Rate Analysis - Unique

This document provides a material statement for civil works conducted by Dr. Prathap. It lists 8 key items of work including earth work, plain cement concrete, reinforced cement concrete columns, beams, slabs, and retaining walls. The quantities of materials used are listed in metric units as well as bags of cement, numbers of bricks, and kilograms of steel. The total costs of materials, labor, and transportation are provided for each work item and in total come to over 11.5 million rupees.

Uploaded by

Ajay Sastry
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views3 pages

Rate Analysis - Unique

This document provides a material statement for civil works conducted by Dr. Prathap. It lists 8 key items of work including earth work, plain cement concrete, reinforced cement concrete columns, beams, slabs, and retaining walls. The quantities of materials used are listed in metric units as well as bags of cement, numbers of bricks, and kilograms of steel. The total costs of materials, labor, and transportation are provided for each work item and in total come to over 11.5 million rupees.

Uploaded by

Ajay Sastry
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

MATERIAL STATEMENT OF CIVIL WORKS OF

DR.PRATHAP
Sl No

ITEM

1 Earth work

2 PCC

3 RCC plinth beams

Qnty
m3

Qnty
cft

1740

61,431.88

89

3,141.70

45.96

1,622.39

4 RCC column footing 137.08

1.5" Metal 3/4" Metal


(cft)
(cft)

2,985.46
98,520.20

Sand
(cft)

Cement
(bags)

Brick
nos

Steel
(kg)

rubble

Labour

TA

491,455.07

491,455.07

62,834.00

355,055.22

1,508
105,591

267.00
88,110.00

1,461
48,199

730
51,120

390.00
128,700.00

9,194.00
505,670.00

194,686.56

4,838.92

4,356
143,757

2,178
152,469

1,165.00
384,450.00

16,449.60
904,728.00

580,670.88

2,166,074.92

928,374.83

5 RCC columns

25.65

905.45

815
26,899

408
28,530

218.00
71,940.00

5,130.00
282,150.00

108,653.40

518,172.33

6 R.C.C retaining wall

62.66

2,211.90

1,991
65,712

996
69,695

532.00
175,560.00

6,266.00
344,630.00

265,427.76

921,024.27

7 R.C.C roof beam

73.64

2,599.49

2,340
77,227

1,170
81,907

626.00
206,580.00

14,728.00
810,040.00

311,939.04

1,487,693.02

196

6,918.80

6,229
205,547

3,114
218,004

1,666.00
549,780.00

16,660.00
916,300.00

830,256.00

2,719,886.51

8 RCC roof slab

MATERIAL STATEMENT OF CIVIL WORKS OF


DR.PRATHAP
Sl No

ITEM

Qnty
m3

Qnty
cft

958.29

33,827.64

126

4,447.80

35.25

1,244.33

4 RCC column footing 151.91

5 RCC columns

1 Earth work

2 PCC

1.5" Metal 3/4" Metal


(cft)
(cft)

Sand
(cft)

Cement
(bags)

Brick
nos

Steel
(kg)

rubble

Labour

270,621.10

2,002
140,145

378.00
124,740.00

1,120
36,967

560
39,207

300.00
99,000.00

7,050.00
387,750.00

149,319.00

5,362.42

4,828
159,309

2,414
168,964

1,291.00
426,030.00

18,830.40
1,035,672.00

643,490.76

30.11

1,062.88

957
31,577

478
33,490

256.00
84,480.00

6,022.00
331,210.00

127,545.96

6 R.C.C retaining wall

152.34

5,377.60

4,841
159,760

2,421
169,442

1,295.00
427,350.00

15,236.80
838,024.00

645,312.24

7 R.C.C roof beam

56.21

1,984.21

1,786
58,948

893
62,520

478.00
157,740.00

11,242.00
618,310.00

238,105.56

8 RCC roof slab

135.43

4,780.68

4,304
142,026

2,152
150,634

1,151.00
379,830.00

11,511.60
633,138.00

573,681.48

3 RCC plinth beams

4,226.61
139,478.03

88,956.00

TA

270,621.10

493,319.42

712,243.26
2,433,466.02

608,302.83

2,239,888.71

1,135,623.80

1,879,309.92