0% found this document useful (0 votes)
22 views1 page

Circular: 70 Marks Only

The project batches were informed to meet their guides and submit survey papers for a CSI convention by October 24th, or their zero'th phase presentation would not be scheduled and their final project evaluation would be out of 70 marks instead of 100. Project coordinators and the head of department signed off on the notice.

Uploaded by

Pradeep Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

Circular: 70 Marks Only

The project batches were informed to meet their guides and submit survey papers for a CSI convention by October 24th, or their zero'th phase presentation would not be scheduled and their final project evaluation would be out of 70 marks instead of 100. Project coordinators and the head of department signed off on the notice.

Uploaded by

Pradeep Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CIRCULAR

All the project batches are hereby informed to meet their respective
guides and submit the survey paper for CSI convention also get the
inputs for zeroth phase of the project which will be scheduled
shortly.
The project batches who fail to submit the survey paper on or before
24th October 2016, their zeroth phase will not be scheduled for
presentation. Also the final evaluation of the project will be done for
70 marks only.

Project coordinator

HOD

You might also like