Checklist Earthing Lightning
Checklist Earthing Lightning
Checklist Earthing Lightning
Project Name :
Project No. :
Client
Proj. Manager/Consultants
Contractor
MEP Contractor
gr
IR Ref. No.:
Level/Area/Location :
Date of Inspection :
S/N
YES
Checklist Items
Check air terminals and copper tapes are securely anchored and
clamped at proper intervals
Check tightness of bonding between the roof & down conductors and test
link
Check all exposed equipments and metal /steel works in the roof are
securely bonded to the air termination network
Check arth rods are driven in the approved location and are provided
with earth pit to allow access for bonding of main earth loop and LPS
earth lead to the earth rod
Check tightness of bonding between the earth rod, main earth loop, LPS
earth lead and test link
10
Check earth pit is provided with appropriate label, engraved "LPS Earth
Below"
11
NO
Remarks / Comments
N/A
The above activities are found to be as per contract requirements and are ready for
release.
The above activities are correct and released for the next activity.
Checked by:
a. Site Electrical Engineer
Name/Signature
Name/Signature
Date
Date
Name / Signature
Date
Note: Checking and approval by AEB shall not relieve the Contractor from his obligation to perform the work in accordance with other contract documents and HSE requirements. This
inspection Checklist is a guide and shall be considered in the routine inspections BUT not limited to it.