Chapter 4 (Concrete Work)
Chapter 4 (Concrete Work)
Chapter Four
CONCRETE WORK
4.1
CONCRETE
Concrete is the most important material in construction because its cost is very cheap
and easily obtained compare to other materials.
appropriate unit of measurement for those items included in the above section of work.
Reference should be made to the Standard Method of measurement (Clauses 5278) for
more detailed information on the preparation of bill of quantities as shown below :
Table 4.1 : Concrete-Method Of Measurement
Item
Mass concrete }
Reinforced concrete }
Prestressed }
Unit
Remarks
Separate items are to be provided for
(i) Different quantities of concrete
(ii) Beams, columns, slabs, etc.
(iii) Concrete 300 mm thick or less.
Thickness to be stated.
cu m
sq m or cu m
lin m, cu m or No.
Sq m
Thickness to be stated
Thickness to be stated
Precast prestressed
concrete
lin m, cu m or No.
Site-made pre-tensioned
members
lin m, cu m or No.
Post-tensioned members
lin m, cu m or No.
4/1
KJC326
Item
Assembly and posttensioning of posttensioned members
Erection of pre-tensioned
members and assembly of
post-tensioned members
Concrete blockwork (e.g.
quay walls, breakwaters,
etc)
Unit
Remarks
no. of assemblies
No.
Includes jointing
Cu m
Shuttering
Vertical, horizontal,
sloping,
curved, domical and other
types of work
sq m
lin m
lin m
Width to be stated
No.
Sq m
Mg
Mg
Mg
4/2
KJC326
Item
Unit
Remarks
Fabric reinforcement
Steel wire or cable for
prestressing on site
sq m, Mg or lin m
Forming holes
Anchorage, including
fixing
tensioning
lin m, No.
No. of wires
Grouting of cables
Pneumatic mortar
lin m
sq m
Thickness to be stated
Lump sum
Pre-tensioning on site
Tensioning, including
anchorage
No. of wires
sq m
No.
The items for concrete include supply, placing in forms or shuttering vibrating and curing.
Shuttering is measured by the area of concrete, which requires support during setting.
The items for shuttering include supply and erection, including all necessary struts and
bearer, treatment before concreting and removal when the concrete has set.
The items for reinforcement includes supply, bending to the shapes shown on the
bending schedules and fixing the reinforcement in the works. Usually it is not possible to
give the precise quantities of reinforcement in the bill of quantities, as the detailed
drawings are not available when the bill is prepared and the quantities must be
estimated.
4/3
KJC326
Main beams
Secondary beams
Columns
0.10 - 0. 37 Mg per cu m
0.08 Mg per cu m
When the total weight of reinforcement has been determined for a component it is
necessary to divide the total weight arbitrarily into separate weights for each diameter of
bar that is likely to be used.
Table 4.1.a : Anchorage (Hooks) And Bending Of Reinforcement
Types
High tensile
steel (T or Y)
4.2
Anchorage (hooks)
Bends
H = 9d
N = 3d
d = diameter of bar
L = length
H = 5d
N = 3d
d = diameter of bar
L = length
H = 11d
N = 4d
Min. limit for hooks = H = 11 d
Length of hooks = H + N = 15d
H = 5.5d
N = 4d
Min. limit for bends = H = 5.5d
Length of bends = H + N = 9.5d
WORK EXAMPLES
4/4
KJC326
Example 4.2.1
Prepare taking off sheet and bill of quantities for mass concrete retaining wall with 30 m
length as shown in Figure 4.2.1. (All measurement in mm)
1.8 m
Concrete work :
4/5
KJC326
(a) Mass concrete for foundation and mass concrete for wall.
(b) Placing of concrete for foundation and placing of concrete for wall.
Concrete for wall thickness 500mm shall be separate from
concrete for wall thickness > 500mm.
(ii)
30.00
2.40
0.90
CONCRETE WORK
Mass Concrete
(1 : 21/2 : 5) concrete grade 7
- 20 mm aggregate for foundation
64.80
m3
(1 : 2 : 4) Concrete grade 15
- 20 mm aggregate for wall & piers
30.00
0.75
4.00
7/
0.75
0.30
4.00
m3
Placing Of Concrete
Mass concrete for foundation
4/6
KJC326
30.00
2.40
0.90
m3
Mass concrete for wall
thickness 300 mm - 500 mm & piers
30.00
0.40
0.89
7/
0.75
0.30
0.89
10.68
1.40
12.08
m3
Mass concrete for wall
thickness exceeding 500 mm & piers
Average thickness of wall
0.5
1.2 +
1.7
1.7/2 = 0.85
7/
30.00
0.85
3.11
79.31
0.75
0.30
3.11
4.90
84.21
m3
Concrete Ancillaries
Formwork to fair finish
(sloping surface)
4/7
KJC326
30.00
4.10
123.00
m2
Formwork to rough finish
24.75
4.00
99.00
Vertical
Width of wall
30.00
7/0.75 = 5.25 less piers
24.75
2
m
Piers
Vertical width 0.4 1.22 m
0.75
4.00
21.00
m2
Piers
Vertical width 0.2 0.4 m
7/2/
0.30
4.00
16.80
m2
Inserts
100 clayware land drain fix in on rake
17/
1
24.75
0.60
0.45
17
6.68
m3
Description
Quantity
4/8
Unit
Rate
RM
KJC326
Mass Concrete
1
64.80
cu. m
96.30
cu. m
64.80
cu. m
12.08
cu. m
84.21
cu. m
123.00
Sq. m
99.00
Sq. m
21.00
Sq. m
16.80
Sq. m
17.0
No
6.68
cu. m
Placing Concrete
3
4
5
10
11
8
9
Total Bill
Example 4.2.2
Slab
4/9
RM
KJC326
Prepare taking off sheet and bill of for the slab shown in Figure 4.2.2 with the thickness
of slab 300 mm. The dimension sheet shall include concrete work (mass concrete for
slab) and reinforcement (bottom only).
4.52 m3
Reinforcement
Reinforcement
(bottom
Y direction)
Reinforcement
(bottom
X direction)
R12 -200
18/
4.37
R10 -100
Length = 4.300
Less (-) cover
2 / 0.025 = 0.050
4.250
Add
bend 2/5d =
2x5x0.012= 0.120
4.370
Length = 3.500
Less (-) cover
2 / 0.025 = 0.050
3.450
Add
bend 2/5d =
2x5x0.010= 0.100
3.550
Total length
required steel
(3500 25 25)
= 3450
No. of steel
3450/200 = 17.25
Say, 18
78.66 m, R12
Total length
required steel
(4300 25 25)
= 4250
No. of steel
4250/100 = 42.5
Say, 43
152.65 m, R10
4 / 10
43/
3.55
KJC326
Item
No.
Description
Quantity
Unit
4.52
cu. m
94.07
Kg
69.80
Kg
Rate
RM
Concrete Work
1
2
3
Example 4.2.3
RM
Beam
The following example illustrates the method of preparing a taking off sheet and BQ for
the reinforcement of the r.c beam (6 units) as shown in Figure 4.2.3.
Description
Quantity
Unit
Rate
Reinforcement
1
2
3
29.82
Kg
68.52
Kg
22.52
Kg
RM
RM
KJC326
BEAM
4 / 12
KJC326
Reinforcement
Stirrups
Reinforcement
(top)
375
2R12
125
Length = 2.600
Add (+) column
2/1/2/0.125
= 0.125
= 2.725
Less (-) cover
2 / 0.025= 0.050
2.675
Length = 0.375
Less (-) cover
2/0.025 = 0.050
0.325
Length = 0.125
Less (-) cover
2.0.025 = 0.050
0.075
0.325+0.075
= 0.400
2 / 0.400 = 0.800
Add
bend 2/5d
2x5x0.012
= 0.120
2.795
Say, 2.80
12mm dia. m.s
6/2/
2.80
add (+)
anchorage 24d
24x0.006= 0.144
0.944
Total length,
say, 0.94
33.60 33.60 m
Reinforc.
(bottom)
No. of stirrups
Length = 2.600
Less (-) column
2/1/0.125= 0.125
= 2.475
2R18
Length = 2.600
Add (+) column
2/1/2/0.125
= 0.125
= 2.725
Less (-) cover
2 / 0.025= 0.050
2.675
Add
bend 2/5d
(2475/150)+1
= 17.5
Say, 18
6 mm dia. m.s
stirrups
6/18
/
0.94
2x5x0.018
= 0.180
2.855
Say, 2.86
6/2/
2.86
Example 4.2.4
R6
34.32 34.32 m
Column And Foundation (Footing)
4 / 13
101.52 101.52 m
KJC326
Drawing no. 4.2.4 is the plan of footings and ground beams of a building. Drawing
no.4.2.4.a is the cross-section (Section Y-Y) for the footings. The drawings might not to
scale. From drawing no. 4.2.4 and 4.2.4.a, prepare the take off of quantities and BQ for:
(i)
(ii)
Concrete work for stump (grade 1:2:4) and footing (grade 1:3:6).
(iii)
Formwork
(iv)
Assumption:
1)
Reinforcement :
(i) Lapping of 40d for steel bar from footing to column.
(ii) Length of bending for reinforcement shall be 5.5d.
(iii) Length of hook for link shall be 24d.
2)
Cover of concrete : 30 mm for footing
25 mm for other members
4 / 14
KJC326
KJC326
4 / 16
KJC326
EXCAVATION WORK
Excavation of 150 mm top soil
from existing level
2/
4/
2.00
2.00
8.00
1.50
1.50
9.00
17.00 m2
Excavation of trench depth
not exceeding 1.5 m
2/
4/
2/
4/
2.00
2.00
1.50
1.50
1.50
1.50
12.00
1.850
0.150 - topsoil
1.700
0.050 + Hardcore
1.750
13.50
25.50 m3
Excavation of trench depth
Exceeding 1.5 m but
not exceeding 3.0 m
2.00
2.00
0.25
2.00
1.50
1.50
0.25
2.25
4.25 m3
CONCRETE WORK
Concrete grade 1:3:6
4 / 17
KJC326
2/
4/
2.00
2.00
0.40
1.50
1.50
0.40
3.60
6.80 m3
Concrete grade 1:2:4
- 20 mm aggregate for stumps
4/
2/
0.20
0.20
1.20
0.25
0.25
1.20
0.19
1.850
0.250 - Ground beam
1.600
0.400 - Footing
1.200
0.15
0.34 m3
FORMWORK
4/4/
2/4/
4/4/
2/4/
Rough surface
formwork for footings
1.50
0.40
9.60
2.00
0.40
6.40
16.00 m2
Rough surface
formwork for side of stump
1.20
0.20
3.84
1.20
0.25
2.40
6.24 m2
REINFORCEMENT
Reinforcement For Footing
4 / 18
KJC326
Reinforcement for
Footing 2000x2000x400
Length of one steel bar
2.000
0.060 - cover 2/0.03
1.940
0.176 + bends 2/5.5d @ 2/5.5/0.016
2.116 2.12
2/2/7/
2.12
59.36
4/2/5/
1.62
64.80
KJC326
2.57
20.56
2/9/
0.94
17.00
MR of M6 link
KJC326
2.38
38.14
4/8/
0.74
23.81
MR of M6 link
4 / 21
KJC326
Item
No.
Description
Quantity
4 / 22
Unit
Rate
RM
KJC326
EXCAVATION WORK
1
17.00
cu. m
25.50
cu. m
4.25
cu. m
6.80
cu. m
0.34
cu. m
FORMWORK
Rough surface formwork for footings
16.00
Sq. m
6.24
Sq. m
228.30
Kg.
33.84
Kg.
9.05
Kg.
2
3
4
5
REINFORCEMENT
8
9
10
Y16, 59.36+64.80+20.56=144.72m,
(3.14x0.0082x144.72x7850)
Y12, 38.14m,
(3.14x0.0062x38.14x7850)
R 6, 17.00+23.81= 40.81m,
(3.14x0.0032x40.81x7850)
(Density of steel bar, assume = 7850kg/m3)
Total Bill
Example 4.2.5
RM
Concrete Road
The following example illustrates the method of preparing a taking-off sheet and bill of
quantities for the concrete road shown in Figure 4.2.5.
4 / 23
KJC326
Description
Quantity
Unit
91.85
91.85
9.20
275.55
sq m
sq m
lin m
Kg
34.30
lin m
24.66
lin m
27.00
lin m
Total Bill
Rate
RM
RM
Precat concrete
kerb 150 x 150
4 / 24
KJC326
180 mm thick
18.00
4.60
4.60
1.70
2/
1.70
1.70
mm (including
concrete
backing)
82.80
0.15
7.80
0.15
2/
Road length
2/5.00 = 10.00
5.80
2/2.00 = 4.00
96.40
4.00
18.00
5.00
ditto curved
2/
/4//2
2
/
/4//
1.702/
2.00
Less (-) kerb 0.30
1.70
4.55
91.85 m2
2/
10/
0.5
2.466
24.66 m
Paving slabs
750 x 750 x 50
mm thick,
bedded on sand
0.05m thick
Expansion joint
9.20 m
Fabric reinfmt.
(approximate)
91.85
3
0.5
(as above)
91.85 m2
4.60
6.30 m
34.30 m
Dowel bars 20
mm. dia
Waterproof paper
2/
18.00
10.00
28.00 m
18.00
1.50
275.55 Kg
4 / 25
27.00 m