ABB Motor
ABB Motor
Our date:
Our reference:
PPTR/Manoch
Tel: +66 ( 0 ) 2762 2033
Fax: +66 ( 0 ) 2709 3368
Email: [email protected]
Samutprakarn
November 28, 2011
11Q1419036
Your date:
Your reference:
PESI
For the attention of:
Praxair Factory
Wattana
QUOTATION: SUPPLY INSERT MOTOR DRIVE FOR REPLACMENT.
PROJECT:
Dear Sir,
We thank you for your inquiry and are pleased to hereby present you with our offer for the supply of
power transformers as stipulated below.
ABB LIMITED
! " # $
"
% $ &
'
)!!)
!**
&
$11 2 ' *
,
3 -2
/
'
&
)*.)
% *
)* ',&(+ 4 & 5 & * -
0 )))
4 554 4
1 /
* +. /$$/
/16/
* 2)3 !! .
Page 1 of 5
specified requirements in all widely applied standards, such as IEC, CENELEC, ANSI/IEEE as well as
local standards.
ABB Thailand is fully committed to delivering to you a product according to the highest quality
standards recognized by ABB customers worldwide.
D. First-class suppliers
To make the best power transformers you need the best suppliers. ABB used both other companies
within the Group and independent suppliers whose operations are subjected to regular quality audits.
This ensures high reliability and low life cycle costs.
E. Outstanding Reference List
ABB at Bangkok has been making the full range of small and medium power transformers for more
than 14 years. We have a long term experience and proven track record of supplying to the local
Thailand customers and exporting to Australia, New Zealand, Malaysia, Indonesia, Philippines,
Singapore and Cambodia, for both industrial customers and utility customers as shown in our reference
list.
1.
SCOPE OF SUPPLY
Parts need be supplied
New insert Motor drive BUF for recovery motor drive BUF 3 for OLTC type UZFRT
550/150 Serial No. 1 ZSC 8681921
Remark:
The above price does not include any installation & service.
2.
PRICES
The prices indicated are expressed in THB and are valid and firm for the delivery period stated.
Our price is valid for the above scope of supply.
Item
Description
Unit Price
( THB)
Qty Unit
748,500
748,500
ABB LIMITED
! " # $
"
% $ &
'
)!!)
!**
&
$11 2 ' *
,
3 -2
/
'
&
)*.)
% *
)* ',&(+ 4 & 5 & * -
0 )))
4 554 4
1 /
* +. /$$/
/16/
* 2)3 !! .
Page 2 of 5
3.
GENERAL CONDITIONS
General Terms and Conditions are according to ORGALIME SE 01 & THABB 106 Re.1.
4.
TECHNICAL DATA
In accordance with the existing unit and ABB Standard.
5.
6.
7.
8.
LIQUIDATED DAMAGE
But we understand that the Purchaser would not impose liquidated damages for later delivery
unless they had suffered loss as a consequence of delayed delivery
9.
CONSEQUENTIAL DAMAGES
ABB Limited shall in no case be liable under any contract as a result of this tender for any
indirect or consequential damages such as but not limited to, loss of profit, loss of use of
equipment, loss of power or claims from third parties due to interruption of power supply.
ABB LIMITED
! " # $
"
% $ &
'
)!!)
!**
&
$11 2 ' *
,
3 -2
/
'
&
)*.)
% *
)* ',&(+ 4 & 5 & * -
0 )))
4 554 4
1 /
* +. /$$/
/16/
* 2)3 !! .
Page 3 of 5
10.
LIMITATION OF LIABILITY
Notwithstanding anything contained in this Contract to the contrary, the Contractor's total
liability in respect of any and all claims for damages or losses which may be arise in
connection with his performance or non-performance under this Contract shall not exceed
of this contract price.
11.
FORCE MAJEURE
Either party shall be entitled to suspend performance of his obligations under the contract to the
extent that such performance is impeded or made unreasonably onerous by any of the following
circumstances: industrial disputes and any other circumstance beyond the control of the parties
such as fire, war, extensive military mobilization, insurrection, terrorism, epidemic or pandemic,
requisition, seizure, embargo, restrictions in the use of power and defects or delays in deliveries
by sub-contractors caused by any such circumstance referred to in this Clause.
A circumstance referred to in this Clause whether occurring prior to or after the formation of the
contract shall give a right to suspension only if it effect on the performance of the contract could
not be foreseen at the time of the formation of the contract.
The party claiming to be affected by Force Majeure shall notify the other party in writing without
delay on the intervention and on the cessation of such circumstance. If Force Majeure prevents
the Purchaser from fulfilling his obligations, he shall compensate the Supplier for expenses
incurred in securing and protecting the Product.
Regardless of what maybe otherwise follow from these General Conditions, either party ought
to be entitled to terminate the contract by notice in writing to the other party if performance of
the contract is suspended under Clause 39 for more than six month
12.
ARBITRATION
Disputes arising in concerning with the contract which cannot be settle or adjust by manual
agreement, shall be finally settle under the rules of conciliation and arbitration of the
international chamber of commerce by three arbitrators appointed in accordance with the rules
for the international chamber of commerce, court of arbitration. All cost of arbitration shall be
borne by the losing party, except as otherwise stipulate in the arbitrage award. All proceedings
will be in English. The place of arbitration shall be in Singapore. The award render shall be final
and conclusive
Arbitration rules ICC or UNCITRL.
13.
QUALITY ASSURANCE
ABB Limited has a comprehensive program of Quality Assurance and Control, which is
compliant with and accredited to the TUV, SGS ISO 9001:2000 and SGS ISO14001: 2000.
14.
BUSINESS SECRET
All commercial data as well as technical documentation of this project shall be treated as
business secret and shall be used for Contract purposes only.
ABB LIMITED
! " # $
"
% $ &
'
)!!)
!**
&
$11 2 ' *
,
3 -2
/
'
&
)*.)
% *
)* ',&(+ 4 & 5 & * -
0 )))
4 554 4
1 /
* +. /$$/
/16/
* 2)3 !! .
Page 4 of 5
15.
WARRANTY
ABB Limited guarantees to make good (repair or replace) any defect in or damage
transformer(s) supplied by ABB Limited under this ccontract, which arises from defective
materials, poor workmanship or design (other than a design made, furnished or specified by
customer or end-user) and which appears or occurs within
12 months form date of delivered.
However, this guarantee is valid only under the condition that supervision of erection and
commissioning is done by ABB Limited or by personnel approved in writing by ABB Limited.
ABB Limited is not responsible for any damage caused by force majeure incidents, accidents,
or other happenings that are beyond our control, including improper treatment or maintenance
of the transformer(s) not done by ABB Limiteds staff.
16.
OFFER VALIDITY
We offer validity period until end of December 2011.
We trust you will find our quotation to your satisfaction and we remain at your service if
any further information should be needed. We are, of course, very interested to hear from you
about the outcome of this quotation.
Yours faithfully,
___________________________
___________________________
Manoch Sangsuvan
Area Sales Manager
Viktor Csernoch
Service Sales Manager
ABB LIMITED
! " # $
"
% $ &
'
)!!)
!**
&
$11 2 ' *
,
3 -2
/
'
&
)*.)
% *
)* ',&(+ 4 & 5 & * -
0 )))
4 554 4
1 /
* +. /$$/
/16/
* 2)3 !! .
Page 5 of 5