Interested & Affected Party Registration Form: 765kV Transmission Lines

Eskom Transmission is planning two new 765kV transmission line projects between Zeus Substation in Mpumalanga and Mercury Substation in the Free State, and between Zeus Substation and Perseus Substation in the Free State, to meet electricity demands. Separate environmental impact assessments will be conducted for each project. Interested and affected parties can register with Margen Industrial Services to participate in the studies by completing a registration form with their contact details and issues of interest or concern.

Uploaded by

udelmark
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views1 page

Interested & Affected Party Registration Form: 765kV Transmission Lines

Eskom Transmission is planning two new 765kV transmission line projects between Zeus Substation in Mpumalanga and Mercury Substation in the Free State, and between Zeus Substation and Perseus Substation in the Free State, to meet electricity demands. Separate environmental impact assessments will be conducted for each project. Interested and affected parties can register with Margen Industrial Services to participate in the studies by completing a registration form with their contact details and issues of interest or concern.

Uploaded by

udelmark
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

765kV Transmission Lines

Zeus Substation to Perseus Substation

Zeus Substation to Mercury Substation

Interested & Affected Party Registration Form


Eskom Transmission is planning to strengthen the existing network between Mpumalanga and the
Eastern Cape to meet urgent short
-term for Coega
as765kV
well asTransmission
longer-term demands
the Eastern
Cape. As part of this network strengthening,
two new
Lines areinplanned:

A 765kV Transmission Line between the Zeus Substation, near Standerton (Mpumalanga)
Mercury Substation near Vierfontein (FreeState);
A 765kV Transmission Line between the Zeus Substation and the Perseus Substation near
Dealesville (Free State).

Separate environmental studies will be conducted for each options.


In line with environmental regulations, Eskom Transmission has appointed Margen Industrial Services
to conduct the Environmental Impact Assessment (EIA). If you wish to participate in this study, please
register as an Interested & Affected Party by completing the form below and returning it to the Public
Participation Office:
Margen Industrial Services
PO Box 12822, Leraatsfontein, 1038 Tel: (013) 690 3928 fax: (013) 699 0917 e-mail:
[email protected]
Contact: Moses Mahlangu Cell 082 854 9538
TITLE (Prof, Dr, Mr, Mrs Ms)
INITIALS

Marianna Nieuwoudt: Cell 082 459 1021


FIRST NAME
SURNAME

ORGANISATION
CAPACITY (e.g secretary chairperson)
ADDRESS
POSTAL CODE

TEL NO

FARM NAME

FAX NO

FARM NO

CELL NO

E-MAIL ADDRESS
What is your main interest in this project?

What issues and concerns would you like to see addressed as part of this project?

PLEASE ADD THE FOLLOWING PERSON/S TO THE MAILING LIST:


Name:Sector/Organisation:..
Telephone no/fax no/address/ e-mail:
...
...
Thank you for your participation