STANDARD
MS 1979:2015
Copyright 2015
DEPARTMENT OF STANDARDS MALAYSIA
STANDARDS MALAYSIA has appointed SIRIM Berhad as the agent to develop, distribute
and sell Malaysian Standards.
For further information on Malaysian Standards, please contact:
OR
SIRIM Berhad
(Company No. 367474 - V)
1, Persiaran Dato Menteri
Section 2, P. O. Box 7035
40700 Shah Alam
Selangor Darul Ehsan
MALAYSIA
Tel: 60 3 5544 6000
Fax: 60 3 5510 8095
http://www.sirim.my
E-mail: msonline@sirim.my
MS 1979:2015
Contents
Page
Scope ................................................................................................................... 1
Normative references ........................................................................................... 1
Requirements ....................................................................................................... 2
Issues addressed ................................................................................................. 2
4.1
4.1.1
4.1.2
4.1.2.1
4.1.3
4.2
4.2.1
4.2.2
4.2.3
4.2.4
4.3
4.3.1
4.3.1.1
4.3.2
4.3.3
4.3.3.1
4.4
4.4.1
4.4.2
4.4.3
4.4.4
4.4.4.1
4.4.5
4.4.6
4.4.7
4.4.7.1
4.4.8
4.4.9
4.5
4.5.1
MS 1979:2015
Contents (continued)
Page
4.5.2
4.6
4.6.1
4.6.2
MS 1979:2015
Contents (continued)
Page
4.8.9
4.8.10
4.8.11
4.8.12
4.8.13
4.9
4.9.1
4.9.2
4.9.3
4.9.4
4.9.5
4.9.6
4.10
4.10.1
4.10.2
4.10.3
4.10.4
4.11
4.11.1
4.11.1.1
MS 1979:2015
Contents (concluded)
Page
4.14.8.2
4.14.9
4.14.9.1
4.14.9.2
4.14.10
COP 88B, Phase sequence check on final three phase circuits ......................... 25
COP 90, Requirement for labelling .................................................................... 26
COP 90A, Requirement for colour coding of cable management system ............ 26
COP 90B, Requirement for colour coding of cables and conductors .................. 27
COP 91, As-built documentation........................................................................ 28
Annex A
Annex B
iv
MS 1979:2015
Committee representation
The Industry Standards Committee on Generation, Transmission and Distribution of Energy (ISC E) under whose
authority this Malaysian Standard was developed, comprises representatives from the following organisations:
Association of Consulting Engineers Malaysia
Department of Standards Malaysia
Federation of Malaysian Manufacturers
Jabatan Kerja Raya Malaysia
Malaysia Nuclear Power Corporation
Malaysian Association of Standards Users
Malaysian Cable Manufacturers Association
Malaysian Electrical Appliances and Distributors Association
Malaysian Green Technology Corporation
Persatuan Kontraktor Elektrikal dan Mekanikal Melayu Malaysia
Sabah Electricity Sdn Bhd
Sarawak Energy Berhad
SIRIM Berhad (Secretariat)
SIRIM QAS International Sdn Bhd
Suruhanjaya Komunikasi dan Multimedia Malaysia
Suruhanjaya Tenaga
Sustainable Energy Development Authority Malaysia
Tenaga Nasional Berhad
The Electrical and Electronics Association of Malaysia
The Institution of Engineers, Malaysia
Universiti Malaya
The Technical Committee on Electrical Installation, Protection and Insulation Practice which supervised the
development of this Malaysian Standard is managed by The Electrical and Electronics Association of Malaysia
(TEEAM) in its capacity as an authorised Standards-Writing Organisation and consists of representatives from the
following organisations:
Association of Consulting Engineers Malaysia
EITA Resources Berhad
G.H. Liew Engineering (1990) Sdn Bhd
Jabatan Bomba dan Penyelamat Malaysia
Jabatan Kerja Raya Malaysia
Sabah Electricity Sdn Bhd
Sarawak Energy Berhad
SIRIM QAS International Sdn Bhd (Electrical and Electronic Testing Section)
Suruhanjaya Tenaga
Tenaga Nasional Berhad (Distribution Division)
Tenaga Nasional Berhad (Generation Division)
The Electrical and Electronics Association of Malaysia (Secretariat)
The Institution of Engineers, Malaysia
Time Era Sdn Bhd
Universiti Malaya
The Working Group on Electrical Installation of Buildings which developed this Malaysian Standard consists of
representatives from the following organisations:
Abbaco Controls Sdn Bhd
Covis Sdn Bhd
Mektricon Sdn Bhd
The Electrical and Electronics Association of Malaysia (Secretariat)
The Institution of Engineers, Malaysia
MS 1979:2015
Foreword
This Malaysian Standard was developed by the Working Group on Electrical Installation of
Buildings under the authority of the Industry Standards Committee on Generation,
Transmission and Distribution of Energy. Development of this Malaysian Standard was carried
out by The Electrical and Electronics Association of Malaysia (TEEAM) which is the
Standards - Writing Organisation (SWO) appointed by SIRIM Berhad to develop standards for
electrical installation, protection and insulation practice.
Major modifications in this revision are as follows:
i)
ii)
COP 02A has been added to address compliance with regulatory requirements and
electrical standards.
iii)
iv)
v)
COP 06: The term earth fault is used to replace the term fault; additional requirements
on the use of overcurrent protective device (OPD) and residual current device (RCD) as
well as the maximum disconnection time have been included.
vi)
COP 07: Recommended value for the resistance of installation earth as well as the
measurement method has been updated.
vii)
Clause 4.3, protection against harmful effects, such as smoke and deleterious effects on
adjacent equipment has been added into consideration.
viii)
ix)
x)
COP 10A has been added to include requirements of thermal cut-off devices.
xi)
COP 11A has been added to include overcurrent protection of neutral conductors.
xii)
COP 11B has been added to include overcurrent protection of protective earthing and
equipotential bonding conductors.
xiii)
COP 12A has been added to allow neutral conductor reduction at the discretion of
Professional Design Electrical Engineer.
xiv)
COP 15: Overload trip current has been updated taking into account the types of circuit
breakers.
xv)
COP 16: The method of ascertaining minimum short circuit current rating has been
revised.
xvi)
COP 20: Installation recommendations to prevent eddy current effects have been
updated.
vi
MS 1979:2015
Foreword (continued)
xvii)
COP 21: Extra low voltage (ELV), signal and control, and instrumentation cables have
been added into consideration.
xviii)
xix)
COP 28A has been added to include requirements for cables not concealed inside
walls, within partitions and similar.
xx)
COP 31: Scope has been extended to cover other wet-equipment apart from water
heater, and requirements for the power circuits have been updated.
xxi)
COP 32A has been added to include requirements for terminations of circuits.
xxii)
COP 32B has been added to include installation requirements of electrical equipment
and accessories.
xxiii)
COP 34: Consideration for load conductors in determining group reduction factor has
been updated.
xxiv)
COP 39: Material of wiring conductors has been restricted to electrical grade copper
only.
xxv)
xxvi)
xxvii)
COP 44: Requirement for cables in final circuit to be continuous without any joint has
been added.
xxviii)
COP 45: Scope extended to cover walls, floors and other similar structures, and
requirements for sealing have been updated.
xxix)
COP 46: Requirements for multi-pole switching device have been updated.
xxx)
COP 47: Scope has been extended to cover disconnector, links or similar.
xxxi)
xxxii)
COP 49: Additional requirement for conductor passing through the magnetic circuit of
an RCD has been included.
xxxiii)
xxxiv)
COP 55: Elaboration on the installation location of RCD has been added.
xxxv)
COP 56: Act and regulation governing the periodic test of RCD has been added.
xxxvi)
COP 59: Additional requirements for the installation of SPD have been included.
xxxvii) COP 60 has been altered to cover the standards to be complied by SPD.
STANDARDS MALAYSIA 2015 - All rights reserved
vii
MS 1979:2015
Foreword (continued)
xxxviii) COP 61: Minimum requirements of SPD ratings have been extended.
xxxix)
xl)
COP 64: Requirements for the earth connection of SPD have been updated.
xli)
COP 65: Requirement for the operation of main incoming isolated has been added.
xlii)
COP 68: Auto-reclosing circuit breaker and RCD are prohibited to prevent unintentional
re-energising.
xliii)
COP 69A has been added to cover sharing of and interconnection installation earthing
systems of different buildings.
xliv)
COP 73: Minimum cross-sectional - area of protective earthing conductor has been
updated.
xlv)
COP 74: Additional requirements on the inspection chamber and the connections have
been included.
xlvi)
xlvii)
xlviii)
xlix)
COP 79A has been added to include separate earthing for the standby ad alternative
system.
l)
li)
COP 88: Requirements for insulation resistance test has been updated taking into
account different circuit nominal voltages and maximum conductor design operating
temperature.
lii)
COP 88A has been added to include socket polarity check on completed electrical
installations.
liii)
COP 88B has been added to include phase sequence check on final three phase
circuits.
liv)
lv)
COP 90A has been added to include requirement for colour coding of cable
management system.
lvi)
COP 90B has been added to include requirement for colour coding of cables and
conductors.
lvii)
viii
MS 1979:2015
Foreword (concluded)
lviii) Annex A has been added to provide an example basic singleline schematic diagram for
single phase incoming distribution board.
lix)
Annex B has added to provide an example basic singleline schematic diagram for three
phase incoming distribution board.
ix