Water Storage Tank Calculations

This document contains calculations for the water storage tank capacity needed for a new construction project in Shahunagar, Belgaum. It tabulates the different plumbing fixtures on each floor and calculates their water fixture unit values. The total fixture units for the building is 851.4. The peak flow is calculated as 180 gallons per minute. The required daily water consumption is 32,400 gallons or 122,647 liters. The size of the overhead water tank for each floor is determined to be 61,323 liters. The underground water storage tank size is calculated to be 246 cubic meters, with each of the two tanks needing a capacity of 123,300 liters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
382 views6 pages

Water Storage Tank Calculations

This document contains calculations for the water storage tank capacity needed for a new construction project in Shahunagar, Belgaum. It tabulates the different plumbing fixtures on each floor and calculates their water fixture unit values. The total fixture units for the building is 851.4. The peak flow is calculated as 180 gallons per minute. The required daily water consumption is 32,400 gallons or 122,647 liters. The size of the overhead water tank for each floor is determined to be 61,323 liters. The underground water storage tank size is calculated to be 246 cubic meters, with each of the two tanks needing a capacity of 123,300 liters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Calculation sheet

STORAGE TANK CAPACITY


CALCULATIONS
087-C08

Contract No. :
: Project Title

SHAHU NAGAR, BELGAUM

Mudassar

Designed by :

087-C08-CALC-20UA-MA-0

Document no. :

Note :
1. Load values assigned to fixtures are based on 2009 IPC, Appendix E, Table E103.3(2), page 130. (see a
2. Table for estimsting demand is based on 2009 IPC, Appendix E, Table E103.3(3), page 131-132.. (see a

Tabulated different kinds of Fixtures with their equivalent water fixture units value in e
floor
level
1.

name of fixtures

flow
theoritical adopted
CWS fu fixture calculated
3
value quantity
fu
(gpm) m /sec diameter diameter
(mm)
(mm)

Basement Floor - Parking

HB
t o t a l
2.

WC pl
PS

5
3

6
6

LAV.pl

ws f u

WC pl
WC pr
PS

5
2.2
3

10
4
14

LAV.- pl

30
18
4
52

0.00
0

0.7
4
ws f u

50
8.8
42
4
2.8
107.6

0.00
0

2nd Floor - RESIDENTIAL

WC

2.2

20

LAV. Aqva
LAV. Dining
KS
SH
WM-PR

0.7
0.7
1.4
1.4
1.4

1
10
10
20
10

HB
PS
t o t a l
5.

1st Floor - COMMERCIAL

LAV - PR
t o t a l
4.

9
9

Ground Floor - COMMERCIAL

t o t a l
3.

3
3
ws f u

3
1
3
20
ws f u

44
0.7
7
14
28
14
3
60
170.7

0.00

3rd Floor - RESIDENTIAL

WC

2.2

20

LAV. Aqva
LAV. Dining
KS

0.7
0.7
1.4

1
10
10

44
0.7
7
14
0.00

Calculation sheet
STORAGE TANK CAPACITY
CALCULATIONS
087-C08

Contract No. :
: Project Title

SHAHU NAGAR, BELGAUM

Mudassar

Designed by :

087-C08-CALC-20UA-MA-0

Document no. :

Note :
1. Load values assigned to fixtures are based on 2009 IPC, Appendix E, Table E103.3(2), page 130. (see a
2. Table for estimsting demand is based on 2009 IPC, Appendix E, Table E103.3(3), page 131-132.. (see a

Tabulated different kinds of Fixtures with their equivalent water fixture units value in e
floor
level

6.

theoritical
adopted
0.00
diameter diameter
(mm)
(mm)
0

4th Floor - RESIDENTIAL

WC

2.2

20

LAV. Aqva
LAV. Dining
KS
SH
WM-PR

0.7
0.7
1.4
1.4
1.4

1
10
10
20
10

HB
PS
t o t a l
7.

flow

calculated
SHfixtures CWS
1.4 fu fixture
20
28
name of
value
quantity
fu
WM-PR
1.4
10
14
HB
3
1
3
PS
3
20
60
t o t a l
ws f u
170.7

3
1
3
20
ws f u

44
0.7
7
14
28
14
3
60
170.7

0.00

5th Floor - RESIDENTIAL

WC

2.2

20

LAV. Aqva
LAV. Dining
KS
SH
WM-PR

0.7
0.7
1.4
1.4
1.4

1
10
10
20
10

HB
PS
t o t a l

Total FU in all the Buildings

Therefore, Peak Flow

3
1
3
20
ws f u

44
0.7
7
14
28
14
3
60
170.7

851.4
180

0.00

FU
GPM

Equivalent in GPM

176.5 or say;

Calculation sheet
STORAGE TANK CAPACITY
CALCULATIONS

Contract No. :
: Project Title

SHAHU NAGAR, BELGAUM

Designed by :

087-C08
Mudassar

Document no. :

087-C08-CALC-20UA-MA-0

Note :
1. Load values assigned to fixtures are based on 2009 IPC, Appendix E, Table E103.3(2), page 130. (see a
2. Table for estimsting demand is based on 2009 IPC, Appendix E, Table E103.3(3), page 131-132.. (see a

Tabulated different kinds of Fixtures with their equivalent water fixture units value in e
flow

theoritical adopted
diameter diameter
(mm)
(mm)
Peak flow = Average flow x peak factor
where : Average flow = daily consumpt
Per day usage = 9 hours (cons
Peak factor = 3
Therefore, Daily consumption = Peak flow x Hours per day usage / Peak factor
= 180 gpm x 9 hours x 60 minutes / 3 = 32,400 gallons = 122,647
This Tank Size is for Overhead Tank = 123 m3

floor
CWS fu fixture calculated
Required
Water
Storage
name of
fixturesTank Capacity
level
value quantity
fu

Overhead Tanks are divided into 2 nos, So Each Tank Will have 61,323 Litres Capacity.
Under Groundr Storage Tank Size:
Assuming a Frequency rate of 2: Means every Alternate day Municiple Water sevice rate
Considering 2-day storage, the rquired Water Storage Tank Capacity = (123 x 2) = 246 m3
Under Groundr Storage Tank Size: = 246 m3
Underground Tanks are divided into 2 nos, So Each Tank Will have 123,300 Litres Capacity.
Hence, the required size of the water storage tank is : L (length) = 10 m, W (width) = 6 m, D(depth) = 3.20 m

Task no. :

Date :

Oct-16

087-C08-CALC-20UA-MA-00

Design Stage :
Checked by:
Revision no. :

2), page 130. (see attachment)


ge 131-132.. (see attachment)

ture units value in each Floor


inside
actual
diameter velocity
(mm)
(m/sec)

90%

remarks

Task no. :

Date :

Oct-16

087-C08-CALC-20UA-MA-00

Design Stage :
Checked by:
Revision no. :

2), page 130. (see attachment)


ge 131-132.. (see attachment)

ture units value in each Floor


inside
actual
diameter velocity
(mm)
(m/sec)

176.5 or say;

180

90%

remarks

GPM

Task no. :

Date :

Oct-16

087-C08-CALC-20UA-MA-00

Design Stage :

90%

Checked by:
Revision no. :

2), page 130. (see attachment)


ge 131-132.. (see attachment)

ture units value in each Floor

inside
actual
remarks
diameter velocity
(mm)
(m/sec)
flow = daily consumption / hours per day usage
usage = 9 hours (considered for office building)
ctor = 3

400 gallons = 122,647 liters , say 123 m3

ice rate
m3

m, D(depth) = 3.20 m