Gantt Chart Capstone

This Gantt chart outlines the tasks and timeline for a project on developing a container system. Key project milestones include a literature review, project proposal writing, site visits, design development, thesis writing, and thesis submission. The project is scheduled to be completed by June 2017 with thesis corrections submitted.

Uploaded by

Wan Radhiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views2 pages

Gantt Chart Capstone

This Gantt chart outlines the tasks and timeline for a project on developing a container system. Key project milestones include a literature review, project proposal writing, site visits, design development, thesis writing, and thesis submission. The project is scheduled to be completed by June 2017 with thesis corrections submitted.

Uploaded by

Wan Radhiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ID

Task Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Duration

Start

Qtr 3, 2016
Aug

Briefing on Title/Introduction
Literature Review/Methodology
Overview on Project
Brainstorming
Journal/Article Finding
Project Proposal Writing
Chapter 1
Chapter 2
Chapter 3
Site Visit at Jabatan Pertanian Perlis
Proposal Submission
Proposal Defence
Proposal Correction
Submission of Final Report
Data Analysis
Design Criteria
Material & Storage Calculation
Costing
Engineering Drawing
Design seating (3 drawing)
Design Measurements
Best Design Selection

Project: CONTAINER SYSTEM


Date: Mon 11/14/16

4 days
17 days
3 days
5 days
9 days
32 days
5 days
16 days
11 days
1 day
1 day
5 days
5 days
1 day
40 days
5 days
20 days
15 days
20 days
6 days
6 days
8 days

Sep

Qtr 4, 2016
Oct
Nov

Dec

Qtr 1, 2017
Jan
Feb

Mon 9/5/16
Fri 9/9/16
Fri 9/9/16
Wed 9/14/16
Wed 9/21/16
Tue 10/4/16
Tue 10/4/16
Tue 10/11/16
Wed 11/2/16
Fri 11/11/16
Mon 11/14/16
Fri 11/25/16
Fri 12/2/16
Fri 12/9/16
Fri 12/9/16
Fri 12/9/16
Thu 12/15/16
Thu 1/12/17
Thu 2/2/17
Thu 2/2/17
Fri 2/10/17
Mon 2/20/17

Task

Manual Task

Deadline

Split

Duration-only

Baseline

Milestone

Manual Summary Rollup

Baseline Milestone

Summary

Manual Summary

Baseline Summary

Project Summary

Start-only

Progress

Inactive Task

Finish-only

Manual Progress

Inactive Milestone

External Tasks

Inactive Summary

External Milestone

Page 1

Mar

Qtr 2, 2017
Apr
May

Jun

Jul

ID

Task Name
23
24
25
26
27
28
29
30
31
32
33

Duration

Start

Qtr 3, 2016
Aug

Thesis Writing
Chapter 1 : Introduction
Chapter 2 : Lit Review
Chapter 3 : Design Approach
Chapter 4 : Design Outcome
Chapter 5 : Conclusion &
Recommendation
Thesis
Submission
Viva voce Preparation
Viva Vove
Thesis Correction
Corrected Thesis Submission

Project: CONTAINER SYSTEM


Date: Mon 11/14/16

30 days
6 days
6 days
6 days
6 days
6 days
1 day
5 days
5 days
8 days
1 day

Sep

Qtr 4, 2016
Oct
Nov

Dec

Qtr 1, 2017
Jan
Feb

Thu 3/2/17
Thu 3/2/17
Fri 3/10/17
Mon 3/20/17
Tue 3/28/17
Wed 4/5/17
Fri 5/5/17
Mon 5/8/17
Mon 5/15/17
Mon 5/22/17
Thu 6/1/17

Task

Manual Task

Deadline

Split

Duration-only

Baseline

Milestone

Manual Summary Rollup

Baseline Milestone

Summary

Manual Summary

Baseline Summary

Project Summary

Start-only

Progress

Inactive Task

Finish-only

Manual Progress

Inactive Milestone

External Tasks

Inactive Summary

External Milestone

Page 2