2.2.5 Recommendation - in Regard To The 2.3.4 Recommendation - The Notification
2.2.5 Recommendation - in Regard To The 2.3.4 Recommendation - The Notification
2.2.5 Recommendation - in Regard To The 2.3.4 Recommendation - The Notification
METEOROLOGY
22 AUG 14
2.3
NOTIFICATIONS REQUIRED
FROM OPERATORS
2.3.1
An operator requiring meteorological service or changes in existing meteorological service
shall notify, sufficiently in advance, the meteorological authority or the aerodrome meteorological office
concerned. The minimum amount of advance notice
required shall be as agreed between the meteorological authority or aerodrome meteorological office and
the operator.
2.3.2
The meteorological authority shall be notified by the operator requiring service when:
a. new routes or new types of operations are
planned;
b. changes of a lasting character are to be made
in scheduled operations; and
c. other changes, affecting the provision of meteorological service, are planned.
Such information shall contain all details necessary
for the planning of appropriate arrangements by the
meteorological authority.
2.3.3
The operator or a flight crew member shall
ensure that, where required by the meteorological
authority in consultation with users, the aerodrome
meteorological office concerned, is notified:
a. of flight schedules;
b. when non-scheduled flights are to be operated;
3.1
3.2
3.2.1
A Contracting State, having accepted the
responsibility for providing a WAFC within the framework of the world area forecast system, shall arrange
for that center:
a. to prepare gridded global forecasts of:
1. upper wind;
2. upper-air temperature and humidity;
3. geopotential altitude of flight levels;
4. flight level and temperature of tropopause;
5. direction, speed and flight level of maximum wind;
6. cumulonimbus clouds;
7. icing; and
8. turbulence;
q$z
q$i