47 QM-006 Dynamic Modification Rule
47 QM-006 Dynamic Modification Rule
Purpose
This manual describes how to create a dynamic modification rule and assign that to a
sampling procedure.
Scope
This manual describes the creation of dynamic modification rule and assignment to sampling
procedure only. Creating a sampling procedure is explained separately.
Overview
Dynamic modification rules are QM basic data at INABB level.
In Dynamic modification rule you define the stages of inspection which an inspection lot has to
follow for every material/vendor combination. The dynamic modification rule has to be
assigned to a sampling procedure with sampling scheme. The inspection severity in the
dynamic modification rule should be available in sampling scheme also.
Event
Only when you want a new dynamic modification rule.
Page 1 of 6
Initial Screen
Field
Description
Modification
Rule
Press Enter
Remarks
Enter an identifier for the Dynamic modification rule. See note.
Note:
These Dynamic modification rule are at INABB level. So whenever you define a new dynamic
modification rule ensure that the first letter always start uniquely; e.g. N04 where N for
Nashik. If the plants within Nashik want to identify their own Modification rules, then use the
description field in the next screen. The same naming convention is applicable to Sampling
scheme and Sampling procedure also.
Page 2 of 6
Page 3 of 6
Inspection Stages
Field
Description
Stage
Insp. Sev
Skip
Remarks
Enter an identifier for the stage
Press F4 and choose an inspection severity (See note). Do not
enter if you have activated the Skip indicator.
Activate this for a skip stage. The inspection severity field should
be blank in this case as mentioned earlier.
Activate this to mark the first/initial inspection stage.
Enter a description for the stage
Ist
Short Text
Press Select all.
Press Stage change.
Create Stage Change
Field
Description
No. of
inspections.
New insp. stage
Rejections
Remarks
Enter the number of inspections that must be conducted before
changing the stage
Enter the new inspection stage at which inspection will be
performed if the conditions for Ok are fulfilled.
Number of rejections after which the stage change should occur.
Page 4 of 6
Remarks
Enter the number of inspections that must be Skipped before
changing the stage
Leave this blank
Press Save.
Now you get a Pop-up screen as shown below
Page 5 of 6
Page 6 of 6