The surface shall be cleaned of all dust and heavier layers of rust by copper
slag blasting the entire internal surface to photographic standard SIS: 0559001967.
2.
The consumption rate of copper slag is 1.6 Kg/Sqm of the blasted area. This
has to be ensured strictly.
3.
All tools, equipments, base material, hand and power tools for cleaning,
including scaffolding material, copper slag blasting equipment, air compressor
etc. shall be arranged by the contractor at site in sufficient quantity.
4.
5.
6.
The blast cleaned surface shall be blasted with dry compressed air before
applying primer. This should be done even if the surface appears very clean
and white in colour. The white colour may be due to deposition of silicon and
reflection of light on the surface.
7.
8.
The time gap between blast cleaning and application of primer shall not be
more than THREE hours. Blast cleaning work shall, commence from top to
bottom.
9.
The blast cleaning operation shall be carried out keeping the nozzle at an
angle of 30 degree to the vertical in order to prevent rebounding abrasive
from showing down the abrasives emerging from nozzle and from under cutting
the material to be removed.
10.
11.
!"
%
"
#$ #
&' ( )
&*
+,.#+#
.$#/
+$#/
.&
+&
.+. -$&$
+-$&$0 1
$ ,
# &$
,&
#/ &$
-$ &-
b)
Pipelines shall be colour coded to indicate the product that is being carried.
Colour coding for all products, shall have one band of 100 mm (4) on each side with a gap of 300
mm (12) in between. Aluminium paint shall be applied on white oil lines and black oil lines shall
be painted black. The product carried shall be written in a gap of 300 mm in white letters for black
oils and black letters for white oils in the flow direction. The size of letters shall be half the
diameter of the pipeline (colour coding chart is enclosed as shown under).
A 45-50 mm thick x 300 mm long arrow (as shown above) shall be painted after each band on the
pipeline with respective colour code in the flow direction.
2.4.2 The recommended colour coding for bands shall be :
PRODUCT
COLOUR
ISC NO.
MS 93 OCTANE
Signal red
537
MS 88/91 Octane
Dark Orange
591
SKO
Golden Yellow
356
Oxford Blue
105
LDO
Aluminium
----
FO
Aluminium
Dark Brown
412
Ethanol
LILAC
-----
A 45-50 mm thick x 300 mm long arrow (Clause 4.3.3) shall be painted after each band on the pipeline with respective
colour code in the flow direction