Chapter 8 Prestressed
Chapter 8 Prestressed
Chapter 8 Prestressed
Pretension
Posttension
Phase 1
Phase 2
Phase 3
Phase 1
Phase 2
Phase 3
Steel
Tendon
Concrete
Between C30
and C60
7 or 19 nos of
strand
High workability
during wet and
high strength
when hardened
High strength
steel
Concrete
strength at
transfer, fci
0.6fck(t) N/mm2
Steel strength
usually 1650
N/mm2
Stresses
Loading Stage
Transfer
Symbol
Value or
Equation
Service
Symbol
Value or
Equation
Compressive
fct
0.6fck (t)
fcs
0.6fck
Tensile
ftt
fctm
fts
Long-term
(a) Creep and shrinkage of the concrete under sustained compression
(b) Relaxation of the prestressing steel under sustained tension
b
Top fibre
yt
N.A
Ungrouted duct
yb
Bottom fibre
Prestressing
tendon
Reinforcement /
bonded tendon
w = 10 kN/m
8m
h = 500 mm
b = 200 mm
fc
+
yt
yb
ft
Mmax = wL2/8 = 80 kNm
Therefore;
ft = fc
= (wL2/8)(h/2) (bh3/12)
= 9.65 N/mm2
N.A
fc = 9.65 N/mm2
14 N/mm2
ft = 9.64 N/mm2
Stress due to
loading
P/A
Stress due to
force P
0 N/mm2
Total stress
9.65 + P/A = 0
Prestress force, P
required to eliminate
tensile stress
= 9.65A
= 965 kN
P
Pe/Zt
fc = 9.65 N/mm2
+
_
14 N/mm2
=
+
ft = 9.65 N/mm2
Stress due to
loading
Pe/Zb
P/A
Stress due to force P
0 N/mm2
Total stress
(a) At Transfer
Mi = Moment due to self weight
_
Mi/Zb
Stress due to
self weight
f1t ftt
Pe/Zt
P/A
Mi/Zt
P/A
+
+
Pe/Zb
f2t fct
Total stress
(a) At Service
ws kN/m (Service Load)
Mi/Zt
Ms/Zt
+
_
Mi/Zb
Stress due to
self weight
Stress due to
ws kN/m
Pe/Zt
P/A
f1s fcs
_
Ms/Zb
P/A
=
+
Pe/Zb
f2s fts
Total stress
-------------------
(1)
(2)
-------------------
(3)
(4)
At Service
Mi/Zt + Ms/Zt + P/A Pe/Zt fcs
Mi/Zb Ms/Zb + P/A + Pe/Zb fts
----------
(5)
----------
(6)
----------
(7)
----------
(8)
ws = 20 kN/m
P
15 m
=bh
= 300 950
= 2.85 105 mm2
= bh3/12
= 300 9503/12
= 2.14 1010 mm4
Modulus of section, Zt = Zb
= Ixx/y
= 2.14 1010 / 475
= 4.51 107 mm3
Stress Distribution
At Transfer
Self weight, wi = (Ac)(25) = (2.85 105)(25) 10-6 = 7.12 kN/m
Mi at mid-span = wiL2/8 = (7.12)(152)/8 = 200.2 kNm
Short-term losses, = (1 0.10) = 0.90
Stress at top fibre
f1t
= Mi/Zt + P/A Pe/Zt
= 5.20 N/mm2
Stress at bottom fibre
f2t
= Mi/Zb + P/A + Pe/Zb
= 17.84 N/mm2
PASS
+
f2t (17.84) fct (16.8)
FAIL
Stress Distribution
At Service
Service load, ws = 20 kN/m
Ms at mid-span = wsL2/8 = (20)(152)/8 = 562.5 kNm
Long-term losses, = (1 0.20) = 0.80
Stress at top fibre
f1s
= Mi/Zt + Ms/Zt + P/A Pe/Zt
= 8.33 N/mm2
Stress at bottom fibre
f2s
= Mi/Zb Ms/Zb + P/A + Pe/Zb
= 3.23 N/mm2
PASS
_
f2k (3.23) fts (0)
PASS
---------- (9)
---------- (10)
Stress limit;
At Transfer
fct = 0.6fck(t) = 0.6(30) = 18.0 N/mm2
ftt = fctm = 0.30 (30)2/3 = 2.90 N/mm2
At Service
fcs = 0.6fck = 0.6(50) = 30.0 N/mm2
fts = 0.0 N/mm2
Increase size
Zb
OK
TARMAC TOPFLOOR
TARMAC TOPFLOOR