0% found this document useful (0 votes)
188 views3 pages

TOR Template

This document outlines the terms of reference for a major project at Temasek Polytechnic School of Informatics & IT. It provides details on the project such as objectives to develop a mobile and wireless computing system, the scope of work including subsystems and milestones, distribution of tasks among team members, constraints, resource needs, potential problems and contingency plans, and a schedule in Gantt chart format to track progress over 15 weeks. It also includes a section for documenting changes to the document throughout the project.

Uploaded by

Aidil Abdullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views3 pages

TOR Template

This document outlines the terms of reference for a major project at Temasek Polytechnic School of Informatics & IT. It provides details on the project such as objectives to develop a mobile and wireless computing system, the scope of work including subsystems and milestones, distribution of tasks among team members, constraints, resource needs, potential problems and contingency plans, and a schedule in Gantt chart format to track progress over 15 weeks. It also includes a section for documenting changes to the document throughout the project.

Uploaded by

Aidil Abdullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Temasek Polytechnic

School of Informatics & IT


Diploma in Mobile & Wireless Computing (MWC)

AY2011/2012 October Semester

Major Project Terms of Reference


Project Particulars
Supervisor
Project Number
Project Title
Project Teams Particulars
Student Number Student Name

Email Address

-1-

Mobile No.

1. INTRODUCTION
Give a short introduction to the project. You may include information such as the
purpose of the project, any relevant background information, the users and usage of the
system, brief description of problems faced thereby leading to the need for this system,
etc.
2. OBJECTIVES / DELIVERABLES
Describe the objectives that you want to achieve through this project. Objectives may be
both technical and non-technical.
3. SCOPE
Provide details of the work to be done e.g. in terms of subsystems, milestones or
functionalities. Such activities may include both deliverable end products and any other
necessary project tasks.
4. DISTRIBUTION OF WORKLOAD
Determine which members of the team will be responsible for what areas of project work.
Individuals responsibilities should be clearly spelt out.
OBJECTIVES /DELIVERABLES

MEMBERS

5. CONSTRAINTS
List any constraints that you expect to face e.g. lab opening hours, different timetable
schedules, etc.
6. RESOURCES
List the hardware and software resources that your project will need.
7. ANTICIPATED PROBLEMS AND CONTINGENCY PLANS
Describe any problems your project may encounter, and propose how your team will
overcome them.

8. SCHEDULE

-2-

Include a schedule to show how your team will manage the project over the 15 weeks.
Students are expected to use MS Project to produce a Gantt chart showing the tasks,
resource assignment, schedule duration and dependency, etc.
9. CHANGE HISTORY
Include the different version and changes to the document through the whole project.