Subject:: TKC Mms 8 Round Ancillary Specifications
Subject:: TKC Mms 8 Round Ancillary Specifications
Subject:: TKC Mms 8 Round Ancillary Specifications
GTF
05/15/08
Engineer
RJH
05/15/08
Dir Engr
DR
05/16/08
GM QA
GTF
05/15/08
REVISION
SUBJECT:
Prepared By
001
05/14/08
1.0
SCOPE
1.1
This document sets forth the broad guidelines for the field visual thread inspection of TKC MMS 8 ROUND connections by independent inspection agencies.
2.0
DEFINITION
2.1
Visual thread inspection shall be defined as those inspections that may be performed on TKC MMS
- 8 ROUND connections without the use of thread element gages.
3.0
4.0
3.2
Threaded Area
3.2.1
Visually inspect for full form thread length. The full form thread length is measured from
the thread start point axially along the thread crests. The connections are required to have
full form threads for the appropriate distance as specified by API 5B Table 2.3 and 2.6
(Lc).
3.3
Make-up Length
3.3.1
Visually inspect each connector for the presence of visual make-up.
3.3.2
The make-up length may be measured with a vernier dial caliper capable of measuring in
0.001" increments. The make-up length is provided in each of Hunting product brochures
under the heading of Make-up loss.
Threaded Area
4.2.1
Visually inspect the full form threaded area for damage. Small areas of impact damage or
galls occurring during hydrotest must be repaired. Field repairable thread damage on new
connectors shall not exceed 0.125" in circumferential length or 0.004" in depth. All
repaired areas should be covered with an anti-gall and anti-corrosion compound such as
Moly-Kote.
4.2.2
Allowable corrosion pitting in the full form thread area shall be as defined in the
DEFINITION OF TERMS under Minor Pitting.
h:\degeorge\myfiles\publisher\tkc mms8rd\visual-00
Page 1 of 2 Pages
SECTION
GTF
05/15/08
Engineer
RJH
05/15/08
Dir Engr
DR
05/16/08
GM QA
GTF
05/15/08
REVISION
SUBJECT:
Prepared By
001
05/14/08
4.3
Coupling Face
4.3.1
Visually inspect the coupling face and OD chamfer for impact damage. Impact damage
that has caused the starting thread crest to be indented sufficiently to cause interference
with the pin connector thread root on make-up is cause for rejection.
4.4
5.0
CONNECTION GAGING
5.1
The gaging of Huntings proprietary connections shall only be performed by a Hunting Quality
Assurance or Service Representative or an approved Licensee. Hunting personnel or Licensee are
the only persons that have availability to the proprietary gages to which the products are
manufactured.
6.0
THREAD/STORAGE COMPOUND
6.1
Upon completion of visual thread inspection verify appropriate thread or storage compound is being
applied to both ends of the tube. The approved thread/storage compound shall be as stated in the
applicable "FIELD RUNNING AND HANDLING PROCEDURE".
NOTE: Notify Hunting Northpoint, Houston, Texas, Quality Assurance Department
immediately if thread/storage compound being applied is not listed in the applicable
"FIELD RUNNING AND HANDLING PROCEDURE".
7.0
REJECTION
7.1
Any thread that does not meet the specified requirements, shall be considered a reject.
7.2
All rejects shall have the entire thread area painted red.
7.3
All rejects shall be clearly identified as reject to protect against out-of-tolerance material being
shipped as prime material.
7.4
Rejection may be reworked by removing the defective condition and re-threading the parts within
the appropriate tolerances.
7.5
Any discrepancies shall be clarified and dispositioned by Huntings Q.A. Department before any
further processing or delivery.
h:\degeorge\myfiles\publisher\tkc mms8rd\visual-001
Page 2 of 2 Pages