KKBOT - MPR March and April - 14 (Modified)
KKBOT - MPR March and April - 14 (Modified)
KKBOT - MPR March and April - 14 (Modified)
INDIA
(MINISTRY OF ROAD TRANSPORT & HIGHWAYS)
(Government of India)
FOUR LANING OF GOA/KARNATAKA BORDER TO
KUNDAPUR SECTION OF NH - 17 FROM KM
93.700 TO KM 283.300 IN THE STATE OF
KARNATAKA UNDER NHDP PHASE IV ON
DESIGN, BUILD, OPERATE, TRANSFER (DBFOT)
TOLL BASIS.
Concessionaire
IRB WESTCOAST TOLLWAY PRIVATE LIMITED
Page
TABLE OF CONTENTS
1.0
Location Plan.............................................................................................
2.0
3.0
Executive Summary....................................................................................
13.
23.
3.
43.
53.
Genral
ProjectLain
AreaTindGolgy
mCealitndrEvo
ExnisgtRhofWay
3.6
Pavement Condition of the time of
award..6
3.7
Existing
Structures.6
4.0
Scope
of
Work.6
4.1
Broad
Scope
of
Work
&
Current
Status..6
5.0 Project Milestones.........................................................................................
15.
ProjectCmplniMs:
6.0
Physical
Progress
and
Financial
Progress 8
6.1
Physical
Progress.8
6.2
Financial
Progress9
7.0
8.0Mobilization
Status
of
Plant
&
Machinery
10
9.0
Safety
Measures
..10
10.0 Weather Report........................................................................................
11.0 Project / Site Organization........................................................................
12.0 Drawing & Design Status..........................................................................
13.0 Event Diary..............................................................................................
14.0 Progress Photographs
15.0 Correspondence with IE & NHAI
16.0 ROB Status
IRB WestcoastTollway Pvt. Ltd.
Page 1
1.0
Location Plan
Page 2
2.0
SR. NO.
PARTICULARS
1.
Name of Project
2.
Total Length of
Project
3.
Contract / Phase
4.
Client / Authority
5.
Concessionaire
6.
Independent
Engineer
7.
8.
9.
10.
11.
12.
13.
14.
Principal EPC
Contractor
Associate EPC
Contractor
Total Project Cost
Date of signing of
Concession
Agreement
Appointed date
Construction
Completion Period
Construction
Completion date
Concession Period
DERSCRIPTION
Page 3
General
The
project road starts from Goa - Karnataka border (km 93.700) and
ends at Kundapur (km 283.300).The total length of project road is
189.600 km based on existing km stones. The project highway
alignment is located between Arabian Sea coast and Western ghats
in Karnataka. At few stretches the highway is close to the Arabian
Sea (within 500m). NH: 63 from Gootyjoins the project road near
Ankola at km 135.450 and NH: 206 from Tumkurjoins at Honnavar at
Km 195.450.
Land use along the highway is predominantly for agriculture.
Majority of the land is being used for wet crop viz, Paddy, Cashew
plantation. There are number of settlements all along the road. The
settlements are for Residential, Commercial, Schools, Hospitals,
Petrol stations, Religious structures etc. Major settlements are close
to the existing highway at number of locations, i.e. Karwar port from
Km 108.300 to Km 108.800 (500m), Seabird compound wall from Km
109.000 to Km 115.800 (7.800 km length) and Navy Fence on either
side of project road approx. from Km 132.050 to Km 135.000 (2.950
km length).
The project consists of Design, Build, Finance, Operation and Transfer
of National Highway. Development of project consists of Four laning
of Goa/Karnataka Border to KundapurSection of NH17 from Km
Page 4
Project Location
The climate along the road is generally hot and humid as it is along
the coast line of Arabian Sea. The average annual rainfall along the
project road is greater than 3,000 mm. The project road receives
very high rainfall during June to August. Annual rainfall and
IRB WestcoastTollway Pvt. Ltd.
Page 5
Temperature
Rainfall (mm)
Actual
Normal
2540
4027.5
3556
4042.8
Temperature ( C)
Minimum
Maximum
15 C
27 C
34 C
34 C
Season
Summer season
Rainy season
Pleasant & Cool
Existing RightofWay along the project road varies from approx 11 m in mountainous
terrain to approx 51 m in plain terrain.
3.6
Existing Structures
Page 6
Highway
as
described
in
ii)
iii)
4.1
Unit
Proposed
Facility
Existi
ng
Facili
ty
Km
165.31
Realignment
Km
21.93
Km
61.262
Both Sides
Longitudinal Drain
Km
61.262
Both Sides
Major Bridges
Nos.
14
13
Flyovers
Nos.
04
Vehicular Underpass
Nos.
03
02
Cattle underpass
Nos.
06
Pedestrian underpass
Nos.
13
10
Minor Bridges
Nos.
39
41
11
ROB
Nos.
02
02
12
RUB
Nos.
01
04
13
Box Culverts
Nos.
66
14
Slab Culverts
Nos.
122
128
15
Nos.
385
478
16
Km.
1.144
Sr.
No
Description
Page 7
Remarks
New
Construction
26 Nos
Reconstruction,
96
Nos
Widening
304 Nos
Reconstruction,
81
Nos
Widening
Sr.
No
Description
Unit
Proposed
Facility
Existi
ng
Facili
ty
17
Toll Plazas
Nos.
03
18
Rest Area
No.
03
19
Bus
Bays&
Shelter
Nos.
53
20
Nos.
04
Bus
Page 8
Remarks
5.1
Sr.
No.
Milestones
Milestone
I
Milestone
II
Milestone
III
Scheduled
FourLaning
date
Period
from
Appointm
ent date
Schedule
d date of
Mileston
e
Aug 8 ,
2014
Concessionaire
shall
have
commenced
construction
of
Project Highway and expended
not less than 10% of the total
capital cost set forth in the
Financial Package.
April6 ,
2015
Concessionaire
shall
have
commenced construction of all
bridges and expended not less
than 30 % of the total capital cost
set forth in the Financial Package.
650 days
Decemb
er12 ,
2015
Concessionaire
shall
have
commenced
construction
of
project facilities and expended not
less than 70 % of the total capital
cost set forth in the Financial
Package.
910 days
August.
28 ,
2016
Concessionaire
shall
have
completed
Four-Laning
in
accordance with the Concession
Agreement.
180 days
400 days
Site Clearance
0.208%
Cumulative
Physical
Progress (in
%)
0.011%
Earth Work
8.132%
0.145%
7.194%
0.000%
Bituminous Course
26.630%
0.000%
Toll Plaza
2.711%
0.000%
3.146%
0.000%
Flyover
5.355%
0.385%
Item
No.
Item Description
Weightage
(in %)
Page 9
Item
No.
Item Description
Weightage
(in %)
Cumulative
Physical
Progress (in
%)
0.824%
0.077%
ROB, RUB
Major Bridges
17.952%
1.795%
10
Minor Bridges
2.735%
0.400%
11
Underpasses
3.643%
0.682%
12
Vehicular Underpasses
1.313%
0.108%
13
Culverts
5.548%
0.000%
14
5.240%
0.000%
15
0.000%
0.000%
16
1.072%
0.000%
17
Maintenance of Roads
0.488%
0.000%
18
2.447%
0.000%
19
HTMS
0.440%
0.000%
20
1.002%
0.000%
21
Tunnelling
1.987%
0.000%
22
Extra Items
1.933%
0.224%
100%
3.826%
Achieved Progress
Monthly % of
Cumulative % of
Financial
Financial Progress
Progress
17.05%
17.05%
1.51%
18.56%
Page 10
Month
Achieved Progress
Monthly % of
Cumulative % of
Financial
Financial Progress
Progress
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
b) S-Curve
See Appendix - M
Page 11
Category
Capacity
Deployed
at Site
60 - 80 Cum/Hr.
02
60 - 80 Cum/Hr.
01
JCB (3DX)
03
1.75 Cum
01
Soil Compactor
10 T
01
Water Tanker
10 KL
01
Dumper
10 MT
04
02
02
Remarks
10.0
Weather Report
See in Appendix-A
11.0
12.0
Page 12
13.0
Sr.
No
.
1
Event Diary
Date
19.03.
2014
Officers
Visited /
Meeting
Conducted
Shri Ram Mishra
Shri K. M. Hegre
Shri. K.
Sriniwasrao
Shri. J.P.Nandi
Sh. B.R.Suresh
Designation
Organization
Project Dirctor
NHAI
Manager
(Tech.)
Team Leader
NHAI
Dy. Project
Head
General
Manager
(Projects)
IRB WTPL
IE
IRB WTPL
Project Dirctor
NHAI
Manager
(Tech.)
General
Manager
(Projects)
NHAI
Shri K. M. Hegre
Sh. B.R.Suresh
IRB WTPL
Remark
Meeting
held at PIUoffice,
NHAI,
Mangalore.
Points
discussed:
See in
Appendix L
Site visit
for
verificatio
n of Utility
Shifting
i.e.
Electrical&
Water
Supply
Shifting.
See
in
Appendix
-L
Meeting on 23.04.2014
3
23.04.20
14
Project
Director
Shri K. M. Hegre
Manager
(Tech.)
Shri.
Srinivasa Team Leader
Rao. K
Shri. A.K.Singh
Resident
Engineer
NHAI
NHAI
IE
IE
Meeting
held at
PIUoffice,
NHAI,
Mangalor
e.
Points
Page 13
Shri. B.R.Suresh
Shri.
PramodSawalkar
Shri. R. Acharya
14.0
GM(Project)
General
Manager
General
Manager
(Liaison)
EDP Incharge
IRB WTPL
IRB WTPL
IRB WTPL
discusse
d: See in
Appendi
x-L
IRB WTPL
Progress Photographs
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
15.0
See Appendix I
16.0
ROB Status:
17.0
See Appendix-K
Page 20