PRE-GROUT INSPECTION
All grout per ASTM C476, 8-10 slump, mix design and psi per SEOR (structural
engineer of record)
Grout consolidation and reconsolidation per ACI 530.5E
Maximum pour height per Approved plans and ACI 530
Maximum lift height per ACI 530 3.5D
Periodic deputy inspection of reinforcement (and materials) per CBC1704.5.1
Special inspection requirements apply to all masonry per CBC 1704.5.1(all
grouting requires continuous deputy inspection and periodic inspection of
reinforcement)
Deputy(s) registered with the City of Santa Monica (S.M.M.C.)
Verify permit description reflects actual work being performed.
Minimum grout key of 1 per ACI 530 3.5F
Bed and head joints 3/8+/- 1/8 and initial bed joints min.and 3/4 max. per ACI
Hot/cold weather precaution requirements in place per CBC 21
FINAL INSPECTION
Wall construction complete, wall capped
Appropriate curing time for retaining wall prior to backfill (28 days typical)
Wall height and length per approved plans
All grout lifts signed off, all city agencies approved
Final deputy inspectors report per CBC 1704
Wall passes the visual acceptance criteria of ACI 530
Smoke alarms per CBC 907
Carbon Monoxide detectors per CBC 420
Seismic gas shutoff valve if permit valuation is over $10,000