Two (2) Years
Two (2) Years
Two (2) Years
08 14 10 Wood Doors:
Provide a three (3) year warranty under provisions of the General Conditions.
(Include coverage of warpage beyond installation tolerances indicated in this
section, delamination or degradation of veneer.)
08 32 13 Sliding Aluminum Glass Doors:
Warrant work of this Section against defects in materials and workmanship in
accordance with the General Conditions for a period of two (2) years.
08 36 13 - Sectional Doors:
Provide five (5) year manufacturers warranty for degradation of finish, including
cracking, rust through or delamination.
Provide five (5) year manufacturers warranty for electric operating equipment.
Provide two (2) year manufacturers warranty for pneumatic operating equipment.
08 41 00 Glazed Aluminum Curtain Walls, Aluminum Frames, Entrances
and Storefronts:
Provide a three (3) year warranty under provisions of the General Conditions from
date of acceptance.
Cover complete system for failure to meet specified requirements. Defects shall
include, without being limited to, misting, leaking, deformation of members,
breakage of glass caused by frame distortions and discoloration of finishes and
sealants.
Refer to Section 08 80 50 for warranty for insulating glass units.
08 71 00 Door Hardware:
Provide five (5) year warranty under provisions of the General Conditions.
Provide ten (10) year warranty coverage of door closers and automatic door
openers.
08 80 50 Glass and Glazing:
Provide a ten (10) year warranty under provisions of the General Conditions for
insulating glass units. Include coverage of sealed glass units from seal failure,
interpane dusting or misting, and replacement of same.
Provide a five (5) year warranty under provisions of General Conditions for mirror.
Include with the second and all subsequent applications for payment a
statement based on the Schedule of Values, a statutory declaration (CCDC 9B),
and a standard Workers Compensation Certificate of Clearance.
01 31 00 Project Management and Coordination
1.0
General:
01 45 00 Quality Control
The Construction Manager shall be responsible for notifying the Chief Building
Official and Consultant in writing for readiness for inspection for stages of
construction work as required under prescribed notices and inspections as
regulated under The Ontario Building Code 2012, Division C Section 1.3.5
Notices and Inspections, articles 1.3.5.1 (1) and (2) and for any additional
notices as prescribed by the local authority having jurisdiction. A minimum of
48 hours notice must be given to the Consultants in advance for an inspection
to be carried out.
Independent Inspections: Distribute reports as follows:
Hand written report by the inspection and/or testing company to be left with
the site supervisor immediately upon completion of the Work.
The site supervisor shall be responsible for issuing the report to each of the
Consultants immediately upon receipt.
Within 5 days of inspection or testing provide one (1) typewritten copy of the
inspection and test reports directly to each of the Consultant; the Construction
Manager and Owner.
FOR CONSTRUCTION INSPECTION AND TESTING SERVICES
CAST IN-PLACE CONCRETE
Review mix designs
Sample, test plastic concrete, for cylinders, retrieve, cure, cap test cylinders and
report results. 1 per 100 cubic meter of concrete for each class of concrete and at
minimum 1 per class of concrete per day of pour. One slump test and one
entrainment test for every compressive strength test as applicable.
FOOTING INSPECTION STRIP AND SPEAD
Confirm adequacy of bearing strata
inspections to approve soil at founding elevations.
CONCRETE REINFORCEMENT INSPECTION
Prior to concreting, confirmation of bar and stirrup sizes and tie and placement for;
.1 Footings
.2 Foundations
.3 Walls
.4 Slabs, on grade and suspended and ramps
.5 Columns and beams
Laboratory Testing:
- 10 sieve analyses
- 10 standard proctor tests
2.5
2.6
MASONRY
.1
Mortar and grout mix designs
.2
Testing and sampling: sets of six cubes
One mortar test for each 100m2 of masonry walls or portion
thereof.
.3
.4
One grout test for each 20m3 of grout for project having more than
20m3 of grout and one test for each 10m3 of grout for projects
having less than 20m3 of grout.
Dimensions and compressive strength of
concrete block. Sets of five
Inspection to conform reinforcing placement,
and reporting 8 visits
2.7
2.8
STRUCTURAL PRECAST
.1 Field Inspection:
Examine for failure of members to come together, individual pieces of
frame including hollow core for twisting, camber and seep, welding of
dowels, grouting of dowels, bearing conditions of precast elements ,
alignment of cast in elements, grouting of bearings, and steel connections.
2.9
BUILDING ENVELOPE
.1 Inspection for continuity of air/ vapour retarder and insulation
components
ROOFING INSPECTIONS
.1 Full time site inspections & final report
2.12
FIRE SPRAY, FIRE STOPPING AND INTUMESCENT PAINT
INSPECTION
.1 Site inspections & final reports include for review of Engineering
judgements Testing for minimum thicknesses to meet ULC/cUL systems
01 78 00 Contract Closeout
Submit a written report that equipment or system has been properly installed
and is functioning correctly.
Complete and submit start-up reports including:
Contractor's system and equipment start up reports.
Manufacturers' equipment start up reports.
been
FORMAT
.1 Organize data in the form of an instructional manual.
.2 Binders: Commercial quality, 8-1/2 x 11 inch (210mm x 280 mm)
maximum ring size.
.3 When multiple binders are used, correlate data into related consistent
groupings.
.4 Cover: Identify each binder with typed or printed title Project Record
Documents; list title of Project, identify subject matter of contents.
.5 Arrange content by systems, or process flow, under Section numbers
and sequence of able of Contents.
.6
Provide tabbed fly leaf for each separate product and system, with
typed description of product and major component parts of equipment.
.7
Quality of Paper: Manufacturers printed data, or typewritten data on 20
pound paper.
.8 Drawings: Provide with reinforced punched binder tab. Bind in with text;
fold larger drawings to size of text pages.
CONTENTS, EACH VOLUME
.1 Table of Contents: Provide title of project; names, addresses, and
telephone numbers of Consultant, Sub-Consultants, and Subcontractors
with name of responsible parties; schedule of products and systems,
indexed to content of the volume.
.2 For Each Product or System: List names, addresses and telephone
numbers of
Subcontractors and
suppliers, including local source of supplies and replacement parts.
.3 Product Data: Mark each sheet to clearly identify specific products and
component parts, and data applicable to installation; delete inapplicable
information.
.4 Drawings: Supplement product data to illustrate relations of component
parts of equipment and systems, to show control and flow diagrams.
.5 Type Text: As required to supplement product data. Provide logical
sequence of instructions for each procedure, incorporating manufacturers
instructions.
.3
SUBMISSION
.1
Submit one copy of completed volumes in final form to Consultants for
review 15 days prior to substantial performance.
.2 Copy will be returned after final inspection, with Architect/Engineer
comments.
.3 Revise content of documents as required prior to final submittal.
.4 Submit two copies of revised volumes of data in final form within ten
days after final inspection.
.2
Annotate with coloured felt tip marking pens, maintaining separate colours
for each major system, for recording information.
.4 Contract Drawings and shop drawings: Legibly mark each item to record
actual construction, including:
.1 Measured depths of elements of foundation in relation to finish first floor
datum.
.2 Measured horizontal and vertical locations of underground utilities and
appurtenances, referenced to permanent surface improvements.
.3 Measured locations of internal utilities and appurtenances, referenced to
visible and accessible features of construction.
.4 Field changes of dimension and detail.
.5 Changes made by change orders.
.6 Details not on original Contract Drawings.
.7 References to related shop drawings and modifications.
.5 Specifications: Legibly mark each item to record actual construction,
including:
.1 Manufacturer, trade name, and catalog number of each project actually
installed, particularly optional items and substitute items.
.2 Changes made by Addenda and change orders.
.6 Other Documents: Maintain manufacturers certifications, inspection
certifications, field test records, and other items required by individual
specification sections.
RECORD DOCUMENTS
.1 Prior to Substantial Performance of the Work, electronically transfer
and provide on CD-ROM
to the Consultant the marked up information
from the as-built documents to a master set of drawing files, as follows:
Drawings: AutoCAD Release 2010.
.2
.3