0% found this document useful (0 votes)
38 views

Boq Labor Works (Roof Works)

The document is a bill of quantities for roof works that includes 6 items: installation of roof truss, installation of roof, installation of gutter, and installation of fiber glass on steel trellis. It provides the quantities, units, and amounts for each item, divided into phases where applicable. The total amount for all items is 11250 Philippine pesos.

Uploaded by

Lance Concepcion
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views

Boq Labor Works (Roof Works)

The document is a bill of quantities for roof works that includes 6 items: installation of roof truss, installation of roof, installation of gutter, and installation of fiber glass on steel trellis. It provides the quantities, units, and amounts for each item, divided into phases where applicable. The total amount for all items is 11250 Philippine pesos.

Uploaded by

Lance Concepcion
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

12.

12.2

12.3
12.4

BILL OF QUANTITY (ROOF WORKS )


ITEM OF WORK
Installation of Roof Truss
12.1.1 Installation of Bottom Chord (Phase 1 - Second Floor)
12.1.2 Installation of Top Chord (Phase 1 - Second Floor)
12.1.3 Installation of Vertical/ Diagonal Member (Phase 1 - Second Floor)
12.1.4 Installation of Bottom Chord (Phase 2 - Second Floor)
12.1.5 Installation of Top Chord (Phase 2 - Second Floor)
12.1.6 Installation of Vertical/ Diagonal Member (Phase 2 - Second Floor)
Installation of Roof
12.2.1 Installation of Roofing Sheets (Phase 1)
12.2.2 Installation of Roofing Sheets (Phase 2)
12.1.3 Installation of Sag Rod (Phase 1)
12.1.4 Installation of Sag Rod (Phase 2)
12.1.5 Installation of LC 100x50x2 (Phase 1)
12.1.6 Installation of LC 100x50x2 (Phase 2)
Installation of Gutter
Installation of Fiber Glass on Steel Trellis
TOTAL

WORKS )
QTY

UNIT

24
24
30
24
24
30

l.m
l.m
l.m
l.m
l.m
l.m

72.8
62.4
21.76
16.32
140
120
26
46.8

sq.m
sq.m
l.m
l.m
l.m
l.m
l.m
sq. m

AMOUNT
Php. 3600
562.5
562.5
675
562.5
562.5
675
Php. 5400
900
787.5
1012.5
787.5
1012.5
900
Php. 450
Php. 1800
Php. 11250