CASE ID :
FM.CS/SSD. 10-01
Please propose the supply arrangements for the following project, mark the cable entry & electrical room
Location on the documents enclosed.
Date:
We hereby declare all the above mentioned data are correct & in case any load changing
is more than 10%, a Revised submission of supply arrangement request will be
proceed . We strongly undertake that,
1- We shall officially report to AADC three months before completion of Electrical Room.
2- Any change request for approved E/R location we shall resubmit for a new AADC
approval within TWO weeks from receiving first AADC reply.
Contractor Signature & Stamp :
Consultant Signature & Stamp :
Contact Tel No :
Contact Tel No :
The Power Supply for LV side will be arranged as the following details by C.S.D
1234-
KW
KW
KW
KW
Service Turret No :
Existing
Cable Size : From Feeder Pillar / Service Turret to the Consumers Main Switch
No's run of 4C X ( 240 , 185
Existing Load if any shall be diverted to new MDB:
3- Others :
Eng&S.Eng
Indoor
New
New
Outdoor
120 , 70 , 50 ,
25 , 16 ) mm2 Cu . SWA cable.
2- Approved AS GIS As per site visit
Eng&S.U.Head
P.S.S.Head
The Power Supply for HV side will be arranged as the following details by A.M.D :
1-Sub Station :
Existing S/S No
New
S/S No
Location
:
:
:
2- Building Construction By :
Capacity :
Capacity :
KVA
KVA
Type :
Type :
Indoor
Indoor
Outdoor
Outdoor
No's run of (1C X 630 mm2, 4C X 240 mm2) Cu. AWA cable.
2- Detail drawings of the HV& Transformer rooms if any must be submitted for AADC approval
3- Others :