Capital District Gondola

Feasibility Study
ALBANY/RENSSELAER NEW YORK

October 2016

Contact
Peter Melewski, PE
National Director of Strategic Planning
McLaren Engineering Group
5 Clinton Square
Albany, NY 12207
(518) 992-4830
[email protected]

McLarenEngineeringandDoppelmayr
designedandconstructedthegondolasystem
attheNewWynnPalaceinCotai.

Table of Contents
Executive Summary
Introduction

Pages

1
2-4

Background & Purpose of Study

Objectives of the Project

Project Location

Local Plans for the Project Area

Stakeholders

Alignments

4-13

Phase 1

Phase 2

Development Costs

Operations & Maintenance

Schedule

CDG Alignments & Stations

Gondola Details

14

CDG Cabins

14

CDG Safety Features

14

Potential Benefits

14-15

Symbiotic Relationship Benefits

14

Transportation Benefits

14

Social Benefits

15

Community Development Benefits

15

Preliminary Economic Benefit Assessment

15

Potential Impacts

16

Funding & Revenue

17

Public

17

Private
Public-Private Partnership (PPP)

17
17

Implementation

17-18

Permitting

18

Planning Review

18

Conclusion/Next Steps

18

APPENDICES
Appendix A: Capital District Gondola Visuals
Appendix B: Press Release
Appendix C: Team Overview
Appendix D: Preliminary Impact Assessment
Appendix E: References

Executive Summary
On July 7, 2016, the McLaren Engineering Group (McLaren) announced the launch of a
transportation feasibility study for an aerial gondola that would connect the Albany-Rensselaer
Amtrak Train Station to downtown Albany with the intent of providing a new, reliable and efficient
transportation option for commuters, visitors and tourists. The nations 9th busiest train station is
physically isolated from the capital city. Urban gondola systems are a growing trend being
contemplated or studied in a number of cities across the United States, and around the world.
The objective of the Capital District Gondola (CDG) feasibility study is to conduct an initial
assessment and overview of: possible alignments; technical feasibility; capital and operating costs;
potential ridership; economic and environmental impacts; implementation timeframes; approval
constraints; and to determine overall system sustainability and viability. The study also identified
interested parties and stakeholders, gauged sentiment of such stakeholders and searched for any
single item that might be cause for disapproval of the project. Determining feasibility is the first step
toward preliminary and final design, funding, environmental review, construction, and operation.
Future work will examine specific project issues in much greater detail.
McLaren has teamed with Doppelmayr, the worlds leading manufacturer of ropeway technologies.
As an indicator of the projects potential, the team grew to six (6) well respected members in just
over two months time, to address items such as ridership, economic impact, funding and
constructability (see Figure 1). A background on the firms comprising the Project Team and their
role, is provided in Appendix C. In addition, Capital Gondola LLC has been created to facilitate
funding and permit applications.
Equally important to the creation of a well versed team, was the support and input received from
key public/private stakeholders on both sides of the Hudson River. The team spent hundreds of
hours meeting with, and reviewing information provided by these stakeholders represented by
Figure (1). The team comprises many seasoned transportation professionals who were pleasantly
surprised by the strong enthusiasm and interest in the study.
The findings of the three (3) month exercise have met or
exceeded expectations. We have identified a one mile long
operating corridor that begins at the Amtrak Station, heads west
across the Hudson River to a proposed station on South Pearl
Street near the Times Union Center/Key Bank Building, and
then continues on to the Empire State Plaza. The project is
technically feasible and constructible with minimal impacts.
The construction budget and operating costs can be offset by
passenger and advertising revenue, with ridership well in the
hundreds of thousands each year. An overview of the findings
can be found on the following pages.
After three months, the Project Team finds the CDG to be
feasible, and retains the potential of being a transformational
project that will create a spark of increased mobility, tourism,
and economic development in two areas of the cities of Albany
and Rensselaer that are currently underdeveloped. We look
forward to continuing our work with key stakeholders, the
general public, and investors as we advanced this unique
project.

Figure 1: Project Team is composed of


Capital Gondola LLC, McLaren Engineering,
Doppelmayr, Camoin Associates, Lemery
Greisler, Urban Gondola Systems LLC, and
Harrison & Burrowes
PAGE 1

Introduction
Background & Purpose of Study
In the late 1960s Union Station in downtown Albany was abandoned and the rail station for travel
to and from Albany - now known as the Albany-Rensselaer Amtrak Station (Amtrak Station) - was
moved across the Hudson River to Rensselaer. This move physically separated the station from
downtown Albany and the State Capitol, making it more difficult for people who live and work in
the city to access the station and for visitors arriving by train whose destination is across the river in
downtown Albany.
The Amtrak Stations location has posed challenges for Rensselaer as well. Much of the real estate
directly around the rail station is either vacant commercial land or surface parking acting as a barrier
to the rest of downtown and the waterfront. There is a sense that the city acts only as a pass-through
to other destinations rather than a destination itself. (City of Rensselaer, June 2016)
In several places in the United States and around the world, aerial gondolas have been used to solve
transportation challenges such as the one between the Albany and Rensselaer. Additionally, urban
gondolas have resulted in increased economic development activity adjacent to the stations,
attracted tourists and had a positive impact on the environment.
The purpose of the study is to assess the feasibility of constructing and implementing a CDG service
between the Amtrak Station in Rensselaer and two locations in downtown Albany (Figure 2: study
area). This unique connection would help solve a transportation challenge while offering stunning
views of the Hudson River, the Empire State Plaza and historic downtown, enhancing the areas
tourism appeal. The CDG service would also make it more attractive to live in Rensselaer and
encourage Transit Oriented Development (TOD).
Objectives of the Project
A CDG system would help meet the following objectives:
1. Address the issue of the Amtrak Stations physical separation from downtown Albany and
the Empire State Plaza.
2. Encourage economic development via transit oriented development, tourism, improved
livability, and additional mobility.
3. Provide an improved bicycle and pedestrian connection between the Amtrak station, the
new esplanade trail in Rensselaer, and bicycle and pedestrian facilities in Albany.
4. Provide an environmentally friendly option for crossing the Hudson River.
5. Reduce the number of automobile trips and compliments existing transit services.
6. Provide a multi-model and ADA compliant system.
7. Initiate a transformative project that creates a spark for development.
8. Improve quality of life in the Capital District.

PAGE 2

Project Location
The project area (see Figure 2) is located in downtown Albany and Rensselaer, New York, adjacent
to the Dunn Memorial Bridge and South Mall Arterial roadway. The proposed CDG system would
extend across features such as the CSX/Amtrak tracks in Rensselaer, the Hudson River, I-787, and
the South Mall Arterial approaching the Empire State Plaza.

Empire State Plaza

South Pearl Street

I-787

Amtrak Station

Figure2

PAGE 3

Local Plans for the Project Area


Based on discussions with key stakeholders (Figure 1), the proposed CDG was assessed in light of
current and future plans in the project area for compatibility. It was found that the CDG would
enhance and be synergistic with several projects that are planned or in progress in the area, including
the Capital Center (March 2017), the Times Union Center improvements, and the downtown Albany
streetscape enhancements on the west side of the Hudson River; and Rensselaers Esplanade (2017)
and DeLaets Landing apartments (2018).
The CDG would be consistent with local and regional planning efforts, including the Albany 2030
plan, which places a strong emphasis on the importance of a multi-modal transportation system that
provides the ability to safely and efficiently move via different modes of transportation. The CDG
system would also complement the Capital District Regional Economic Development Councils
Capital 2030 Upstate Revitalization Initiative Plan and the 2016 Rensselaer Waterfront
Downtown Revitalization Initiative proposal.
Stakeholders
McLaren Engineering Group, is leading the study effort in association with Doppelmayr, the worlds
leading manufacturer of ropeway technologies for gondolas, Camoin Associates, Harrison &
Burrowes, Urban Gondola Systems LLC, and Lemery Greisler LLC (team member overviews can be
found in Appendix C). In addition, the Capital Gondola LLC has been created to facilitate funding
and permit applications. The team has received valuable input and insight from regional
transportation partners, public organizations, and private entities for the preparation of this feasibility
study. Their time and effort is deeply appreciated. A press release on the intent of the study was
released on July 7, 2016. Conversations have been held with numerous public officials and
public/private stakeholders in Albany and Rensselaer to obtain input on the project. In general, the
response has been positive and supportive. The stakeholder chart (Figure 1) illustrates the
collaborative effort. The Project Team is at the core since it receives information from and
disseminates information to all pertinent stakeholders.

Alignments
After investigating eight (8) potential alignments (see Figure 6) along the one mile corridor, one
alignment was selected for cost estimating purposes only. Final station locations to be determined.
Gondolas travel in one continuous loop. It is more economical to have the gondola system
alignment as straight as possible. Bends and turns increase cost.
The alignment comprises two (2) phases.
Phase 1 provides for construction of a 3,891-foot long CDG line
from the Amtrak Station to South Pearl Street (Key Bank/Times
Union Center area). This would allow individuals arriving at
the Amtrak station to travel to downtown Albany destinations.
It would consist of 8 towers and 2 gondola stations (Figures 3,
4A & 4B) with the primary drive location within the South Pearl

Figure 3: Amtrak Station


Gondola station shown at the SW
corner of Amtrak Station
PAGE 4

Street station. For purposes of cost estimating the South Pearl


Street station is shown near Key Bank. Another location could
be adjacent to the Times Union Center. Phase 1 lines would
travel at a speed of 14 mph with a trip time of 4.27 minutes.
Design Option A Functional: This design option includes
CDG stations at the Amtrak Station and South Pearl Street.
Project needs would be met.
Design Option B Enhanced: This design option is similar to
Design Option A, but would include architectural upgrades,
such as glass walls at the stations, as funding permits.
Phase 2 would extend the system an additional 1,556 feet to the
Empire State Plaza (Figure 5). Phase 2 would include 6 additional
towers with the primary drive location within the station at
South Pearl Street. Phase 2 would travel at a speed of 14 mph,
with a trip time of 2.31 minutes.

Figure 4A: South Pearl Street


Station Key Bank Option

Design Option A Functional: This design option addresses


project needs and provides an enjoyable experience.
Design Option B Enhanced: This design option is similar to
Design Option A, but would include architectural upgrades
such as glass walls at the South Pearl Street station.
The total system represented by the combination of Phase 1 and
Phase 2 alignments would be over 1-mile long. Phase 1 and
Phase 2 are designed to function as separate systems, with a
common station on South Pearl Street. This allows Phase 1 and
Phase 2 to be built concurrently, or Phase 2 at a later date,
depending on funding and logistics. The total system would be
designed to accommodate 1,200 people per hour (pph) initially.
Cabins can be added to accommodate up to 2,400 pph as
demand grows, with a cab spacing of 240 feet, and a cabin
arriving every 24 seconds at each station. Cabins would detach
from the moving line and slow to a walking speed within the
stations for boarding purposes.

Figure 4B: South Pearl Street Station


Times Union Center Option

Only Phases 1 and 2 are potential actions that would address


the objectives of this study. The Null Alternative, does not.

Figure 5: Empire Plaza Station


Option using existing vacant
transportation tunnel

PAGE 5

Development Costs
Depending on the alignment and phase/option chosen, the budgeted cost for planning, design, fabrication, construction, and inspection
ranges from approximately $17M to $30M, as detailed below:
Phase 1
Percent
Option A
$2,090,430
13%
$4,600,480
28%

Item
Amtrak Station
Intermediate Station
Empire State Plaza Station

Phase 1
Percent
Option B
$3,580,050
18%
$6,031,920
31%

Phase 2
Option A

Phase 2
Option B

Percent

Percent

$1,000,000

12%

$2,000,000

20%

$1,446,120

16%

$1,446,120

14%

$587,220
$5,786,109

6%
62%

$587,220
$5,786,109

6%
57%

Tower Foundations

$1,942,960

12%

$1,942,960

10%

Towers 11 & 12
Gondola Components
Reset Ped Ramp at Along I-787

$6,562,550
$1,000,000

38%
6%

$6,562,550
$1,000,000

34%
5%

$250,000

2%

$250,000

1%

$250,000

3%

$250,000

2%

$134,400

1%

$134,000

1%

$117,600

1%

$117,600

1%

$16,580,820

100%

$19,501,880

100%

$9,187,049

100%

$10,187,049

100%

Maintenance/Protection of
Traffic
Component Installation
TOTAL
Total
Option A
$2,090,430
$4,600,480
$1,000,000

8%
18%
4%

Total
Option B
$3,580,050
$6,031,920
$2,000,000

$3,389,080

13%

$3,389,080

11%

$587,220
$12,348,659
$1,000,000

2%
48%
4%

$587,220
$12,348,659
$1,000,000

2%
42%
3%

$500,000
$252,000

2%
1%

$500,000
$252,000

2%
1%

$25,767,869

100%

$29,688,929

100%

Percent

Percent
12%
20%
7%

Option A

Phase 1
Phase 2
Total

64%
36%
100%

$16,580,820
$9,187,049
$25,767,869

Option B

Phase 1
Phase 2
Total

66%
34%
100%

$19,501,880
$10,187,049
$29,668,929

Annual Operating & Maintenance Costs


Phase 1
$1,610,000
Phase 2
$790,000
Total
$2,400,000
Note: Planning, design, permitting, inspection costs, as
well as contingencies are included in cost estimates.

PAGE 6

Operations & Maintenance (O&M)


It is anticipated that the CDG would operate approximately 16 hours per day, seven days a week
throughout the year. The CDG would operate in most weather conditions.
Based on the experience at other existing gondola locations an optimum staff of up to 36 full and
part time employees will be needed for operation and maintenance when the CDG is fully
functional. Fewer staff would be needed if only phase one were implemented.
The O&M team would consist of management, maintenance staff and operating personnel.
The following positions will be needed to operate and maintain the CDG:
General Manager - would plan, direct, manage, and oversee the overall operation and maintenance
of the CDG. The position provides a high level of responsible and complex management,
coordinating activities with other management staff and outside agencies.
Duty/Shift Manager - would primarily responsible for overseeing the day-to-day operations and
maintenance of the CDG, troubleshooting, organizing maintenance schedules, and keeping records.
The position also involves ensuring the proper execution of day-to-day administrative functions of
the office, as well as ensuring the proper conduct of all employees.
Mechanical/Electrical Technician - would be responsible for performing preventive and corrective
maintenance to all CDG components. The Technician also troubleshoots and resolves operational
disturbances. All maintenance technicians will be cross-trained to operate the system, which will
provide staffing flexibility for break relief, emergency shifts, and vacation coverage.
Operator - would be responsible for monitoring the CDG during all modes of operation. The
position also involves performing minor troubleshooting, such as identifying alarms and resetting
faults.
Administrative Assistant - is primarily responsible for providing administrative services in order to
ensure effective and efficient operations. The position involves managing the activities of the office
and support the operations team.
To guarantee that personnel are available to address all concerns regarding the operation and
maintenance of the CDG, the following shift pattern based on a standard shift model and good
industry practice would be followed:

During operational hours of the system at least one staff member will have managerial duties
and will act as Duty/Shift Manager.

Platform supervision is done at each station platform by at least two responsible operators as
per codes and standards.

At least one technician will be on duty during hours of operation and three mechanical/
electric technicians will perform maintenance tasks during the non-operational shift.

PAGE 7

Schedule
The entire project could be built and operational by the end of 2019.
Task Description

Start Date

End Date

Feasibility Study

July 2016

Oct. 2016

Funding

July 2016

Dec. 2019

Permitting

Nov. 2016

Sept. 2019

Detailed Design

Jan. 2017

June 2017

SEQRA Process/Final Design Report

Nov. 2016

June 2017

Fabrication of Components

Sept. 2017

Mar. 2018

General Construction

April 2018

Sept. 2019

System Testing & Adjustment

Sept. 2019

Nov. 2019

Opening

Dec. 2019

Completion of this project according to the proposed schedule and development costs is contingent
upon securing private, state, federal, and local government, necessary to initiate construction in
June, 2017.

PAGE 8

Figure 6: CDG Alignments & Stations

Figure6:AllAlignments

PAGE 9

Figure 3: Amtrak Station Gondola station shown at the SW corner of Amtrak Station

PAGE 10

Figure 4A: South Pearl Street Station Key Bank Option

PAGE 11

Figure 4B: South Pearl Street Station Times Union Center Option

PAGE 12

Figure 5: Empire Plaza Station Option using existing vacant transportation tunnel

PAGE 13

Gondola Details
CDG Cabins
Functional level cabins would feature level-step boarding for ADA accessibility, as well as flip up
seats to make room for handicap mobility devices and bicycles. Cabin doors operate using
automatic opening and closing mechanisms in each station, and feature doorway spotlights to be
used during night operations. Windows provide UV protection, as well as passive ventilation
designs and kick panel ventilation that continue to maintain high safety standards. A wide variety
of cabin upgrade options are available. CDG capacity is maximum of 8 people, less if there is a
wheel chair or bicycle on board. The capacity is 6 people if cabins are air conditioned due to weight
limitations.
CDG Safety Features
Many safety features are standard for CDG systems, lending to their reputation as a safe and reliable
form of transportation. To keep the system operating during times of maintenance or even the full
loss of power, the main drive station operates off of a diesel backup motor. During these periods,
line speeds slow to a walking pace to allow the remaining passengers to exit. Cabins can be
optionally equipped with two-way radio connections to the stations to allow communication with
passengers during evacuations or emergencies. Customized maintenance schedules can also be
created to minimize loss of service for riders. In the rare event that an emergency evacuation is
needed, vertical evacuation procedures can be performed.

Potential Benefits
It is expected that the CDG would generate a variety of benefits to users of the service and the region,
as explained below:
Symbiotic Relationship Benefits
Construction of the CDG, particularly the stations, can result in mutually beneficial symbiotic
relationships with other proposed projects in the project area. For example, a Regional Intermodal
Center has been proposed by CDTA for the downtown Albany area. There is the potential to
leverage CDTAs goals with the Gondola station at South Pearl Street to result in economies of scale,
instead of building separate facilities. One could also add a private developer, for example, for a
parking garage, retail, etc. A win-win-win scenario. Similar scenarios could happen at the Amtrak
Station and the Empire State Plaza.
Transportation Benefits
Development of a CDG system would provide an attractive transportation alternative for travel
within the study area. It would be quicker, cleaner and more efficient than existing modal options
and consistent with New York State Smart Growth policy, which encourages mobility through
transportation choices including improved public transportation and reduced automobile
dependency. For example, state employees working at the Empire State Plaza who need to take the
train, can use the CDG to and from the station, which may reduce travel expenses for the individual
and the state.
In other cities where gondola systems have been installed as a part of the transportation network
there have been reductions in automobile trips, which leads to lower levels of automobile emissions
(Davila, 2013). In Albany, this would mean less trips on the Dunn Memorial Bridge and South Mall
Arterial.
PAGE 14

The CDG system would improve the conditions for walking and biking in the two cities by providing
connections between areas that have traditionally required an automobile to travel. The CDG would
provide a link between the new multi-use trail in Rensselaer and the statewide Mohawk-Hudson/Erie
Canalway Trail which begins across the river in Albany.
Social Benefits
The CDG would provide a variety of societal benefits, perhaps most notably it would act as a catalyst
for social and economic development in the Capital District: an innovative spark that is currently
lacking. The increased interactions between the two cities will help to build social capital in the
region, inspiring creative ideas and projects. It would enhance pride in the community.
By helping to remove the barriers to active transportation, the CDG would encourage more people
to bike and walk, increasing levels of physical activity and reducing air pollution within the region.
It is estimated that by making the switch to active transportation for trips of less than five miles results
in an estimated gain of 9.25 years of life expectancy across all ages (Hartog, 2010). Implementing
a CDG system would put Albany and Rensselaer at the forefront of the movement to implement
transportation systems that improve public health and wellbeing.
There will also be quality of life benefits as a result of the CDG. The CDG would reduce the stress
of travelers coming to and from the area by providing a simple, fast and fun connection between the
two downtowns. It would also provide a low stress commuting option between Albany and
Rensselaer.
Community Development Benefits
Implementation of the Capital District could provide significant community development benefits in
Albany and Rensselaer. CDG projects in other locations around the United States and abroad have
been found to stimulate increased economic activity in the areas around the stations. CDG stations
in Rensselaer and downtown Albany where there is vacant property nearby, provide an excellent
opportunity for Transit Oriented Development (TOD). TOD is a type of community development
that includes a mixture of housing, office, retail and/or other amenities integrated into a walkable
neighborhood and located within a half-mile of public transportation hubs. It is essential that TOD
creates better access to jobs, housing and opportunity for people of all ages and incomes, which the
CDG can help ensue. Successful TOD provides people from all walks of life with convenient,
affordable and active lifestyles and create places where our children can play and our parents can
grow old comfortably. (Reconnecting America Website)
Preliminary Economic Benefit Assessment
The potential economic impact of the CDG is a critical factor in assessing the feasibility of the
project. Camoin Associates, a national economic development consultant, was commissioned to
conduct an initial assessment on whether this type of project will have a positive or negative impact
on the host regions economy. While the full report is included in Appendix D, a summary of the
findings is provided below.
Camoin first conducted a review of similar projects around the United States and abroad to assess
the impacts on host communities and provide lessons learned about how to conduct a successful
project. Gondola systems in London, England, Portland, Oregon, Telluride, Colorado, LePaz,
Bolivia, Koblenz, Germany and New York City, New York. Although it is not a gondola system,
Walkway over the Hudson in Poughkeepsie, New York was also reviewed. While these examples
are not identical to the situation in the Capital District, they are nonetheless instructive. The case
studies show that the aerial gondola or cable car is a versatile mode of transportation that can fit in
PAGE 15

dense urban areas, historic districts, geographically challenging areas, and tourism hubs. These
systems generally have a positive environmental effect on their host communities, generate tourist
use, and stimulate increased economic activity in the areas around the stations.
Secondly, Camoin conducted an inventory of the sources of likely riders for the CDG based on a
review of nearby tourism assets, regional commutation patters and the potential for longer stays by
existing visitors to the area and others. A full economic impact analysis is required to understand
the magnitude of the project will result in new jobs, earnings, and sales for the region, but based on
the review of other projects, an understanding of the Capital Region and downtown Albany, and the
factors that determine success of a project like this, Camoin believes that an initial determination is
possible. The main sources of new economic impact that will result from the Project include:

Annual Impact: The Project would result in annual new economic activity as people who are
currently visiting downtown Albany and the Capital Region extend their stay to ride the CDG.
This will result in new jobs, earnings, and sales in the region as they spend more time and money
locally. The CDG will also be a draw all on its own, attracting people to the Capital Region who
otherwise may not have come to visit.

Construction Impact: There will be a temporary economic impact during the period of
construction. This impact will be substantial, a portion of which will be sourced locally and
have an impact on local suppliers and companies.

Transformational Impact: The Project will result in transformational impacts for the Capital
Region that cannot yet be measured, such as environmental benefit, increased development on
the Rensselaer side, increased development on vacant land in Albany, rising property value,
increased diversity of transportation options, more regionalism as Rensselaer and Albany are
connected, and a unique feature to highlight for the Capital District marketing materials.

Based on these three different types of impacts, Camoin determined it is clear that the CDG will
create new economic activity for the host communities resulting in new jobs, earnings, sales, and
local tax revenue. The degree to which the CDG will impact the communities will vary from a large
temporary impact during construction to a more moderate annual impact depending on the number
of annual riders and the proportion of those riders who are spending new money in the area.
Furthermore, the ability of the CDG to grow will be tied to marketing of the facility, strong
connections to existing tourist destinations, and development on the Rensselaer side of the Hudson
River.

Potential Impacts
Gondolas cause nominal disruption to the natural areas over which they pass because of their aerial
nature. There is no need for major infrastructure or environmental changes because of their modular
installation process and their impact on land use is far less than other modes of transit. They also
emit minimal noise and light pollution compared to automotive and light rail alternatives and they
have been proven to reduce air pollution in cities where they have been built. The systems are
powered by electric motors which are assisted by batteries that use many of the same recharging
principles found in hybrid automobiles.
As most of the property that the CDG would aerially cross is publicly owned, Right-of-Way (ROW)
impacts will be minimal given the site of the project.
PAGE 16

The most significant impact would be visual as the towers, cars and cable line would extend across
the skyline. While some may think that this is visually disruptive, to others the appearance of the
small CDG cabins in continual motion will provide a sense that the region is dynamic and forward
thinking. In addition, the CDG system will offer users long range views of the Hudson River Valley.

Financing & Funding Options


There are several possible ways to fund a large transportation project like the CDG, ranging from
fully private to fully public or a combination of the two, known as public-private partnerships (PPP)
Private
Investors are often interested in financing transportation solutions like the CDG. A private team may
form a limited liability company (LLC) that develops, finances, constructs, and own and operates the
CDG. Funds are raised by the private team from a myriad of sources, including private equity,
private placement of securities or a low interest loan from the federal Department of Transportation
known as Transportation Infrastructure Finance and Innovation Act (TIFIA) or other local and state
transportation funding. Private land owners and developers may also be interested in having the
CDG land or take off from their property or in their building.
Public
A public municipality, agency or authority might assemble the funding required to construct and
operate the CDG through programming its own funds or by utilizing federal transportation grants
such as the Transportation Investment Generating Economic Recovery (TIGER) program or state
grants such as the Consolidated Funding Application (CFA), subsidies and charging user fees. A
local government entity can lease land for ascent and descent for a nominal charge.
Public-Private Partnership (PPP)
A public sector organization and a private party may enter into a contract in which the private party
implements the CDG project and assumes a majority of the financial, technical and operational risk
in the project. The government contributions to a PPP may be in kind. In a PPP the public sector is
able to harness the expertise and efficiencies that the private sector can bring to the delivery of
facilities traditionally procured and delivered by the public sector. A PPP is structured so that the
public sector body seeking to make a capital investment does not incur any borrowing. The PPP
borrowing is incurred by the private sector entity implementing the project.

Implementation
Prior to constructing, the CDG permits would be required from the appropriate regulatory agencies.
A State Environmental Quality Review (SEQR) would be required as well. In addition, right-of-way
would need to be assembled for the stations, towers and air rights and municipal planning approvals
would be required as explained further below:

PAGE 17

Permitting
Potential permits that would needed before construction could start include the following:

NYS Department of Environmental Conservation (DEC) - erosion and sediment control plan
and a storm water pollution prevention plan (SWPPP) will be required if more than an acre
of land is being disturbed. A protection of waters permit would be required for work in or
adjacent to the river.

NYS Department of Transportation (DOT) Right-of-Way Work Permit - needed for work
within and over State Highway ROWs.

State Historic Preservation Office (SHPO) - archeological and historic preservation review.

United States Army Corps of Engineers (ACOE) - nationwide permit for work in or over the
river.

State Environmental Quality Review Act (SEQRA) - a SEQRA review will be conducted to
assess the environmental impacts associated with the implementation of the CDG project.
A lead agency will need to be determined for the environmental quality review. This is
typically a municipality or the county, but can be a state agency. The lead agency will
determine if the proposed action is a Type II, unlisted or Type 1. Unlisted Type I actions
will require that an environmental assessment form be completed. At the conclusion of the
review process, a positive or negative determination will be made by the lead agency. Since
the CDG is a transportation facility, the New York State Department of Transportation
(NYSDOT) would be a likely candidate to be lead agency.

Rail crossing permits the CDG will pass over rail tracks owned or operated by Amtrak and
CSX/Canadian Pacific, which may require permits for working overhead.

Federal Aviation Administration (FAA) a Form 7460-1, Notice of Proposed Construction or


Alteration FAA permit may be required.

Planning Reviews
The CDG will be located in two principal jurisdictions, the cities of Albany and Rensselaer. The
CDG towers and stations will require review by the respective municipal planning boards for
conformance with the zoning code. The city councils will also need to approve the overall project
concept.

Conclusion/Next Steps
The objective of the CDG feasibility study was to conduct a short duration assessment of the viability
of an urban gondola system. McLaren and Doppelmayr entered this study not knowing what we
would discover. The findings of the three (3) month exercise have met or exceeded expectations.
Our Project Team grew as the initial findings came back positive, and the information gleaned from
numerous meetings with public and private stakeholders in the study corridor was very helpful in
progressing this study. The enthusiasm expressed by stakeholders also exceeded expectations.
We have identified a 1 mile long operating corridor that is anchored by the Albany-Rensselaer
Amtrak Station on the east, and the Empire State Plaza on the west with an intermediate station at
PAGE 18

South Pearl Street in the vicinity of the Times Union Center and Key Bank Building. The system can
be built in one or two phases depending on sequencing and funding. The construction budget and
operating costs can be addressed by a combination of private investment, public funds, advertising
revenue, and passenger fees. Ridership is expected to be in the hundreds of thousands annually.
We have found the CDG to be feasible and has the potential of being a transformational project for
the Capital District. The studys findings support advancing the project. The next steps will focus on
securing funding sources, optimizing public/private partnerships; and developing a more refined
ridership and economic impact analysis. The Project Team will continue to work closely with public
stakeholders / elected officials as the work progresses to obtain the necessary reviews and approvals,
develop a construction schedule, and keep develop and maintain a public outreach program.
We wish to acknowledge the many people, both public and private, who contributed time, energy
and resources to this study. It truly was a collaborative effort, and we look forward to building on
those relationships as this exciting project progresses.

PAGE 19

Appendix A: Capital District Gondola Visuals

Appendix B: Press Releases


McLaren Engineering Group Launches Gondola Study
to Connect Albanys Downtown with AlbanyRensselaer Train Station
Innovative, vital multi-modal transportation link will provide the Capital Region with economic, tourism and
environmental benefits
Albany, NY -- July 7, 2016 McLaren Engineering Group announced today the launch of a transportation
feasibility study for an aerial gondola that would connect the Albany-Rensselaer Train Station to downtown
Albany providing a new, reliable and efficient transportation option for commuters, visitors and tourists.
The study will be managed out of McLarens downtown Albany office by Peter Melewski, National Director
of Strategic Planning. Currently, McLaren is self-funding the study and assembling a team to execute it. The
team includes Doppelmayr, the worlds leading manufacturer of ropeway technologies for gondolas, which
has a nearby Ballston Spa, NY, office.
The gondola will provide a much-needed transportation link across the river for commuters, visitors and
tourists, says Malcolm McLaren, President and CEO, McLaren Engineering Group. The Albany train station,
Amtraks 9th busiest, is physically isolated from the capitol and downtown businesses. An aerial gondola
system will provide a unique, cost-effective transportation mode that will benefit the entire region.
I want to thank McLaren for undertaking this study for a new and innovative link between the train station
and our Capital City, says Albany Mayor Kathy Sheehan. Cities around the country and the world have
used gondolas as a cost effective way to solve transportation challenges and this is the first step in determining
whether it is the right solution for Albany.
Gondola systems, comprising a series of cable cars, can be constructed at a fraction of the cost and time
frame required for traditional rail systems. No bridges or tunnels are necessary, and a well-designed system
can be up and running within two years. Additionally, cable cars can cross obstacles easily, are safe for
passengers, offer views of the city and are environmentally friendly with no emissions.
This is one of those once in a lifetime projects that will gain significant momentum as it is better
understood, continues McLaren. We expect this project to generate considerable excitement and draw
supporters and funding sources from the public and private sector.
We commend McLaren for its vision and commitment to seeking innovative solutions. We look forward to
reviewing the findings from the feasibility study, says Mark N. Eagan, CEO, Capital Region Chamber.
The Capital District Transportation Authority (CDTA) is exploring new and expanded ways to improve
mobility throughout the Capital Region so this study is well-timed, said Carm Basile, Chief Executive
Director, Capital District Transportation Authority.
About McLaren Engineering Group
McLaren Engineering Group features eight engineering divisions, staffed with nearly 200 employees in 10
offices. Founded in 1977, McLaren has successfully completed over 12,000 projects, from inspection to
design to construction management. With experts in numerous engineering disciplines and a passion for
innovation and out-of-the-box thinking McLaren can address any project's specific range of design
requirements with technical excellence and innovation. Headquartered in West Nyack, NY, McLaren has
offices in New York City, NY; Albany, NY; Lehigh Valley, PA; Middletown, CT; Baltimore, MD; Roswell,
GA; Orlando, FL; San Luis Obispo, CA; and Oran, Algeria. www.mgmclaren.com

Appendix C: Team Overview

McLaren Engineering Group, with almost 40 years of service, is a respected and renowned firm that
features multiple engineering divisions, staffed with over 180 employees in 10 offices worldwide.
We have successfully completed over 14,000 projects, a figure that encompasses inspection, design,
and management for many different project types.
As its legacy builds, McLaren has grown into a company that offers a set of engineering services that
few other firms provide. With experts in numerous engineering disciplines, we blend staff resources
to address a projects specific range of design requirements. This ability leads to better management,
cost efficiencies, and a more elegant, technically sound solution.
McLaren serves our clients through the Transportation, Leisure & Amusement Entertainment
Industries, Government, Education, Energy, Healthcare, Industrial, Maritime, Public Infrastructure,
and Real Estate Development Markets:

As quality, technology and market leader in gondola engineering, Doppelmayr operates production
plants, as well as sales and service centers in over 35 countries worldwide. They manufacture cable
cars, gondolas, chair lifts, ski resorts and amusement parks, as well as urban people movers and
material handling systems. To date, they have built more than 14,700 installations for customers in
90 nations. Flexibility, know-how and pioneering spirit make Doppelmayr ideally equipped to meet
the project needs.
Innovative transport systems from Doppelmayr continually set new standards. Top comfort and
safety define our installations in summer and winter tourism regions, as well as in the urban transit
sector. Our material transport and gondolas systems offer impressive efficiency and performance.
All-year-round experience and innovative concepts round off our extensive portfolio.
With Doppelmayr, customers get top quality in modern design, user-friendly solutions and optimum
service. From the initial idea to the completed project and beyond.

Harrison & Burrowes is a 36 year old company that was founded in 1980 by brothers Wally and
Jeff DiStefano. H&B has had a storied history in the heavy highway industry with many significant
and reputable projects to its name. H&B has completed two successful design-build projects to go
along with the award winning Checkerhouse Bridge in Richmond, Vermont, the Walkway over the
Hudson, the Batchellerville Bridge over the Great Sacandaga Reservoir, the Rehabilitation of the
Dunn Memorial Bridge (once in 2005 during its collapse and again in 2011 under contract) and the
Albany Riverwalk Pedestrian Bridge to the Corning Preserve.

Camoin Associates has provided economic development consulting services to municipalities,


economic development agencies, and private enterprises since 1999. They specialize in real estate
market analysis to evaluate the feasibility and impacts of proposed projects. Through the services
offered, Camoin Associates has had the opportunity to serve EDOs and local and state governments
from Maine to Texas; corporations and organizations that include Lowes Home Improvement,
FedEx, Volvo (Nova Bus) and the New York Islanders; as well as private developers proposing
projects in excess of $600 million. Their reputation for detailed, place-specific, and accurate analysis
has led to projects in 27 states and garnered attention from national media outlets including
Marketplace (NPR), Forbes magazine, and The Wall Street Journal. Additionally, their marketing
strategies have helped clients gain both national and local media coverage for their projects in order
to build public support and leverage additional funding. The firm currently has offices in Saratoga
Springs, NY, Portland, ME, and Brattleboro, VT.

Lemery Greisler LLC is a leading Capital District business law firm with significant experience in
Economic and Project Development, Private Equity and Public Finance. Lemery Greisler partners
Seth Finkell and Charles Dumas will draw on their experience in financing and development to
support Capital Gondola LLC on this groundbreaking project that requires the coordination of several
public and private interests. Mr. Finkell will assist on matters of financial structuring and Mr. Dumas
will assist on matters of zoning and development. Lemery Greisler has advised on many local
projects that use entrepreneurial ventures to benefit the public good. The most visible example in
recent history is Lemery Greislers serving as lead counsel on the Luther Forest Technology Campus
zoning and development which was critical to the successful launch of GlobalFoundries in Malta,
New York.

Urban
Gondola Systems LLC
Urban Gondola Systems LLC (UGS) has experienced team members and an extensive track record
that gives them the ability to successfully manage complex infrastructure and transportation projects,
integrating finance, management and operational issues to deliver full service project delivery.
UGS has a dedicated team that will work closely on clarifying the project objectives and
opportunities to then develop a streamlined plan for our goals on the project. Their services include
Public Private Partnership (P3) project delivery; Concessionaire and construction contractor
selection; Project planning and project management; Cost projections and traffic studies;
Procurement design and implementation; Constructability reviews; Overcoming permitting hurdles;
Investigating transportation grant opportunities; and user focus strategy embracing stakeholder
outreach, social media, branding, and political local, state and federal government.

Appendix D: Preliminary Impact Assessment

Appendix E: References
Amtrak, A. M. (2013, October 13). News Release. Retrieved from Amtrak:
https://www.amtrak.com/ccurl/730/658/FY13-Record-Ridership-ATK-13-122.pdf
Amtrak, A. M. (2015). NEC MAPS & DATA. Retrieved from Amtrak:
https://nec.amtrak.com/content/stations-and-ridership
Davila, Julio. "Medellns Aerial Cable-cars: Social Inclusion and Reduced Emissions." University
College London, 2013.
https://www.ucl.ac.uk/silva/bartlett/dpu/metrocables/dissemination/Davila-Daste-2012UNEP.pdf
Environmental Defense Fund (EDF), "The Cross-State Air Pollution Rule Health and Economic Benefits
for New York." Environmental Defense Fund, 2009.
https://www.edf.org/sites/default/files/EDF%20CSAPR%20Fact%20Sheet_NY.pdf
Hartog, Jeroen Johan De, Hanna Boogaard, Hans Nijland, and Gerard Hoek. "Do the Health Benefits
of Cycling Outweigh the Risks?" Environmental Health Perspectives 118.8 (2010): 1109-116.
University of Utrecht. Web. 4 Nov. 2015.
Houston, D., Wu, J., Ong, P., & Winer, A. (n.d.). Structural Disparities of Urban Traffic in Southern
California: Implications for Vehicle-Related Air Pollution Exposure in Minority and HighPoverty Neighborhoods. Journal of Urban Affairs, 565-592.
Novaco, Raymond W., and Oscar I. Gonzalez. "Commuting and Well-being." Technology and
Psychological Well-being (2009): 174-205. Cambridge University Press.
CityofRensselaer(June2016).DowntownRensselaerWaterfront.Rensselaer:SubmittedtoNYSCapitalRegion
RegionalEconomicDevelopmentCouncil.

SMG. (2016). What is the Capital Complex? Retrieved from Albany Capital Center:
http://albanycapitalcenter.com/what_is_the_capital_complex/