The document provides tutorial instructions for using Milestones Simplicity software. It teaches how to open lesson files, enter project steps and dates, add symbols and bars to create a schedule, add and move columns, and add a title. The second lesson teaches how to display the current date and page number, add freeform text, and customize text attributes by changing font, size, style, and color. It also covers adding dates to symbols and annotating symbols with text.

Uploaded by

nottingham03290
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Simplicity 2010 Tutorials

The document provides tutorial instructions for using Milestones Simplicity software. It teaches how to open lesson files, enter project steps and dates, add symbols and bars to create a schedule, add and move columns, and add a title. The second lesson teaches how to display the current date and page number, add freeform text, and customize text attributes by changing font, size, style, and color. It also covers adding dates to symbols and annotating symbols with text.

Uploaded by

nottingham03290
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

Tutorials

Thelessonschedulesforthesetutorialswereinstalledwhenyouin
stalledMilestonesSimplicity2010.TheycanbeaccessedunderFile|
OpenaFile|LessonChart.

Ifyouhaveanyquestions,comments,orsuggestionsaboutthese
lessons,don'[email protected].

19892010KIDASASoftware,Inc.AllRightsReserved

Lesson1GettingStarted
Inthislessonyouwilllearnhowto:

MilestonesSimplicity'sComboToolbox.
EnterProjectSteps.
AddSymbols(milestones)andHorizontalBarstoYourScheduleusingtheComboToolbox.
AddaColumn.
MoveaColumn.
AddaScheduleTitle.
OpentheScheduleforthisLesson.

1. OnthetoolbarchoosetheFiletab.
2. IntheFilesandTemplates:OpenandSaveOptionssec
tion,clickthe
downarrownexttoOpen.
3. ChooseLessonChart.
4. SelectLesson1StarterSchedule.mld.
5. Savethescheduletoanaccessiblefolderonyourhard
drive,suchasyourDocumentsfolder.ChooseFiletab,in
theFilesandTemplates:OpenandSaveOptionssection
clickSaveAs...chooseChart.Thiswillinsureyouhave
accesstosavingandeditingofthistutorialfile.
Note:

Thetextinthebubblesisdisplayedforillustrationpurposes
(youwon'tseethemonyourschedule).ThearealabeledCol
umniswhereyouwillenteryourprojectsteps.ScheduleArea
iswhereyouwilladdsymbolsandhorizontalbarsbasedon
thedatesthatappearinthearealabeledHeadings.TheEn
hancedToolbarisafastwaytoperformbasictaskswithout
havingtopulldownamenu.YouwillusetheToolboxtobuild
theschedule.

Lesson1StarterSchedule

MilestonesSimplicity'sComboToolbox.
ThetoolboxforthislessoncontainstworowsofTools,tworowsofSymbol+BarCombinationsandonerowofVertical
Links:
Tools:
BigPlus

isforaddinginformationtotheschedule.

TheArrow

isformakingchangestotheschedule.

TheBigT(text)
Theline

allowsyoutoaddfreeformlinesegmentstotheschedule.

Thesquare
Thecircle
Symbols:

isforaddingtexttotheschedule.

allowsyoutoaddfreeformboxestotheschedule
allowsyoutoaddfreeformellipsestotheschedule.

usedtodepictspecificdates

HorizontalBar:
Verticallinks:

usedtoshowspanofaproject
usedtoshowdependencies

Note:

Rightclickthetoolboxtochangeitsattributes.
1-1

Toolbox

Entertheprojectsteps.

1. Clickthetexttool

inthetoolbox.

2. InthefirstspacebelowthecolumnheadingProjectSteps,clickonce.
3. Typein:Getmaterials.Thenpressthedownarrowonyourkeyboard.This
willtakeyoutothenexttaskrow.(Ifyouprefer,youcanclickwithyour
mousewithinthecellofthenexttaskrow.)
4. Typein:Tearoffoldroof.Pressthedownarrowonyourkeyboardtomove
downtothenextrow.
5. Typein:Putdowntarpaper.Pressthedownarrowonyourkeyboardto
movedowntothenextrow.

EnterProjectSteps

6. Typein:Nailonshingles.Hereiswhatyouwillsee:
Note:

Ifyoumadeanymistakes,dontworry.Mistakesareeasyto
correct.Clickonthetextyouneedtochangeorrightclickon
thetaskrowthatyouwanttocorrectandchooseEditTask
fromthepopupmenu.

PressingEnterinthelastrowonyourpagemaytakeyouto
anew(blank)page.Ifthishappens,usethePageUpkeyto
movebacktoPage1orchoosetheEdittabintheDelete
sectionchooseCurrentPage.
ProjectSteps

AddSymbols(milestones)andHorizontalBarstoYourScheduleusingtheComboToolbox.
Addthebarforthe"Getmaterials"step
1. Clickonceonthesmallplustotheleftofthefirstsymbol+bar+symbolcombinationinthe
toolbox,asshown(notetheentirerowishighlightedinlightblue):
2. MovethemouseintothescheduleareatotherightofthewordsGetmaterials,thecursor
willchangetocrosshairswiththedate.

ToolboxSelection

Cursor

3. WhenthedatedisplayednexttothecursorisTuesday10/12/10.
A. Clickdown(andhold)withtheleftmousebutton.
B. Dragtwodaystotheright,Thursday10/14/10.
C. Releasethemousebutton.Thesymbol,bar,symbolisaddedtotheschedule.

Symbol,Bar,Symbol

1-2

Addthebarforthe"Tearoffoldroof"step
1. MoveyourmouseintothescheduleareatotherightofTearoffoldroof.
2. WhenthedatedisplayednexttothecursorisWednesday10/13/10,
A. Clickdown(andhold)withtheleftmousebutton.
B. DragtotherightandreleasethemouseonMonday10/18/10.You
shouldseethis:
Symbol,Bar,Symbol

Addasinglemilestoneforthe"Putdowntarpaper"step
1. MoveyourmouseintothescheduleareatotherightofPutdowntarpaper.
2. Thistime,youwillnotbedraggingthemouse.Whenthedatenexttothecursor
indicatesTuesday10/19/10,clickoncewiththeleftmousebutton.Thisaddsa
singlemilestone:

Addthebarforthe"Nailonshingles"step

Bar

Nowgoaheadandaddasymbol,bar,symbolcombinationforNailonshin
gles.ThestartdateforthisstepisWednesday10/20/10andtheenddateis
Friday10/22/10.Yourscheduleisalmostdone:

Symbol,Bar,Symbol

AddaColumn.
NowweyouaregoingtoaddanEndDatesmartcolumn.Thiscolumnisgoingtoautomaticallyfillwitheachtasksenddate.
1. ChooseInserttab.
2. IntheRows,ColumnssectionchooseNewColumn.
3. SelectEndDate.

EndDateColumn

1-3

MoveaColumn.
1. Clickthearrowtool

inthetoolbox.

2. Movethecursortothetopborderofthecolumntobemoved(thelinejustaboveFinish,inourexample.).The
cursorshouldchangetotheinsertioncursor.
3. Clicktheleftmousebuttonanddragthecolumntotherightuntilyouseetheinsertionmarker
wherethecolumnwillbeinserted.

indicating

4. Releasethemousetodropthecolumnattheinsertionpoint.
Theexamplesshowmovingacolumnfromtheleftsideofthescheduletotherightside.

ColumnMoveCursor

InsertionCursor

ColumnMoved

AddaScheduleTitle.
1. ChoosetheInserttab.
2. InthetitlesectionchooseInsert/EditChartTitle,Specify
Titledialogboxappears
3. TypeinRoofingProjectasshown.
4. ForJustificationchooseLeftasshown.
5. ForTitleBackgroundColorOverridechoosetheChange
buttonandselectblueasshown.
6. UnderBorder,TitleWidth,ShadowcheckonDrawBor
derforWidth:chooseTitleTextasshown.
7. UnderBorder,TitleWidth,ShadowcheckonDraw
ShadowchoosetheChangebuttonandselectblueas
shown.
8.

CheckonInsertExtraSpaceUnderChartTitleasshown.

9.

ClickOK.

ScheduleWithATitle

1-4

SpecifyTitleDialogBox

Lesson2WorkingwithText
Inthislessonyouwilllearnhowto:

DisplaytheCurrentDateandPageNumber.
AddaBlockofFreeformText.
CustomizeFreeformTextbyChangingItsAttributes.
AddDatestoSymbols.
AnnotateaSymbolUsingSymboltext.
AddTextinTheMiddleofaBarUsingSymbolText.
OpentheScheduleforthisLesson.

1. OnthetoolbarchoosetheFiletab.
2. IntheFilesandTemplates:OpenandSaveOptionssection,click
the
downarrownexttoOpen.
3. ChooseLessonChart.
4. SelectLesson2StarterSchedule.mld.
5. Savethescheduletoanaccessiblefolderonyourharddrive,such
asyourDocumentsfolder.ChooseFiletab,intheFilesandTem
plates:OpenandSaveOptionssectionclickSaveAs...choose
Chart.Thiswillinsureyouhaveaccesstosavingandeditingofthis
tutorialfile.

Lesson2StarterSchedule

DisplaytheCurrentDateandPageNumber.
Pagenumber
1. OntheViewtabintheOptionalsectioncheckonPageNumber.
2. Clickingonceontheactualpagenumberintheschedulewillcausethetoolbarto
changeandprovideyouwithoptionstochangetheattributesofthepagenumber.

CurrentDate
1. ChoosetheDatestabintheCurrentDatesectioncheckonDisplayDateDisplay
Date.
2. Clickingonceonthecurrentdatewillcausethetoolbartochangeandprovide
youwithoptionstochangetheattributesofthecurrentdate.

Note:
It'spossibletodisplaythecurrentdateandpagenumberanywhere
onyourscheduleusingfreeformtextand"substitutabletextstring"
options.Forexample:
Thefreeformtextstring"Page&curpageof&maxpage"displaysas
"Page1of3"onthefirstpageofa3pageschedule.
Thefreeformtextstring"&date"displaysthecurrentdate.

PageNumber

DisplayDate

DisplayedPageNumberAndDate

2-1

AddaBlockofFreeformText.
1. Clickinthe

texttooltoolbox.

2. Clickintheschedulearea,totherightoftheNailonshingles
step:

EnterFreeformText

3. Type3Mancrewtoarrive.
4. PressEntertosplitthetextontoanewline.
5. Typeby8amdaily.
FreeformText

CustomizeFreeformTextbyChangingItsAttributes.
1. Clickingonceonthefreeformtextwillcausethetoolbartochangeandprovideyouwithoptionstochangethe
attributesofthefreeformtext.

FreeformTextAttributeOptions

2. IntheFontsectionchangethe:
a. FonttoArial
b. Sizeto24
FreeformTextRevised

c. HorizontalAlignmenttoCenter
d. TextStylecheckonBold,Italic,Underline
e. TextColortodarkpurple.
3. IntheBackgroundColorsectionchangethe:
A. SetFillColortolightpurple
B. SpecialEffectstoFadetoBottom
C. CheckoffTransparent
4. CheckonShowShadowandSetShadowColortodarkpurple

2-2

AddDatestoSymbols.
1. Inthetoolbox,doubleclickthe symbolthatisusedforthestart
symbolsonyourschedule.ThisbringsuptheSymbolOptionsdia
logbox.
2. IntheSymbolOptionsdialogboxclicktheTextandDateProper
tiestab.
3. UnderDatePlacement,chooseAboveandCenter.
4. ClickOK.Eachstartsymbolnowhasadatedisplayedaboveit:
Note:

Justthemonthanddayaredisplayedforsymboldatesinthisex
ample.Ifyouwouldlikeadifferentdateformat,choosetheDates
tabintheDateRelatedSettingssectionclickSetSymbolDateFor
mat.

SymbolDates

AnnotateaSymbolUsingSymboltext.
1. Clickthe

arrowtoolinthetoolbox.

2. ClicktheendsymbolfortheGetMaterialsstep.ThetoolbarchangestoCurrentObjectSymbol.
3. AtthebottomofthetoolbarclicktheTexttab.

SymbolTextAttributeOptions

4. IntheTextsection:
A. InLine1:typeinMaterials
B. InLine2:typeinTarpaper,shingles,nails
C. InDateSuffixtypeinEst.
D. IMPORTANTclickonApplyTextChanges
5. IntheTextsectionnexttoLine1:MaterialschooseTextOverridetheSymbol
TextLine1Overridesdialogboxappearschange:
A. TextColorOverridetolightpurple
B. IntheTextAttributesOverridessectioncheckonBoldOverride
6. IntheTextPlacementsectionchange:
A. Vertical:toAbove

TextLineOverride

B. Horizontal:toRight
7. IntheDatePlacementsectionchange:
A. Vertical:toBelow
B. Horizontal:toCenter

SymbolText

2-3

AddTextinTheMiddleofaBarUsingSymbolText.
1. Clickthe

arrowtoolinthetoolbox.

2. ClickthestartsymbolfortheTearoffoldroofstep.ThetoolbarchangestoCurrentObjectSymbol.
3. AtthebottomofthetoolbarclicktheTexttab.

SymbolTextAttributeOptions

4. IntheTextsection:
A. InLine1:typeinSmithConst.
B. IMPORTANTclickonApplyTextChanges
5. IntheTextPlacementsectionchange:
A. Vertical:toMiddle
B. CheckonCenterTextonBar

TextOnABar

MoreaboutMilestonesSimplicityandText

Symboltextisthebestwaytoannotatelargeschedules,especiallyifyouneedtextto"stick"toataskorsymbol
DefaultSymboltextisappliedtosymbolsbydoubleclickingasymbolintheToolboxandchoosingtheSymbol
Optionsdialogbox,DefaultTexttab.Eachtimethesymbolisaddedtotheschedulethedefaulttextalsogets
added.Symbolsalreadyontheschedulewillnotbeaffectedbytheaddingofdefaultsymboltext.

Freeformtextismostusefulforblocksoftextthatareindependentofanytaskorsymbol.Freeformtextwillnot
movewithataskrowitisindependentofanyobject.

GloballychangeanytextstylechoosetheFormattabDefaultTextsection.
Doyouwanttoaddlengthynotestoasymbol,butnotdisplaythenotesontheschedule?Tryusingsymbolnotes.
Clickanysymbolonyourschedule.ThetoolbarwillchangetoSelectiontabCurrentObjectSymbol.choosethe
notestabatthebottomofthetoolbar.TypeinthenotesitisveryimportanttochooseApplyTextChangesto
avoidlosingyourtypedintext.

Doyouwanttodisplaytheschedule'sfilename?Justusefreeformtextandtypeinsomethinglikethis:Myfile's
nameis&filename.Then,whenyouclickawayfromthetext,MilestonesSimplicitywillsubstitutetheactualfile
nameandgiveyousomethinglikethis:Myfile'snameisc:\myschedulefiles\factoryschedule.mls

2-4

Lesson3CustomizingtheToolbox
Inthislessonyouwilllearnhowto:UnlockToolboxfromsidebar.

ChangetheAppearanceofaSymbolintheToolbox.
ChangetheAppearanceofaHorizontalBarintheToolbox.
ChangetheAppearanceofaVerticalLinktheToolbox.
ChangethelookoftheToolbox.

OpentheScheduleforthisLesson.

1. OnthetoolbarchoosetheFiletab.
2. IntheFilesandTemplates:OpenandSaveOptionssection,
clickthe
downarrownexttoOpen.
3. ChooseLessonChart.
4. SelectLesson3StarterSchedule.mld.
5. Savethescheduletoanaccessiblefolderonyourharddrive,
suchasyourDocumentsfolder.ChooseFiletab,intheFiles
andTemplates:OpenandSaveOptionssectionclickSave
As...chooseChart.Thiswillinsureyouhaveaccesstosaving
andeditingofthistutorialfile.
Lesson3StarterSchedule

ChangetheAppearanceofaSymbolintheToolbox.
Anysymbolinthetoolboxcanbecustomizedforyourneeds.Whenachangeismadetoasymbolinthetoolbox,andthat
symbolcurrentlyexistsontheschedule,thatsymbolontheschedulechangesaccordingly.
RedTriangle
1. First,noticethateachtaskrowcontainsaredtrianglesymbol,and
thesamesymbolisinthetoolbox.Additionally,theredtriangleap
pearsinthelegendbelowtheschedule.
2. Inthetoolbox,doubleclickontheredtrianglesymbol.Thisbringsup
theSymbolOptionsdialogbox.
3. UnderStandardShapes,scrollandselectthe28thsymbol(thenull
symbol).
4. ClicktheTextandDatePropertiestab.
5. UnderDatePlacement,chooseHide.
6. UnderTextPlacement,chooseHide.

SymbolOptions

7. ClickOK.
Note:

Allredtrianglesymbolsontheschedulehavebeen
changedtonullsymbolswithnodates.Theredtrianglein
thelegendchangedaswell.

ChangedSymbol

3-1

GreenUpsideDownTriangle.
1. Inthetoolbox,doubleclickonthegreenupsidedowntrianglesymbol.
ThisbringsuptheSymbolOptionsdialogbox.
2. UnderStandardShapes,scrollandselectthe43rdsymbol(arrowhead).
3. ClicktheColor/Pattern/Size/Shadowtab.
4. UnderOutlineColor,scrollandchooseBlue.
5. UnderFillColor,scrollandchooseCustomBlue.
6. UnderShadows,checkShowShadowonSymbol.Acheckmarkindicates
thisfeatureisturnedon.
7. UnderSize,chooseMediumfortheSize.indicateswhichsizeofshadow
willbeappliedtothesymbol.
8. ForshadowColor,chooseNavy.
9. ClicktheTextandDatePropertiestab.
10. UnderDatePlacement,chooseAbovethenCenter.
11. UnderTextPlacement,chooseHide.
SymbolOptions

12. ClickOK.
13. Ifamessageaboutsymbolplacementappears,thenselectYes.
Note:

Allgreenupsidedowntrianglesymbolsontheschedulehavebeen
changedtobluearrowheadsymbolswithdatesabovethesymbol.

ChangedSymbol

ChangetheAppearanceofaHorizontalBarintheToolbox.
Whenyoumakeachangetoabarinthetoolbox,andthatbaralreadyexistsontheschedule,allincidentsofthatbarson
theschedulewillchange.
1. Inthetoolbox,doubleclickonthebluebarthatisbe
tweenthenullsymbolandthebluearrowhead.This
bringsuptheBarOptionsdialogbox.
2. KeepthesameBarType.
3. UnderFillColor,choosechangebuttonandpicklightblue.
4. UnderLineColor,choosechangebuttonandpickblue.
5. UnderTypeofEffect,clickthedownarrowandchoose
FadetoLeft.
6. UnderShadowSettings,checkShowShadow.
BarOptions

7. ForShadowSize,chooseMedium.
8. ChooseaShadowColorchoosechangebuttonandNavy.
9. ClickOK.
Note:

Now,thebarfadesfromwhitetoblue.Noticethelegendentry
alsoreflectsthebarchanges.

ChangedBar

3-2

ChangetheAppearanceofaVerticalLinktheToolbox.
1. Doubleclickthefirstverticalbarinthetoolbox.Thisbrings
uptheVerticalLinkOptionsdialogbox.
2. UnderColor,scrollandchooseLimeGreen.
3. UnderLinePattern:choosedashedline
4. UnderShape,scrollandchoosenumber3.
5. ForArrowheadType,chooseTriangular.
6. ForArrowheadSize,chooseLarge.
7. ClickOK.

VerticalLink

Note:

TheBlackverticallinkisnowagreendashedarrow.

ChangedVerticalLink

ChangethelookoftheToolbox.
Byrightclickingthetoolboxyoucanchangethelookofthetoolboxbyselectingfromthemenuoptions.
Toolboxposition:
Undocked:
RightclickthetoolboxandchoosetheSidebarOptions.ChooseDonotshowSidebar.YouwillhavetocloseMile
stonesandopenMilestonesfortheoptiontotakeeffect.
DockedtotherightoftheMilestoneswindow:
RightclickthetoolboxandchoosetheSidebarOptions.ChooseShowsidebaronright.YouwillhavetocloseMile
stonesandopenMilestonesfortheoptiontotakeeffect.
DockedtotheleftoftheMilestoneswindow:
RightclickthetoolboxandchoosetheSidebarOptions.ChooseShowsidebaronleft.YouwillhavetocloseMile
stonesandopenMilestonesfortheoptiontotakeeffect.
Hidden:
Tohidethetoolboxitmustbeundocked.RightclickthetoolboxandchooseHideToolbox.Toturnthetoolbox
backonchoosetheViewtabintheOptionalItemssectioncheckonToolbox.

Undocked

LeftDocked

3-3

RightDocked

ToolboxType
Standard:
OriginalMilestonestoolbox.Thestandardtoolboxcon
tains2rowsoftools,upto8rowsofsymbolsforatotal
of36symbols,upto8rowsofhorizontalbarsforatotal
of16barsandupto2rowsofverticallinksforatotalof
8verticallinks.
Combo:
Thecombotoolsboxessymbol,bar,symbolcombina
tionscanbesetupforeasyadditiontoaschedule.The
combotoolboxcontains2rowsoftools,upto16rowsof
symbol,bar,symbolcombinationsandupto2rowsof
verticallinksforatotalof8verticallinks.
Toswitchbetweenthetoolboxesrightclickthetoolbox
chooseSwitchto.
Tochangetheattributes,numberofsymbols,bars,verti
callinks,orhighlightinginthetoolbox.Rightclickthe
toolboxandchooseToolboxProperties.TheCustomize
ToolboxSize,Type,Highlightdialogboxwillappear.

Standard

Combo

Onceyouhavecustomizedthetoolboxyoucancopythetoolboxand
pastethetoolboxintoanotherschedule.
1. RightclickthattoolboxandchooseCopyToolbox.
2. OpenanotherMilestonesschedule.
3. RightclickthattoolboxandchoosePasteToolbox.
ToolboxProperties

YoumustopenthescheduleinthesameinstanceofMilestones.

3-4

Lesson4WorkingwithDependencies
Inthislessonyouwilllearnhowto:

SetupDependenciesforaProject.
TurnonDependencyModeandAdjustTasksUsingDependencies.
AdjustTasksandtheEntireScheduleUsingShiftAllDates.

OpentheScheduleforthisLesson.

1. OnthetoolbarchoosetheFiletab.
2. IntheFilesandTemplates:OpenandSaveOptionssection,click
the
downarrownexttoOpen.
3. ChooseLessonChart.
4. SelectLesson4StarterSchedule.mld.
5. Savethescheduletoanaccessiblefolderonyourharddrive,such
asyourDocumentsfolder.ChooseFiletab,intheFilesandTem
plates:OpenandSaveOptionssectionclickSaveAs...choose
Chart.Thiswillinsureyouhaveaccesstosavingandeditingofthis
tutorialfile.
Lesson4StarterSchedule

SetupDependenciesforaProject.
Herearethedependencieswearegoingtosetupforthisschedule:

ManufacturecanbeginonlyafterDesignisfinishedandDesigncanbeginonlyafterPlanisfinished.

TestcantbestarteduntilDesignisfinished

MarketcantbestarteduntilTestisfinished.

ManufacturecanbeginonlyafterDesignisfinishedandDesigncanbeginonlyafterPlanisfinished.
Addaverticallinkfrom"Plan"to"Design"and"Design"to"Manufacture"
1. Clickinthe

arrowtoolinthetoolbox.

2. Clickonce

onblackverticallinkinthe.

3. HoldtheCtrlkeyonthekeyboard,andclickonceonthewordPlan,then
onceonDesign,andonceonManufacture.Now,releasetheCtrlkey.
4. Thosethreetaskrowsshouldbehighlightedinblack.
5. NextchooseInserttabintheVerticalLink(s)sectionchooseVerticallinks
betweenselectedtaskrows.ThiswillbringuptheCreateVerticalLinks/
Dependenciesdialogbox.

HighlightedTasksToBeLinked

6. UnderTypeofSymbolstoLink,chooseLinknormalsymbols.
7. UnderDirectiontoLink,chooseDownward.
8. UnderTypeofLink,choose(FS)FinishtoStart(connectstheendsymbols
ononetaskrowtothestartsymbolsonthenexttaskrow).
9. PressOK.Clickoutsideofthescheduletoeliminatethetaskrowhighlight.
Thetaskswillnowhaveblackverticallinksbetweenthem.

LinkedTasks

4-1

TestcantbestarteduntilDesignisfinished.
Addaverticallinkfrom"Design"to"Test"
1. Clickinthe
2. Clickonce

arrowtoolinthetoolbox.
onblueverticallinkinthetoolbox.

3. HoldtheCtrlkeyonthekeyboard,andclickonceonthewordDesign,
andthenonceonTest.Now,releasetheCtrlkey.
4. NextchooseInserttabintheVerticalLink(s)sectionchooseVertical
linksbetweenselectedtaskrows.ThiswillbringuptheCreateVertical
Links/Dependenciesdialogbox.
5. UnderTypeofSymbolstoLink,chooseLinknormalsymbols.
LinkedTasks

6. UnderDirectiontoLink,chooseDownward.
7. UnderTypeofLink,choose(FS)FinishtoStart

8. PressOK.Clickoutsideofthescheduletoeliminatethetaskrowhighlight.Thetaskswillnowhaveabluevertical
linksbetweenthem.
MarketcantbestarteduntilTestisfinished.
HereisanotherwaytoaddaverticalLinkfrom"Test"to"Market"
1. Inthetoolbox,clickonceonthe

plustool.

2. Ontheschedule,clickonceontheendsymbolforTest
3. Inthetoolbox,clickonceonthered

verticallink.

4. Ontheschedule,clickonceonthestartsymbolforMarket.Thetaskswill
nowhavearedverticallinksbetweenthem.

LinkedTasks

TurnonDependencyModeandAdjustTasksUsingDependencies.
TurnonDependencyMode
1. ChooseTheDatestabintheDateRelatedSettingscheckonDependencyMode.WhenactivatedDep.Mode:On
willbevisibleinthelowerrightcorneroftheMilestoneswindow.
Adjusttheschedule
ThescheduleshowsthePlanstageissupposedtobecompletedJanuary19th.However,duetounforeseentechnicaldiffi
culties,thePlanstagewillnotbecompleteuntilFebruary8th.Toadjustthescheduletoreflectthechange:
1. Clickthe

arrowtoolinthetoolbox.

2. OntheenddatesymbolforPlan,clickandholdusingtheleftmouse
button.
3. DragthesymboltotherightuntilyoureachFebruary8th,thenre
leasethemousebutton.

SlippedTask

Note:

Allofthedependenttaskshaveslippedbythesameamountoftime:

DependentTasksSlip

4-2

AdjusttheEntireScheduleUsingShiftAllDates.
Supposeyourentireprojectscheduleneedstobemovedforwardbecauseitcannotstartatthescheduledtime.Theentire
schedulecanshiftusingtheShiftAllDatesoptions.
1. ChooseDatestabintheDateRangeToolsectionchooseShiftalltask
dates.TheShiftallDatesforScheduledialogboxappears.
2. ForNumberofWorkingDaystoShift,enter30.
3. ClickForwardsothatitisselected.
4. ClickResetScheduleStartandEndDatessothatitisnotchecked.
5. ClickOK.Yourschedulehasbeenshiftedahead30days:

EntireScheduleShifted30Days

4-3

Lesson5OutliningyourSchedule
Inthislessonyouwilllearnhowto:
SetUpIndentingforaColumn.
OutlinetheStepsintheProject.
InsertanOutlineLevelColumn
SetShading,Gridline,andTextpropertiesforeachOutlineLevel.

OpentheScheduleforthisLesson.

1. OnthetoolbarchoosetheFiletab.
2. IntheFilesandTemplates:OpenandSaveOptionssection,click
the
downarrownexttoOpen.
3. ChooseLessonChart.
4. SelectLesson5StarterSchedule.mld.
5. Savethescheduletoanaccessiblefolderonyourharddrive,such
asyourDocumentsfolder.ChooseFiletab,intheFilesandTem
plates:OpenandSaveOptionssectionclickSaveAs...choose
Chart.Thiswillinsureyouhaveaccesstosavingandeditingofthis
tutorialfile.
Lesson5StarterSchedule

SetUpIndentingforaColumn.
TheTabkeyandtwotoolbariconsallowyoutochangetheoutlinelevelofeachtask.
Setupindentingforacolumn
1. Clickinthe

arrowtoolinthetoolbox.

2. ClickonthePROJECTScolumnheading.Thetoolbarwill
changetotheSelectiontab.ClickonswitchtoColumn
3. IntheColumnTypeandFormatsectionenter0.20forIndentperOutlineLevel.Important:presstheapplybut
ton.Youwillnotnoticeanydifferenceonyourschedule.

5-1

OutlinetheStepsintheProject.
Next,youwillindenttheprojectstepsundereachstreetaddress,therebychangingtheirOutlineLevelfrom1to2.
1. Clickthe

arrowtoolinthetoolbox.

2. HoldingtheCtrlkeydown,inthePROJECTcolumn,clickonceon
eachoftheprojectstepsthatisnotanaddress.(Whenselected,
thetaskrowwillhighlightinblack.)
3. ClickonceontheOutlineLevelicononthe
toolbartochangeallofthesestepstolevel2.
4. Clickwithinthescheduleareatodeselecttheprojectsteps.

SelectedTask

Note:

Theprojectstepsundereachstreetnameareindented:

TasksIndentedToLevel2

Next,youwillindentselectedtasksfromOutlineLevel2to3.
1. Click

thearrowtoolinthetoolbox.

2. HoldingtheCtrlkeydown,clickonceonthewordPoolPlumbing
andonceonthewordHookupWaterforeachstreetaddress
3. ClickonceontheOutlineLevelicononthe
toolbartochangeallofthesestepstolevel3.
4. Clickwithinthescheduleareatodeselecttheprojectsteps.

SelectedTask

Note:
TheprojectstepsunderPlumbingforeachstreetnamearein
dented:

TasksIndentedToLevel3

5-2

InsertanOutlineLevelColumn
NowweyouaregoingtoaddanOutlineLevelsmartcolumn.Thiscolumnis
goingtoautomaticallytelltheoutlinelevelofeachtask.
1. OnthetoolbarchoosetheInserttab.
2. IntheRowsandColumnsectionchooseNewColumn.
3. InthedropdownboxselectOutlineLevel.

OutlineLevelColumn

SetShading,Gridline,andTextpropertiesforeachOutlineLevel.
1. Click

thearrowtoolintheToolbox.

2. HoldingdowntheCtrlkeyselect301Sunspotand455Tombstone,theoutlinelevel1steps.
3. ThetoolbarwillchangetotheSelectiontab.
4. IntheTaskRowSettingssectionchooseMoreTaskRowOptions.
5. InthedropdownmenuchooseGridline/Shade.TheHorizontalGridProp
ertiesforSelectedTasklinesdialogboxappears.
6. ChooseApplyNewSelectiontoallThreeSections.
7. ChoosetheShadingtab.
8. UnderLeftColumnschooseShadetheTaskRows.Notealltheothersec
tionsofShadetheTaskRowsarealsoselected.
9. UnderShadeColorchoosetheChangebutton.
10. Selectlightyellow.
11. PressOK.NotealltheothersectionsofShadeColornowshowlightyellow.

HorizontalGridlineProperties

12. PressOKagain.
13. Clickwithinthescheduleareatodeselecttheprojectsteps.
Note:

Yourschedulenowhasoutlinelevel1taskshighlightedinyellow.

Byfollowingthesamestepsforenhancingoutline1youcanalsoenhanceoutlinelevels2and3.

Level1HorizontalGridlinesShaded

HorizontalGridlinesShadedPerOutlineLevel

5-3

Lesson6ShowingProgress
Inthislessonyouwilllearnhowto:

TurnonSymbolandBarFilltoStatusDate.

ShowaProjectisAheadorBehindSchedule.

OpentheScheduleforthisLesson.

1. OnthetoolbarchoosetheFiletab.
2. IntheFilesandTemplates:OpenandSaveOptionssection,click
the
downarrownexttoOpen.
3. ChooseLessonChart.
4. SelectLesson6StarterSchedule.mld.
5. Savethescheduletoanaccessiblefolderonyourharddrive,such
asyourDocumentsfolder.ChooseFiletab,intheFilesandTem
plates:OpenandSaveOptionssectionclickSaveAs...choose
Chart.Thiswillinsureyouhaveaccesstosavingandeditingofthis
tutorialfile.
Lesson6StarterSchedule

TurnonSymbolandBarFilltoStatusDate.
WhenFilltoStatusDateisturnedonforsymbolsandbars,thesymbols
andbarsarefilledwiththeirnormalfillcolorsuptothecurrentdate.After
thecurrentdate,theyarehollow(awhitecolorfill)toindicatefuture,in
completeactivity.
Thecurrentdatefortheexamplescheduleis3/23/11.Noticethecurrent
dateisdepictedbytheverticaldottedlineontheschedule.
TurnonSymbolsFilltoStatusDate
1. ClicktheDatestab.
2. IntheDateRelatedSettingsclickSymbols:FilltoStatusDateand
BarsFilltoStatusDate.Acheckmarkindicatesthisfeatureis
turnedon.

SymbolAndBarsFilledToStatus

ShowaProjectisAheadorBehindSchedule.
BehindSchedule
1. Clickthe
2.

arrowtoolintheToolbox.

RightclickonceonthewordPrototype.Therightclickmenuwill
appear.

3. IntherightclickmenuchooseDateOffset.TheDateOffsetdialog
boxappears.
4. ClickthebuttonforBehindSchedulesothatitisselected.
5. ForOffsetAmountenter16forDays.
6. ClickOK.ThePrototypestepisnowindicatedasbeingbehind
schedule:
AheadandBehind

AheadofSchedule
1. RightclickonceonthewordsRefine&Design.Therightclickmenuwillappear.
2. IntherightclickmenuchooseDateOffset.TheDateOffsetdialogboxappears.
3. ClickthebuttonforAheadofSchedulesothatitisselected.
4. ForOffsetAmount,enter30forDays.

5. ClickOK.TheRefine&Redesignstepisnowindicatedasbeingaheadofschedule.