The document outlines a project management methodology that includes 10 stages from initiate to close: initiate, define, design, build, test, transition, deploy, operate, optimize and close. It shows the key deliverables required at each stage of the process moving from project-focused to more system-focused as the project progresses. The methodology is intended to guide teams through all phases of a project from initial planning to finalization.

Uploaded by

suvirgupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
241 views1 page

PMM System Route: Project Management Methodology

The document outlines a project management methodology that includes 10 stages from initiate to close: initiate, define, design, build, test, transition, deploy, operate, optimize and close. It shows the key deliverables required at each stage of the process moving from project-focused to more system-focused as the project progresses. The methodology is intended to guide teams through all phases of a project from initial planning to finalization.

Uploaded by

suvirgupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Management Methodology

PMM System Route

Design
Initiate

Deploy
Build

Define

Transition
Close

Test
Entry

Initiate to
Define

Baseline

Project Charter (P)

Project Requirements (P)

System Risk
Assessment (S)

User Requirements
Specification (S)
Solution Architecture
(Define) (P)

Roles & Responsibilities (P)

Design
to Build

Build to
Test

Test Cases
(S)

Organizational Impact
Analysis (P)

Go/No-Go
Approval

Test
Report (S)

Admin Close
Report (P)

Functional Risk
Assessment (S)

Key

Training Material (S)

Mandatory
Deliverable

Communication Material (P)


Operational Support Plan (S)

As Required
Deliverable

Organizational Change Plan (P)

(P) Project
(S) System
Version July 2013

Traceability (S)
Project Status Report (P)
Project Schedule (P)

Supplier Assessment
/ Audit Report (S)

CSV
Deliverable
Joint CSV
Deliverable

Design Spec (S)

Deployment Plan (P)

Validation Plan (S)

Admin
Close

Test Plan (S)


Soln Arch (Design)
(P)

Functional Specification (S)


Data Classification Report (S)

Test to
Transition

Validation Registry (S)


Validation Report (S)

You might also like