Executive Summary
This report describes the results of a high-level concept exploration conducted for the
21st Century Special Operations Forces Ship. The study began with a detailed examination of
the Sponsor Requirements and development of a Mission Need Statement. An initial design
sequence was performed with the goal of maximizing Overall Measure of Effectiveness
(OMOE) for minimum cost. The OMOE and cost of the ship were determined by applying
modified versions of the Massachusetts Institute of Technology (MIT) OMOE and Cost
Models. After analyzing several possible variants using OMOE versus cost optimization
techniques, a single design was selected for further evaluation and refinement.
One of the driving factors was to be able to produce this and any follow-on ships at
relatively low cost. In order to do this, mature technologies were used, particularly in the area
of communications, berthing accommodations, and previous designs and arrangements were
emulated to exploit repeatability and to reduce cost. The Large, Medium-Speed, Roll-On/RollOff Ship (LMSR) was used as the starting point for the variant characteristics in an effort to
leverage on previous design efforts.
The Program of Ships Salvage and Engineering (POSSE) software package was used
to analyze a modified midship structural section and to perform intact and damaged stability
analyses. Finally, seakeeping of the design was analyzed using the Ship Wave Analysis
(SWAN) program. The ship design has undergone numerous changes since the study's
inception. The current design is extremely stable and meets all of the project engineering
constraints. The final baseline design meets current naval performance standards. According
to a weight-based cost model, the lead ship conversion cost estimate is $86.16 million. This
is within the threshold value of $90 million. The baseline design characteristics are provided
below:
SOF Ship Dimensions and Performance
LBP
Beam
Full Load Displacement
Full Load KG
Max speed
884 ft
106 ft
48,937 ltons
39.98 ft
24.0 knots
LOA
Full Load Draft
Light Ship Displacement
Light Ship KG
Endurance
951 ft
27.80 ft
37,681 ltons
45.57 ft
10,000+ nm @ 24 knots
Acknowledgements
This study was conducted for the Projects in Naval Ship Conversion Design course (13.413)
at the Massachusetts Institute of Technology (MIT). Mr. Michael Bosworth, Manager for Research
and Development at the Naval Sea Systems Command (SEA 05), served as the program sponsor and
provided the initial concept for the conversion project. The findings of the study, in this report,
describe the benefits, costs, and challenges associated with the conversion. The authors hope that this
study will contribute to the Navys pursuit of a Special Operations Forces platform.
Throughout the project, many individuals from several organizations provided invaluable
operational and technical assistance. The team acknowledges the contributions and advice from these
people with sincere appreciation.
Special Operations Command (SOCOM)
CAPT John S. Kamen
CAPT Kevin B. Lynch
CDR Peter J. Newton
Computer Sciences Corporation (CSC)
Mike Stedding
David Helgerson
Naval Sea Systems Command (NAVSEA)
Michael Bosworth
Philip Sims
Mark Smith
LCDR Gregg Baumann
Military Sealift Command Headquarters (MSCHQ)
Rick Anderson
James Kent
Lincoln Labs Document Control
Chris Nentwig
National Science Foundation Research (ERC)
Table of Contents
1.0 MISSION NEED............................................................................................................................................ 8
1.0 MISSION NEED............................................................................................................................................ 8
1.1 Defense or National Guidance and Policy.................................................................................................. 8
1.2 Threat Analysis ........................................................................................................................................... 8
1.3 Current Capability Assessment................................................................................................................... 8
1.4 Capability Need .......................................................................................................................................... 9
1.5 Recommended Alternatives ......................................................................................................................... 9
2.0 DESIGN REQUIREMENTS AND PLAN................................................................................................. 10
2.1 Required Operational Capability.............................................................................................................. 10
2.2 Concept of Operations/Operational Scenarios ......................................................................................... 11
2.3 Constraints and Standards........................................................................................................................ 11
2.3.1 Constraints ........................................................................................................................................ 11
2.3.1.1 Design........................................................................................................................................ 11
2.3.1.2 Manning .................................................................................................................................... 12
2.3.2 Standards........................................................................................................................................... 12
2.4 Goals and Thresholds ............................................................................................................................... 13
2.5 Design Philosophy and Decision Matrix .................................................................................................. 13
3.0 CONCEPT EXPLORATION ..................................................................................................................... 15
3.1 Baseline Concept Design .......................................................................................................................... 15
3.2 Alternative Technologies and Systems ...................................................................................................... 16
3.3 Concept Ship Variants and Trade-Off Studies .......................................................................................... 16
3.4 Variant Assessment ................................................................................................................................... 18
3.5 Final Baseline Concept Design................................................................................................................. 19
4.0 FEASIBILITY STUDY AND ASSESSMENT .......................................................................................... 21
4.1 Design Definition...................................................................................................................................... 21
4.1.1 Ship Geometry .................................................................................................................................. 21
4.1.2 Combat Systems and Mission Payload ............................................................................................. 22
4.1.3 Propulsion, Electrical, and Auxiliary Systems .................................................................................. 24
4.1.4 Survivability and Signatures ............................................................................................................. 25
4.1.5 Manning ............................................................................................................................................ 25
4.1.6 Arrangements .................................................................................................................................... 25
4.1.6.1 General Arrangements............................................................................................................... 25
4.1.6.2 Inboard Profile........................................................................................................................... 26
4.1.6.2.1 Deck Plans ......................................................................................................................... 26
4.1.6.2.2 Deckhouse Plans................................................................................................................ 29
4.1.6.3 Tank Layouts............................................................................................................................. 32
4.1.7 Structural Design............................................................................................................................... 33
4.1.7.1 Midship Section Concept Design .............................................................................................. 33
List of Tables
Table 1. Sponsor Requirements (SR)........................................................................................................ 10
Table 2. Required Operational Capabilities (ROC) ................................................................................ 10
Table 3. Measures of Performance (MOP)............................................................................................... 11
Table 4. Notional Composite Scenario...................................................................................................... 11
Table 5. Nominal Ship Operating Characteristics................................................................................... 13
Table 6. OMOE Weights............................................................................................................................ 14
Table 7. LMSR Dimensions and Performance......................................................................................... 15
Table 8. Concept Ship Variant Summary ................................................................................................ 17
Table 9. OMOE Weights............................................................................................................................ 19
Table 10. SOF Ship Dimensions and Performance.................................................................................. 19
Table 11. Weights Removed and Added by SWBS.................................................................................. 20
Table 12. LMSR & SOF Ship Principal Dimensions............................................................................... 21
Table 13. Space Balance ............................................................................................................................. 26
Table 14. LMSR to SOF Ship Comparison .............................................................................................. 35
Table 15. LMSR & SOF Ship Stability Parameters Comparison .......................................................... 37
Table 16. LMSR & SOF Ship Stability Parameters Comparison .......................................................... 38
Table 17. Intact Stability results................................................................................................................ 39
Table 18. Stress Comparison ..................................................................................................................... 40
Table 19. Damaged Stability Results for Full Load Case Under Severe Wind and Wave Conditions 42
Table 20. Damaged Stability Results for Minimum Operating Case Under Severe Wind and Wave
Conditions.......................................................................................................................................... 42
Table 21. Weight and KG Comparison .................................................................................................... 43
Table 22. Damaged Stability Results for Full Load Case Under Severe Wind and Wave Conditions 44
Table 23. Damaged Stability Results for Minimum Operating Case Under Severe Wind and Wave
Conditions.......................................................................................................................................... 45
Table 24. LMSR-SOF Stress Comparison................................................................................................ 45
Table 27. Conversion Cost Estimates........................................................................................................ 50
Table 28. SOF Ship Dimensions and Performance.................................................................................. 52
Table 29. Summary of Removals and Additions...................................................................................... 52
Table of Figures
Figure 1. LMSR Outboard Profile ................................................................................................................... 15
Figure 2. Total OMOE for Ships Considered ................................................................................................. 18
Figure 3. LMSR and SOF Ship Comparison of Outboard Profiles .............................................................. 22
Figure 4. SOF Ship Topside Arrangement ...................................................................................................... 23
Figure 5. CIWS Arcs of Fire............................................................................................................................. 23
Figure 6. LMSR Middle Level Machinery Arrangement .............................................................................. 24
Figure 7. Topside Arrangement Comparison ................................................................................................. 27
Figure 8. SOF Ship Deck Layouts .................................................................................................................... 29
Figure 9a. Deckhouse Layout-A Deck.............................................................................................................. 30
Figure 9b. Deckhouse Layout-01 Level............................................................................................................ 30
Figure 9c. Deckhouse Layout-02 Level ............................................................................................................ 31
Figure 9d. Deckhouse Layout-03 Level............................................................................................................ 31
Figure 9e. Deckhouse Layout-04 Level ............................................................................................................ 32
Figure 9f. Deckhouse Layout-05 Level ............................................................................................................ 32
Figure 10. SOF Ship Tank Layouts.................................................................................................................. 33
Figure 11. SOF Ship Midship Section Structure............................................................................................. 34
Figure 12. Lightship Weight Distribution ....................................................................................................... 37
Figure 13. GZ Curve for Intact Stability in Stillwater ................................................................................... 39
Figure 14. Full Load Shear & Bending Stresses for Intact Stability in Stillwater ....................................... 41
Figure 15. GZ Curve for Damaged Full Load under Wind-Wave Conditions ............................................ 42
Figure 16. GZ Curve for Damaged Minimum Operating under Wind-Wave Conditions.......................... 43
Figure 17. Damage Full Load Shear & Bending Stresses, Hogging .............................................................. 44
Figure 18. Damage Minimum Operating Shear & Bending Stresses, Hogging ........................................... 45
List of Appendices
Appendix A.................................................................................................................................................. 55
Appendix B.................................................................................................................................................. 60
Appendix C.................................................................................................................................................. 72
Appendix D.................................................................................................................................................. 75
Appendix E.................................................................................................................................................. 84
Appendix F ................................................................................................................................................ 114
Appendix G ............................................................................................................................................... 203
Appendix H ............................................................................................................................................... 216
Although this program provides afloat prepositioning of Army equipment, the need for
immediate transport of SOF can be directly related. This is evident in the war on terror in
Afghanistan where USS Kitty Hawk (CV-63) was taken from her assigned duties to serve as
a SOF transport and support platform. The MNS should be used to guide SOF platform
design, research, development, and cooperative efforts with U.S. Allies. Based on the MNS
guidance and policy, the SOF platform must provide support for interagency, joint, and allied
forces. This vessel will provide modular flexibility to perform individual or multiple
missions, thereby freeing other major assets to dedicate their full resources to the
performance of their primary missions.
1.2 Threat Analysis
The SOF platform itself can be characterized as a non-combatant; however, the
mission of the forces it transports is offensive. The SOF platform serves as a mobile offshore
base from which SOF can be deployed.
1.3 Current Capability Assessment
Currently there is no platform specifically designated for SOF purposes. Submarines,
aircraft carriers, and other surface ships are detailed as needed for SOF deployment. A
recent example, as mentioned previously, is USS Kitty Hawk (CV-63) which was relieved of
carrier duties to provide SOF support for Operation Enduring Freedom (i.e., the war on terror
in Afghanistan).
ROC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
10
MOE #
1
2
3
4
5
areas both forward and aft of the superstructure. Below decks, the ships holds will be
converted to offices, briefing rooms, berthing areas, and other various spaces required to
support a SOF deployment. These modifications will be done at a minimum cost without
neglecting the comfort of the personnel.
2.3.1.2 Manning
The manning requirements of the SOF ship will be the normal manning of the T-AKR
300. This consists of 30 Military Sealift Command (MSC) civilian personnel, a fraction of
what is typically required for an operational naval vessel of this size. Since this vessel will
not have any offensive capability and is not envisaged to engage in ship-to-ship warfare, the
crew will not be sized for combat condition damage control.
The ship must provide berthing accommodations for significant numbers of personnel
for SOF operation. Embarked SOF personnel will be considered in the same manner as an
Air Wing embarked on an aircraft carrier, and their accommodations will be maintained
separate from the ships crew.
The Navy-wide initiatives in manning reduction will be incorporated into the design
of the SOF ship modifications. Recent advances made in habitability, upkeep, and shipboard
training should all be investigated for utilization in the below-decks modifications to the
LMSR. The forward thinking already used in the LPD-17, CVN(X), and DD(X) projects
should be leveraged to provide the best possible use of manpower on the SOF ship.
2.3.2 Standards
The following standards were used in the development of this conversion design:
General Specifications for Ships of the United States Navy, NAVSEA S(AA0-AA-SPN010/Gen-Spec)
12
The primary mission of this ship is to support SOF missions. Therefore, all other
considerations are subordinate to performing this mission. The essential measures of
effectiveness reflect fulfillment of the SOF mission, as well as operational requirements for
the ship. To assess operational effectiveness, an OMOE model provided a score based on
performance relative to the sponsor requirements. This model consists of a weighted-sum of
individual MOE scores. The weightings are the averaged results of independent comparisons
of all MOE by each design team member. Table 6 lists the OMOE weights.
Table 6. OMOE Weights
Overall
LCC Reduction
SOF Mission
14
0.5
0.25
0.25
0.2
0.5
0.2
0.1
884 ft
106 ft
62,069 Ltons
45.29 ft
24 knots
LOA
Full Load Draft
Light Ship Displacement
Light Ship KG
Endurance
951 ft
37 ft
33,026 Ltons
47.47 ft
12,000 nm @ 24 knots
The T-AKR 300 ships have a cargo capacity of 13,250 long tons with 397,413 square
feet of available cargo area. They provide roll on/roll off (RO-RO) capability, and lift on/lift
off capability. The ships are powered by four Colt Pielstick 10 PC4V diesel engines that can
produce a speed of 24 knots at a design draft of 35 feet. The Bob Hope class is currently
being built for the US Navy by Avondale Industries. The oldest ship was commissioned in
1998, so a long service life is expected. This 951 foot long LMSR is an excellent platform
on which to perform SOF ship modifications.
Courtesy of www.globalsecurity.org
15
The major modifications done to the base hull were the removal of all appendages,
ladders, ramps, and cranes above the main deck (designated Deck A). A new deck, or flight
deck, was then attached to the main deck forward of the existing superstructure. The major
components added were the systems and support equipment required for self-defense and for
SOF operations. These major additions were: (1) two Rolling Airframe Missile Launchers
(RAMs); (2) two Close-In Weapon Systems (CIWS); (3) modular C4I system infrastructure;
(4) two aircraft elevators; (5) aviation refueling and medium-level maintenance support; (6)
two hangar bay boat cranes; (7) increased berthing and messing facilities; and (8) medical
and dental facilities.
3.2 Alternative Technologies and Systems
Several technological alternatives were analyzed for this conversion. New technology
exists, or is in development, for the modular communication equipment. Similarly,
innovations to crew habitability are always being investigated.
The LMSRs are not armed and do not possess a combat system. They do have a C3I
suite sufficient to perform standard operations with other naval vessels. As a result, modular
C4I systems will be installed. This will reduce not only size and weight from the SOF ship,
but also required maintenance and repair costs as well as manning.
Because embarked SOF personnel will be considered in the same manner as an Air
Wing embarked on an aircraft carrier, berthing and messing facilities will be maintained
separate from the ships crew. Based on the mission requirements of the ship, the berthing on
the ship will consist of large, modular berthing compartments, with the exception of berthing
for officers who will have larger multi-person staterooms. The food preparation will become
more automated and streamlined, using an outside service to support preparation and cleanup
of meals, as well as using the new prepared meals currently being tested.
LPD
CV
AO
LMSR
Merchant
(commercial)
SOF Mission
Aviation
Flight Deck
VTOL/STOVL
sum
ratio to max of .2
0.05
0.04
0.09
0.16
0.04
0.04
0.08
0.13
0.07
0.05
0.12
0.20
0.03
0.01
0.04
0.07
0.03
0.01
0.04
0.07
0.03
0.01
0.04
0.07
Boat Capability
ratio to max of .2
0.07
0.20
0.07
0.20
0.07
0.20
0.07
0.20
0.07
0.20
0.07
0.20
Transformational
ratio to max of .1
0.01
0.02
0.01
0.04
0.03
0.10
0.02
0.06
0.03
0.10
0.03
0.08
Costs
Operational Cost
Age
Propulsion
Speed
Crew size
Draft
sum
ratio to max of .25
0.00
0.00
0.07
0.02
0.05
0.13
0.10
0.05
0.05
0.05
0.05
0.05
0.25
0.18
0.00
0.00
0.07
0.00
0.02
0.08
0.06
0.03
0.05
0.05
0.07
0.05
0.25
0.18
0.08
0.08
0.07
0.08
0.03
0.35
0.25
0.08
0.07
0.07
0.08
0.03
0.33
0.24
Conversion Cost
Structure
Tankage
Habitability
C4I
Self-defense
Propulsion
sum
ratio to max of .25
0.00
0.02
0.07
0.05
0.07
0.02
0.22
0.20
0.02
0.02
0.07
0.05
0.07
0.02
0.23
0.22
0.07
0.02
0.07
0.05
0.05
0.00
0.25
0.23
0.03
0.07
0.03
0.03
0.03
0.03
0.23
0.22
0.07
0.07
0.02
0.02
0.02
0.08
0.27
0.25
0.03
0.05
0.02
0.02
0.02
0.00
0.13
0.13
17
Figure 2 shows that the LMSR received the highest OMOE of the six ship classes
considered. Although one ship might have an advantage for a given category, the LMSR
had the highest overall OMOE. As mentioned previously, the LMSR program currently has
19 ships. The oldest ship was commissioned in 1998, so a long service life is expected and
availability of the LMSR is not a concern.
OMOE
0.6
Modular technology
Aviation Support
Boat Support
Operation Costs
Conversion Costs
0.5
0.4
0.3
0.2
0.1
0
1
LPH
LPD
CV
4
Ship
AO
5
LMSR
6
COMMERCIAL MERCHANT
18
Overall
LCC Reduction
SOF Mission
0.5
0.25
0.25
0.2
0.5
0.2
0.1
884 ft
106 ft
48,937 ltons
39.98 ft
24.0 knots
LOA
Full Load Draft
Light Ship Displacement
Light Ship KG
Endurance
951 ft
27.80 ft
37,681 ltons
45.67 ft
10,000+ nm @ 24 knots
Table 11 summarizes the total weight removed from and added to the ship by Ships
Work Breakdown Structure (SWBS). The complete list of equipment removed is included in
Appendix B. The complete list of equipment added, including SOF support systems and ship
self-defense armament, is included in Appendix B.
19
100
200
Propulsion Plant
15.74
15.74
300
Electric Plant
34.19
69.9
400
Command and
Surveillance
Auxiliary Systems
Outfit and Furnishings
Armament
76.19
695.63
99.09
0
1452.02
1425.72
1405.95
38.06
7421.54
500
600
700
Total
20
21
22
each have 360 of coverage. The topside arrangement is shown in Figure 4 and the arcs of
fire coverage are shown in Figure 5.
The SOF ship will also have a Global Command and Control System: Maritime
(GCCS-M) and Joint Maritime Communication and Information System (JMCIS). All
systems must be compliant with the Defense Information Infrastructure (DII) and Common
Operating Environment (COE). Furthermore, an additional Command and Control Center is
located aft on the C Deck directly under the superstructure for ease of access.
23
24
25
Area (ft2)
397,413
Volume (ltons)
14,080
Required Space
Payload Type
Mission Support
Human Support
Area (ft2)
170,476
103,496
Ship Support
40,007
52,167
Tanks
Volume (ltons)
Freshwater Tanks
1,231
Seawater Tanks
2,173
4,361
JP-5
1,043
Miscellaneous Tanks
456
366,146
134
9,398
26
Flight deck areas are located both forward and aft of the deckhouse. The primary
landing areas are located forward of the deckhouse. Two aircraft elevators are located in the
forward flight deck area. The starboard elevator is located near midships, and the port
elevator is just forward of the deckhouse. These are sized to accommodate the large
helicopters that could be utilized by a SOF group. A smaller secondary landing area is
located directly aft of the deckhouse. There is no direct access to the aircraft elevators from
this area, but there is a small hangar built into the rear of the deckhouse. This area is large
enough to support major maintenance to one small helicopter.
The ability to create a large flight deck was a primary concern when selecting a
platform for the SOF ship. Figure 7 shows scale comparisons of CVN68, LMSR (SOF ship
configuration), and LHD1. The reconfiguration of the SOF ship provides a flight deck area
comparable to that of the LHD.
27
allocation breakdown, see Appendix C. Aircraft access to the hangar bay is via the two
elevators described above. Forward of the elevators are boat ramps on both the port and
starboard sides, the center of which is at frame 37. Inboard of the ramps are storage locations
for a number of helicopters. Helicopters can be stored between frames 50 and 92. At frame
58, a cargo elevator is located centerline which connects to the F deck and all intervening
decks. Between frames 92 and 96 the machinery exhaust stacks are found centerline; these
stacks extend from the C deck to the top of the deckhouse. Between frames 99 and 113,
additional helicopters can be stored.
The C deck contains departmental areas, officer country, and briefing rooms. The
ships store and barber are located between frames 20-33. Medical/Dental and the
library/chaplain (frames 33 and 50), briefing rooms and air/weapons departments (frames 5065), officer country and SCIF rooms (frames 65-85), CIC/Ops and Radio/Crypto spaces
(frames 85-99), and supply and personnel departments (frames 99-113) are located on
opposite sides of centerline between the given frames. The steering gear is positioned
between frames 113 and 117.
The D deck contains the gym, crew berthing, crew galley and mess, machinery room
and auxiliary machinery room. The gym is located between frames 20-33. Crew berthing
(frames 33 and 50), crew galley and mess (frames 50-65), crew berthing (frames 65-85),
machinery room (frames 85-99), and auxiliary machinery room (frames 99-113) are located
on opposite sides of centerline between the given frames.
The E deck contains EDG room, general stores, reefer stores, food stores, MAA/Brig,
armory, machinery room and auxiliary machinery room. The EDG room is located between
frames 20-33. General stores (frames 33 and 50), reefer stores and food stores (frames 5065), MAA/Brig and armory (frames 65-85), machinery room (frames 85-99), and auxiliary
machinery room (frames 99-113) are located on opposite sides of centerline between the
given frames.
The F deck contains general stores, weapons magazine, machinery room and
auxiliary machinery room. The general stores are located between frames 33-50 weapons
magazine (frames 50-85), machinery room (frames 85-99), and auxiliary machinery room
(frames 99-113) are located on opposite sides of centerline between the given frames.
28
29
30
31
32
extending to the hull. Freshwater (1381 ltons) is located in six tanks just aft of frame 99.
Lube oil and miscellaneous service tanks contain 136 and 466 ltons respectively.
33
34
35
in both the modified superstructure and C deck configuration. A lightship weight summary
is presented in Table 15.
Removing the topside cranes, the aft ramp, the topside fan rooms, and relocating the
emergency diesel generator contributed to lowering the VCG. From the stability standpoint
the weight removed has a center of gravity well above the VCG, near amidships and close to
the centerline. Its values were:
conditioning systems, and relocating the emergency diesel generator also lowered the VCG.
The addition of the two elevators contributed to moving the LCG forward. The values
obtained were:
ft, and a KG of 45.67 ft. The results are very similar to the LMSR Lightship conditions, and
as such fulfill all the stability requirements. The lightship weight distribution can be seen in
Figure 12. The final stability parameters and a comparison between the original and
modified ship are shown in Table 15.
36
37
38
Still water
100 knots wind
High Speed Turn. 24 knots, Radius of turn 3000 ft.
The results were satisfactory for every case. Table 17 shows the stability results for
the cases described. It is important to highlight that the SOF ship model has a better stability
performance than the Watson does for the three conditions described. Figure 13 shows the
worst case GZ curve, the high speed turn for the minimum operating condition.
Table 17. Intact Stability results
Full
Load
Min Op
Cond
Disp.
[ltons]
KG
[ft]
Mean Draft
[ft]
Trim
[ft]
GZ Max
[ft]
Heel Angle
Still Water
Heel Angle
High Speed
Turn
Propeller
Immersion
0.1o Port
Heel
Angle
100kt
wind
0.9o
48,937
39.98
27 ft 9.7 in
0.20 A
46,452
40.92
26 ft 8.3 in
0.35 A
8.00 @
38.4o
7.13 @
38.3o
2.2o
114 %
0.4o Stbd
1.4 o
2.8 o
109 %
39
The POSSE Intact Stability Module does not simulate the ship behavior in waves or
under severe weather conditions. The Salvage Module is used for this purpose as well as for
assessing damage due to flooded compartments. For the non-damaged case, the procedure is
to damage a small compartment that will not affect stability during hogging and sagging
cases so that wave and wind conditions can be applied. The hull strength was also tested
using the POSSE Intact Module for stillwater conditions indicated in the stability analysis.
The stresses were found to be very close for both the full load and minimum operating
conditions. The hogging condition has the highest stresses, and they are significantly higher
than the sagging conditions. This can be attributed a higher loading density distribution in
the fore and aft parts of the ship to maintain trim and stability. Table 18 shows a summary of
the strength analysis for the two loading cases analyzed. Figure 14 shows full load shear and
bending stresses. A complete report of all intact stability case results and diagrams are
included in Appendix E.
Sea Condition
Stillwater
Hogging
Sagging
40
-3.47
7.72
-8.46
-5.36
14.95
-16.23
-1.70
-2.72
2.74
Minimum
Operating
Condition
-3.53
7.85
-8.62
-5.31
15.09
-16.31
-1.70
-2.32
2.34
Figure 14. Full Load Shear & Bending Stresses for Intact Stability in Stillwater
4.1.10 Damaged Stability and Strength Analysis
The stability results for full load and minimum operating conditions are listed in Tables 19
and 20 respectively. The stability values show that the SOF ship is extremely stable under
extreme conditions. The worst case condition occurs with damage to the midship section
during a hogging condition. Overall, the ship will experience its worst heel angle of 5.2
41
degrees while hogging during minimum operating conditions. Figures 15 and 16 show the
worst case GZ curves for the damaged full load and minimum operating conditions under
wind-wave effects.
Table 19. Damaged Stability Results for Full Load Case
Under Severe Wind and Wave Conditions
Condition
Stillwater
Hogging
Sagging
Damage Fwd
Damage Mid
Damage Aft
Damage Fwd
Damage Mid
Damaged Aft
Damage Fwd
Damage Mid
Damaged Aft
GMt
[ft]
GZ max
[ft]
Static Heel
Angle
[deg]
Wind Heel
Angle
[deg]
Range of
positive GZ
[deg]
Freeboard to
margin line
[ft]
11.16
10.34
8.12
7.85
6.55
7.61
17.28
15.52
10.40
7.19 @37.0So
4.83 @32.3So
6.11 @37.9Po
5.29 @39.0So
2.31 @35.7So
5.22 @38.9Po
7.90 @35.1So
5.98 @32.5So
5.68 @37.5So
0.1So
0.6So
0.1Po
0.1So
1.0So
0.1Po
0.0So
0.4So
0.8So
0.9So
1.1So
1.4Po
1.6So
1.7So
1.8Po
0.4So
0.8So
1.6So
> 59.9 o
> 59.4 o
> 59.9 o
> 59.9 o
> 58.0 o
> 59.9 o
> 60.0 o
> 59.6 o
> 59.2 o
53.65
41.78
62.62
67.08
39.22
64.44
35.43
39.91
46.88
Figure 15. GZ Curve for Damaged Full Load under Wind-Wave Conditions
Table 20. Damaged Stability Results for Minimum Operating Case
Under Severe Wind and Wave Conditions
Condition
Stillwater
Hogging
Sagging
Damage Fwd
Damage Mid
Damage Aft
Damage Fwd
Damage Mid
Damaged Aft
Damage Fwd
Damage Mid
Damaged Aft
GMt
[ft]
GZ max
[ft]
Static Heel
Angle
[deg]
Wind Heel
Angle
[deg]
Range of
positive GZ
[deg]
Freeboard to
margin line
[ft]
10.32
9.09
7.09
6.85
6.19
6.44
17.42
15.22
8.88
6.53 @36.4So
4.25 @32.1So
5.28 @37.4Po
4.67 @38.0So
1.65 @34.8So
4.49 @37.9Po
7.29 @34.1So
5.40 @31.7So
4.98 @36.4So
0.4So
2.5So
0.6Po
0.6So
4.1So
0.7Po
0.2So
1.5So
0.3So
1.4So
3.1So
2.3Po
2.5So
5.2So
2.9Po
0.6So
1.9So
1.3So
> 59.6 o
> 56.5 o
> 59.4 o
> 59.4 o
> 49.5 o
> 59.3 o
> 59.8 o
> 58.5 o
> 59.7 o
53.59
42.90
63.15
68.52
39.38
65.76
35.97
41.86
48.59
42
Figure 16. GZ Curve for Damaged Minimum Operating under Wind-Wave Conditions
Displacement
KG
Draft, Amidships
Trim
GMt (corrected)
GZMAX
Damage Forward
Damage Amidship
Damage Aft
43
SOF
48,937 ltons
39.98 feet
27.8 ft
0.20 feet
11.94 feet
8.00 feet
11.16 feet
7.19 feet
10.34 feet
4.83 feet
8.12 feet
6.11 feet
Stillwater
Hogging
Sagging
Damage Fwd
Damage Mid
Damage Aft
Damage Fwd
Damage Mid
Damaged Aft
Damage Fwd
Damage Mid
Damaged Aft
Shear
Stress
[ksi]
Deck Bending
Stress
[ksi]
Keel
Bending
Stress [ksi]
-4.95
2.71
-3.51
-5.49
4.11
-4.61
-5.44
3.41
-2.44
11.42
3.38
7.70
15.28
7.09
13.13
6.67
-8.63
3.76
-12.63
-3.93
-8.52
-16.62
-7.68
-14.41
-7.74
9.43
-4.12
Figure 17. Damage Full Load Shear & Bending Stresses, Hogging
44
Stillwater
Hogging
Sagging
Damage Fwd
Damage Mid
Damage Aft
Damage Fwd
Damage Mid
Damaged Aft
Damage Fwd
Damage Mid
Damaged Aft
Shear
Stress
[ksi]
Deck Bending
Stress
[ksi]
Keel
Bending
Stress [ksi]
-4.95
2.91
-3.59
-5.55
3.90
-4.67
-5.43
3.32
-2.51
11.76
7.12
8.08
15.68
14.07
13.55
6.85
-8.40
3.80
-13.00
4.51
-8.88
-16.98
10.84
-14.77
-7.92
9.19
-4.13
Figure 18. Damage Minimum Operating Shear & Bending Stresses, Hogging
4.1.10.2.1 Comparison of LMSR and SOF ship
The strength properties of the LMSR and SOF ship are compared below in Table 24,
as determined using POSSE. The SOF ship has a significantly better performance during
hogging conditions, while the sagging conditions are nearly twice as high. Overall, the SOF
ship is structurally sound.
Load Condition
Full Load
45
SOF
-5.49
15.28
-16.62
3.41
-8.63
9.43
The ship has a satisfactory performance for all the cases analyzed and presents better
stability and structural performance than the original LMSR. The results obtained for both
the Intact and Damaged Conditions indicate, from a stability standpoint, that the conversion
is feasible and will have good performance in all weather conditions.
4.2 Performance Analysis
4.2.1 Mission
The primary mission of the SOF ship is to provide a platform for SOF operations.
The SOF ship will act as a base of operations for the planning and execution of SOF missions
ashore (insertion, close air support, extraction) and afloat (naval interdiction, capture of
assets such as oil platforms).
46
search radar into a cohesive ship defense system. The SSDS provides a high level of
protection against anti-ship missiles and aircraft.
4.2.3 Seakeeping and Maneuvering
4.2.3.1 Natural frequencies
The resonant roll and pitch frequencies were computed using standard naval
architecture equations and the ships dimensions as calculated by SWAN. All calculations
are shown in Appendix G. A Pierson-Moskowitz sea spectrum was then used to relate the
resonant periods to significant wave heights. These results gave a rough indication of the
motion of the ship. The results are summarized in Table 25.
Table 25. Calculated Resonant Data
5.33 m
kroll
kpitch
46.08 m
kyaw
15.787 m
roll
0.17 Hz
pitch
0.225 Hz
Troll
5.876 sec
Tpitch
4.454 sec
The motions of the ship have vertical components (heave, pitch and roll) that can
create serious problems, thus causing the ship to behave like a damped spring-mass system.
In order to understand the nature of the ship response to sinusoidal waves, it is useful to
derive the natural frequencies for heave and pitch. For ship motions, the maximum motions
do not necessarily occur around synchronism. The magnitude of the exciting forces and the
coefficients in the equations of motion all depend on the encounter frequency. Encounter
frequency can depend on various parameters, including wavelength, ship speed, and heading.
Therefore, at low frequencies, resonance can occur at very short wavelengths with a very
small exciting force. However, at higher forward speeds, the frequency of encounter can
cause resonance to fall within the range of wavelengths where the exciting forces are large.
The T-AKR 300 Bob Hope class hull currently has good seakeeping characteristics, as it is a
relatively large, heavy ship with a low KG.
47
24
knots
0.03
0.12
0.164
0.08
The flight deck motion analysis indicates that the SOF ship can conduct flight
operations in sea state 5 up to its maximum sustained speed of 24 knots. Generally, as the
ships speed increases, it becomes more stable and motions decrease. As speed increases, the
maximum value of the spectrum peak decreases. Therefore, as the design currently stands,
flight operations would NOT be limited at any speed in Sea State 5.
48
4.2.4 Environmental
As the conversion did not affect existing waste processing equipment, the ship
maintains the same level of environmental standards and remains in compliance with US
Navy policy for waste disposal. There will, however, be a need for increased sanitation
equipment due the addition of SOF. All sanitation equipment installed for this conversion
will meet all guidelines and environmental standards within US Navy environmental policies.
4.3 Operation and Support
The SOF ship crew is the same as that of the LMSR. This crew will operate the ship
under all circumstances. When a SOF group is embarked, the ships crew and SOF will
operate largely independent of each other. However, as mentioned previously, SOF will be
required to provide personnel to augment the ships crew with hotel tasks.
4.4 Cost and Risk
4.4.1 Cost Estimation
A weight-based methodology developed by the MIT 13A program was modified and
used to estimate the conversion costs. The estimate is broken down into removal costs,
addition costs, shipbuilder, and government costs. Table 27 lists the major cost estimates in
FY03 dollars. The model assumed a 3% inflation rate, an in-service date of 2004, and a 30year service life. The development of the SOF model sought to be cost-effective in all
decisions. Each specific modification received a cost estimate through a SWBS breakdown
approximation of weights added and removed. This weight change was entered into the
weight-based cost model and a variant cost was obtained. Accuracy of this variant cost is
subject to change based on contractor and overhead costs. This weight-based cost analysis
produced costs within sponsor requirements. If the entire removal and addition of weights
was performed in the cheapest category of the SWBS breakdown groups (Hull Structure), the
estimated conversion cost is 41.2 million dollars. Obviously, there are electrical and
outfitting modifications that need to be performed, and these SWBS weight groups have
higher Cost Equivalent Ratios (CERs) associated with them. That brings the conversion cost
to 86.16 million dollars. Further investigation would need to be performed in this area to
49
ensure that the CERs being used are accurate. The complete cost model is included in
Appendix H.
Table 27. Conversion Cost Estimates
Estimate Source
Estimate ($M)
86.16
250.00
300.49
The LMSR program currently has 19 ships. The addition of each ship to the fleet lowers
the cost associated with each follow-on vessel. The values listed above take into account the
lead ship serving as a follow-on ship. The cost calculated for new construction of an LMSR
using our cost model is 434.29 million dollars. According to Avondale Industries, the
contract for the seventh strategic sealift ship is $250 million. A cost correction factor of
0.576 was applied to the total SOF conversion cost and new construction ships.
4.4.2 Risk
Risk can be defined as the probability of failure multiplied by a measure of the
consequences of failure. This design attempts to minimize risk where feasible, while still
maintaining an aggressive approach to use of innovative technology to improve effectiveness
and lower cost. The following areas were considered in the risk areas in the assessment of the
SOF Ship design:
area is a failure of the mission of the ship. Therefore, the two most important areas to
develop are the flight deck and hangar bay. Flight decks have been installed on carriers for
over 80 years. However, as with all other new ship modifications, first time installation of a
new component is always full of risk. The technology used to install the new flight deck,
therefore must be compatible with that used to install the flight decks on the other modern
CVNs or LHAs.
50
Advanced crew berthing and accommodation technology is well developed, and has
been used successfully on recent ship modifications. These berthings are light, simple to
construct, and provide more crew comfort. It is essential that such technology be
incorporated into the design of this ship for weight reduction and reduced equipment costs.
The last area of possible risk entails the development of modularized C4I systems.
Since SOF bring their own equipment, it was essential that sections of the ship be designated
for such equipment as a plug and play design. Further study would have to be conducted
in this area to determine exactly what modifications would have to be made to the existing
command and control systems, particularly what kind of electronic provisions would have to
be cable ready.
51
884 ft
106 ft
48,937 ltons
39.98 ft
24.0 knots
LOA
Full Load Draft
Light Ship Displacement
Light Ship KG
Endurance
951 ft
27.80 ft
37,681 ltons
45.67 ft
10,000 + nm @ 24 knots
The SOF ship design removes the topside cranes, aft ramp, and internal deck hatches
and ramps from the current LMSR. It was important to retain the original superstructure for
cost reduction as well as for strength and stability concerns. The flight deck was then
mounted on the main deck and the elevators were added. The SOF Ship design increases the
lightship weight by 3957 long tons. The ships crew size remains the same, but it has
capacity for an additional 2000 personnel for troop transport. Also, a ship self-defense
system was installed for protection against threats. Similarly, space was allocated for the
command and communications center for mission need. The cost of the conversion is
estimated at $86.16 million. Table 29 summarizes the removals and additions to the original
ship.
Table 29. Summary of Removals and Additions
Removals
Additions
Flight Deck
Cranes
Elevators
Aft Ramp
Ship Self-Defense System
Topside Fan Rooms
Command and Control Centers
Internal Hatches and Ramps
Ready/Briefing/SCIF Rooms
Berthing Facilities
Weapons Magazines
Ship Support Storage
Mission Support Storage
Medical and Dental Facilities
Boat Cranes and Winches
AC/ventilation
52
53
References
[1] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/takr-300.htm
[2] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/takr-295.htm
[3] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/cvn-68.htm
[4] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/lhd-1.htm
[5] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/lph-2.htm
[6] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/lha-1.htm
[7] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/lpd-4.htm
[8] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/mark_v.htm
[9] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/rhib.htm
[10] Federation of American Scientists, Accessed the website at
http://www.fas.org/man/dod-101/sys/ship/tao-187.htm
[11] Federation of American Scientists, Accessed the website at
http://www.chinfo.navy.mil/navpalib/factfile/ships/ship-takr2.html
[12] Federation of American Scientists, Accessed the website at
http://niigata-power.com/ps/prod/de.htm
[13] Global Security Organization, Accessed the website at
http://www.globalsecurity.org/military/library/budget/fy1997/dot-e/navy/97ssds.html
[14] Ships Drawing and Specifications, T-AKR 300 Bob Hope Class
[15] Weight and Moment Estimate, T-AKR 300 Bob Hope Class
The Program of Ships Salvage and Engineering (POSSE) and Ship Wave Analysis (SWAN)
software packages were used for this for this study.
54
Appendix A
Mission Needs Statement
55
UNCLASSIFIED
MISSION NEED STATEMENT
FOR
A SPECIAL OPERATIONS FORCES SHIP
1. DEFENSE PLANNING GUIDANCE ELEMENT
a. This Mission Need Statement (MNS) provides requirements for a Special
Operations Forces (SOF) ship for the near future. The multi-mission capabilities are a result
of the chosen combat suite, hull, and mechanical and electrical systems. The above systems
ensure battlespace dominance for expeditionary, interagency, joint and allied forces. This
ship must operate wherever required to provide SOF capabilities. The mission capabilities
must be fully interoperable with other naval, interagency, joint and allied forces.
b. This MNS should guide 21st Century SOF surface ship design, research,
development and acquisition program decisions, service and joint doctrine, and cooperative
efforts with U.S. allies.
2. MISSION AND THREAT ANALYSIS
a. Mission. The general mission of this ship is to provide integrated SOF capabilities,
to provide independent forward presence, and to operate as an integral part of joint and allied
maritime warfare operations.
b. Objectives. The Special Operations Forces Ship must have flexibility to meet the
multi-mission requirements, while at the same time, employing a self defense capability
against a variety of threats. It must be interoperable with other expeditionary, interagency,
joint, and allied forces under the C4I for the Warrior/Copernicus architecture. The Special
Operations Forces Ship must contribute to open ocean surface, air, and sub-surface
dominance.
c. Capabilities.
(1) Power Projection The ship must destroy or neutralize enemy targets ashore
through the use of coordinated aviation and special operations forces. It must be
capable of conducting cooperative operations with other ships, submarines, aircraft,
space and land systems.
(2) Battlespace Dominance To support regional expeditionary, joint and allied
force operations, and maintain sea lines of communication. The ship must be able to
embark and support armed rotary-wing, VTOL/STOVL aircraft as well as
deployment of SOF.
(3) Command, Control and Surveillance The ship must be fully interoperable
with other naval, interagency, joint, and allied forces, and with space and ground
based sensors under the C4I for the Warrior/Copernicus architecture. The
communications suite must have an integrated database capable of interfacing in a
Joint Task Force/Combined Task Force (JTF/CTF) environment to include
56
compatibility with joint systems such as the Global Command and Control System
(GCCS), the Joint Worldwide Intelligence Communications System (JWICS) and the
Joint Deployable Intelligence Support System (JDISS). It must be designed to be a
tactical operational extension using Tactical Command Center (TCC) and Tactical
Data Information Exchange System (TADIX) within the emerging Joint
Communications Planning and Management System. The ship must have a full suite
of radios and antennas to support full connectivity via EHF/SHF/UHF SATCOM
using full DAMA for each circuit. The ship must have an cryptologic capability
designed to collect, process and geolocate signals of interest in order to describe and
fully exploit the electronic battle space. Cryptologic capability is required to provide
near real-time indications and warning and situational awareness to tactical decision
makers and to support CO situational awareness, coordinate actions with other forces
and communicate the ship's actions to appropriate commanders. Connectivity must
include seamless integration for both organic and off-ship sensor inputs to shooter
actions.
(4) Survivability The ship shall have the survivability criteria of ship system
redundancy to ensure graceful degradation of capability to make the total loss of the
ship highly unlikely even if hit.
(5) Mobility The ship must steam to design capability and maneuver at
sustained task force speeds. The design must provide sufficient machinery
redundancy for graceful degradation of mobility and survivability. The ship must be
able to perform seamanship, airmanship and navigation tasks; prevent and control
damage; and replenish at sea.
(6) Fleet Support Operations Conduct in-flight refueling of rotary wing
aircraft; conduct Search and Rescue (SAR) operations; and provide routine health
care, first aid assistance, triage and resuscitation.
(7) Non-Combat Operations The ship must provide emergency and disaster
assistance; support operations to evacuate noncombatant personnel in areas of civil or
international crisis; support and conduct vertical takeoff and/or rotary wing aircraft
operations; provide unit-level upkeep and maintenance.
3. NON-MATERIAL ALTERNATIVES
Mission Area Analyses were conducted as part of the SOF/Aviation support platform.
These analyses determined that changes in doctrine and operational concepts are not
sufficient to address deficiencies. Doctrine changes and operational concepts required
without a SOF platform would include: inability to project expeditionary strike power from
the sea; severely degraded ability to project precise strike power against land targets;
inability to maintain meaningful, visible forward presence for coalition building; thus
requiring allies undertake these missions.
57
58
5. CONSTRAINTS
a. Key Boundary Conditions.
(1) Architecture The ship design must employ a total ship
architectural/engineering approach that optimizes life cycle cost and performance;
minimizes operating conflicts; permits rapid upgrade and change in response to
evolving operational requirements; allows computational and communication
resources to keep technological pace with commercial capabilities wherever possible.
More specifically this implies physical element modularity; functional sharing of
hardware; open systems information architecture; ship wide resource management;
automation of Command, Control, Communications, and Computers (C4I), combat
engineering, and navigation functions; integrated ship wide data management;
automation and minimization of maintenance and administrative functions; and
embedded training. The approach should also promote commonality of design among
ship classes.
(2) Design Consideration should be given to the maximum use of modular
designs in the SOF ship infrastructure. Emerging technologies must be accounted for
during the developmental phase. Since communication and data systems hold the
greatest potential for growth, and therefore obsolescence, their installations must be
modularized as much as possible to allow for future upgrades. Use standard man-tomachine interfaces among the systems onboard. The man-to-machine interfaces
should be consistent with existing user-friendly systems.
(3) Personnel The ship must be automated to a sufficient degree to realize
significant manpower reductions in engineering, combat systems, ship support and
Condition III watchstanding requirements.
(4) Back-fit Major functional elements of a Special Operations Forces Ship
must be applicable to other forward fit ship construction programs.
b. Operational Constraints.
(1) The Special Operations Forces Ship must incur only minimal degradation
of operational capability in heavy weather or in the presence of electromagnetic,
nuclear, biological and chemical contamination and/or shock effects from nuclear and
conventional weapon attack.
(2) Any Special Operations Forces Ship must meet the survivability
requirements of Level I as defined in OPNAVINST 9070.1.
(3) The Special Operations Forces Ship must provide rotary-wing,
VTOL/STOVL, and unmanned aerial vehicle (UAV) landing and hangaring facilities.
Ammunition storage for operational support of armed aircraft must also be provided.
(4) The ship must be able to operate in U.S., foreign, and international waters
in full compliance with existing U.S. and international pollution control laws and
regulations.
(5) All ship and combat system elements must make use of standard
subsystems and meet required development practices. The Special Operations Forces
Ship must be fully integrated with other U.S. Navy, Marine Corps, joint and allied
forces, and other agencies. Joint goals for standardization and interoperability will be
achieved to the maximum feasible extent.
(6) The ship must be able to transit through the Panama Canal (PANAMAX).
59
Appendix B
Weights Removed/Added
60
13.413.Conversion
Project
Weight
Removed
Displacem
Lightship data
#
Description
1
2
3
4
5
6
7
8
10
11
12
Fan house 02
Fan house 03
fan enclosures A deck
04 mod to stack
HULL STRUCTURAL
CLOSURES
Hatch, scuttle & berp
Deck A-B
Hinged ramp A dk to B dk
Hinged ramp B dk to C dk
fan enclosures A deck
Kingpost for sternramp
Cargo hatches inst. Arrays
TOTAL GROUP
Light
Element
16
LCG
1621173.00
VCG
Moment
ft-tons
496.87
TCG
16756014.00
LCG
Moment
ft
ft-tons
0.32
10640.00
TCG
Moment
ft
ft-tons
ft
9.81
3.65
15.24
57.35
125.00
125.00
93.00
142.93
1226.00
456.00
1416.86
8196.75
701.11
700.10
221.23
773.15
6876.49
2553.96
3370.44
44338.61
-13.98
-42.34
5.38
11.66
-137.12
-154.46
81.96
668.68
167
168
168
169
169
123
172
172
170
162.10
3.89
2012.00
36.54
132.35
1.90
173.84
10.71
2619.37
93.33
93.33
82.00
99.00
66.00
104.00
132.00
99.69
87.17
15129
363.43
164984.00
3616.97
8734.84
198.06
22947.14
1067.28
228336.11
766.00
756.56
687.00
723.74
639.02
687.00
910.16
322.14
702.65
124169
2946.04
1382244.00
26441.84
84571.74
1308.31
158224.03
3448.83
1840492.89
0.00
-7.55
0.00
-13.08
35.52
99.00
0.10
-2.82
1.84
0
-29.40
0.00
-477.88
4700.93
188.53
17.38
-30.19
4828.45
2619.37
87.17
228336.11
702.65
1840492.89
1.84
4828.45
607.37
87.17
228336.11
702.65
1840492.89
1.84
4828.45
15.74
15.74
120.00
120.00
1888.44
1888.44
759.76
759.76
11956.34
11956.34
12.49
12.49
196.56
196.56
15.74
120.00
1888.44
759.76
11956.34
12.49
196.56
29.61
0.11
29.71
2.40
2.40
120.00
143.00
120.08
120.00
104.11
3552.60
15.30
3567.90
250.18
250.18
882.26
757.00
881.81
885.57
885.57
26119.31
81.00
26200.31
2128.02
2128.02
-0.33
-23.00
-0.41
3.66
3.66
-9.77
-2.46
-12.23
8.79
8.79
259
250
GROUP 200
14
15
48.07
Tons
GROOP 100
Mchry csg A-03
TOTAL GROUP
Weight
KG light
123
123
123
162
13
33723.00
312
313
310
342
340
61
17
398
390
GROUP 300
18
2.08
2.08
120.00
102.49
212.65
212.65
885.10
885.10
1836.58
1836.37
1.94
1.94
4.03
4.02
34.19
117.89
4030.73
882.27
30164.70
0.02
0.58
512
510
526
526
520
534
530
551
550
2.49
2.49
0.14
0.20
0.34
0.42
0.42
0.34
0.34
120.00
120.00
120.00
120.00
120.00
120.00
107.11
120.00
108.24
298.92
298.92
17.28
23.40
40.68
45.20
45.20
36.91
36.91
885.57
885.57
885.98
765.38
816.61
766.33
766.33
766.96
766.96
2205.95
2205.95
127.58
149.25
276.83
323.39
323.39
261.53
261.53
-4.55
-4.55
1.09
5.55
3.66
5.10
5.10
5.96
5.96
-11.33
-11.33
0.16
1.08
1.24
2.15
2.15
2.03
2.03
23
24
25
589
589
589
580
20.53
242.15
405.74
668.41
132.00
132.00
117.29
123.07
2709.56
31963.14
47588.66
82261.36
912.05
950.94
612.08
744.05
18721.65
230265.37
248342.28
497329.30
0.00
0.00
-4.45
-2.70
0.00
0.00
-1805.52
-1805.52
26
598
590
23.63
23.63
120.65
120.65
2850.47
2850.47
441.50
441.50
10430.44
10430.44
0.00
0.00
0.00
0.00
695.63
122.96
85533.54
734.34
510827.44
-2.60
-1811.43
0.59
98.50
99.09
123.91
127.50
127.48
73.35
12558.75
12632.10
776.56
766.00
766.06
459.72
75451.00
75910.72
1.31
0.00
0.01
0.78
0.00
0.78
99.09
127.48
12632.10
766.06
75910.72
0.01
0.78
3464.01
95.96
332420.92
712.86
2469352.10
0.93
3214.93
1452.01
95.96
332420.92
712.86
2469352.10
0.93
3214.93
19
20
21
22
GROUP 500
27
28
GROUP 600
MODIFICATION INCLUDED AB DK
631
634
630
62
Total Disp
FINAL STABILITY
PARAMETERS
30258.99
VCG
LCG
42.59
63
472.14
TCG
0.25
13.413.Conversion
Project
Weight
Added
Light
#
Description
Element
Displacem
30258.99
KG after
mod
42.59
0.00
LCG
472.14
0.00
Weight
VCG
Moment
LCG
Moment
TCG
0.25
tons
TCG
Tons
ft
ft-tons
ft
ft-tons
ft
ft-tons
10640.00
Moment
111
1210.49
89.37
108181.76
102.02
123494.50
0.00
0.00
111
1449.19
89.37
129514.29
351.63
509579.38
0.00
0.00
111
175.35
89.37
15670.94
740.06
129768.78
0.00
0.00
116
55.19
83.00
4580.52
475.00
26213.83
0.00
0.00
5
6
7
117
123
123
170
185
184
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
192.00
3.23
3.46
3088.91
0.70
0.29
1.36
0.10
0.85
0.07
0.07
0.04
0.02
2.07
0.04
2.72
3.26
0.37
1.90
1.14
1.48
0.13
83.00
18.00
18.00
88.71
18.00
130.02
109.78
109.78
110.00
110.78
110.00
109.78
110.00
110.34
110.11
124.98
125.21
125.00
125.21
125.00
124.98
90.00
15936.00
58.07
62.28
274003.86
12.60
37.58
149.30
11.09
93.83
8.20
8.14
3.95
1.76
228.29
4.84
339.95
408.69
46.63
237.40
142.75
185.47
11.70
475.00
181.35
727.00
285.98
183.90
780.08
706.01
793.41
776.98
774.00
798.00
675.17
766.68
697.00
784.17
732.36
781.42
828.89
739.04
733.71
780.78
871.74
91200.00
585.04
2515.42
883356.94
128.73
225.44
960.17
80.13
662.76
57.28
59.05
24.31
12.27
1442.09
34.50
1992.02
2550.55
309.18
1401.22
837.90
1158.68
113.33
0.00
-2.78
-1.16
0.00
-0.56
41.27
23.60
45.51
-11.09
46.42
-46.42
52.29
2.29
-19.94
-52.36
-0.92
-7.19
3.64
-3.45
-0.10
-0.71
35.25
0.00
-8.97
-4.01
-12.98
-0.39
11.93
32.10
4.60
-9.46
3.44
-3.44
1.88
0.04
-41.26
-2.30
-2.50
-23.47
1.36
-6.54
-0.11
-1.05
4.58
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
141
64
142
143
144
145
32
33
34
35
144
145
146
147
148
149
150
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
Arrg H dk
Arrg H dk
Arrg H dk
Arrg H dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array blw 04 dk
Comp array H dk
Comp array H dk
Comp array H dk
Side shell 04
Side shell 04
HELO ELEV. Supp. Sys. PORT
HELO ELEV. Supp. Sys. STDB
Arrg H dk
Arrg H dk
Arrg H dk
Int arrgment
Hdk frame fnd
Hdk frame fnd
Hdk fnd
Hdk fnd
Hdk fnd
Hdk fnd
Hdk fnd
Emergency diesel mach. Foundations
Storerooms + issue rooms
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
3.46
0.43
0.46
1.44
0.18
0.16
0.23
0.09
0.20
0.25
0.35
0.72
0.22
0.16
0.18
0.41
0.31
0.20
0.14
0.23
0.32
0.81
0.15
145.60
145.60
0.33
1.57
1.08
0.17
0.14
0.13
0.07
0.07
0.14
0.21
4.13
160.00
814.11
90.00
90.00
90.00
90.00
121.98
122.00
121.98
122.12
122.14
122.23
121.78
122.00
121.98
122.12
122.14
122.23
122.00
122.00
91.00
91.00
91.00
120.00
120.00
60.00
60.00
91.00
91.00
91.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
16.10
15.00
65
311.58
38.79
41.58
129.60
21.83
19.64
28.06
11.48
24.18
31.05
42.62
87.84
26.59
19.66
22.23
49.75
37.70
23.79
12.47
20.84
28.67
97.68
17.40
8736.00
8736.00
30.03
143.14
98.55
14.85
12.87
11.61
6.39
6.57
12.24
18.81
371.61
2576.00
12211.65
756.70
781.94
780.91
799.02
775.73
839.88
744.60
802.46
799.85
855.94
744.96
799.52
741.04
760.30
826.90
846.75
728.07
793.46
829.87
883.17
844.95
649.05
585.44
550.05
390.05
846.29
887.07
845.78
799.00
801.00
786.00
794.00
702.00
767.00
819.63
817.89
220.78
201.00
2619.70
337.02
360.78
1150.59
138.86
135.22
171.26
75.43
158.37
217.41
260.74
575.65
161.55
122.41
150.50
344.63
224.97
154.72
113.69
202.25
266.16
528.33
84.89
80087.28
56791.28
279.28
1395.36
915.98
131.84
114.54
101.39
56.37
51.25
104.31
171.30
3377.07
35324.80
163636.11
1.04
10.21
-17.02
-35.25
-6.61
2.40
2.97
3.35
0.04
0.00
-3.83
4.69
1.34
-7.78
0.50
-2.45
-0.15
-11.20
-2.88
-22.13
-3.47
6.12
51.54
35.50
-35.50
-10.11
-10.77
-5.60
-10.44
15.56
1.92
43.25
-19.34
40.38
-28.47
0.10
0.00
6.45
3.60
4.40
-7.86
-50.76
-1.18
0.39
0.68
0.31
0.01
0.00
-1.34
3.38
0.29
-1.25
0.09
-1.00
-0.05
-2.18
-0.39
-5.07
-1.09
4.98
7.47
5168.80
-5168.80
-3.34
-16.94
-6.06
-1.72
2.23
0.25
3.07
-1.41
5.49
-5.95
0.41
0.00
5251.01
TOTAL GROUP
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
0
90
91
92
93
94
GROUP 100
Mchry csg A-03
GROUP 200
Emerg dsl outf
TOTAL GROUP
Mchnery csge to 03 lvl
Outft Emerg diesel
Comp array blw 04 dk
Pwr sys lvl 04
Comp array blw 04 dk
Arrg below H dk
Arrg below H dk
Arrg below H dk
Pwr sys H dk
TOTAL GROUP
Mchnery csge to 03 lvl
Light sys dk 04
Comp array blw 04 dk
Arrg below 04 dk
Arrg below 04 dk
Arrg below 04 dk
Arrg below H dk
Arrg below H dk
Arrg below H dk
Comp & fltr house
Comp & fltr house
TOTAL GROUP
Outft Emerg diesel
Mchnery csge from 03 lvl
Arrg H dk
TOTAL GROUP
Outft Emerg diesel
TOTAL GROUP
GROUP 300
Antenna arrgment
180
259
312
310
321
324
321
321
324
321
321
321
321
320
331
331
332
332
332
332
332
332
332
331
331
330
342
342
342
340
398
390
421
1301.07
27.72
36063.51
279.11
363142.88
3.96
5149.84
4389.98
15.74
15.74
29.61
29.61
2.02
1.05
0.44
0.47
0.11
0.87
1.26
0.59
0.47
7.28
0.03
0.10
0.77
0.81
0.88
1.01
0.29
0.26
0.86
0.15
0.15
5.29
12.40
10.16
3.08
25.64
2.08
2.08
69.90
70.63
16.00
16.00
18.00
18.00
18.00
18.00
120.00
124.90
120.00
91.00
91.00
91.00
60.00
62.60
18.00
98.99
98.99
98.78
99.12
99.12
99.14
99.00
98.99
18.00
18.00
94.06
18.00
18.00
77.00
25.09
18.00
18.00
31.00
310067.36
251.79
251.79
532.98
532.98
36.34
18.90
53.28
58.45
12.84
79.17
115.02
53.60
28.08
455.69
0.61
9.70
75.83
79.91
87.23
99.71
28.35
25.64
85.33
2.61
2.61
497.53
223.20
182.88
237.08
643.16
37.44
37.44
2166.81
283.94
219.76
219.76
183.90
183.90
183.90
183.90
788.91
793.50
772.00
832.55
854.09
877.25
893.50
564.26
183.90
734.50
795.73
743.72
770.38
841.00
832.94
888.14
861.50
744.50
744.50
801.58
183.90
183.90
872.86
266.65
183.90
183.90
300.61
1246499.82
3458.36
3458.36
5445.28
5445.28
371.29
193.14
350.28
371.36
82.60
724.32
1079.57
516.70
418.16
4107.42
6.21
71.98
609.53
601.67
677.93
846.05
238.22
230.03
742.61
107.95
107.95
4240.13
2280.36
1868.42
2687.78
6836.56
382.51
382.51
21011.91
1.17
12.49
12.49
-0.56
-0.56
-0.56
-0.56
-0.74
0.00
-0.75
1.23
-1.81
0.00
0.00
-0.46
-0.56
0.00
-4.17
0.00
-8.79
0.00
0.57
1.14
0.00
12.50
12.50
-1.30
-0.56
-0.56
12.42
1.00
1.94
1.94
0.04
5136.86
196.56
196.56
-16.58
-16.58
-1.13
-0.59
-0.33
0.00
-0.08
1.07
-2.29
0.00
0.00
-3.35
-0.02
0.00
-3.19
0.00
-7.74
0.00
0.16
0.30
0.00
1.81
1.81
-6.87
-6.94
-5.69
38.24
25.61
4.04
4.04
2.85
0.10
47.70
4.77
727.25
72.73
0.00
0.00
66
95
96
97
Antenna arrgment
Elec. arrgment
Elec. arrgment
TOTAL GROUP
422
421
422
420
1.36
0.10
1.36
2.92
47.70
39.70
39.70
43.70
64.92
3.97
54.03
127.69
730.00
727.25
730.00
729.81
98
432
0.46
99
436
1.88
120.00
55.68
120.00
225.60
100
436
2.02
120.00
101
Antenna arrgment
434
0.26
102
Comp array C Dk
432
103
104
105
106
107
108
109
110
111
112
113
114
123
124
125
126
127
128
115
116
117
118
119
120
121
122
993.53
72.73
993.53
2132.51
-5.07
0.00
-5.07
-4.72
-6.90
0.00
-6.90
-13.80
745.00
345.68
-4.00
-1.86
776.00
1458.88
0.00
0.00
242.64
776.00
1569.07
0.00
0.00
47.70
12.45
732.00
191.05
9.87
2.58
0.46
47.70
22.13
745.00
345.68
-4.00
-1.86
436
1.88
47.70
89.68
776.00
1458.88
0.00
0.00
436
434
432
436
436
432
436
436
432
432
432
430
441
441
445
446
441
441
445
446
440
2.02
0.26
0.46
1.88
2.02
0.46
1.88
0.20
0.76
17.00
17.00
50.93
1.83
0.75
0.20
0.74
1.83
0.75
0.20
0.74
7.04
47.70
39.70
39.70
39.70
39.70
47.30
47.40
47.20
39.70
61.3
61.3
62.11
47.70
47.70
47.70
47.70
39.70
39.70
39.70
39.70
43.70
96.45
10.36
18.42
74.64
80.27
21.95
89.11
9.44
30.33
1042.10
1042.10
3163.35
87.34
35.78
9.54
35.30
72.69
29.78
7.94
29.38
307.74
776.00
732.00
735.00
735.00
735.00
387.00
384.00
386.00
369.00
369.00
369.00
474.10
738.55
729.07
743.36
744.76
748.55
739.07
743.36
744.76
741.77
1569.07
191.05
341.04
1381.80
1486.17
179.57
721.92
77.20
281.92
6273.00
6273.00
24144.98
1352.29
546.80
148.67
551.12
1370.60
554.30
148.67
551.12
5223.57
0.00
9.87
-4.00
0.00
0.00
-4.00
0.00
0.00
-4.00
42.00
-42.00
-0.10
1.97
-5.22
0.00
0.00
1.97
-5.22
0.00
0.00
-0.09
0.00
2.58
-1.86
0.00
0.00
-1.86
0.00
0.00
-3.06
714.00
-714.00
-5.33
3.61
-3.92
0.00
0.00
3.61
-3.92
0.00
0.00
-0.62
Shipboard PC cabling
493
0.80
124.00
99.20
792.50
634.00
0.00
0.00
499
493
499
493
499
1.80
0.80
1.80
0.80
1.80
127.87
47.70
47.70
39.70
39.70
230.17
38.16
85.86
31.76
71.46
760.00
792.50
760.00
735.00
735.00
1368.00
634.00
1368.00
588.00
1323.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
67
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
150
151
152
153
154
155
156
157
158
Shipboard PC cabling
METEOROLOGICAL SYSTEM
SPECIAL PURPOSE INTELLIGENCE
SPECIAL PURPOSE INTELLIGENCE
Cmd & surv
TOTAL GROUP
GROUP 400
Mchnery csge to E DK
Outft Emerg diesel
Mchnery csge to E Dk
Mchnery csge to E DK
Mchnery csge to E DK
AIR CONDITIONING SYSTEM
TOTAL GROUP
Outft Emerg diesel
Mchnery csge E DK
WASHDOWN SYSTEM
PLUMBING DRAINAGE AFT
PLUMBING DRAINAGE FWD
DRAINAGE AND BALLASTING
SYSTEM
TOTAL GROUP
Miscellaneous tanks
Mchnery csge to E DK
Piping Diesel Emer. Mach Box
TOTAL GROUP
493
494
495
495
499
490
511
512
512
514
514
514
510
526
526
523
528
528
2.00
0.70
1.20
1.80
1.80
15.30
76.19
0.18
2.49
2.04
0.33
0.33
94.94
100.47
0.14
0.20
8.54
28.03
32.00
47.70
123.00
119.00
121.50
46.80
77.38
62.77
18.00
18.00
18.00
18.00
18.00
25.00
46.46
18.00
18.00
25.00
25.78
15.00
95.40
86
143
219
84.24
1183.85
4782.62
3.24
44.82
36.72
5.94
5.85
4568.00
4667.45
2.52
3.60
213.50
723
480
385.00
798.00
810.00
803.00
382.00
676.38
549.27
183.84
182.90
183.67
189.90
766.76
628.17
606.32
183.84
189.90
456.61
657.90
134.89
770.00
558.60
972.00
1445.40
687.60
10348.60
41849.67
33.09
455.42
374.69
62.67
249.20
59638.00
60914.10
25.74
37.98
3899.43
18440.94
4316.48
0.00
0.00
0.00
-12.80
0.00
-1.51
-0.56
-0.76
1.56
-0.56
-0.56
4.15
14.23
13.45
-0.76
-0.56
-14.56
5.78
0.00
0.00
0
0
-23
0.00
-23.04
-42.78
-0.14
3.88
-1.14
-0.18
1.35
1351
1351.69
-0.11
-0.11
-124.3424
162
0
529
520
532
534
534
530
353.41
422.32
0.32
0.42
3.04
3.78
19.00
19.27
19.73
18.00
38.69
34.79
6715
8137.02
6.31
7.56
117.62
131.49
346.89
353.56
686.00
183.90
675.50
621.76
122594
149314.96
219.52
77.24
2053.51
2350.27
1.90
1.68
32.00
1.94
-22.02
-14.78
541
541
540
551
555
550
571
570
19.24
35.00
54.24
0.08
72.00
72.08
20.00
20.00
30.00
15.00
20.32
18.00
15.00
15.00
78.30
78.30
577.20
525.00
1102.20
1.39
1080.00
1081.39
1566
1566.00
534.88
134.96
276.82
803.11
535.77
536.06
345.64
345.64
10291.00
4723.60
15014.60
61.84
38575.44
38637.28
6913
6912.80
-7.95
0.00
-2.82
2.67
0.00
0.00
0.00
0.00
671
708.93
10.24
0.81
-66.94
-55.89
152.97164
0
-152.97
0.21
0.00
0.21
0
0.00
586
587
588
196.20
291.60
100.00
78.00
78.00
76.00
15303.60
22744.80
7600.00
352.50
326.25
452.50
69160.50
95134.50
45250.00
-15.95
25.50
0.00
-3129.39
7435.80
0.00
68
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
Liferafts
Liferafts
Environmental Polution Control Sys
HELO Handling, serv, stowage
TOTAL GROUP
GROUP 500
Non structural balckheads
Ladders
Interior joiner stairs
Loiner door & wind list
Ladders
Interior joiner stairs
Auxiliary System fundation FWD
Loiner door & wind list
TOTAL GROUP
583
583
583
588
580
621
623
623
624
623
623
623
624
620
9.42
9.42
46.20
100.00
752.84
1425.72
205.23
0.57
2.54
19.67
4.56
2.54
158.63
19.67
413.42
94.50
94.00
15.00
71.00
73.35
49.33
15.00
45.00
45.00
45.00
45.00
35.00
15.00
35.00
18.06
890.28
885.57
693.00
7100.00
55217.26
70336.81
3078.45
25.70
114.30
885.24
205.20
88.90
2379.45
688.52
7465.76
166.45
166.45
135.88
352.50
337.67
369.88
135.78
737.24
740.49
738.12
737.24
740.49
220.00
738.12
240.31
1568.13
1568.13
6277.66
35250.00
254208.91
527352.92
27866.13
420.96
1880.84
14520.30
3361.81
1880.84
34898.60
14520.30
99349.79
26.80
-26.80
0.00
3.56
6.19
4.57
0.00
6.88
11.85
-13.20
6.88
11.85
6.79
1.75
2.29
252.48
-252.48
0.00
356.00
4662.41
6514.38
0.00
3.93
30.10
-259.67
31.37
30.10
1077.10
34.43
947.35
638
630
641
644
642
18.51
18.51
11.40
15.78
6.45
18.00
18.00
59.70
59.70
34.98
333.23
333.23
680.58
942.07
225.621
581.00
581.00
531.00
485.48
403.78
10756.05
10756.05
6053.40
7660.87
2604.381
0.00
0.00
0.00
0.79
0
0.00
0.00
0.00
12.47
0.00
643
644
19.12
19.67
34.97
35.03
668.6264
689.0401
405.98
408.76
7762.3376
8040.3092
0
0
5.74
0.00
645
642
3.12
6.45
34.89
34.98
108.8568
225.621
409.33
602.34
1277.1096
3885.093
0
0
0.00
0.00
643
644
645
642
19.12
19.67
3.12
6.45
34.97
35.03
35.00
34.98
668.6264
689.0401
109.2
225.621
609.45
604.67
605.89
602.34
11652.684
11893.8589
1890.3768
3885.093
0
0
0
0
5.74
0.00
0.00
0.00
643
644
645
642
19.12
19.67
3.12
6.45
34.97
35.03
35.00
34.98
668.6264
689.0401
109.2
225.621
609.45
604.67
605.89
602.34
11652.684
11893.8589
1890.3768
3885.093
0
0
0
0
5.74
0.00
0.00
0.00
643
644
19.12
19.67
34.97
35.03
668.6264
689.0401
609.45
604.67
11652.684
11893.8589
0
0
5.74
0.00
69
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
645
642
3.12
6.45
35.00
34.98
109.2
225.621
605.89
403.78
1890.3768
2604.381
0
0
0.00
0.00
643
644
645
642
19.12
19.67
3.12
6.45
34.97
35.03
35.00
34.98
668.6264
689.0401
109.2
225.621
405.98
408.76
409.33
403.78
7762.3376
8040.3092
1277.1096
2604.381
0
0
0
0
5.74
0.00
0.00
0.00
643
644
645
640
652
651
652
654
655
656
651
650
661
661
664
665
664
661
19.12
19.67
3.12
317.34
18.90
25.93
1.54
0.31
13.47
7.40
16.56
84.11
12.90
12.90
20.09
50.00
1.09
6.87
34.97
35.03
35.00
37.11
47.70
36.13
36.01
35.98
35.97
36.09
20.00
35.52
65.04
65.13
64.78
64.67
65.34
65.14
668.6264
689.0401
109.2
11777.23
901.53
936.81
55.46
11.26
484.55
266.99
331.20
2987.81
839.02
840.18
1301.62
3233.50
71.42
447.51
405.98
408.76
409.33
506.50
382.00
567.00
576.89
587.90
586.45
845.60
576.90
555.26
631.00
631.00
431.00
631.00
794.50
679.33
7762.3376
8040.3092
1277.1096
160732.72
7219.80
14701.74
888.41
184.01
7900.07
6255.75
9553.46
46703.25
8139.90
8139.90
8660.08
31550.00
74.13
4667
0
0
0
0.15
0.00
33.51
-7.80
24.46
-28.42
27.14
2.11
8.53
0.00
0.00
0.00
0.00
12.07
2.77
5.74
0.00
0.00
46.88
0.00
868.88
-12.01
7.66
-382.85
200.78
34.94
717.40
0.00
0.00
0.00
0.00
13.19
19.0
662
2.09
35.00
73.15
728.23
1522
6.70
14.0
663
664
665
660
671
671
671
671
671
671
2.09
31.25
13.21
152.50
0.70
3.02
5.82
4.73
16.09
0.82
35.00
65.00
65.00
65.37
83.00
83.00
83.00
50.00
43.87
47.70
272
2031.25
858.65
9968.30
58.10
250.33
483.31
236.70
705.82
39.26
657.42
107.55
691.22
502.43
431.00
431.00
431.00
431.00
331.00
382.00
1374
3361
9131
76619.01
301.70
1299.90
2509.71
2040.35
5325.46
314.39
9.09
33.44
7.80
7.96
0.00
0.00
2.67
0.00
0.00
12.51
19.0
1045.0
103.0
1213.19
0.00
0.00
15.55
0.00
0.00
10.30
70
221
222
223
673
673
673
670
699
690
153.80
165.00
5.09
355.07
65.00
65.00
15.00
14.99
47.70
19.14
14.76
14.76
2307.00
2473.35
242.75
6796.61
959.40
959.40
131.71
335.69
231.20
249.56
135.78
135.78
20257.00
55388.85
1176.58
88613.93
8825.70
8825.70
1.89
8.67
0.00
4.92
0.00
0.00
290.68
1430.55
0.00
1747.08
0.00
0.00
225
GROUP 600
PHALANX STDB
721
1405.95
6.29
28.66
153.78
40288.33
967.28
349.66
774.00
491600.46
4868.46
3.32
-42.10
4671.90
-264.81
226
PHALANX PORT
721
6.29
153.78
967.28
771.00
4849.59
42.10
264.81
227
721
0.94
145.00
136.01
771.00
723.20
-28.60
-26.83
228
229
230
721
723
723
720
763
763
760
0.94
2.94
2.94
20.34
12.86
4.86
17.73
145.00
13.00
13.00
112.26
44.12
77.00
53.14
136.01
38.22
38.22
2283.01
567.56
374.53
942.09
774.00
607.5
607.5
724.79
631.00
756.85
494.77
726.01
1786.05
1786.05
14739.36
8117.18
654.14
8771.32
28.60
0.00
0.00
0.00
28.45
22.89
26.92
26.83
0.00
0.00
0.00
365.98
111.34
477.32
38.06
84.73
3225.10
617.66
23510.68
12.54
477.32
7421.54
58.09
431118.83
317.36
2355283.82
2.28
16957.08
224
231
232
GROUP 700
TOTAL MODIFICATION
Total Disp
VCG
LCG
TCG
37680.53
45.64061423
441.6572402
0.651093
71
Appendix C
Space Allocations
72
SSCS
1
1.1
1.11
1.12
1.13
1.131
1.132
1.14
1.15
1.16
1.2
1.3
1.311
1.3123
1.32
1.34002
1.35
1.36
1.37
1.9
1.91
1.94
2
2.1
2.11
2.13
2.14
2.14003
2.15
2.16
2.2
2.22202
2.22204
2.22403
2.231
2.232
2.233
2.3
2.4
2.41
2.42001
2.44
2.46
2.47
2.48
2.5
73
Required
Area
Allocated
Difference
170476.7083
23178.79637
1466.77315
5481.00758
12958.04112
10000
2958.04112
758.173
2393.49384
121.30768
5788.94246
141062.2306
85000
40000
2000
2000
2000
10000
2062.23056
446.73886
374.42082
72.31804
103495.6943
75000
5500
40000
145.8025
145.8025
2689
1200
21295.21
1112
10000
583.21
2400
3600
6000
1200
4350
2000
650
450
450
1000
450
76.98372
170476.7083
23178.79637
1466.77315
5481.00758
12958.04112
10000
2958.04112
758.173
2393.49384
121.30768
5788.94246
141062.2306
85000
40000
2000
2000
2000
10000
2062.23056
446.73886
374.42082
72.31804
103495.6943
75000
5500
40000
145.8025
145.8025
2689
1200
21295.21
1112
10000
583.21
2400
3600
6000
1200
4350
2000
650
450
450
1000
450
76.98372
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.6
2.7
3
3.1
3.2
3.3
3.301
3.302
3.304
3.305
3.306
3.307
3.5
3.6
3.62
3.63
3.64
3.71
3.73
3.74
3.75
3.76
3.78
3.8
3.9
4
4.1
4.3
4.31
4.32
4.321
4.322
4.341
4.342
4.35
4.36
CBR PROTECTION
LIFESAVING EQUIPMENT
SHIP SUPPORT
SHIP CNTL SYS(STEERING&DIVING)
DAMAGE CONTROL
SHIP ADMINISTRATION
GENERAL SHIP
EXECUTIVE DEPT
SUPPLY DEPT
DECK DEPT
OPERATIONS DEPT
WEAPONS DEPT
DECK AUXILIARIES
SHIP MAINTENANCE
OPERATIONS DEPT (ELECT SHOP)
WEAPONS DEPT (ORDINANCE SHOP)
DECK DEPT (CARPENTER SHOP)
SUPPLY DEPT
OPERATIONS DEPT
DECK DEPT (BOATSWAIN STORES)
WEAPONS DEPT
EXEC DEPT(MASTER-AT-ARMS STOR)
CLEANING GEAR STOWAGE
ACCESS (INTERIOR-NORMAL)
TANKS
SHIP MACHINERY SYSTEM
PROPULSION SYSTEM
AUX MACHINERY
GENERAL (AUX MACH DELTA)
A/C&REFRIGERATION
A/C(INCLUDE VENT)
REFRIGERATION
SEWAGE
TRASH
MECHANICAL SYSTEMS
VENTILATION SYSTEMS
SUM
74
1456.85858
116.642
40006.68643
3723.79585
7139.07361
4360.30802
493.97887
1133.17703
1817.86557
300.35315
314.9334
300
4357.74512
20425.76383
653.1952
332.4297
659.61051
13760.25674
428.07614
3796.6971
273.52549
317.26624
204.70671
10060.95571
797.24807
52166.96808
13545.63546
11549.30763
6679.50413
4869.8035
3586.15829
999.62194
189.54325
94.48002
703.93447
15000
366146.0571
1456.85858
116.642
40006.68643
3723.79585
7139.07361
4360.30802
493.97887
1133.17703
1817.86557
300.35315
314.9334
300
4357.74512
20425.76383
653.1952
332.4297
659.61051
13760.25674
428.07614
3796.6971
273.52549
317.26624
204.70671
10060.95571
797.24807
52166.96808
13545.63546
11549.30763
6679.50413
4869.8035
3586.15829
999.62194
189.54325
94.48002
703.93447
15000
366146.0571
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Appendix D
Tank Weights
75
76
77
78
79
80
81
82
83
Appendix E
POSSE Intact Stability Analysis
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
Appendix F
POSSE Damaged Strength Analysis
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
Appendix G
SWAN Seakeeping Analysis
203
12 KNOTS
204
6.0
5.0
4.0
3.0
2.0
1.0
0.0
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Frequency (rad/sec)
Pitch U = 12 knots
Roll U = 12 knots
Heave U = 12 knots
205
1.1
= 150 deg
P.M. Sea Spectrum
Sea State 5
Response Spectra
0.020
0.018
0.016
0.014
0.012
0.010
0.008
0.006
0.004
0.002
0.000
0.4
0.5
0.6
0.7
0.8
0.9
Frequency (rad/sec)
Heave U = 12 knots
Pitch U = 12 knots
206
Roll U = 12 knots
1.0
**********************************************************
*
*
*
SWAN2 2002 SOLVE
*
*
*
*
*
*
Copyright (C) 2002
*
*
Massachusetts Institute of Technology
*
*
*
**********************************************************
---------------------------------------------------------GRID INFORMATION
Name
:
SOF
---------------------------------------------------------Sheet#
NP1
NP2
NP
KP
MP
1
16
58
928
3
0
2
4
30
120
3
0
3
21
30
630
2
1
4
30
30
900
1
0
------------------------------------------------------------------------------------------------------------------PRINCIPAL HYDROSTATIC PARTICULARS
density (kg/m^3)= 1025.000 gravity (m/s^2)=
9.800
---------------------------------------------------------Waterline Length
(m) :
2.525E+2
Waterline Beam
(m) :
3.224E+1
Maximum Draft
(m) :
6.888E+0
Displacement
(m^3) :
2.496E+4
Wetted Surface Area (m^2) :
7.148E+3
LCB (from origin)
(m) :
-1.997E+0
TCB (from origin)
(m) :
0.000E+0
VCB (from origin)
(m) :
-2.526E+0
---------------------------------------------------------Waterplane Area
(m^2) :
6.070E+3
LCF (from origin)
(m) :
-1.333E+1
Metacentric height
(m) :
6.865E+0
---------------------------------------------------------Mass
(kg) :
3.992E+7
Mass/density
(m^3) :
3.895E+4
LCG (from origin)
(m) :
1.347E+2
TCG (from origin)
(m) :
1.545E-1
VCG (from origin)
(m) :
2.720E+0
Radii of Gyration
(m) :
1.689E+1 (roll)
(about CG)
(m) :
8.068E+1 (pitch)
(m) :
2.816E+1 (yaw)
----------------------------------------------------------
207
18 KNOTS
208
6.0
5.0
4.0
3.0
2.0
1.0
0.0
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Frequency (rad/sec)
Pitch U = 18 knots
Roll U = 18 knots
Heave U = 18 knots
209
1.1
= 150 deg
P.M. Sea Spectrum
Sea State 5
Response Spectra
0.025
0.020
0.015
0.010
0.005
0.000
0.4
0.5
0.6
0.7
0.8
0.9
Frequency (rad/sec)
Heave U = 18 knots
Pitch U = 18 knots
210
Roll U = 18 knots
1.0
**********************************************************
*
*
*
SWAN2 2002 SOLVE
*
*
*
*
*
*
Copyright (C) 2002
*
*
Massachusetts Institute of Technology
*
*
*
**********************************************************
---------------------------------------------------------GRID INFORMATION
Name
:
SOF
---------------------------------------------------------Sheet#
NP1
NP2
NP
KP
MP
1
16
58
928
3
0
2
4
30
120
3
0
3
21
30
630
2
1
4
30
30
900
1
0
------------------------------------------------------------------------------------------------------------------PRINCIPAL HYDROSTATIC PARTICULARS
density (kg/m^3)= 1025.000 gravity (m/s^2)=
9.800
---------------------------------------------------------Waterline Length
(m) :
2.525E+2
Waterline Beam
(m) :
3.224E+1
Maximum Draft
(m) :
6.888E+0
Displacement
(m^3) :
2.496E+4
Wetted Surface Area (m^2) :
7.148E+3
LCB (from origin)
(m) :
-1.997E+0
TCB (from origin)
(m) :
0.000E+0
VCB (from origin)
(m) :
-2.526E+0
---------------------------------------------------------Waterplane Area
(m^2) :
6.070E+3
LCF (from origin)
(m) :
-1.333E+1
Metacentric height
(m) :
6.865E+0
---------------------------------------------------------Mass
(kg) :
3.992E+7
Mass/density
(m^3) :
3.895E+4
LCG (from origin)
(m) :
1.347E+2
TCG (from origin)
(m) :
1.545E-1
VCG (from origin)
(m) :
2.720E+0
Radii of Gyration
(m) :
1.689E+1 (roll)
(about CG)
(m) :
8.068E+1 (pitch)
(m) :
2.816E+1 (yaw)
----------------------------------------------------------
211
24 KNOTS
212
6.0
5.0
4.0
3.0
2.0
1.0
0.0
0.3
0.4
0.5
0.6
0.7
0.8
0.9
Frequency (rad/sec)
Pitch U = 24 knots
Roll U = 24 knots
Heave U = 24 knots
213
1.0
1.1
= 150 deg
P.M. Sea Spectrum
Sea State 5
Response Spectra
0.014
0.012
0.010
0.008
0.006
0.004
0.002
0.000
0.4
0.5
0.6
0.7
0.8
Frequency (rad/sec)
Heave U = 24 knots
Pitch U = 24 knots
214
Roll U = 24 knots
0.9
1.0
**********************************************************
*
*
*
SWAN2 2002 SOLVE
*
*
*
*
*
*
Copyright (C) 2002
*
*
Massachusetts Institute of Technology
*
*
*
**********************************************************
---------------------------------------------------------GRID INFORMATION
Name
:
SOF
---------------------------------------------------------Sheet#
NP1
NP2
NP
KP
MP
1
16
58
928
3
0
2
4
30
120
3
0
3
21
30
630
2
1
4
30
30
900
1
0
------------------------------------------------------------------------------------------------------------------PRINCIPAL HYDROSTATIC PARTICULARS
density (kg/m^3)= 1025.000 gravity (m/s^2)=
9.800
---------------------------------------------------------Waterline Length
(m) :
2.525E+2
Waterline Beam
(m) :
3.224E+1
Maximum Draft
(m) :
6.888E+0
Displacement
(m^3) :
2.496E+4
Wetted Surface Area (m^2) :
7.148E+3
LCB (from origin)
(m) :
-1.997E+0
TCB (from origin)
(m) :
0.000E+0
VCB (from origin)
(m) :
-2.526E+0
---------------------------------------------------------Waterplane Area
(m^2) :
6.070E+3
LCF (from origin)
(m) :
-1.333E+1
Metacentric height
(m) :
6.865E+0
---------------------------------------------------------Mass
(kg) :
3.992E+7
Mass/density
(m^3) :
3.895E+4
LCG (from origin)
(m) :
1.347E+2
TCG (from origin)
(m) :
1.545E-1
VCG (from origin)
(m) :
2.720E+0
Radii of Gyration
(m) :
1.689E+1 (roll)
(about CG)
(m) :
8.068E+1 (pitch)
(m) :
2.816E+1 (yaw)
----------------------------------------------------------
215
Appendix H
Cost Models
216
Definitions (units):
Kdol :=
Mdol
1000
dol :=
Kdol
1000
lton := 2240 lb
CNA := 2.2
CND := 0.5
Base Weight
WA
100
:= 25332.18 lton
WA
300
WA
:= 668.04 lton
WA
400
500
600
:= 61.06 lton
WA
700
:= 4.15 lton
:= 4074.85 lton
:= 1771.71 lton
2. Additional Characteristics:
Total Weight Added:
WAdd :=
WA i1
WAdd = 31911.99lton
i1
CPO's:
Enlisted: NE := 22
Enlisted:
NC := 0
2
NC := NE NC
3
LS := 30
Officers: NO := 8
NS := 1
3. Inflation:
Base Year:
YB := 2003
iy := 1 .. YB 1998
RI := 3.
FI :=
iy
217
RI
1 + 100
FI =
YIOC := 2004
RP := 1
KN1 :=
.55 Mdol
lton
+ Propulsion
KN2 :=
KN3 :=
1.0 Mdol
lton
CAL
CAL
CAL
300
.91
).772
200
.808
CAL
100
1.2 Mdol
lton
+ Electric
.772
100
CAL
= Mdol
CAL
= Mdol
100
.808
200
300
).91
400
).617
CAL
300
= Mdol
2.0 Mdol
lton
+ Auxiliary
KN5 :=
KN6 :=
KN7 :=
400
= Mdol
).782
CAL
= Mdol
600
).784
CAL
= Mdol
700
).987
CAL
= Mdol
CAL
CAL
700
.987
500
600
.784
CAL
500
.782
1.0 Mdol
lton
CAL
1.0 Mdol
lton
+ Armament
.617
1.5 Mdol
lton
+ Outfit
400
500
600
700
+ Integration/Engineering: (Lead ship includes detail design engineering + plans for class)
KN8 :=
10. Mdol
Mdol
1.099
CAL
800
CAL
i1
i1
1.099
CAL
800
= Mdol
+ Ship Assembly + Support: (Lead ship includes all tooling, jigs, special facilities for class)
KN9 :=
2.0 Mdol
( Mdol )
.839
CAL
900
CAL
i1
i1
.839
CAL
i1
+ CAL
800
+ CAL
900
i1
CAtot = Mdol
218
CAL
900
= Mdol
CTOT := CAtot
+ Profit:
FP := .10
CLP := FP CTOT
CLP = Mdol
PL = Mdol
CSB = Mdol
CLMPG := 0 Mdol
CLMPG = Mdol
+ Outfittimg Cost :
CLOUT := .02 PL
CLGOV = Mdol
CLEND := CSB
CLEND = Mdol
CLPDEL := .05 PL
219
CLPDEL = Mdol
CLA = Mdol
Correction Factor:
:=
250
434.292
=
CLAc = Mdol
220
Mdol := coul
Definitions (units):
Kdol :=
Mdol
1000
dol :=
Kdol
1000
lton := 2240 lb
CNA := 2.2
CND := 0.5
Base Weight
WA
100
:= 29114.79 lton
WA
300
WA
:= 707.75 lton
WA
400
500
600
:= 137.25 lton
WA
700
:= 42.21 lton
:= 4831.93 lton
:= 3078.57 lton
2. Additional Characteristics:
Total Weight Added:
WAdd :=
WA i1
i1
WAdd = lton
CPO's:
Enlisted: NE := 22
Enlisted:
NC := 0
2
NC := NE NC
3
LS := 30
Officers: NO := 8
NS := 1
3. Inflation:
Base Year:
YB := 2003
iy := 1 .. YB 1998
RI := 3.
FI :=
RI
1 + 100
iy
221
FI =
YIOC := 2004
RP := 1
KN1 :=
.55 Mdol
lton
+ Propulsion
KN2 :=
KN3 :=
1.0 Mdol
lton
CAL
CAL
CAL
300
.91
).772
200
.808
CAL
100
1.2 Mdol
lton
+ Electric
.772
100
CAL
= Mdol
CAL
= Mdol
100
.808
200
300
).91
400
).617
CAL
300
= Mdol
2.0 Mdol
lton
+ Auxiliary
KN5 :=
KN6 :=
+ Armament
KN7 :=
= Mdol
).782
CAL
= Mdol
600
).784
CAL
= Mdol
700
).987
CAL
= Mdol
CAL
CAL
700
.987
500
600
.784
1.0 Mdol
lton
400
CAL
500
.782
1.0 Mdol
lton
CAL
1.5 Mdol
lton
+ Outfit
400
.617
500
600
700
+ Integration/Engineering: (Lead ship includes detail design engineering + plans for class)
KN8 :=
10. Mdol
Mdol
CAL
800
1.099
CAL
i1
i1
1.099
CAL
800
= Mdol
+ Ship Assembly + Support: (Lead ship includes all tooling, jigs, special facilities for class)
KN9 :=
2.0 Mdol
( Mdol )
.839
CAL
900
CAL
i1
i1
.839
CAL
i1
+ CAL
800
+ CAL
900
i1
CAtot = Mdol
222
CAL
900
= Mdol
CTOT = Mdol
+ Profit:
FP := .10
CLP := FP CTOT
CLP = Mdol
PL = Mdol
CSB = Mdol
CLMPG := 0 Mdol
CLMPG = Mdol
+ Outfittimg Cost :
CLOUT := .02 PL
CLGOV = Mdol
CLEND := CSB
CLEND = Mdol
CLPDEL := .05 PL
223
CLPDEL = Mdol
CLA = Mdol
Correction Factor:
:=
250
434.292
=
CLAc = Mdol
224
Definitions (units):
Kdol :=
Mdol
1000
dol :=
Kdol
1000
lton := 2240 lb
CNA := 2.2
CND := 0.5
Removed Weight
WD
100
:= 607.37 lton
WD
WD
:= 34.19 lton
WD
WD
300
400
500
600
:= 0 lton
WD
700
:= 0 lton
:= 695.63 lton
:= 99.09 lton
Added Weight
WA
100
:= 5703.21 lton
WA
300
WA
:= 69.9 lton
WA
400
500
600
:= 76.19 lton
WA
700
:= 38.06 lton
:= 859.08 lton
:= 658.29 lton
2. Additional Characteristics:
Total Weight Removed:
WDel :=
WDi1
i1
WDel = lton
WA i1
i1
WAdd = lton
CPO's:
Enlisted:
NC := 0
2
NC := NE NC
3
LS := 30
Enlisted: NE := 22
Officers: NO := 8
NS := 1
3. Inflation:
Base Year:
YB := 2003
iy := 1 .. YB 1998
RI := 3.
FI :=
RI
1 + 100
iy
225
FI =
YIOC := 2004
RP := 1
KN1 :=
.55 Mdol
lton
+ Propulsion
KN2 :=
KN3 :=
1.0 Mdol
lton
CDL
CDL
CDL
300
.91
).772
200
.808
CDL
100
1.2 Mdol
lton
+ Electric
.772
100
CDL
= Mdol
CDL
= Mdol
100
.808
200
300
).91
400
).617
CDL
300
= Mdol
2.0 Mdol
lton
+ Auxiliary
KN5 :=
KN6 :=
+ Armament
KN7 :=
= Mdol
).782
CDL
= Mdol
600
).784
CDL
= Mdol
700
).987
CDL
= Mdol
CDL
CDL
700
.987
500
600
.784
1.0 Mdol
lton
400
CDL
500
.782
1.0 Mdol
lton
CDL
1.5 Mdol
lton
+ Outfit
400
.617
500
600
700
+ Integration/Engineering: (Lead ship includes detail design engineering + plans for class)
KN8 :=
10. Mdol
Mdol
1.099
CDL
800
CDL
i1
i1
1.099
CDL
800
= Mdol
+ Ship Assembly + Support: (Lead ship includes all tooling, jigs, special facilities for class)
KN9 :=
2.0 Mdol
( Mdol )
.839
CDL
900
CDL
i1
i1
.839
CDL
900
= Mdol
(CDL)i1 + CDL
800
+ CDL
900
i1
CDtot = Mdol
226
KN1 :=
.55 Mdol
lton
+ Propulsion
KN2 :=
KN3 :=
1.0 Mdol
lton
CAL
CAL
CAL
300
.91
).772
200
.808
CAL
100
1.2 Mdol
lton
+ Electric
.772
100
300
400
CAL
= Mdol
CAL
= Mdol
100
.808
200
).91
CAL
300
= Mdol
2.0 Mdol
lton
+ Auxiliary
KN5 :=
KN6 :=
KN7 :=
.782
600
700
CAL
CAL
700
.987
500
600
.784
CAL
500
1.0 Mdol
lton
).617
CAL
400
= Mdol
1.0 Mdol
lton
+ Armament
.617
1.5 Mdol
lton
+ Outfit
400
).782
CAL
= Mdol
).784
CAL
= Mdol
).987
CAL
= Mdol
500
600
700
+ Integration/Engineering: (Lead ship includes detail design engineering + plans for class)
KN8 :=
10. Mdol
Mdol
1.099
CAL
800
CAL
i1
i1
1.099
CAL
800
= Mdol
+ Ship Assembly + Support: (Lead ship includes all tooling, jigs, special facilities for class)
KN9 :=
2.0 Mdol
( Mdol )
.839
CAL
900
CAL
i1
i1
.839
CAL
i1
+ CAL
800
+ CAL
900
i1
CAtot = Mdol
227
CAL
900
= Mdol
CTOT = Mdol
+ Profit:
FP := .10
CLP := FP CTOT
CLP = Mdol
PL = Mdol
CSB = Mdol
CLMPG := 0 Mdol
CLMPG = Mdol
+ Outfittimg Cost :
CLOUT := .02 PL
CLGOV = Mdol
CLEND := CSB
CLEND = Mdol
CLPDEL := .05 PL
228
CLPDEL = Mdol
CLA = Mdol
Correction Factor:
:=
250
434.292
=
CLAc = Mdol
229