Teikoku Pump Refrigeration O&M Manual
Teikoku Pump Refrigeration O&M Manual
Teikoku Pump Refrigeration O&M Manual
.
. Before
Before
operatingthe
thecanned
cannedmotor
motorpump,
pump,read
readthis
this"Instruction
"InstructionManual"
Manual"and
and"Caution
"Cation
operating
Your
Safety"
avoid
improper
operation.It is
It is
essential
your
safety
and
Notes
Notes
forfor
Your
Safety"
to to
avoid
improper
operation.
essential
forfor
your
safety
and
avoiding
disaster.
avoiding disaster.
.
is imperative that the pump be shut down immediately if the bearing wear monitor
. It It
is
that the pump
be shut
down
thered
bearing
wear
monitor is in
the red. Operating
the pump
while
theimmediately
monitor is inifthe
will void
the
is inimperative
thewarranty.
red. Operating the pump while the monitor is in the red will void the warranty.
__ 4 __
__
__
Obtain a copy of the Teikoku Inspection Report (shown above) to verify flow conditions.
Verify the liquid level in the vessel is sufficient to not cause dry running or cavitation.
Verify the reverse circulation piping is per Teikokus Reverse Circulation Piping Connection
as shown on the previous two pages.
Verify the supplied reverse circulation orifice is installed between the reverse circulation
flange at the rear of the motor and the reverse circulation piping.
Verify that the number stamped on the orifice handle matches the product code on the pump
nameplate.
__
6 __
ROTATION CHECK
Step 1: Pump must be primed before checking rotation.
Step 2: Check if suction valve, discharge valve, and reverse circulation valve are all 100% open.
Step 3: Start motor. If the Bearing Wear Monitor (TRG) swings immediately to the red, the pump
is most likely running backwards. Stop the motor, reverse the leads, and then repeat rotation
check.
(Alternate Step 3: You should also check if the discharge pressure matches the Teikoku
Inspection Report curve. If it does, the pump is rotating correctly. If the discharge pressure is
65% or less than what is shown on the curve, the pump is rotating in the reverse direction. Swap
the leads and repeat rotation check.)
STARTING THE PUMP
Step 1: Make sure the pump is primed and is running in the correct rotation. Also, verify that the
suction valve and the reverse circulation valve is 100% open.
Step 2: Close the discharge valve to 20% open
Step 3: Start the motor.
Step 4: Slowly open the discharge valve till you reach the desired flow rate.
CHECKS DURING PUMP OPERATION
x
x
x
x
__
7 __
__ 8 __
__ 9 __
__ 10 __
__ 11 __
__ 12 __
__ 13 __
__ 14 __
__ 15 __
__ 16 __
__ 17 __
__ 18 __
__ 19 __
__ 20 __
__ 21 __
__ 22 __