Preliminary Audit Report: Future Vision Netlink LTD.

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

International Standards Certifications Pty Ltd

Report No

A/91/

Page No.

1 of 3

A.C.N. 071 810 949

Suite 32, No 7, Anella Ave Castle Hill, NSW 2154, Australia.

Audit Date(s)

11th July2002

PRELIMINARY AUDIT REPORT


COMPANY:

Future Vision Netlink Ltd.,

AUDITED
SITE(S):

108, Lalita Complex, Nr. H. D. F. C. Bank, Mithakali Six Road, Navrangpura,


Ahmedabad 380 009. Gujarat, India.

STANDARD:
CLIENT:

ISO 9002:1994
As above
SCOPE OF AUDIT / CAPABILITY

Scope : Multi level Marketing of Web Spaces

Total Manpower :
ANZSIC Code :

Reported By..SignatureDate. ...


4.1

MANAGEMENT RESPONSIBILITY:
FORM 5 AUDREP 1
ISSUE 1
REV 2

Page 1 of 3

Company name
PRELIMINARY AUDIT REPORT
BY:

Report No

A/91/

Page No.

2 of 3

Audit Date(s)

4.2

QUALITY SYSTEM:

4.3

CONTRACT REVIEW :

4.4

DESIGN CONTROL:

.
4.5

DOCUMENTS AND DATA CONTROL:

4.6

PURCHASING:

4.7

CONTROL OF CUSTOMER SUPPLIED PRODUCT:

4.8

PRODUCT IDENTIFICATION AND TRACEABILITY:

.
4.9

PROCESS CONTROL:

4.10

INSPECTION AND TESTING:

4.11

CONTROL OF INSPECTION AND MEASURING AND TEST EQUIPMENT:


FORM 5 AUDREP 1
ISSUE 1
REV 2

Page 2 of 3

Company name
PRELIMINARY AUDIT REPORT
BY:

4.12

Report No

A/91/

Page No.

3 of 3

Audit Date(s)

INSPECTION AND TEST STATUS:

.
4.13

CONTROL OF NON-CONFORMING PRODUCTS:

.
4.14

CORRECTIVE AND PREVENTIVE ACTION:

4.15

HANDLING, STORAGE, PACKING, PRESERVATION AND DELIVERY:

4.16

CONTROL OF QUALITY RECORDS:

4.17

INTERNAL QUALITY AUDIT:

4.18

TRAINING

4.19

SERVICING:

4.20

STATISTICAL TECHNIQUES:

FORM 5 AUDREP 1
ISSUE 1
REV 2

Page 3 of 3

You might also like