2 WCDMA D2u D4u Distributed NodeB Commissioning

Download as pdf or txt
Download as pdf or txt
You are on page 1of 66

9326 d2U /9926 BBU 2U/4U

Distributed Node B
Commissioning

All Rights Reserved Alcatel-Lucent 2006

Agenda
Distributed NodeB Description

Distributed NodeB Commissioning


Distributed NodeB Commissioning Testing

July 2014

All Rights Reserved Alcatel-Lucent 2006

Distributed Node B
Description

All Rights Reserved Alcatel-Lucent 2006

9326 d2U V2 Node B Presentation

9326 d2U V2 with xCCM-U + MDA (4xE1/T1)


eCEM-U or xCEM-U

xCCM-U

MDA 4 x E1/T1 Fan Rack / RUC V2

9326 d2U V2 with xCCM-U + MDA (GE)


eCEM-U or xCEM-U

xCCM-U

MDA GE

Fan Rack / RUC V2

NOTE: For more information refer to Product Description or MOPG or PEI (Engineering rules) of the dedicated Product
4 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

9926 BBU (d2U V3) Node B Presentation

9926 BBU (d2U V3) with eCCM-U + MDA (4xE1/T1)


eCEM-U

eCCM-U

MDA 4 x E1/T1 Fan Rack / RUC V2

9926 BBU (d2U V3) with eCCM-U + MDA (GE)


eCEM-U

eCCM-U

MDA GE

Fan Rack / RUC V2

NOTE: For more information refer to Product Description or MOPG or PEI (Engineering rules) of the dedicated Product
5 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

9926 BBU 4U (d4U V3) Node B Presentation

NOTE: For more information


refer to Product Description or
MOPG or PEI (Engineering
rules) of the dedicated
Product
6 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

xCCM-U for d2U V2 Presentation


xCCM-U with MDA 4 E1/T1

Refer to IEH521 sections


Section 702 to perform CCM-U Board Migration
+
Procedure
GPEC Training: Presentations of eModules and MD8
Eltek PSU Cabinet.
https://all1.na.alcatellucent.com/Teams/GCDNetworks/WirelessGPEC/DeliveryReadine
ss/WCDMA/UTRAN/Training/W-CDMA_trainings.html

xCCM-U with MDA GE

NOTE: For more information refer to Product


Description or MOPG or PEI (Engineering rules)
of the dedicated Product
7 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

eCCM-U for d2U V2 / d2U V3 / d4U Presentation


eCCM-U with MDA 4 E1/T1

eCCM-U with MDA GE

8 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

xCEM-U & eCEM-U for d2U V2 / d2U V3 / d4U Presentation

xCEM-U

eCEM-U

Refer to IEH521 sections


Section 703 to perform CEM-U Board Migration Procedure

9 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Optional Modules for d2U/d4U Presentation

LPPCM for d2U/d4U

eAM for d2U/d4U

10 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Distributed Node B
Commissioning

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning - Initial preparation steps


Start

The flow diagram outlines the


initial preparation steps for the
commissioning of a Node B to
connect the laptop on the CCMU and launch the TIL in local
mode.

Acquire and read all required


documentation for d2U/d4U
and RRH commissioning

Acquire all required HW and


SW tools into your laptop

Is that the
Node B
Software is
already
installed on
the
Laptop?

Follow Proc. 1:
NodeB Software Installation
on the laptop

Is that the
laptop has
already
used for
TIL
connection
?
Y

Follow Proc. 2:
First Laptop Setting

Follow Proc. 3:
TIL Connection
Perform the Node B Commissioning
Procedures or
Close the TIL GUI, the Web Browser and
remove the RJ45 cable from the CCM-U and
the laptop

End

12 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning SW Download to Node B and Activation


The flow diagram outlines
the steps for the Node B
commissioning to
Download the Software to
the Node B and activate
the new release with the
TIL in local Mode.

Check the TCP/IP properties


or redo the preparation steps
(refer to previous flowcharts)

Start

Follow Proc. 3:
TIL Connection
Y

DBS 4U
Is used?
N

The TIL is
Launched and
displays the
GUI?

Follow Proc. 4:
Specific Preparation
Follow Proc. 5:
NodeB Software
Downloading

Follow Proc. 6:
New Node B release
Activation

Follow Proc. 7:
Node B Configuration
Checks

Perform the Node B Commissioning


Procedures or
Close the TIL GUI, the Web Browser and
remove the RJ45 cable from the CCM-U and
the laptop

End

All Rights Reserved Alcatel-Lucent 2006

Start

Node B commissioning Set all Node B parameters


Follow Proc. 3: TIL Connection

The flow diagram outlines


the steps for the Node B
commissioning to Set all
Node B parameters with
the TIL in local Mode.

Follow Proc. 7: Node B Configuration Checks


Follow Proc. 8: Node B Setting BTS Parameters
Follow Proc. 9: Node B Setting RRH Parameters
Follow Proc. 10: Node B Setting Backhaul Parameters
If ATM Iub used

If Hybrid Iub used

Follow Proc. 11

Follow Proc. 11: Node B Setting PCM E1 Parameters

Follow Proc. 12

Follow Proc. 12: Node B Setting PCM T1 Parameters

Follow Proc. 13

Follow Proc. 13: Node B Setting PCM&IMA Parameters


Follow Proc. 14: Node B Setting Ethernet Parameters

Follow Proc. 16: Node B Setting IP Parameters

Follow Proc. 14

Follow Proc. 15: Node B Setting ATM Parameters

Follow Proc. 15

If
Neid
= SN
in TIL
GUI

If Iub over IP used

Follow Proc. 17: Node B Neid Exchange with the TIL


N
Follow Proc. 18: Sending I&C Parameters to NodeB
Follow Proc. 19: Node B Reset in Connected Mode
Follow Proc. 20: I&C Parameters Verification
Follow Proc. 21: MCA Backup File
Follow Proc. 23: Final Commissioning Operations

End
All Rights Reserved Alcatel-Lucent 2006

Follow Proc. 16

Node B commissioning Node B Form Parameters


The form of parameters based on the CIQ must be documented by the coordinator according to the
expected parameters and configuration.

The form of parameters must be send by email or available on a link.


The following table is the list of Node B parameters required prior to commissioning.

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Node B Form Parameters PCM Parameters


PCM (E1) Parameters

PCM (T1) Parameters

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Node B Form Parameters PCM/IMA & ATM Parameters

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Node B Form Parameters Ethernet & IP Parameters

18 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Node B Form Parameters BTS Packaging

19 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Node B Form Parameters BTS Packaging (Continued)

20 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Applicable IEH521 Sections & Methods Documents


Applicable IEH 521 Sections for WCDMA Node B commissioning

Applicable Methods documents for IEH 521 Sections 3xx

21 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Material Requirements


The hardware and software tools required to perform the commissioning method.

22 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Procedures Overview


The following table provides an
overview about the steps required to
perform commissioning of WCDMA Node
B dependant on the backhaul
interface.

23 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 1: Node B Software Installation on the Laptop


Description:
This procedure gives the process to use the hard disk of the PC as the source for the software upgrade.
Condition:
This procedure has to be executed only at the first time Procedure of Node B SW Installation on Laptop
(initial setup) to install the Node B software delivery
Step Action
components on the PC.
1
Open the compress software (ex here: tar.gz)
If already done no action is required.
2
Select Options and Configuration
Required Data
The following data are required for the setup:
3
Select Miscellaneous or Select all
Node B software available on a Web server or
4
Remove the check box: TAR file smart CR/LF
Node B software available on a CD
conversion.

Procedure of Preparation before Node B SW Install.


Step

Insert the Node B software release CD-ROM in the


CD-ROM drive.
NOTE: In this case the Node B Software into the CDROM is not compressed.

Action

Click Start in the Windows Taskbar.

Select Programs/Windows Explorer.

Click on the CD-ROM drive letter

Double-click on C: to open it.

Click on the Delivery folder to select the NodeB SW

Verify that a Delivery folder is present on your


laptop.
NOTE: The Delivery folder must be unique and only
dedicated to the last Software release delivery.

Press the CTRL + C to copy the Delivery folder in the


clipboard.

Click on C: to select it.

10
Press the CTRL + V to paste the clipboard content in
Check the type of Node B Software delivery
C:
If Node B Software delivery from a Web server
continue to the next procedure to perform step 1 up
11
Wait during the transfer
to step 4 and continue with step 7 up to the end.
Check on the folder C:/ delivery the existence of the
If Node B Software delivery using a CD-ROM
new SW2006
file UNB
continue
the next
to perform step 5 All Rights Reserved Alcatel-Lucent
24 | Distributed
Nodewith
B Commissioning
| July procedure
2014
NOTE:
The
Node B SW is now available on the PC.
up to the end.

Node B commissioning Proc 2: First Laptop Setting


Description:
This procedure gives the process for the first Laptop setting to prepare the first TIL connection with the WCDMA Node B.
Preconditions:
The following preconditions for this procedure step must be met:
PC has never been set as TIL GUI
Have Java run type environment installed into the laptop with the right version
Have User ID and Password for TIL GUI available

First Laptop Setting Procedure

Step

Action

In the Local Area Connection:


Select Internet Protocol Version 4 (TCP/IPv4)

Click on Properties

In TCP/IP Properties screen, in the IP Address tab:


Note and record the current configuration (if
necessary)

Modify properties to access Node B digital board:


Select use the following IP address

Fill the following IP address:


IP Address :
223.254.254.1

Subnet mask : 255.255.240.0


6

Click OK to quit the TCP/IP Properties screen

Click OK to quit the network screen

25 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 3: TIL Connection


Description:
This procedure gives the process
TIL connection on
To connect the Laptop on the CCM-U board and
To launch the TIL in Local Mode (direct connection to CCM-U board)
CCM-U (Port 1)
Preconditions:
The PCMCIA card setting on the Laptop should be correctly configured according to Proc.2.
In case of Outdoor Node B and before opening the doors:

TIL Connection Procedure


Step

Action

Connect the RJ45 (Cross-Cable) between Laptop and


the CCM-U board (Port1)
NOTE: When connecting the RJ45 the Green LED
should light on Port 1 of the CCM-U

Start the Web Browser.

In the URL field of your web browser.


Enter the following address:

TIL

http://223.254.254.244/til/index.html
IMPORTANT: This URL field will be use for CCM-U
coming from factory only.
In case of re-use CCM-U from field customer, a
specific Node B IP address is required to enter into
the URL field:

http://<Node B IP Address>/til/index.html
4

Press Return
NOTE: During Java Applet downloading, a progress
bar isNode
displayed.
All Rights Reserved Alcatel-Lucent 2006
26 | Distributed
B Commissioning | July 2014

Node B commissioning Proc 3: TIL Connection (continued)


TIL Connection Procedure (Continued)
Step

Action

When the Java Applet is completely downloaded and


if not already filled.
Enter your User Name.
Enter your Default Path (the directory where the
results will be saved).

Click Start on the TIL Applet


NOTE: During TIL manager and test server
connection, a message is displayed.

In the Security window


Enter the Login: nodeb
Enter the Password: Nodeblnx
IMPORTANT:
The Login nodeb and the password nodeblnx will be
used during the TIL connection on the CCM-U not
built.
IMPORTANT:
During the TIL connection, a new Login and a new
Password could be required by the customer after
build the node B.
NOTE: to change the Login and Password can be
found in the manual Alcatel-Lucent 9353 Wireless
Management System -Security Fundamentals (refer
to the reference section)

Click OK
NOTE: At the end of the connection, the TIL board
27 | eModules
migration
| Sept 2011 | July 2014
All Rights Reserved Alcatel-Lucent 2006
Distributed
Node B Commissioning
screen is displayed.

Node B commissioning Proc 3: TIL Connection (continued)


Example of TIL GUI for d2U

28 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 5: Node B Software Downloading


Description:
This procedure describes how to download the software into the Node B.
Preconditions:
The upgrade of Node B will be done from one software release to the current network release in local mode
(direct connection between the laptop up to the CCM-U board).
To use the hard disk of the PC as the source of the upgrade, the Node B software delivery components must be previously
installed on the PC
The Laptop Setting and TIL connections are already done and available.

Node B Software Downloading Procedure


Step

Action

In the TIL GUI:


Go to Tools menu

Select Software Upgrade

Select New Software Download

In the Choose a delivery file dialog box:


Check that the name of the folder is the same as the
current network Node B release to download.

Double Click on the folder UN

Select the File named FILE0_<Version>.

Click Choose a delivery file


NOTE: The software downloading starts and a
progress bar is displayed on the screen.

29 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 5: Node B Software Downloading (Continued)


Node B Software Downloading Procedure (Continued)
Step
8

Action
Wait while the 2 steps are automatically performed:
Step 1: Each file is transferred from the PC to the CCM-U board.
Step 2: Files are transferred from the CCM-U to the others boards.
NOTE: The transfer files takes around:
6 mn for step 1.
4 mn for step 2.
NOTE: On the front panel of the CCM-U the lower rectangle LED is
blinking.
At the end of the download, a success message is displayed.

Click OK

30 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 6: New Node B Release Activation


Description:
This procedure describes how to activate the new software on the Node B.
Preconditions:
The laptop setting and TIL connections are already done and available.
The Node B software downloading is already perform

New Node B Release Activation Procedure


Step

Action

In the TIL GUI:


Go to Tools menu

Select Software Upgrade

Select Activation and iBTS reset

Click OK to confirm the reset

Click OK to close the last screen

Close imperatively the WEB browser in order to take


into account the new TIL JAVA Applet

Wait while the Node B Startup


NOTE: The Node B startup takes:
Around 3min for CCM-U
Around 4min for other boards

Apply specific requirement after the Node B release


activation

31 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 6: New Node B Release Activation

Latest Software release Verification Procedure


Step

Action

Re-start the Web browser.

Re-start the TIL Applet

Verify that the TIL GUI shows the correct Node B


configuration and the latest software release.

Check the Distributed Node B Software reference


Version used, which is displayed at the bottom of
the TIL GUI.

End of this procedure

32 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(Continue)

Node B commissioning Proc 7: Node B Configuration Checks Procedure


Description:
This procedure describes how to check the Node B operational condition prior to start commissioning.
Check MCA Status
Node B Configuration Checks Procedure
Check Hybrid Iub (HIUB)
Step Action
Check Node B Alarm Status
Check GPSAM Status
1
In the TIL GUI:
Check RRH Alarm Status
Check the MS (MCA status) LED displayed on GPSAM
board
Preconditions:
The TIL must be already connected to the CCM-U
2
Check that the information contained in the TIL
The software must be at the right version
board's GUI complies with the Node B configuration:
Check the Software Reference
Check the Node B type
Verify that the Serial Number is the same as the
Serial Number given by the packing list (refer to
planning part).
NOTE: If abnormal check occurred, contact the site
coordinator before going on.

33 | Distributed Node B Commissioning | July 2014

Check that for Hybrid IuB configuration a maximum of


4 PCM lines is in active status by checking the HIUB
label must be in Green.

Check all Boards Alarms condition that there is no


alarm.
Check with label AL (Alarm) that no board appears in
alarms (RED color).
NOTE: To troubleshoot alarms check the AlcatelLucent Node B Commissioning and Fault
Management User Manual: TIL (refer to references
section) and/or contact the support team.

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 7: Node B Configuration Checks Procedure


Node B Configuration Checks Procedure (Continued)
Step

Action

Check GPSAM Alarms condition that there is no


alarm.
Right click on the GPSAM board and select Alarms to
open the Alarm status.
Exception: expected alarms on GPSAM board are
allowed.
User alarm
Door contact alarm

Check RRH Alarms condition that there is no alarm.


On the GUI xCOB:
Right click on the OIx GUI connected with the RRH
select RRH alarms.

In the Pop-up menu of RRH view


Right click on the RRH and select Alarms to check
that no RRH appears in alarms (RED color).

In the Pop-up menu of RRH view,


Right click on the GUI to select Return to main GUI

34 | Distributed Node B Commissioning | July 2014

(continue)

NOTE: To troubleshoot alarms check the Alcatel-Lucent


Node B Commissioning and Fault Management User
Manual: TIL (refer to references section) and/or contact
the support team.

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 7: Node B Configuration Checks Procedure

(continue)

Execute procedure as per table below to save the I&C parameters to the default path.
Procedure to save the I&C Parameters
Step

Action
1

In the TIL GUI:


Go to the I&C Menu
Select Save I&C parameters

In the File_name field of the dialog box


Type the name of the file where the old I&C parameter will be saved.
NOTE: This name must be equal to:
old_<NeId>.til with NeId=Serial Number of the Node B.

This command save the default configuration data before commissioning Node B.
Click Save.
NOTE: The file will be saved in
<Default path>/[email protected]/Icparam folder.
The <Default path> is the path defined during TIL launching.
NOTE: In case of problem, go back to this file in order to restore the default parameters.

35 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 8: Node B Setting BTS Parameters


Description:
This procedure describes how to set BTS parameters with the TIL:
BTS Packaging
Fallback to previous I&C data
GPS Synchronization
Preconditions:
The laptop setting and TIL connections are already done and available.
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)
The selection of the BTS Packaging parameter must be agreed with the coordinator to get the expected configuration.
(refer to BTS Packaging table from commissioning planning section)

Node B Setting BTS Parameters Procedure

Step

Action

In the TIL GUI:


Go to I&C menu

Select Change I&C parameters

Select BTS

Note: with d4U only, on the TIL GUI / BTS an additional parameters appears above
the BTS Packaging parameter : BTS mode (Feature: d4U in Dual Mode)
Select SingleMode for d4U in single mode with only one CCM-U used or
Select SplitMode for d4U in dual mode with two CCM-U used (for 2 Node B in d4U)
For more information refer to IEH521 Section 705 Single to Dual Node B Migration
Procedures. (and an additional sheet 2NodeBs appears on the left of I&C parameters
TIL GUI for CEM-U allocation)
36 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 8: Node B Setting BTS Parameters (Continued)


Node B Setting BTS Parameters Procedure (Continued)
Step

Action

For BTS Packaging


Select the drop-down menu of the BTS packaging
according to the Node B configuration on field.

For Fallback to previous I&C data


Select the drop-down menu of the Fallback to
previous I&C data

For GPS Synchronization if used


Select the drop-down menu of the GPS
Synchronization.

Press the Send to BTS button only after completion


of all parameters setting in all relevant tabs.

37 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 9: Node B Setting RRH Parameters


Description:
This procedure describes how to set RRH parameters with the TIL
Preconditions:
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)
The laptop setting and TIL connections are already done and available.
Use case with RRH (Optical CPRI Link)
Use case with TRDU (Electrical CPRI Link)

Node B Setting RRH Parameters Procedure


Step

Action

In the TIL GUI:


Go to I&C menu

Select Change I&C parameters

Select RRH

For RRH Type:


Select the drop-down menu of the RRH type.
NOTE: The default parameter value is CPRI
(1,2,3,4,5,6)

Press the Send to BTS button only after completion


of all parameters setting in all relevant tabs.

38 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 10: Node B Setting Backhaul Parameters


Description:
This procedure describes how to set Backhaul parameters with the TIL :
Use case of ATM Iub network (ATM only)
Use case of Hybrid Iub network (IP + ATM simultaneous)
Use case of Iub over IP network (IP only)
Preconditions:
The laptop setting and TIL connections are already done and available.
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)
The CCM-U must be equipped with the following daughter board according the network used:

Node B Setting Backhaul


Parameters Procedure

Step

Action

In the TIL GUI:


Go to I&C menu

Select Change I&C parameters

Select BACKHAUL

39 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 10: Node B Setting Backhaul Parameters

(continued)

Node B Setting Backhaul Parameters Procedure (Continued)


Step
4

Action
For Type of Incoming Link:
Select the drop-down menu of the Type of Incoming
Link.

Press the Send to BTS button only after completion


of all parameters setting in all relevant tabs.

40 | Distributed Node B Commissioning | July 2014

NOTE:
Depending of the CCM-U board configuration and Transport
type select the correct value for TYPE OF INCOMING LINK.
-- For ATM Iub
-select E1/T1
-- For NIP IuB with optical fiber
- connect on ports 3 or 4 select STM
-- For NIP Iub without MDA GE
-connect on port 2 select Fast Ethernet
-- For NIP Iub with MDA GE
-connect on port 5 select Gigabit Ethernet

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 11: Node B Setting PCM E1 Parameters


Description:
This procedure describes how to set PCM E1 parameters with the TIL.
This procedure applies in case of :
The PCM protection module is present if necessary.
The E1 PCM parameters of the site are different from the factory default parameters.
Preconditions:
The laptop setting and TIL connections are already done and available.
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)
The following table shows the E1 factory default parameters:
NOTE: (1) Must not be modified.

Node B Setting PCM E1 Parameters


Procedure
Step

Action

In the TIL GUI:


Go to I&C menu

Select Change I&C parameters

Select PCM

41 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 11: Node B Setting PCM E1 Parameters


Node B Setting PCM E1 Parameters Procedure (Continued)
Step

Action

For PCM type:

For E1 Adaptation:

For PCM E1 frame:

42 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(continued)

Node B commissioning Proc 11: Node B Setting PCM E1 Parameters

(continued)

Node B Setting PCM E1 Parameters Procedure (Continued)


Step

Action

For PCM receive sensitivity:


Select the default value

For E1 PCM CRC threshold:


Enter the value 915 if not already done

Step
Procedure if PCM Protection Module used

Action

For Protection module: (If PCM protection module is


present)

Press the Send to BTS button only after completion of all


parameters setting in all relevant tabs.

Execute procedure as per table below if


PCM protection module used

43 | eModules migration | Sept 2011


43 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 12: Node B Setting PCM T1 Parameters


Description:
This procedure describes how to set PCM T1 parameters with the TIL.
This procedure applies in case of :
The PCM protection module is present.
The T1 PCM parameters of the site are different from the factory default parameters.
Preconditions:
The laptop setting and TIL connections are already done and available.
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)
The following table shows the T1 factory default parameters:
NOTE: (1) Must not be modified.

Node B Setting PCM T1 Parameters


Procedure
Step

Action

In the TIL GUI:


Go to I&C menu

Select Change I&C parameters

Select PCM

44 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 12: Node B Setting PCM T1 Parameters


Node B Setting PCM T1 Parameters Procedure (Continued)
Step

Action

For PCM type:

For PCM T1 frame:


Select the frame profile Extended super frame

For PCM coding:


Select the coding profile B8ZS

For LBO:
Select the default value

Click Validate on the LBO view

45 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(continued)

Node B commissioning Proc 12: Node B Setting PCM T1 Parameters


Node B Setting PCM T1 Parameters Procedure (Continued)
Step

Action

For PCM receive CRC:


Select the default value

10

For PCM receive sensitivity:


Select the default value

11

For PCM CRC threshold:


Enter the value 320 if not already done

46 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(continued)

Node B commissioning Proc 12: Node B Setting PCM T1 Parameters


Step
Procedure if PCM Protection Module used

(continued)

Action

For Protection module: (If PCM protection module is


present)

Press the Send to BTS button only after completion of all


parameters setting in all relevant tabs.

Execute procedure as per table below if


PCM protection module used

47 | eModules migration | Sept 2011

47 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 13: Node B Setting PCM&IMA Parameters


Description:
This procedure describes how to set PCM&IMA parameters with the TIL.
This procedure applies in case of ATM Iub or Hybrid Iub with:
IMA Configuration or
Drop and insert configuration.
PCM carrying OAM link value is different from 1
Preconditions:
The laptop setting and TIL connections are already done and available.
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)

Node B Setting PCM&IMA Parameters Procedure


Step

Action

In the TIL GUI:


Go to I&C menu

Select Change I&C parameters

Select PCM&IMA

For IMA usage parameter:


Note: when IuB is over IP the parameter IMA Usage is
set to Standard

Press the Send to BTS button only after completion of


all parameters setting in all relevant tabs.

48 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 13: Node B Setting PCM&IMA Parameters


Procedure If IMA Configuration used
Step

Action

If the IMA Parameters are already displayed: (for IMA


Configuration)
Do not change the parameter value

For PCM with OAM link/Synchro in NIP parameter: (for


IMA Configuration)
Do not change the parameter value

For IMA Version parameter: (for IMA Configuration)


Do not change the parameter value

Press the Send to BTS button only after completion of


all parameters setting in all relevant tabs.

49 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(Continued)

Node B commissioning Proc 13: Node B Setting PCM&IMA Parameters


Procedure If Drop & Insert Configuration used
Step
1

Action
For Drop & Insert Configuration
In Mask of PCM timeslots used:
Type the hexadecimal value in the rectangular box or
Click inside the box to select the Time Slot (TS).
Details explanation: The hexadecimal value is getting
reflected by the graphic representative TS boxes.

NOTE: TS status can be changed individually by single


clicking the TS box. Status changed will be reflected by
the color change.
2

Press the Send to BTS button only after completion of


all parameters setting in all relevant tabs.

50 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(Continued)

Node B commissioning Proc 14: Node B Setting Ethernet Parameters


Description:
This procedure describes how to set Ethernet parameters with the TIL
Preconditions:
The laptop setting and TIL connections are already done and available.
The Backhaul Parameters must be already set.
Use case of Hybrid Iub network (IP + ATM simultaneous)
Use case of Iub over IP network (IP only)
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)

Node B Setting Ethernet Parameters Procedure


Step

Action

In the TIL GUI:


Go to I&C menu

Select Change I&C parameters

Select Ethernet

For VLAN ID:


Set OAM VLAN ID to the value provided by CIQ if Iub is
over IP

For VLAN TAGGING:


Set VLAN TAGGING to Enabled if Iub is over IP
If Iub over IP not used do not change the parameter
value

51 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 14: Node B Setting Ethernet Parameters


Node B Setting Ethernet Parameters Procedure (continued)
Step

Action

For LAG/HUBBING:
Keep the parameter value at No LAG and Hubbing

For Eth Port used for IF:


Select the drop-down menu of the Eth Port used for IF.

For Eth Port used for Hubbing:


Do not Change the parameter value

Press the Send to BTS button only after completion of all


parameters setting in all relevant tabs.

Set Eth Port used for iub IF to :


- MotherBoard RJ45 if Iub is over IP and no MDA GE is available
- MDA RJ45 or MDA SFP1 or MDA SFP2 if Iub is over IP and MDA GE is available
52 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(Continued)

Node B commissioning Proc 14: Node B Setting Ethernet Parameters


Node B Setting Ethernet Parameters Procedure (If CCM-U used with GE MDA)
Step

Action

For VLAN ID: (If CCM-U used with GE MDA)


Keep the parameter value at 1

For VLAN TAGGING: (If CCM-U used with GE MDA)


Do not change the parameter value

For LAG/HUBBING: (If CCM-U used with GE MDA)


Select the parameter value at 0

For Eth Port used for IF: (If CCM-U used with GE MDA)
Select the parameter value at 4

For Eth Port used for Hubbing: (If CCM-U used with GE MDA)
Select the parameter value at 8

Press the Send to BTS button only after completion of all parameters setting in
all relevant tabs.

53 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(Continued)

Node B commissioning Proc 15: Node B Setting ATM Parameters


Description:
This procedure describes how to set ATM parameters with the TIL if necessary
Preconditions:
The laptop setting and TIL connections are already done and available.
Use case of Hybrid Iub network (IP + ATM simultaneous)
Use case of full ATM Iub network (ATM only)
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)

Node B Setting ATM Parameters Procedure


Step

Action

In the TIL GUI:


Go to I&C menu

Select Change I&C parameters

Select ATM Parameters

Type the OMC-B VP identifier parameter value


according to the customer information CIQ
(example here: 1)

Type the OMC-B VC identifier parameter value


according to the customer information CIQ
(example here: 32)

Do not change all other parameters values.

Press the Send to BTS button only after completion


of all parameters setting in all relevant tabs.

54 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 16: Node B Setting IP Parameters


Description:
This procedure describes how to modify the IP Address parameters with the TIL.
This procedure applies in case the IP network is not equipped with a DHCP server.
Preconditions:
Node B Setting IP Parameters Procedure
The laptop setting and TIL connections are already done
Step Action
and available.
Use case of Hybrid Iub network (IP + ATM simultaneous)
1
In the TIL GUI:
Go to I&C menu
Use case of Iub over IP network (IP only)
The form of parameters based on the CIQ must be documented
and available according to the expected configuration.
(refer to form parameters table from commissioning
planning section)

55 | Distributed Node B Commissioning | July 2014

Select Change I&C parameters

Select IP Parameters

For the Existence of a DHCP server


Select No

For the BTS IP Address


Type the BTS IP Address coming from the CIQ

For the OMC-B IP Address


Type the OMC-B IP Address coming from the CIQ

For the Sub-network mask


Type the Sub-network mask IP Address coming from
the CIQ

Do not change the other parameters value of:


the OMC-B port
the BTS port
the Default Gateway IP Address
Note : Default Gateway Ip Address will be
available only if the Backhaul is IP.

Press the Send to BTS button only after completion


of all parameters setting in all relevant tabs.

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 17: Node B NeID Exchange (If Necessary)


Description:
This procedure describes how to retrieve and change the BTS NeID (Serial number) with the TIL.
The BTS NeID is locally stored from factory into the RUC memory of the Node B.
Preconditions:
The laptop setting and TIL connections are already done and available.
The Web browser is started with in the URL field the BTS IP@ according to :
>http://BTS IP@/til/index.html
The serial Number of the Node B must be available on the frame NeID label.
The form of parameters based on the CIQ must be documented and available according to the expected configuration.
(refer to form parameters table from commissioning planning section)

Node B NeID Exchange Procedure

Step

Action

In the main TIL GUI:


Check the SerialNumber which is displayed on the bottom
of the page.

In the TIL GUI:


Go to I&C menu

Select
Change I&C
parameters

Select BTS

For Serial Number:


Type the right NeID number
NOTE: The NeID (= Serial Number) must be unique in the
same network and different from 012345.

6 56 | eModules
Press
the |Send
button only after completion
of all
migration
Sept 2011to |BTS
All Rights Reserved Alcatel-Lucent 2006
56 | Distributed
Node B Commissioning
July 2014
parameters setting in all relevant tabs.

Node B commissioning Proc 18: Sending I&C Parameters to the Node B


Description:
This procedure describes how to send the I&C parameters to the CCM-U board in order to update the MCA Module with the
TIL
Preconditions:
The laptop setting and TIL connections are already done and available.
All I&C parameters have been already correctly set with the previous procedures using the TIL

Sending I&C Parameters to Node B Procedure


Step

Action

In the TIL GUI: Go to I&C menu

Select Change I&C parameters

Select BTS

For Fallback to previous I&C data: Select Deactivate

Click Send to BTS


NOTE: During MCA update, a message is displayed

Approximately 15 seconds after, a success message is displayed,


Click OK

DO NOT Reset BTS Equipment after changing the TIL parameters.


All Rights Reserved Alcatel-Lucent 2006
Lets the activation to be performed during the integration.

57 | Distributed Node B Commissioning | July 2014

Node B commissioning Proc 19: Node B reset in Connected Mode


Description:
This procedure describes how to reset the Node B in connected mode with the TIL
This procedure applies when at least one of I&C parameters has been modified.
Preconditions:
The laptop setting and TIL connections are already done and available.
At least one of I&C parameters has been modified.

Node B reset in Connected Mode Procedure


Step

Action

In the TIL GUI: Go to Tools menu

Select BTS reset

Select Reset in connected mode

Click OK in the Confirm the reset window

Click OK in the End of reset window

Wait while Node B Startup


NOTE: Node B Startup takes:
Around 3mn for CCM-U
Around 4mn for other board

Check that no card appears in alarm.


NOTE: All LEDs on each module should be green, except for
MCAs (MCA not configured).

In the TIL GUI: Go to Connection menu

Select Connect to BTS

10

Check if the Node B is now Connected to OMC-B.


58 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

NOTE:
Reset in stand alone mode if the
BTS is not connected to WMS or
Reset in connected mode if it is
connected to WMS.

Node B commissioning Proc 20: I&C Parameters Verification


Description:
This procedure describes how to verify if the new I&C parameters are correctly saved in the MCA module with the TIL
Preconditions:
The laptop setting and TIL connections are already done and available.

I&C Parameters Verification Procedure


Step

Action

In the TIL GUI: to verify that the TIL used is correct:


Check the CCM-U Iub network configuration:
ATM or
Iub over IP or
Hybrid Iub

Check that the Software reference corresponds to an expected


SW Version. (ex: UA08.x or LR13.x)

Check that the iBTS packaging corresponds to the site


configuration

Check that the Node B TIL GUI is


Not connected to OMC-B and
Config. file not found

In the TIL GUI: Go to I&C menu

Select Save I&C parameters

59 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 20: I&C Parameters Verification

I&C Parameters Verification Procedure (Continued)


Step

Action

In the File-name field of the dialog box:


Type the name of the file where the new I&C parameters will be
saved.
NOTE: This name must be equal to new_<NeId>.til with
NeId=Serial number of the Node B.

Click Save
NOTE: The file will be saved in:
<Default path>/[email protected]/Icparam folder.
The <Default path> is the path defined during TIL launching.

Open the file new_<NeId>.til

10

Verify the I&C parameters you have entered comply with those of
the report sheet.

60 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

(Continued)

Node B commissioning Proc 21: MCA Backup File


Description:
This procedure describes how to create a MCA backup file with the TIL
This backup file must be stored on a customer server and will be reused exclusively in case of maintenance action with a
double fault (MCA and CCM-U failures).
Handover of the MCA backup file to the customer is coordinated by the TPM.
Preconditions:
The laptop setting and TIL connections are already done and available.
The I&C parameters verification must be completed.

MCA Backup File Procedure


Step

Action

In the TIL GUI: Go to I&C menu

Select MCA recovery tools

In the MCA recovery tools dialog box:


Select Prepare MCA file on CCM Board
Click OK

At the end of the operation, a success message is displayed


concerning MCA file creation

Click OK

61 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Proc 21: MCA Backup File

(continued)

MCA Backup File Procedure (continued)


Step

Action

In the MCA recovery tools dialog box:


Select Save MCA file on local disk
Click OK

At the end of the operation, a success message is displayed


concerning Save MCA file on local disk

Click OK
7

Open the MCABackup folder present on your default path to


verify if MCA backup file exists.
NOTE: The number given in the file name must be the same as
the serial number (NEid) of the Node B.
NOTE: The default path is <Default
path>/[email protected].
The <Default path> is the path defined during TIL launching.

Send by email the MCA backup file to the coordinator TPM.

=> The Node B is ready for integration


62 | Distributed Node B Commissioning | July 2014

All Rights Reserved Alcatel-Lucent 2006

Distributed Node B
Commissioning Testing

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Testing Proc 22: IP Ping Test


Description:
This procedure describes how to test the IP Link with the TIL
This test is not mandatory and is only applicable with an IP Network configuration (Hybrid Iub or Iub over IP)
Preconditions:
The laptop setting and TIL connections are already done and available.
The IP link (Hybrid Iub or Iub over IP) is physically connected on both sites.
The IP address of the OMC-B.

MCA Backup File Procedure


Step

Action

In the TIL GUI: Go to Tools menu

Choose IP Ping

In the IP Ping menu


Check the IP Address
to test

Click on Ping

A IP Ping Process window appears


Click OK

A IP Ping test result


window appears
Check that the test
result indicate
in the last IP Ping
Result: is Reachable
64 | Distributed Node B Commissioning Testing | July 2014

All Rights Reserved Alcatel-Lucent 2006

Node B commissioning Testing Proc 23: Final Commissioning Operations


Description:
This procedure describes how to perform final commissioning operations
Preconditions:
The laptop setting and TIL connections are already done and available.
The Node B has been reset in connected mode
The tests are successfully

Final Commissioning Operations Procedure


Step

Action

Close the Web browser

Remove the cable between Port 1 of the CCM-U and the laptop

Finish filling out the report sheet available in the Commissioning


Test Records section 399
NOTE: All non-compliance cases have to be physically spotted on
site and described

Leave one copy of the report sheet on site and send one to the
coordinator.

Refer to the coordinator for any corrective action.

Clean the site

Now the Node B commissioning is finish and this Node B is ready to


be integrated in an existing UTRAN, according to the UTRAN
version used and following the Integration Procedure IEH521 or :
Alcatel-Lucent Node B UA08.1 Integration in an existing UTRAN

65 | Distributed Node B Commissioning Testing | July 2014

All Rights Reserved Alcatel-Lucent 2006

=> The NodeB is ready to be


integrated in an existing
UTRAN

www.alcatel-lucent.com

66 | eModules migration | Sept 2011

All Rights Reserved Alcatel-Lucent 2006

You might also like