The firm is facing many problems related to the inefficiency of the plant layout.
Some of them are:
Due to the space constraint they are not able to purchase the machines which
are expected to give a higher productivity.
A lot of machines are being used in second and third shift which is beyond
justification.
Apart from that there are several other problems like the privacy of the
employees is being hampered
Alternatives
Build a new plant : one of the alternatives is to build a new plant in an area
19000 square foot. The costs involved are $100,000 for purchasing the land and
$40/ square foot for construction.
Question
Which expansion option would you recommend to Glenn Moore? Justify your
position.
Solution
Buying a new plant Renting additional area(yrly)
$860,000
If we opt for building new plant then it will cost $860,000*.15 i.e. $129,000 while
renting the yearly cost is $67,200 so financially renting seems to be the better
alternative.
From the above calculations it is clear that building new plant will involve a huge
initial cash outflow. Thus it would be better not to block the money in the form of
bulding. Instead we should pay it in instalment in the form of monthly rent.
Question 2
Design an effective block plan and evaluate it. Cite any qualitative consideration
that you believe make your design attractive.
1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 Are
department 0 1 2 3 4 5 a
1 administrati I A E U A E O O O O I E O U 3
ve office
2 conference I U U U U U U U U U U U U U 1
room
3 eng & matl A U I U U O A E E I E E U O 2
mngmnt
4 productn E U I U A A A A A I I E O A 1
mangr
5 lunch room U U U U U U U U U U U U U U 2
6 computer A U U A U A X U U U O I U U 1
7 Inventory E U O A U A A O O O O U U U 2
strage
8 machine O U A A U X A A X I O U U I 6
shop
9 assembly O U E A U U O A A A I U I A 7
area
10 cleaning O U E A U U O X A O O U U U 1
11 welding O U I I U U O I A O O U U U 1
12 electronic I U E I U O O O I O O E U U 1
13 sales & E U E E U I U U U U U E O U 2
accntng
14 shipping O U U O U U U U I U U U O U 1
15 load test U U O A U U U I A U U U U U 1
32
From the above table Total Closeness Rating (TCR) of each department was
calculated .The basis of calculating TCR was
A E I O U X
125 25 5 1 0 -125
Following were the scores of each department
E I O U X TCR
A
1 2 3 2 5 2 0 340
2 0 0 1 0 13 0 5
3 2 4 2 2 4 0 362
4 6 2 3 1 2 0 816
5 0 0 0 0 14 0 0
6 3 0 1 1 8 1 256
7 3 1 0 5 5 0 405
8 4 0 2 2 4 2 262
9 5 1 2 2 4 0 662
10 2 1 0 4 6 1 154
11 1 0 3 4 6 0 144
12 0 2 3 5 4 0 70
13 0 4 1 1 8 0 106
14 0 0 1 3 10 0 8
15 2 0 1 1 10 0 256
30 18 22 36 100 4
1. The first department placed in the layout is the one with the greatest TCR
value. If a tie exists, choose the one with more As.
3. The second department is the one with an A relationship with the first one. If
a tie exists,choose the one with the greatest TCR value.
(Source: www.personal.psu.edu)
340
1 administrative 6
office
2 conference 5 12
room
3 eng & matl 362 5
mngmnt
4 productn mangr 816 1
5 lunch room 0 13
6 Computer 256 14
7 inventory 405 3
storage
8 machine shop 262 4
9 assembly area 662 2
10 Cleaning 154 15
11 Welding 144 8
12 Electronic 70 10
13 sales & accntng 106 9
14 Shipping 8 11
15 load test 256 7
62.5
125 62.5
125 4 125
62.5
187.5 187.5 62.5
125 9 4 125
62.5 187.5 187.5 62.5
62.5
187.5 187.5 62.5
187.5 9 4 125
62.5
187.5 187.5 62.5
187.5 9 4 187.5
187.5 7 8 187.5
62.5 187.5 187.5 62.5
62.5
187.5 250 187.5 62.5
187.5 3 9 4 187.5
62.5
187.5 250 187.5 62.5
187.5 3 9 4 187.5
62.5 1 7 8 187.5
62.5 187.5 250 187.5 62.5
62.5
187.5 250 187.5 62.5
187.5 3 9 4 187.5
62.5 1 7 8 187.5
62.5
187.5 250 187.5 62.5
187.5 3 9 4 187.5
62.5 1 7 8 187.5
62.5 11 15 13 187.5
250 3 9 4 187.5
250 1 7 8 250
187.5 11 15 13 187.5
62.5
187.5 250 62.5 62.5
187.5 14 12 2 187.5
250 3 9 4 250
250 1 7 8 250
187.5 11 15 13 187.5
62.5 187.5 250 187.5 62.5
0
62.5 187.5 250 187.5 62.5
62.5 312.5 14 12 2 187.5
125 5 3 9 4 250
62.5 312.5 1 7 8 250
0 187.5 11 15 13 187.5
0 62.5 187.5 250 187.5 62.5
62.5
187.5 250 250 187.5 62.5
187.5 6 14 12 2 187.5
125 5 3 9 4 250
62.5 312.5 1 7 8 250
0 187.5 11 15 13 187.5
0 62.5 187.5 250 187.5 62.5
62.5
187.5 250 250 187.5 62.5
187.5 6 14 12 2 187.5
250 5 3 9 4 250
187.5 10 1 7 8 250
62.5 312.5 11 15 13 187.5
0 62.5 187.5 250 187.5 62.5
6
14 12 2
5 3 9 4
10 1 7 8
11 15 13
Based on the space available for each department and the block plan developed
following is the recommended facility layout
6
13 13 9 9 12 2
5 1 15 9 9 9 4
5 1 14 3 9 9 8 8 8
10 1 11 3 8 8 8 7 7
The departments of production viz machine shop, assembly room as well as the
conference room is kept adjacent to production managers cabin
Computer is kept near to sales and accounting and administrative area
Inventory storage area is very close to the machine shop and to the assembly
area