Working Drawings Checklist PDF
Working Drawings Checklist PDF
Working Drawings Checklist PDF
Floor plan
Plan element
Remarks
Room titles
emphasised.
Floor finishes
Change in levels
steps, stairs.
by dotted indication.
by dotted indication.
note materials.
Services
Scale
usually 1:100.
North point
BC1731
Page 1 of 6
Elevations
Plan element
Remarks
FL to CL heights
particularly if stepped.
include RWPs.
Overhangs dimensioned
eg eaves, gables.
Meter boxes
eg gable ends.
Usually 1:100.
BC1731
Page 2 of 6
Section
Plan element
Remarks
FL to CL heights
FL floor level
CL ceiling level
GL original and finished
Footings
Roof construction
Scale
usually 1:100.
BC1731
Page 3 of 6
Site plan
Plan element
Remarks
Site size
Setbacks
Clothes line
if in contract.
Scale
usually 1:200.
North point
BC1731
Page 4 of 6
Footing plan
Sometimes required where it is not obvious from the floor plan as to the footing layout, dimensions
overall widths, setbacks etc.
Plan element
Remarks
ie isolated footings.
relate to elevations.
Floor construction
Scale
usually 1:100.
Footing details
Plan element
Remarks
if related to coursing.
Scale
usually 1:10.
BC1731
Page 5 of 6
General
Plan element
Remarks
ie of project.
BC1731
Page 6 of 6