-16
25-Sep-16
11
MM/0007
500H/MRHE/P/TN
/IF/0296
Solimpeks
8-Sep
14-Sep-16
20-Sep-16
Page 36
MEP - Mechanical
Summary
Approved / Approved as Noted
16
13
3
TOTAL SUBMISSIONS
32
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
S.
No.
Submittal
No.
12
MM/0007
(Supplier 2)
13
14
MM/0008
Details of Submittals
Transmittal No.
Rev
500H/MRHE/P/TN
/BS/425
500H/MRHE/P/TN
/BS/558
500H/MRHE/P/TN
/IF/0297
500H/MRHE/P/TN
/IF/0430
MM/0009-A
Manufacturer
Ariston
Supplier
Vimco
Booster Pumps
Armstrong
Duration of
Response
Remarks / Notes:
Status
Reference Details
Document Date
Outgoing Date
Response
Received Date
6-Oct
9-Oct-16
22-Oct-16
31-Oct
2-Nov-16
8-Sep
10-Sep-16
25-Sep-16
9-Oct
11-Oct-16
17-Oct-16
27-Oct
29-Oct-16
2-Nov-16
500H/MRHE/P/TN
/IF/0549
MM/0009-B
500H/MRHE/P/TN
/IF/0554
Transfer Pumps
Armstrong
29-Oct
29-Oct-16
2-Nov-16
15
MM/0010
500H/MRHE/P/TN
/IF/0343
Hepworth
25-Sep
25-Sep-16
8-Oct-16
16
MM/0011
500H/MRHE/P/TN
/IF/0347
GI Sheets
Nippon
25-Sep
27-Sep-16
10-Oct-16
500H/MRHE/P/TN
/IF/0362
28-Sep
1-Oct-16
3-Oct-16
17
MM/0012
AC Split Unit
Carrier
Page 37
MEP - Mechanical
Summary
Approved / Approved as Noted
16
13
3
TOTAL SUBMISSIONS
32
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
Details of Submittals
S.
No.
Submittal
No.
Transmittal No.
Rev
17
MM/0012
500H/MRHE/P/TN
/BS/527
500H/MRHE/P/TN
/BS/546
500H/MRHE/P/TN
/BS/0392
500H/MRHE/P/TN
/BS/0426
500H/MRHE/P/TN
/BS/0466
500H/MRHE/P/TN
/BS/0484
500H/MRHE/P/TN
/BS/393
500H/MRHE/P/TN
/BS/543
18
19
20
MM/0013
MM/0013
(Supplier 2)
MM/0014
AC Split Unit
Valves
Exhaust Fans
Manufacturer
Carrier
Tecofi
Pegler - UK
S&P
Supplier
Outgoing Date
Response
Received Date
23-Oct
24-Oct-16
26-Oct-16
26-Oct
27-Oct-16
1-Nov-16
3-Oct
4-Oct-16
5-Oct-16
6-Oct
9-Oct-16
11-Oct-16
12-Oct
12-Oct-16
15-Oct-16
17-Oct
18-Oct-16
25-Oct-16
3-Oct
4-Oct-16
5-Oct-16
26-Oct
26-Oct-16
30-Oct-16
MM/0015
500H/MRHE/P/TN
/BS/530
Beta - UAE
23-Oct
24-Oct-16
22
MM/0016
500H/MRHE/P/TN
/BS/467
Envotec - USA
12-Oct
12-Oct-16
Page 38
Remarks / Notes:
Document Date
21
Duration of
Response
Status
Reference Details
O
17-Oct-16
MEP - Mechanical
Summary
Approved / Approved as Noted
16
13
3
TOTAL SUBMISSIONS
32
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
S.
No.
Submittal
No.
23
MM/0017
Details of Submittals
Transmittal No.
Rev
500H/MRHE/P/TN
/BS/469
500H/MRHE/P/TN
/BS/493
Manufacturer
Lawton - UK
Supplier
Duration of
Response
Remarks / Notes:
Status
Reference Details
Document Date
Outgoing Date
Response
Received Date
12-Oct
13-Oct-16
16-Oct-16
18-Oct
19-Oct-16
25-Oct-16
24
MM/0018
500H/MRHE/P/TN
/BS/485
Aerofoam - U.A.E.
15-Oct
18-Oct-16
25-Oct-16
25
MM/0019
500H/MRHE/P/TN
/BS/476
Ideal - U.S.A.
M/s. Meaptashi
15-Oct
17-Oct-16
25-Oct-16
26
MM/0020
500H/MRHE/P/TN
/BS/477
Canvas Cloth
15-Oct
17-Oct-16
19-Oct-16
27
MM/0021
500H/MRHE/P/TN
/BS/528
Air Vents
Watts - Italy
23-Oct
24-Oct-16
2-Nov-16
28
MM/0022
500H/MRHE/P/TN
/BS/529
23-Oct
24-Oct-16
5-Nov-16
29
MM/0023
500H/MRHE/P/TN
/BS/536
Ambush - UAE
23-Oct
25-Oct-16
2-Nov-16
30
MM/0024
500H/MRHE/P/TN
/BS/540
Hepworth - UAE
25-Oct
25-Oct-16
30-Oct-16
31
MM/0025
500H/MRHE/P/TN
/BS/567
Pegler - UK
3-Nov
5-Nov-16
Page 39
MEP - Mechanical
Summary
Approved / Approved as Noted
16
13
3
TOTAL SUBMISSIONS
32
Date:
1-Jan-17
A - Approved
B - Approved As Noted
C - Revise & Re-submit
D - Rejected
O - Under Review (POL)
S.
No.
Submittal
No.
Transmittal No.
Details of Submittals
Rev
Manufacturer
Supplier
Document Date
Page 40
Outgoing Date
Response
Received Date
Duration of
Response
Remarks / Notes:
MEP - Mechanical
Status
Reference Details