Ovality Correction

Method 1
The use of this is recommended where it is possible to remove the tackle after ovality correction and subsequent
jointing.

Position the timber strut and jack (approximately 5


tonne capacity) into the spigot end at 90 deg to the major
axis.(rubber /timber packing should be placed in position
to prevent damage to the pipe lining)
Extend the jack until the ovality is within the tolerance
detailed in table 2 (page 10)
Complete the jointing operation with the major axis
of the spigot in the vertical position
After jointing remove the tackle
When jointing with couplings it may be necessary to
use 2 jacks in order to obtain a round profile

Method 2
The use of this method is recommended where it is not possible to remove the tackle as described in method 1, after
ovality correction and subsequent jointing.

Place the tackle around the spigot end of the pipe


at a position 450mm from end with the major axis of
the spigot vertical. Where pipes are tape wrapped ,
rubber pads or similar should be placed between the
re rounding tackle and the pipe for protection
Tighten the two nuts evenly until the ovality is
within the tolerances specified in table 2 page 10
Complete the jointing operation with the major
axis of the spigot in the vertical position
After jointing remove the tackle