Golen Astore Remaining Works
Golen Astore Remaining Works
Golen Astore Remaining Works
Cumulative
Progress %
as of 10th
Nov, 2016
Intake Works
Excavation
Complete
Diversion
Complete
Reinforcement
Fabrication
RCC Pouring
Complete
Temporary
Cofferdams as
the water
level is rising
Stilling Basin
as per Engr.
Kashif design
on site
Small
Collection
Chamber
Intake
Protective
Work (GI Wire)
19m
Complete
Complete
Complete
Complete
Cutoff Wall
5th Apr,2017
20th
Apr,2017
1st Apr,2017
10th
May,2017
In Progress
30th
Approach
Canal
Excavation
Flood Wall
100%
Filling and
75%
Responsib
ility
Compaction
Pipe Canal
Nov,2017
Complete
20th
Nov,2016
10th
Dec,2016
15th
Apr,2017
30th
Apr,2016
10th
Apr,2017
25th
Apr,2017
Spill way
1st Apr,2017
10th
Apr,2017
Gate
1st Apr,2017
Sand Filling
RR Masonry
Canal
Slab Covering
PCC
Sedimentation
Tank
Excavation
100%
Reinforcement
Fabrication
RCC Pouring
100%
RR Masonry
100%
Plaster
100%
Spillway
0%
100%
100%
Gravel Trap
Excavation
RR Masonry
Complete
Grouting
Complete
PCC Bed
Complete
Baffle Wall
Complete
Headrace
Canal
Excavation
Complete
RR Masonry
Complete
Grouting
100%
PCC
70%
Plaster
Complete
Superpassage
( Masonry)
Slab Covering
Complete
25%
Fore bay
Excavation
Complete
1st Apr,2017
10th
Apr,2017
20thApr,201
7
15th
May,2017
Reinforcement
Fabrication
RCC Pouring
Complete
RR Masonry
Complete
Plaster
Complete
Spillway
Complete
Spillway
Plaster
PCC
20%
Complete
15th
Apr,2017
30th
Apr,2017
Anchor Blocks
1st Apr,2017
Penstock
Alignment
Power House
15th
Apr,2017
15th
Apr,2017
15th
May,2017
Complete
Excavation
Complete
Lean Concrete
Complete
Plum Concrete
Complete
Reinforcement
Fabrication
RCC Pouring
90%
RR Masonry
20%
Machine
Foundation
Depending on
availability of
foundation
Drawings by
manufacturer.
0%
Plaster
Tail Race
Canal
Protective
Work
Installation of
Electromecha
nical
Equipment
(E&M)
Procurement
Process
Delivery of
E&M
80%
10th
Apr,2017
10th
Apr,2017
1st Apr,2017
20th
Apr,2017
20th
Apr,2017
30th
Apr,2017
10th
april,2017
30th
April,2017
15th
May,2017
1st
May,2017
1st
May,2017
30th
May,2017
30th
May,2017
20th
May,2017
In progress
January
15,2017
May
15,2017
0%
January
15,2017
equipment
Installation of
E&M
equipment
Transmission
and
Distribution
(T&D)
Procurement
Process
Delivery of
T&D
equipment
Installation of
T&D
equipment
-----
Photo Gallery
May
20,2017
June
30,2017
September
10,2016
December
15,2016
18th
Nov,2016
April
1,2017
April
10,2016
June
15,2016
Fig 1
Fig 2
Fig
Fig 4
3
Approach Canal Pipe
Fig 5
Collection Chamber
Fig 6