DESCRIPTION
Item No.
Basic rate
EXCAVATION
1
Excavation over site to reduce level ,in any material except rock requiring
blasting including depositing and leveling as directed up to a distance not
exceeding 10 m away from excavation.
Per Cu.m.
0.50 day U/SK labourer
150.00
Excavation trenches for walls / column pits in soft / loose soil from 0.25m
to 1.5 m deep and depositing excavated material to a distance not
exceeding 10 m away from excavation.
Per Cu.m.
0.353 day U/SK labourer
105.90
Excavation trenches for walls / column pits in ordinary soil from upto 1.5 m
deep and depositing excavated material to a distance not exceeding 10 m
away from excavation.
Per Cu.m.
0.80 day U/SK labourer
240.00
Excavation trenches for walls / column pits in hard dense soil from up to
1.5 m deep and depositing excavated material to a distance not exceeding
10 m away from excavation.
Per Cu.m.
1.25 day U/SK labourer
375.00
BSR
Page 2
Item No.
DESCRIPTION
Excavation in trenches for walls / column pits in Mud /wet soil up to a depth
of 1.5 m and depositing excavated material to distance not exceeding 10
m away from excavation.
(Earthwork & dewatering paid for separately)
Basic rate
Per Cu.m.
1.00 day U/SK labourer
300.00
Excavation in trenches for walls column pits in Hard rock requiring blasting
up to a depth of 1.0m and depositing excavated material to a distance not
exceeding 10 m from excavations
Per 2.83 Cu.m
Materials
0.34 Kg blasting powder
3 m fuse
0.45 Kg jumper steel
Fuel & forge - 20% of materials cost
224.40
255.00
48.60
105.60
labour
1 day SK Labourer
2days U / SK labourer
350.00
600.00
559.58
175.00
43.75
450.00
668.75
BSR
Page 3
DESCRIPTION
Item No.
Basic rate
1,314.00
Labour
1/2 day U / SK labourer
150.00
157.42
190.00
28.50
135.00
353.50
BSR
Page 4
DESCRIPTION
Item No.
14
Basic rate
190.00
28.50
210.00
428.50
EARTHWORK SUPPORT
15
16
Materials
0.5 Cu.m class II timber (Rubber ) (4 uses )
Add 5% on above for wedges
786.25
39.31
Labour
1 days carpenter
3 days U / SK Labourer
450.00
900.00
2,175.56
161.15
1,336.63
66.83
Labour
2 days carpenter
6 days U / SK Labourer
900.00
1,800.00
4,103.46
303.96
BSR
Page 5
DESCRIPTION
Item No.
17
Basic rate
4,450.18
222.51
Labour
8 days carpenter
20 days U / SK Labourer
3,600.00
6,000.00
14,272.68
1,057.24
CONCRETE WORK
MIXING
Note:
a) Water available at site
b) If, water is not available allowances should be made for transport of water.
c) Sand - includes 15% for bulking.
A
1,587.00
410.75
1,104.00
93.75
Labour
0.35 day skilled labourer
2.125 days U / Sk labourer
122.50
637.50
3,955.50
BSR
Page 6
DESCRIPTION
Item No.
B
Basic rate
2,208.00
387.50
1,276.00
93.75
Labour
0.35 day skilled labourer
2.125 days U / SK Labourer
122.50
637.50
4,725.25
2,932.50
325.50
1,189.00
93.75
Labour
0.35 day skilled labourer
2.125 days U / SK Labourer
122.50
637.50
5,300.75
3,795.00
294.50
1,102.00
93.75
Labour
0.35 day skilled labourer
2.125 days U / SK Labourer
122.50
637.50
6,045.25
BSR
Page 7
DESCRIPTION
Item No.
Basic rate
PLACING
18
1,977.75
197.78
Labour
1/8 day skilled labourer
1/2 days U / SK Labourer
43.75
150.00
2,966.63
296.66
Labour
1/8 day skilled labourer
3/4 days U / SK Labourer
43.75
225.00
4,738.55
4,709.38
5,933.25
593.33
Labour
1/2 day skilled labourer
1 1/4 days U / SK Labourer
175.00
375.00
4,717.72
BSR
Page 8
DESCRIPTION
Item No.
20B
7,087.88
708.79
345.00
labour
3/4 day skilled labourer
1-3/4 days U / SK Labourer
3/4 day mason
3/4day carpenter
262.50
525.00
337.50
337.50
Curing
Jute Hessian 3.0 m2
Water 250 liters
1 days U / Sk labourer
78.00
300.00
6,654.78
Basic rate
7,951.13
795.11
345.00
labour
3/4 day skilled labourer
13/4 days U / SK Labourer
3/4 day mason
3/4day carpenter
262.50
525.00
337.50
337.50
Curing
Jute Hessian 3.0 m2
Water 250 liters
1 1/2 days U / Sk labourer
78.00
300.00
7,287.83
BSR
Page 9
DESCRIPTION
Item No.
21
Basic rate
6,048.32
604.83
920.00
Labour
1 day skilled labourer
3 days U / SK Labourer
1 day mason
1day carpenter
350.00
900.00
450.00
450.00
Curing
Jute Hessian - 7.5 m2
water 280 liters
11/2 days U / SK labourer
195.00
450.00
10,368.15
8,100.12
8,343.12
8,505.12
Note:
1) For columns in 1st floor add. 3% to ground floor rate.
2) For columns in 2nd floor add. 5% to ground floor rate.
22
6,048.32
604.83
920.00
Labour
1 day skilled labourer
3 days U / SK Labourer
1 day mason
1day carpenter
350.00
900.00
450.00
450.00
BSR
Page 10
DESCRIPTION
Item No.
Curing
Jute Hessian - 5.6 m2
water 300 liters
11/2 days U / SK labourer
Basic rate
145.60
450.00
10,318.75
8,061.53
8,303.37
8,464.60
Note:
1) For columns in 1st floor add. 3% to ground floor rate.
2) For columns in 2nd floor add. 5% to ground floor rate.
23
Per 1.35 m3
Materials
1.35 m3 concrete
Add 10% for wastage
3.72 m2 - Jute Hessian
1 day hire or vibrator
Water (280 liters)
6,379.09
637.91
96.72
920.00
labour
1 day mason
1 day carpenter
3 day U / Sk labourer
1 day SK labourer
11/2 days U / Sk labourer (curing)
450.00
450.00
900.00
350.00
450.00
10,633.72
7,876.83
8,113.13
8,270.67
Note:
1) For columns in 1st floor add. 3% to ground floor rate.
2) For columns in 2nd floor add. 5% to ground floor rate.
BSR
Page 11
DESCRIPTION
Item No.
24
Basic rate
Cement concrete in 225 X 150 beam upto 1st floor level (grade 20)
Consider 38.0m 225 X 150 mm
Per 1.28 m3
Materials
1.28 m3 concrete
Add 10% of wastage
1 day hire of vibrator
6,048.32
604.83
920.00
Labour
1 Days Sk Labourer (vibrator)
4 Days U / Sk labourer
1day mason
1day carpenter
350.00
1,200.00
450.00
450.00
Curing
Jute Hessian 7.0 m2
182.00
450.00
10,655.15
25
8,324.34
8,574.07
Cement concrete in 225 X 225 beam upto 1st floor level (grade 20)
Consider 25.0m length of 225 X 225 mm
beam I.e. Cubes
Per 1.28 m3
Materials
1.28 m3 concrete
Add 10% of wastage
6,048.32
604.83
Plant
1 day hire of vibrator
920.00
Labour
1 day mason
1 day carpenter
1 day Sk Labourer (vibrator)
4 days U / Sk labourer
450.00
450.00
350.00
1,200.00
BSR
Page 12
DESCRIPTION
Item No.
Curing
Jute Hessian 5.6 m2
Water 300 liters
1.5 day U / Sk labourer
145.60
450.00
10,618.75
26
Basic rate
8,295.90
8,544.78
6,709.86
670.99
920.00
Labour
1 days Sk labourer (vibrator)
4 days U / Sk labourer
1 day mason
1 day carpenter
350.00
1,200.00
450.00
450.00
Curing
Jute Hessian 3.0 m2
Water 250 liters
1 1/2 days U / Sk labourer
78.00
450.00
11,278.84
7,942.85
8,181.13
BSR
Page 13
DESCRIPTION
Item No.
27
Basic rate
6,709.86
670.99
920.00
Labour
1 day mason
1 day carpenter
1 days Sk labourer (vibrator)
4 days U / Sk labourer
450.00
450.00
350.00
1,200.00
Curing
Jute Hessian 2.4 m2
Water 250 liters
1.5days U / Sk labourer
62.40
450.00
11,263.24
28
7,931.86
8,169.82
6,048.32
604.83
920.00
Labour
1 day Sk labourer (vibrator)
4 days U / Sk labourer
1 day mason
1 day carpenter
350.00
1,200.00
450.00
450.00
Curing
Jute Hessian 1.0 m2
Water 130 liters
11/2 days U / Sk labourer
per 1.28 m3 or 75.5 l.m of lintel.
26.00
450.00
10,499.15
8,202.46
8,448.54
BSR
Page 14
DESCRIPTION
Item No.
29
Basic rate
6,048.32
604.83
920.00
Labour
1 days Sk labourer (vibrator)
4 days U/Sk labourer
1 days mason
1 day carpenter
350.00
1,200.00
450.00
450.00
Curing
Jute Hessian 5.10 m2
Water 250 liters
1.5 days U/Sk labourer
132.60
450.00
10,605.75
8,285.74
8,534.32
FORM WORK
30
230.65
187.20
88.20
48.96
Fabricating
1 /2 day carpenter
1/2 U / Sk labourer
225.00
150.00
930.01
232.50
BSR
Page 15
DESCRIPTION
Item No.
112.50
75.00
187.50
785.40
581.78
Sawn timber formwork to sides of foundation beams and the like. Average
height 225mm.
Contact area - 135 Sq.m.
(a) Making Mould as above
(b) Assembling (Per use)
Materials
1/2 liter mould oil
10.6 l.m 100 X 50 mm. props (10 uses)
32
24.00
10.00
68.90
112.50
150.00
365.40
31
Basic rate
232.50
10.00
68.90
Labour
1/4 day carpenter
1/2 day U / Sk labourer
112.50
150.00
187.50
761.40
564.00
820.70
131.40
493.20
890.50
64.80
Labour
(a) 1/2 day carpenter
(b) 2 day U / Sk labourers
225.00
600.00
BSR
Page 16
DESCRIPTION
Item No.
Basic rate
3,225.60
806.40
80.64
887.04
491.53
540.68
450.00
600.00
45.50
32.40
1,127.90
225.00
600.00
825.00
Total cost for ,making the mould assembling aligning dismantling and cleaning
for 55(A
ft. +per
use
B +use
C + D)
3,380.62
676.12
1,306.50
878.40
549.00
105.28
110.00
2,949.18
BSR
4,060.80
2,359.50
131.04
Page 17
DESCRIPTION
Item No.
Basic rate
2) Labour
a) 3 days carpenter
b) 3 days U / Sk labourer
1,350.00
900.00
8,801.34
2,200.34
2,640.40
B) Assembling
Materials
a) 210 m 100 x 50 mm vertical timber props (10 uses)
b) 19.80 m - 50 x 50 mm bracing for props.
c) 122 Nr. Wedges
d) 3.07 Sq.m 25 mm base plates for props.
8,190.00
712.80
610.00
577.16
10,089.96
1,681.66
Add 20% of above for repairs total cost of material for assembling per use
2,017.99
450.00
1,200.00
90.00
64.80
1,804.80
225.00
600.00
825.00
7,288.19
391.84
BSR
Page 18
Item No.
DESCRIPTION
34
STEEL (TOR)
Tor steel reinforcement to lintels slab beams or columns bent to shape laid
in position and tied with G.I wire as directed.
Materials
1 Mt / Tor steel rods including transport to site
(Allow for wastage 15%)
13.6 Kg 16 BWG binding wire
Add 1.5% of steel cost for spacers or chairs
Labour
20 days blacksmith
20 days U / Sk labourer
Basic rate per M.ton.
816.00
586.50
57.80
STEEL (MILD)
Mild steel reinforcement to lintels slab beams or columns bent to shape
laid in position and tied with G.I wire as directed. (6 mm. diameter)
Materials
1 Mt / Tor steel rods including transport to site
(Allow for wastage 15%)
17 Kg 16 BWG binding wire
Add 1.5% of steel cost for spacers or chairs
Labour
20 days blacksmith
20 days U / Sk labourer
Basic rate per M.ton.
34,000.00
5,100.00
1,020.00
586.50
9,000.00
6,000.00
55,706.50
55.71
36,000.00
5,400.00
9,000.00
6,000.00
57,802.50
35A
Basic rate
34,000.00
5,100.00
816.00
586.50
9,000.00
6,000.00
55,502.50
55.50
BSR
Page 19
DESCRIPTION
Item No.
36
Basic rate
BRICK WORK
Brickwork in cement and sand 1:5 in 115mm thick walls in ground floor
Per Sq.m
Materials
60 bricks
Add 5% for wastage
0.14 Bag cement (50 Kg bags)
0.03 m3 sand
Water 21 liters
210.00
10.50
48.30
23.25
Labour
0.16 days mason
0.22 days U / Sk Labourer
72.00
66.00
6.90
Scaffolding - Add 5%
436.95
420.00
21.00
113.85
46.50
labour
0.24 days mason
0.28 days U / Sk labourer
108.00
84.00
5.76
Scaffolding - Add 3%
799.11
616.00
30.80
172.50
69.75
148.50
153.00
6.03
1,196.58
Page 20
DESCRIPTION
Item No.
39
Basic rate
Steps 300mm x 150mm in brick in cement and sand 1:5 with 12 mm thick
cement and sand 1:2 rendering including necessary excavation.
Per 3.0 L.m.
Materials
120 bricks
Add 5% for wastage
0.50 Bag cement
0.14 m3 sand
Water 60 liters
40
420.00
21.00
172.50
108.50
Labour
1/2 day mason
1/2 day U / Sk labourer
225.00
150.00
365.67
Bricks drains in cement and sand 1:5 225 mm. wide and 150 - 225 mm
average depth including cement rendering 12 mm thick 1:2 to exposed
faces with and including necessary excavation.
Per 3.05 m
Materials
140 bricks
Add 5% for wastage
0.80 Bag cement
0.15 m3 sand
Water 91 liters
Labour
1 1/4 days mason
1 1/4 days U / Sk labourer
Basic Rate per 3.05 m
562.50
375.00
1,844.25
604.67
41
490.00
24.50
276.00
116.25
BLOCK WORK
150 mm thick hollow blockwork in cement and sand mortar 1:5 in ground
floor (cavities unfilled)
Per Sq.m
size of each block 400 x 200 x 150 mm
Materials
12. Nr. hollow cement block
Allow 5% for wastage
0.08 Bag cement (50 Kg bags)
0.012 m3 sand
408.00
20.40
27.60
9.30
Labour
0.16 days mason
0.27 days U / Sk labourer
Scaffolding - Add 3%
72.00
81.00
4.59
622.89
Page 21
DESCRIPTION
Item No.
42
100 mm thick Hollow block masonry in cement and sand mortar 1:5 with
cavities unfilled.
Per Sq.m
size of each block 400 x 200 x 100
Materials
12 Hollow cement blocks
Allow 5% for wastage
0.04 Bag cement (50 Kg bags)
0.008 m3 sand
336.00
16.80
13.80
6.20
Labour
0.11 day mason
0.22 days U / Sk labourer
Scaffolding - Add 5%
49.50
66.00
5.78
494.08
Basic rate
1,300.00
621.00
232.50
Labour
1.40 day masons
2.12 day U /SK Labourer
630.00
636.00
3,419.50
44
1,300.00
621.00
232.50
Labour
1.6 days mason
2.5 days U / Sk labourer
Scaffolding - Add 3%
720.00
750.00
44.10
3,667.60
BSR
Page 22
DESCRIPTION
Item No.
45
Basic rate
CERAMIC TILING
200 x 200 mm. Ceramic floor tiles bedded in 20 mm cement mortar 1:3 and
pointing with grouting in ground floor.
Per 9.3 Square meter
Materials
225 Ceramic tiles 200 X 200
Add 5% for wastage
2.50 bag cement wastage (50 Kgs bags)
0.18 m3 sand
100 g wax polish
2.25 kg. tile grout
500 g cotton waste
6,750.00
337.50
862.50
139.50
22.50
180.00
17.00
Labour
4 days mason
4 days U / Sk labourer
1/2 day U / Sk labourer for polishing
1,800.00
1,200.00
150.00
4,371.50
A.
1,232.15
B.
1,155.94
C.
1,333.76
46
300 x 300 mm. Ceramic floor tiles bedded in 20 mm cement mortar 1:3 and
pointing joints with grouting in ground floor.
Per 9.3 Square meter
Materials
100 Ceramic tiles 300 X 300
Add 5% for wastage
2.50 bag cement wastage (50 Kgs bags)
0.18 m3 sand
100 g wax polish
2.25 kg. tile grout
500 g cotton waste
4,800.00
240.00
862.50
139.50
22.50
180.00
17.00
Labour
As above item
3,150.00
4,371.50
A.
1,011.99
B.
1,203.92
C.
1,599.09
D.
3,010.38
E.
Basic rate per Square Meter (luxury Rustic tiles to terrace & varandaha)
BSR
1,373.28
Page 23
DESCRIPTION
Item No.
47
Basic rate
Glazed tiles fixed to walls including 20 thick bedding in cement motor 1:3
and pointing joints with grouting in ground floor. (specials measured
separately)
Per 9.3 Square meter
Materials
400 glazed tiles 150 X 150mm
Add for wastage on cutting 5%
2 1/2 bag cement (50 Kgs bags)
0.18 m3 sand
500.0 g white cement
3.0 Kg tile grout
500 g cotton waste
Labour
4 days mason
4 days U/Sk labourer
1/4 days U / Sk labourer for cleaning
4,000.00
200.00
862.50
139.50
14.00
240.00
17.00
1,800.00
1,200.00
75.00
4,348.00
919.14
B.
941.72
C.
Glazed border tiles 150 x 75 mm. fixed to walls including 20 thick bedding
in cement motor 1:3 and pointing joints with grouting in ground floor.
Per 10 meter
1,226.24
Materials
68 glazed boder tiles 150 x 75mm
Add for wastage on cutting 5%
0.25 bag cement (50 Kgs bags)
0.01 m3 sand
50.0 g white cement
0.3 Kg tile grout
100 g cotton waste
1,496.00
74.80
86.25
7.75
1.40
24.00
3.40
Labour
0.5days mason
0.5 days U/Sk labourer
225.00
150.00
2,068.60
Total
206.86
BSR
Page 24
DESCRIPTION
Item No.
48A
Basic rate
Granite Flooring on 25mm. cement and sand 1:2 bedding in ground floor
Per 9.0 Square meter
Materials
25 Nr 600 X 600 mm Granite Slabs
Add 5% for wastage on cutting
3 bags cement (50 Kgs bags)
0.2 m3 cubes sand
1.5 Kg white cement
100 g wax polish
500 g cotton waste
53,000.00
2,650.00
1,035.00
155.00
2,100.00
22.50
17.00
Labour
5 days mason
4.5 days U /Sk labourer
1/2 day U / Sk labourer (polishing)
2,250.00
1,350.00
150.00
6,969.94
8,136.61
49
Terra Cotta tile paving to floor bedded in 20 mm cement mortar 1:3 and
pointing in neat cement in ground floor
Per 9.3 Square meter
Materials
225 Ceramic tiles 200 X 200
Add 5% for wastage
2.50 bag cement wastage (50 Kgs bags)
0.18 m3 sand
100 g wax polish
100 g. Coloured figment
500 g cotton waste
2,925.00
146.25
862.50
139.50
22.50
30.00
17.00
Labour
4 days mason
4 days U / Sk labourer
1/2 day U / Sk labourer for polishing
1,800.00
1,200.00
150.00
Total
7,292.75
784.17
BSR
Page 25
DESCRIPTION
Item No.
Basic rate
Timber framework for calicut pattern tile hip roof in single storey building
consisting of wall plate, beam, ridge plate, rafters etc. (wood preservative
to be measured separately)
Per 54.0 Square meter
51
Materials
1.00 m3 timber
Add 10% for wastage
200 l.m. 50 X 25 reapers
Add 10% for wastage
3.60 Kg wire nails 150mm long
0.90 Kg wire nails 50 mm long
35,000.00
3,500.00
9,000.00
900.00
259.20
64.80
Labour
7 days carpenter
8 days U / Sk labourer
Total per 54.0 square meters
3,150.00
2,400.00
54,274.00
1,005.07
1,035.23
Roof covering with calicut pattern clay tiles in single storied building
(Timber frame work & ridge covering measured separately)
Per 55.70 Square meter
Materials
750 Tiles
9,000.00
Labour
3 days carpenter
3 days U / Sk labourer
Per 54.0 square meter
1,350.00
900.00
11,250.00
201.97
208.03
BSR
Page 26
DESCRIPTION
Item No.
52
53
54
Basic rate
12,950.00
1,295.00
129.60
Labour
2.5 days carpenter
3 days U / Sk labourer
Total per 33.5 Square meter
1,125.00
900.00
16,399.60
489.54
504.23
19,250.00
1,925.00
129.60
Labour
4.5 days carpenter
6 days U / Sk labourer
Total per 33.5 Square meter
2,025.00
1,800.00
25,129.60
750.14
772.64
9,672.00
388.80
450.00
600.00
11,110.80
331.67
341.62
BSR
Page 27
DESCRIPTION
Item No.
55
56
57
31,500.00
3,150.00
259.20
64.80
Labour
7 days carpenter
8 days U / Sk labourer
Total per 54.0 square meters
3,150.00
2,400.00
40,524.00
1,209.67
1,245.96
Additional cost for planning four side of rafters per square meter.
Planning cost per 1.0 L.m. of rafter.
Cost per I.0 m2 of exposed rafter roof (14.0 L.m. rafters per 1.0 m 2 )
7.00
98.00
Additional cost for four side planning per square meter - say
97.00
One layer half round clay tiles over corrugated asbestos roof covering
Per 9.0 Square meter
Materials
650 half round clay tiles
2,860.00
Labour
2 days U / Sk labourer
Basic rate per 9.0 Square Meter
600.00
3,460.00
384.44
Basic rate
Asbestos close fittings ridging fixed complete with roofing screws and
washers.
Per 4.0 m length
Materials
4 pairs ridges 1.12m long
16 roofing screws and washers.
900.00
86.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
Per 4.0 m ridging
112.50
75.00
1,173.90
293.48
BSR
Page 28
DESCRIPTION
Item No.
59
60
Basic rate
Ridging covering with calicut pattern ridge tiles bedded in cement lime
mortar 1:1:4
Per 4.0 m ridging
Materials
10 ridge tiles
1/3 bag cement (50 Kgs)
0.06 m3 sand
6.75 Kg slaked lime
0.25 Kg colouring powder
185.00
115.00
46.50
40.50
75.00
Labour
1/4 day mason
1/4 day U / Sk labour
112.50
75.00
162.38
20 X 225mm high valance board fixed with brass screws to ends of rafters
(for tile roofing)
Per 10.0 L.m
Materials
2.25 m2 25 mm planks
Add 5% for wastage
32 Nos. 40mm brass screws
Labour
1 day carpenter
1 days U / Sk labourer
Scaffolding - Add 5%
Total per 10.0 L. meter
630.00
31.50
124.80
450.00
300.00
37.50
1,573.80
157.38
490.00
24.50
93.60
Labour
2 day carpenter
1.5 days U / Sk labourer
Scaffolding - Add 5%
Total per 10.0 L. meter
900.00
450.00
67.50
2,025.60
202.56
BSR
Page 29
DESCRIPTION
Item No.
62
20 X 225 high barge board fixed with brass screws at 600 mm centers to
sides of rafters
Per 10.0 m2
Materials
2.25 m2 25 mm. Planks
add 5% for wastage
16 nos. of 38 mm. Brass screws
Labour
1 day carpenter
1 days U / Sk labourer
Scaffolding - Add 5%
630.00
31.50
62.40
450.00
300.00
37.50
1,511.40
63
64A
Basic rate
151.14
Ridging covering with large half round ridge tiles bedded in cement lime
mortar 1:1:4
Per 4.0 m ridging
Materials
10 ridge tiles
1/3 bag cement (50 Kgs)
0.06 m3 sand
6.75Kg slaked lime
80.00
113.85
46.50
40.50
Labour
1/4 day mason
1/4 day U / Sk labour
112.50
75.00
117.09
Laying of 25 mm. thick glass wool insulation and one layer of Aluminium
foil to roof with BRC fabrics.
Per 10 m2
Materials
10 m2 Aluminium foil with 25mm thick glass wool layer
10 m2 75 x 75 mm. Square BRC net.
5% for waste and laps
1 Kg 25 mm. Wire nails.
Labour
1/4 day carpenter
1/2 day U/Sk. Labour
1,600.00
600.00
110.00
72.00
112.50
150.00
2,644.50
Total
264.45
BSR
Page 30
DESCRIPTION
Item No.
64B
Laying of 25 mm. thick glass wool insulation and one layer of Aluminium
foil to roof without BRC fabrics.
Materials
10 m2 Aluminium foil with 25mm thick glass wool layer
5% for waste and laps
100 g of 19 mm. Panel pins
Labour
1/4 day carpenter
1/4 day U/Sk. Labour
1,600.00
80.00
36.00
90.00
60.00
1,866.00
Total
186.60
Basic rate
750.00
37.50
36.00
90.00
60.00
973.50
Total
97.35
18 B.W.C. (1.2mm) galvanized iron sheet valley gutter 0.90m girth overall
once bent with end laps not less than 225 mm width including 20mm
tongued and grooved planks (Balau) laid to slope and profile on timber
members
Consider 4.50m
Materials
2 G.I. Sheet (2.4 x1.2 m)
1.0 lit. wood preservative
0.10 Bag cement (50 Kg)
2.5 Kg. slaked lime
0.03 cu.m sand
4.25 m2 19mm thick planks
0.90 Kg 40mm wire nails
4,400.64
60.00
34.50
15.00
23.25
4,505.00
64.80
BSR
Page 31
DESCRIPTION
Item No.
Labour
a) Fixing boarding and applying wood preservative
1 day carpenter
1 day U / Sk labourer
b) Making and Fixing G.I sheets
1/2 day tinker
1/2 day U / Sk labourer
c) Building sides
1/4 day mason
1/2 day U / Sk labourer
450.00
300.00
225.00
150.00
112.50
150.00
10,490.69
2,331.26
Basic rate
18 B.W.C. (1.2 mm) galvanized iron flashing 450mm girth overall 3 times
bent with end laps not less than 150mm, lead soldered, turned 150mm into
chase cut in wall and pointed in cement mortar 1:2 lower end dressed over
roof covering not less than 300 mm wide
Consider 4.50m
2,200.32
17.25
23.25
90.00
225.00
56.25
225.00
2837.07
630.46
BSR
Page 32
DESCRIPTION
Item No.
Basic rate
CEILING
68
8,050.00
36.00
442.00
86.25
46.50
25.00
90.00
Labour
2 1/2 days carpenter
1/2 day mason
1 1/2 days U / Sk labourer
Scaffolding Add 3%
1,125.00
225.00
450.00
54.00
10,629.75
590.54
Horizontal ceiling lining using 1200 X 1200 mm flat asbestos cement sheets
fixed with and including beading and cove moulding on timber framework.
(timber framework & painting measured separately)
Per 18.0 Sq.m
Materials
20.0 m2 flat asbestos sheets
18.0 m, 50 x 50 mm halmilla cove mouldings
38.0 halmilla beadings
100g 25 mm clout nails
96 Nos. 40 mm brass screws
2,920.00
1,044.00
750.50
36.00
374.40
Labour
1 1/2 days carpenter
2 days U / Sk labourer
Scaffolding - Add 3%
Total
675.00
600.00
38.25
6,438.15
357.68
BSR
Page 33
Item No.
DESCRIPTION
Horizontal ceiling lining using 1200 X 1200 mm flat asbestos cement sheets
fixed on timber framework without beading and cove moulding . (timber
framework & painting measured separately)
Basic rate
2,920.00
36.00
Labour
1 1/4 days carpenter
1.5days U / Sk labourer
Scaffolding - Add 3%
Total
562.50
450.00
30.38
3,998.88
222.16
Flat asbestos cement ceiling sheets fixed to underside of roof rafters with
necessary timber battens with beading and cove moulding . (painting
measured separately)
Per 18.0 Sq.m
Materials
25.0 m2 flat asbestos sheets (40% wastage)
18.0 m, 50 x 50 mm halmilla cove mouldings
38.0 halmilla beadings
100g 25 mm clout nails
96 Nos. 40 mm brass screws
18.0 m. 50 x 50 mm class I timber battens
12.0 m, 50 x 6 mm timber strips (for leveling)
2,920.00
1,044.00
750.50
36.00
374.40
1,764.00
159.00
Labour
2.5 days carpenter
2 days U / Sk labourer
Scaffolding - Add 3%
Total
1,125.00
600.00
38.25
8,811.15
489.51
BSR
Page 34
DESCRIPTION
Item No.
70
Basic rate
Horizontal ceiling lining using 1200 X 1200 mm flat gypsum plaster board
sheets fixed with and including pointing and cove moulding on timber
framework. (timber framework & painting measured separately)
Per 18.2 Sq.m
Materials
20.0m2 flat plaster board sheets
51.2 m pasting tape
136 Nos. 38 mm brass screws
4,080.00
345.60
530.40
Labour
1 1/2 days carpenter
2 days U / Sk labourer
Scaffolding - Add 3%
Total
675.00
600.00
38.25
6,269.25
344.46
1.3560
Materials
36.0 m. 100 x 50mm timber joists
20.0 m2, 150 x 19 mm Lunumidella ceiling planks
10.0 kg. Cement
0.12 m2 sand
4 Kg 38mm brass nails
Labour
Making holes, fixing joists and making good
1 day mason
1 day carpenter
3 days U / Sk labourer
Fixing ceiling boards
3 days carpenter
3.5 days U / Sk labourer
Scaffolding - Add 3%
Total
450.00
450.00
900.00
1,350.00
1,050.00
126.00
19,168.00
1,064.89
6,660.00
6,500.00
69.00
93.00
1,520.00
14,842.00
1,044.00
374.40
Page 35
DESCRIPTION
Item No.
Labour
For Making holes, fixing joists and making goodas above.
Fixing ceiling boards
3 days carpenter
4 days U / Sk labourer
Scaffolding - Add 3%
Total
1,800.00
1,575.00
1,200.00
137.25
20,972.65
1,165.15
Basic rate
7,150.00
159.00
144.00
1,520.00
Labour
3 days carpenter
6 days U / Sk labourer
Scaffolding - Add 3%
1,350.00
1,800.00
94.50
12,217.50
678.75
7,150.00
1,520.00
Labour
2 days carpenter
4 days U / Sk labourer
Scaffolding - Add 3%
900.00
1,200.00
63.00
10,833.00
601.83
BSR
Page 36
DESCRIPTION
Item No.
74A
1,400.00
44.00
102.00
40.00
4,497.30
Labour
5 days carpenter
1 1/2 days U / Sk labourer
1/4 day mason
1/4 day U / Sk labourer (fixing, frame)
Total per 2.10 Sq.m.
2,250.00
450.00
112.50
75.00
8,970.80
4,271.81
Door single hung 1.0 X 2.10 m high overall with frame having 38mm thick
Yellow Balau timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Materials
For Frame as above item 71 A
Sash
1.90 m2 38 mm planks
75A
Basic rate
1,586.00
2,527.00
Labour
As above item 70 A
2,887.50
7,000.50
3,333.57
Door single hung 1.0 X 2.10 m high overall with frame having 32 mm thick
Mahogany timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Materials
For Frame as above item 71 A
Sash
1.90 m2 32 mm planks
1,586.00
3,752.50
Labour
As above item 70 A
2,887.50
8,226.00
3,917.14
BSR
Page 37
DESCRIPTION
Item No.
B
Door single hung 1.0 X 2.10 m high overall with frame having 32 mm thick
Yellow Balau timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Materials
For Frame as above item 71 A
Sash
1.90 m2 32 mm planks
C.
1,586.00
1,900.00
Labour
As above item 71 A
2,887.50
6,373.50
3,035.00
Door single hung 1.0 X 2.10 m high overall with frame having 25 mm thick
Yellow Balau timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Materials
For Frame as above item 71 A
Sash
1.90 m2 25 mm planks
76A
Basic rate
1,586.00
1,567.50
Labour
As above item 71 A
2,887.50
6,041.00
2,876.67
Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 38 mm thick Mahogany timber sash and 94 x 69 mm frame.
(glazing, iron ironmongery and painting measured separately )
per 2.52 sq.m
Materials
a) Frame
0.05 Cu.m 100 x75 mm timber
2 Nr. Spur stones
6 Nr. Fiber / plastic plug with 100 mm long screws
2 Nr.12mm 12 mm dia mild steel dowels 100 mm long
1,750.00
44.00
102.00
40.00
b) Sashes
1.52 Sq.m 38mm thick planks
3,597.84
BSR
Page 38
DESCRIPTION
Item No.
Labour
6 days carpenter
2 days U / Sk labour
1/4 day mason
1/4 day U / Sk labourer (fixing, frame)
2,700.00
600.00
112.50
75.00
9,021.34
3,579.90
Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 38 mm thick Yellow Balau timber sash and 94 x 69 mm
frame. (glazing, iron ironmongery and painting measured separately )
Materials
For Frame as above item 73 A
b) Sashes
1.52 Sq.m 38mm thick planks
Labour
As above item 73 A
77A
Basic rate
1,936.00
2,021.60
3,487.50
7,445.10
2,954.40
Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 32 mm thick Mahogany sash and 94 x 69 mm frame.
(glazing, iron ironmongery and painting measured separately )
Materials
For Frame as above item 73 A
1,936.00
b) Sashes
1.52 Sq.m 32mm thick planks
3,002.00
Labour
As above item 73 A
3,487.50
8,425.50
3,343.45
Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 32 mm thick Yellow Balau timber sash and 94 x 69 mm
frame. (glazing, iron ironmongery and painting measured separately )
Materials
For Frame as above item 73 A
b) Sashes
1.52 Sq.m 32mm thick planks
Labour
As above item 73 A
1,936.00
1,520.00
3,487.50
6,943.50
2,755.36
Page 39
DESCRIPTION
Item No.
Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 25 mm thick Yellow Balau sash and 94 x 69 mm frame.
(glazing, iron ironmongery and painting measured separately )
Materials
For Frame as above item 73 A
b) Sashes
1.52 Sq.m 32mm thick planks
Labour
As above item 73 A
78A1
1,936.00
1,254.00
3,487.50
6,677.50
2,649.80
Ordinary Plywood door single hung 0.95 X 2.10 overall with frame having
32mm thick sash and 94 X 69 frame. (Iron-mongery and painting measured
separately)
Per 2.00 Sq.m (0.95 X 2.100)
Materials
a) Frame 0.05 m3 100 X 75 timber
2 Nr. Spur stones
6 Nr fiber/plastic plugs with 100 mm. long brass screws.
1,750.00
44.00
102.00
2,100.00
Labour
3/4 day carpenter
3/8 day U / Sk labourer
1/4 day mason
1/4 day U / Sk labourer (fixing, frame)
A2
Basic rate
337.50
112.50
112.50
75.00
4,633.50
2,316.75
Ordinary Plywood decorative door single hung 0.95 X 2.10 overall with
frame having 32mm thick sash and 94 X 69 frame. (Iron-mongery and
painting measured separately)
Per 2.00 Sq.m (0.95 X 2.100)
Materials
For Frame as above item 75 A
b) Sash 1 Nr 2.00 X 0.85 plywood sash
Labour
As above item 75 A
1,896.00
2,470.00
637.50
5,003.50
2,501.75
BSR
Page 40
Item No.
DESCRIPTION
B1.
Marine Plywood door single hung 0.95 X 2.10 overall with frame having
32mm thick sash and 94 X 69 frame. (Iron-mongery and painting measured
separately)
Per 2.00 Sq.m (0.95 X 2.100)
Materials
a) Frame 0.05 m3 100 X 75 timber
2 Nr. Spur stones
6 Nr fiber/plastic plugs with 100 mm. long brass screws.
1,750.00
44.00
102.00
1,790.00
Labour
3/4 day carpenter
3/8 day U / Sk labourer
1/4 day mason
1/4 day U / Sk labourer (fixing, frame)
B2.
Basic rate
337.50
112.50
112.50
75.00
4,323.50
2,161.75
Marine Plywood decorative door single hung 0.95 X 2.10 overall with frame
having 32mm thick sash and 94 X 69 frame. (Iron-mongery and painting
measured separately)
Per 2.00 Sq.m (0.95 X 2.100)
Materials
For Frame as above item 76 A
1,896.00
2,660.00
Labour
As above item 76 A
637.50
5,193.50
2,596.75
BSR
Page 41
DESCRIPTION
Item No.
79
Basic rate
Door ledged, braced and battened single hung 0.76 X 2.0 m. overall with
frame having 19 mm thick tongued & grooved planks and 94 X 69 mm.
frame. (Ironomongery and painting measured separately)
Per 1.52 m2
80A
Materials
a) Frame
0.04 m3 100 X 75 Timber
2 Nr. Spur stones
6 Nr. Fiber/plastic plugs with 100mm long brass screws
2 Nr 12mm mild steel dowels 100mm long
1,400.00
44.00
102.00
40.00
2,660.00
140.40
Labour
2 1/4 days carpenter
1 day U / Sk labourer
1/4 day mason (fixing frame)
1 /4 day U / Sk labourer (-do-)
1,012.50
300.00
112.50
75.00
5,886.40
3,872.63
Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 32 mm. Mahogany sashes and 94 x 69 mm frame and mullions.
(Glazing, iron mongery and painting measured separately)
I.e. Per 2.52 m2
Materials
a) Frame
0.09 m3 100 X 75 Timber
4 Nr. Fiber/plastic plugs with 100mm long brass screws
3,150.00
68.00
1,777.50
Labour
6 days carpenter
2 1/2 day U / Sk labourer
1/2 day mason (fixing frame)
1 /2 day U / Sk labourer (-do-)
2,700.00
750.00
225.00
150.00
8,820.50
3,500.20
BSR
Page 42
DESCRIPTION
Item No.
B
Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 32 mm. Yellow Balau sashes and 94 x 69 mm frame and
mullions.(Glazing, iron mongery and painting measured separately)
Materials
For Frame as above item 77 A
b) Sashes
0.90 sq.m 75 x 32 mm timber
81A
Basic rate
3,218.00
900.00
Labour
As above item 77A
3,825.00
7,943.00
3,151.98
Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 25 mm. Mahogany sashes and 94 x 69 mm frame and
mullions.(Glazing, iron mongery and painting measured separately)
Materials
For Frame as above item 77 A
3,218.00
b) Sashes
0.90 sq.m 75 x 25 mm timber
1,260.00
Labour
As above item 77A
3,825.00
8,303.00
3,294.84
Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 25 mm. Yellow Balau sashes and 94 x 69 mm frame and
mullions.(Glazing, iron mongery and painting measured separately)
Materials
For Frame as above item 77 A
3,218.00
b) Sashes
0.90 sq.m 75 x 25 mm timber
742.50
Labour
As above item 77 A
3,825.00
7,785.50
3,089.48
BSR
Page 43
DESCRIPTION
Item No.
C
Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 19 mm. Yellow Balau sashes and 94 x 69 mm frame and
mullions.(Glazing, iron mongery and painting measured separately)
Materials
For Frame as above item 77 A
b) Sashes
0.90 sq.m 75 x 19 mm timber
82A
Basic rate
3,218.00
558.00
Labour
5 days carpenter
2 day U / Sk labourer
1/2 day mason (fixing frame)
1 /2 day U / Sk labourer (-do-)
2,250.00
600.00
225.00
150.00
7,001.00
2,778.17
3mm clear sheet glass pans exceeding 0.15 m2 but not exceeding 4m2 cut
and fixed with timber beadings to doors and windows.
Consider sash 0.9 X 1.2m high with 75 X 32 mm style and 8 Nrs. Glass panes.
Per 0.80 m2
Materials
0.80 m2 glass panes
9.0 l.m. 12 X 12 mm beading
50 Nos. brass panel pins
212.00
78.75
20.00
Labour
1/2 day Carpenter
1/2 day U / Sk labourer
225.00
150.00
685.75
857.19
5mm clear sheet glass pans exceeding 0.15 m2 but not exceeding 4m2 cut
and fixed with timber beadings to doors and windows.
Consider sash 0.9 X 1.2m high with 75 X 32 mm style and 8 Nrs. Glass panes.
Materials
0.80 m2 glass panes
9.0 l.m. 12 X 12 mm beading
50 Nos. brass panel pins
299.20
78.75
20.00
Labour
1/2 day Carpenter
1/2 day U / Sk labourer
225.00
150.00
772.95
966.19
Page 44
DESCRIPTION
Item No.
83A
Basic rate
Timber louver panel 94 x69 mm frame and 19mm. thick louvers fixed at
40mm c/c on door and window frames (luxury)
Consider 1.2 x0.45 m
a) Frame
0.024 m3 100 X 75 Timber
2 Nr. Fiber/plastic plugs with 100mm long brass screws
0.75 sq.m 100 x 25 mm timber
840.00
34.00
1,050.00
Labour
2.5 days carpenter
1 day U / Sk labourer
1,350.00
300.00
3,574.00
6,618.52
Timber louver panel 94 x69 mm frame and 19mm. thick louvers fixed at
40mm c/c on door and window frames. ( moderate)
Consider 1.2 x0.45 m
a) Frame
0.024 m3 100 X 75 Timber
2 Nr. Fiber/plastic plugs with 100mm long brass screws
1.0 sq.m 100 x 19 mm timber
Labour
2. days carpenter
3/4 day U / Sk labourer
840.00
34.00
1,060.00
900.00
225.00
3,059.00
5,664.81
Timber louver panel 94 x69 mm frame and 19mm. thick louvers fixed at
40mm c/c on door and window frames. (normal)
Consider 1.2 x0.45 m
a) Frame
0.02 m3 100 X 75 Timber
2 Nr. Fiber/plastic plugs with 100mm long brass screws
.46 sq.m 50 x 19 mm timber
700.00
34.00
795.00
Labour
1.5 days carpenter
1/2 day U / Sk labourer
675.00
150.00
2,354.00
4,359.26
BSR
Page 45
DESCRIPTION
Item No.
84
IRONMONGERY
1,230.00
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
Basic rate
1,461.90
974.60
585.00
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
816.90
544.60
225.00
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
456.90
304.60
825.00
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
1,056.90
704.60
BSR
Page 46
DESCRIPTION
Item No.
E
Basic rate
330.00
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
561.90
374.60
142.50
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
374.40
249.60
525.00
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
756.90
504.60
187.50
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
419.40
279.60
BSR
Page 47
DESCRIPTION
Item No.
85
86A
112.50
44.40
Labour
1/4 day carpenter
1/4 day U / Sk labourer
112.50
75.00
344.40
229.60
60.00
10.80
Labour
2 hrs carpenter
2hrs U / Sk labourer
112.50
75.00
258.30
1,200.00
Labour
4 hrs carpenter
4 hrs U /Sk labourer
225.00
150.00
1,575.00
1,900.00
Labour
4 hrs carpenter
4 hrs U /Sk labourer
Basic rate
225.00
150.00
2,275.00
4,300.00
Labour
5 hrs carpenter
5 hrs U /Sk labourer
281.25
187.50
4,768.75
Page 48
DESCRIPTION
Item No.
87
A
225.00
Labour
2 hrs carpenter
2 hrs U /Sk labourer
112.50
75.00
412.50
775.00
Labour
2 hrs carpenter
2 hrs U /Sk labourer
112.50
75.00
962.50
1,200.00
Labour
3 hrs carpenter
2 hrs U /Sk labourer
168.75
75.00
1,443.75
160.00
15.20
Labour
2 hrs carpenter
2 hrs U /Sk labourer
112.50
75.00
362.70
90.68
Basic rate
260.00
15.20
Labour
2 hrs carpenter
2 hrs U /Sk labourer
112.50
75.00
462.70
115.68
BSR
Page 49
DESCRIPTION
Item No.
89
Materials
4 casement stays
16 Nr. 12 mm brass screws
380.00
15.20
Labour
2 hrs carpenter
2 hrs U /Sk labourer
112.50
75.00
582.70
145.68
98.00
9.50
Labour
1/2 hr. carpenter
1/2 hr. U/Sk labourer
28.13
18.75
154.38
49.00
7.60
Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer
28.13
18.75
103.48
78.00
7.60
Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer
28.13
18.75
132.48
Basic rate
93.00
7.60
Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer
28.13
18.75
147.48
Page 50
DESCRIPTION
Item No.
Basic rate
91
Materials
1 Nr. Barrel bolt
8 Nr. 12 mm Brass screws
38.00
7.60
Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer
28.13
18.75
92.48
58.00
7.60
Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer
28.13
18.75
112.48
75.00
7.60
Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer
28.13
18.75
129.48
Materials
6 Nr. Casement fasteners
24 Nr. 12 mm brass screws
210.00
22.80
labour
1/2 day carpenter
1/2 day U / SK labourer
225.00
150.00
607.80
101.30
BSR
Page 51
DESCRIPTION
Item No.
B
Basic rate
Casement fasteners(M)
Materials
6 Nr. Casement fasteners
24 Nr. 12 mm brass screws
360.00
22.80
labour
1/2 day carpenter
1/2 day U / SK labourer
225.00
150.00
757.80
126.30
540.00
22.80
labour
1/2 day carpenter
1/2 day U / SK labourer
225.00
150.00
937.80
156.30
93
Materials
6 brass fanlight catches
24 Nr. 12 brass screws
210.00
22.80
labour
1/2 day carpenter
1/2 day U / SK labourer
225.00
150.00
607.80
101.30
480.00
22.80
labour
1/2 day carpenter
1/2 day U / SK labourer
225.00
150.00
877.80
146.30
BSR
Page 52
DESCRIPTION
Item No.
Basic rate
Materials
6 brass fanlight catches
24 Nr. 12 brass screws
780.00
22.80
labour
1/2 day carpenter
1/2 day U / SK labourer
225.00
150.00
1,177.80
196.30
Materials
6 draw rings
12 Nr. 12 brass screws
90.00
11.40
Labour
1 hr. carpenter
1 hr. U Sk labourer
56.25
37.50
195.15
32.53
174.00
11.40
Labour
1 hr. carpenter
1 hr. U Sk labourer
56.25
37.50
279.15
46.53
246.00
11.40
Labour
1 hr. carpenter
1 hr. U Sk labourer
56.25
37.50
351.15
58.53
Page 53
DESCRIPTION
Item No.
Basic rate
PLASTERING
95
20mm thick DPC, in cement sand 1:2 finished with 2 coats hot tar and
blinded with sand
Per 9.30 Sq.m
Materials
2.25 Bag cement (50Kg)
0.31 m3 sand
6.0 liters DPC tar
Firewood (4.5Kg)
Water 40 liters
96
776.25
240.25
168.00
22.50
Labour
1 1/4 days mason
2 1/2 days U / Sk labourer
562.50
750.00
270.91
97
483.00
124.00
Labour
1 day mason
1 1/2 days U / Sk labourer
Scaffolding - Add 3%
450.00
450.00
27.00
164.95
276.00
180.00
155.00
Labour
2 1/2 days mason
2 1/2 days U / SK labourer
Scaffolding - Add 3%
1,125.00
750.00
56.25
273.36
BSR
Page 54
DESCRIPTION
Item No.
98
276.00
180.00
155.00
Labour
2 days mason
2 days U / Sk laboures
99
100
900.00
600.00
Scaffolding - Add 3%
45.00
231.83
16 mm thick external plaster to walls in cement, lime and sand mortar 1:1:5
finished semi-rough with wooden float
Per 9.30 sq.m
Materials
0.80 bag cement (50 kg)
20.00 kg slaked lime
0.20 cu.m sand
water 45 liters
Material cost.
Labour
1 days mason
1 1/4 days U / Sk laboures
276.00
120.00
155.00
551.00
450.00
375.00
Scaffolding - Add 3%
24.75
150.62
4.44
56.25
1.69
62.38
Basic rate
16 mm thick internal plaster to walls in cement, lime and sand mortar 1:1:5
finished smooth with lime putty and floating.
Per 9.30 sq.m
Materials
0.80 bag cement (50 kg)
30.00 kg slaked lime
0.20 cu.m sand
water 45 liters
Material cost.
276.00
180.00
155.00
611.00
BSR
Page 55
DESCRIPTION
Item No.
Labour
1 1/2 days mason
1 1/2 days U / Sk laboures
102
675.00
450.00
Scaffolding - Add 3%
33.75
190.30
4.93
72.00
2.16
79.09
Basic rate
12 mm thick rendering in cement and sand mortar 1:3 finished smooth with
(Trowel finished).
Per 9.30 sq.m
Materials
1.40 bag cement (50 kg)
0.15 cu.m sand
water 45 liters
483.00
116.25
599.25
104
Labour
7/8 days mason
1 1/2 days U / Sk laboures
1/4 days U / Sk laboures (curing)
393.75
450.00
75.00
163.23
621.00
116.25
Labour
1 days mason
1 1/2 days U / Sk labourer
1/4 days U / Sk laboures (curing)
450.00
450.00
75.00
184.11
BSR
Page 56
DESCRIPTION
Item No.
105
Basic rate
106
603.75
139.50
Labour
1 days mason
2 days U / Sk labourer
1/4 days U / Sk laboures (curing)
450.00
600.00
75.00
200.89
107
776.25
139.50
Labour
1.25 days mason
2 days U / Sk labourer
1/4 days U / Sk laboures (curing)
562.50
600.00
75.00
231.53
776.25
193.75
681.00
Labour
1 1/4 days mason
2 days U / Sk labourer
1/4 days U / Sk laboures (curing)
562.50
600.00
75.00
310.59
BSR
Page 57
Item No.
DESCRIPTION
108
Basic rate
34.50
7.75
30.00
Labour
3/8 days mason
5/16 days U / SK labourer
112.50
110.25
96.72
109
207.00
54.25
180.00
Labour
13/8 days mason
1/2 days U / SK labourer
618.75
150.00
121.00
BSR
Page 58
DESCRIPTION
Item No.
Basic rate
PAINTING
110
Prepare and apply one coat of preservative (oil type) to structural timber
including touching up cut ends etc. after fixing.
Per 9.3 Sq.m
Materials
2.75 ltr. Wood preservative (oil type)
75 mm brush (1/10 use)
165.00
17.60
Labour
3/4 painter
1/2 day U / Sk labourer
337.50
150.00
72.05
255.00
35.20
Labour
1.0 painter
1/2 day U / Sk labourer
450.00
150.00
95.72
Prepare surface of steel truss and apply two coats of anti corrosive primer.
Consider 9.3 Sq.m
Materials
2 1/4 ltr. Anti-corrosive primer
0.15 ltr. Mineral turpentine
1 wire brush
50 mm brush (1/8 use)
855.00
14.25
18.00
12.50
Labour
1 1/2 Painter
1 1/2 day U / Sk labourer
675.00
450.00
217.72
BSR
Page 59
DESCRIPTION
Item No.
113
Apply one coat of anti-corrosive primer and two coats enamel paint on
already shop primed and erected steel roof truss
Consider 9.3 Sq.m
Materials
0.20 ltr. Ant-corrosive primer
1 1/3 ltr. Enamel paint
0.20 ltr. Mineral turpentine or thinner
50 mm brush ( 1/5 use)
Labour
2 1/2 days painter
1 day U / Sk labourer
Scaffolding - Add 3%
114
115
76.00
485.45
19.00
20.00
1,125.00
300.00
42.75
222.39
Prepare and apply two coats primer and finishing coat of enamel paint to
mild steel (angle / flat) gate.
Consider 4.5 Sq.m
Materials
1 1/2 ltr. Anti-corrosive primer
2/3 ltr. Enamel paint
0.20 ltr. Mineral turpentine or thinner
1/2 wire brush
50 mm brush ( 1/5 use )
570.00
240.90
19.00
9.00
20.00
labourer
1/2 day painter
3/4 day U / Sk labourer
225.00
225.00
1,308.90
290.87
135.30
20.00
Labour
1 1/2 days painter
675.00
89.28
Basic rate
229.50
20.00
28.00
Labour
1/2 day painter
1/2 day U/Sk labourer
225.00
150.00
652.50
BSR
70.16
Page 60
DESCRIPTION
Item No.
117
119
900.00
20.00
14.00
225.00
75.00
1,234.00
132.69
Basic rate
Preparing and painting wood work with primer and 2 coats enamel paint
Per 9.3 Sq.m
Materials
3/4 ltr. Primer
2.50 ltr. Enamel paint (2 coats)
50mm brush (1/10 use)
2 sand papers
270.00
912.50
10.00
28.00
Labour
1 1/2 days painter
1/2 day U/Sk labourer
675.00
150.00
219.95
212.50
6.30
23.63
17.75
11.55
Labour
2 1/2 days painter
2 1/2 day U / Sk labourers
1,125.00
750.00
56.25
Scaffolding - Add 3%
2,202.98
20.49
BSR
Page 61
DESCRIPTION
Item No.
120
121
Basic rate
2,202.98
225.00
150.00
Scaffolding - Add 3%
11.25
24.06
351.00
403.20
33.80
28.00
Labour
1 1/4 day painter
122
562.50
Scaffolding - Add 3%
16.88
150.04
Prepare and apply one coat of Alkali resistant primer and two coats of
emulsion paint to walls (external)
Per 9.3 Sq.m
Materials
Primer 0.90 ltr. Primer
1.40 ltr. Emulsion paint
Water 0.40 liters
150 mm brush (1/10 use)
2 sand papers
351.00
525.00
33.80
28.00
Labour
1 1/4 day painter
123
562.50
Scaffolding - Add 3%
16.88
163.14
215.63
35.00
BSR
Page 62
DESCRIPTION
Item No.
Labour
2 days painter
2 days U / Sk labourer
Scaffolding - Add 3%
124
900.00
600.00
45.00
1,795.63
16.69
125
126
Basic rate
Labour
3/4 day painter
Scaffolding - Add 3%
337.50
10.13
81.27
Prepare and apply one coat alkali resistant primer and two coats of
emulsion paint to soffit of slabs
Consider 9.0 m2
Materials
0.90 ltr. Primer
1.50 ltr. Emulsion paint
150mm brush (1/10 use)
351.00
432.00
33.80
Labour
1 3/4 days painter
Scaffolding - Add 3%
787.50
23.63
175.05
734.40
58.08
Labour
1/2 day painter
1/2 day U / Sk Labourer
225.00
150.00
125.54
BSR
Page 63
Item No.
DESCRIPTION
127
Prepare timber surface and apply two coats of wood preservative and two
coats of sanding sealer to timber ceiling.
Per 9.3 Sq.m
Materials
As per item No. 112
As per item No. 113
277.50
934.00
Labour
1.125 day Painter
1.125 day U / Sk labourer
Scaffolding - Add 3%
506.25
337.50
10.36
222.11
128
Basic rate
PLUMBING
PLUMBING - PVC PIPES
20 mm diameter PVC pipes fixed to walls (specials paid separately)
129
Per 3.0 m
Materials
3.9 m pipes
3 clips and nails
2 grms solvent gum
81.90
19.50
1.39
Labour
1 hr. plumber
1 hr. U / Sk labourer
56.25
37.50
196.54
65.51
Materials
3.9 m pipes
3 clips and nails
3 grms. Solvent cement
Labour
1 hr. Plumber
1 hr. U / Sk labourer
56.25
37.50
242.09
80.70
BSR
Page 64
DESCRIPTION
Item No.
130
32mm dia meter PVC pipes fixed to walls (specials paid separately)
Per 30.0 m.
Materials
30.0 m pipes
Add 5% for wastage
8 Nr. - 32mm dia sockets
32 grms. Solvent cement
35 clips and nails
1,650.00
82.50
68.00
22.24
227.50
Labour
1/2 day plumber
1/2 day U / Sk labourer
225.00
150.00
2,425.24
80.84
2,610.00
130.50
102.40
33.36
332.50
Labour
3/4 day plumber
3/4 day U/Sk labourer
337.50
150.00
3,696.26
123.21
Basic rate
3,877.50
193.88
148.00
44.48
332.50
Labour
3/4 day plumber
3/4 day U/Sk labourer
337.50
150.00
5,083.86
169.46
Page 65
DESCRIPTION
Item No.
133
6,450.00
322.50
222.40
332.50
77.84
Labour
3/4 day plumber
3/4 day U/Sk labourer
337.50
150.00
7,892.74
263.09
11,367.00
568.35
792.40
980.00
77.84
Labour
3/4 day plumber
3/4 day U/Sk labourer
337.50
150.00
14,273.09
475.77
Basic rate
90 mm dia meter PVC pipes fixed to walls Type 600 (specials paid
separately)
Per 30.0 m
Materials
30.0 m pipe
Add 5% for wastage
8 Nr. - 90mm sockets
200 grms. Solvent cement
35 clips and screws
9,678.00
483.90
1,426.00
139.00
980.00
Labour
1 day plumber
1 day U / Sk labourer
450.00
300.00
13,456.90
448.56
Page 66
DESCRIPTION
Item No.
136
Basic rate
Excavation for laying 20 -90 mm dia meter PVC pipes in ground not less
than 450mm deep, back filling & compacting
Per 30.0 m
Labour
2 1/4 days U / Sk labourer
675.00
Chasing brickwork for laying 20mm to 50mm dia PVC pipes and making
good average depth 50 mm (pipes and specials paid separately)
Per 30.0m
Materials
0.20 Bag cement (50 Kg Bag)
0.04 m3 sand
69.00
31.00
Labour
3 days mason
3 days U / Sk labourer
1,350.00
900.00
2,350.00
78.33
58.00
13.90
Labour
2 hrs. plumber
Total per 10 nr.
112.50
184.40
18.44
0.03
87.00
20.85
Labour
2 hrs. plumber
Total per 10 nr.
112.50
220.35
22.04
BSR
Page 67
DESCRIPTION
Item No.
140
145.00
27.80
Labour
2 hrs. plumber
112.50
28.53
Basic rate
213.50
41.70
Labour
2 hrs. plumber
112.50
36.77
427.50
55.60
Labour
2 hrs. plumber
112.50
59.56
661.50
97.30
Labour
1/2 day plumber
225.00
983.80
98.38
BSR
Page 68
DESCRIPTION
Item No.
144
1,210.00
139.00
Labour
1/2 day plumber
225.00
1,574.00
157.40
2,093.00
166.80
Labour
1/2 day plumber
225.00
2,484.80
248.48
147
Basic rate
69.50
20.85
Labour
1/2 day plumber
225.00
315.35
31.54
117.00
31.28
Labour
1/2 day plumber
225.00
373.28
37.33
Page 69
DESCRIPTION
Item No.
148
197.50
41.70
Labour
1/2 day plumber
225.00
464.20
46.42
290.50
62.55
Labour
1/2 day plumber
225.00
578.05
57.81
509.00
83.40
Labour
1 day plumber
450.00
1,042.40
104.24
Basic rate
774.00
145.95
Labour
1 day plumber
450.00
1,369.95
137.00
Page 70
DESCRIPTION
Item No.
152
1,650.00
208.50
Labour
1 1/2 day plumber
225.00
2,083.50
208.35
3,696.00
250.20
Labour
1 1/2 day plumber
675.00
4,621.20
462.12
110 mm dia meter PVC pipes fixed to walls (specials paid separately)
grade 400
Materials - per 30. L.m.
30.0 m pipe
Add 5% for wastage
8 Nr. - 110 mm sockets
260 grms. Solvent cement
35 clips and screws
Labour
1 day plumber
1 day U / Sk labourer
7,440.00
372.00
1,706.80
180.70
1,820.00
450.00
300.00
12,269.50
408.98
Basic rate
6,410.00
278.00
BSR
Page 71
DESCRIPTION
Item No.
Labour
1 1/2 day plumber
675.00
7,363.00
736.30
2,133.50
198.08
225.00
2,556.58
255.66
Basic rate
Excavation for laying 110 - 90 mm dia meter PVC pipes in ground depth not
exceeding 1.0 m back filling & compacting and concrete haunching.
Per 30.m
Materials
0.072 m3 1:3:6 concrete
13.75 m3 excavation
13.75 m3 Backfilling
30.0 m pipe
Add 5% for wastage
8 Nr. - 110 mm sockets
200 grms. Solvent cement
339.68
3,300.00
1,443.75
14,175.00
708.75
1,706.80
139.00
Labour
1 day plumber
1 day U / Sk labourer
450.00
300.00
22,562.98
752.10
BSR
Page 72
DESCRIPTION
Item No.
158A
Basic rate
197.50
10.59
218.48
158.86
16.49
55.00
Labour
1/2 day mason
1/2 day U/Sk labourer
225.00
150.00
1,031.92
110 mm dia PVC gully with 150 x 150 x 150 mm gully box including
excavation, 4" cement concrete 1:2:4 (20mm) base, surrounded by 4 1/2"
thick cement and sand 1:5 extended 150mm above top of gully box
including making connection 12.5 mm cement and sand 1:2 rendering
internally and exposed faces finished smooth with neat cement floating
and providing Stainless Steel grating on top of gully
Per Nr.
Materials
110 mm dia P.V.C. gully - 1 Nr.
0.10 m3 excavation
0.50 m2 102.5 mm brickwork
0.02 m3 cement concrete 1:2:4 (20mm)
0.10 m2 12.5 mm thick cement rendering 1:2
1 Nr. - stainless steel grating suit to 110 mm. Gully box
197.50
10.59
218.48
158.86
16.49
185.00
Labour
1/2 day mason
1/2 day U/Sk labourer
225.00
150.00
1,161.92
BSR
Page 73
Item No.
DESCRIPTION
159
Manhole 600 x 600 mm internally with invert depth not exceeding 600mm
including excavation, backfilling 150 mm cement concrete 1:2:4 (20mm)
base with 10 mm dia meter mild steel rods at 100mm centers bothways,
forming channels and benching in similar concrete, 115 mm walls in brick
in cement 1:5, 12.5 mm thick cement and sand 1:2 rendering internally and
exposed surfaces including channels, benching and 50 mm thick RCC
removable cover slab 675 x 675 mm inlet and outlet connection all
complete to working order.
Materials
1.0 m3 excavation
0.20 m3 cement concrete 1:2:4 (20 mm) in base & channels
3.0 m2 215 mm brickwork in cement 1:5
2.6 m2 12.5 mm cement rendering 1:2
1 - RCC cover slab
Labour
1 1/2 days mason
2 1/2 days U / Sk labourer
Basic rate
240.00
945.05
2,397.33
478.69
260.00
675.00
750.00
5,746.07
550 x 400 mm glazed Vitreous China wash basin with 20 mm dia Chromium
plated pillar/mixer tap, waste plug, Chromium plated waste chain and stay,
including fixing wash basin on brackets. (Water supply and waste water
connection measured separately) ( L)
Per Nr.
Materials
1 wash basin complete with waste plug and chain
1 - 20mm tap
" L " iron brackets. - 2 Nr.
4 wooden plug
6 - 38.5 mm brass screws
0.90 Kg cement
Labour
5/8 day plumber
1/2 day mason
1 day U / Sk labourer
9,450.00
6,500.00
276.00
80.00
23.40
6.90
281.25
225.00
300.00
17,142.55
BSR
Page 74
Item No.
DESCRIPTION
550 x 400 mm glazed Vitreous China wash basin with 20 mm dia Chromium
plated pillar/mixer tap, waste plug, Chromium plated waste chain and stay,
including fixing wash basin on brackets. (Water supply and waste water
connection measured separately) ( M)
Per Nr.
Materials
1 wash basin complete with waste plug and chain
1 - 20mm tap
" L " iron brackets. - 2 Nr.
4 wooden plug
6 - 38.5 mm brass screws
0.90 Kg cement
Labour
1/2 day plumber
1/2 day mason
1 day U / Sk labourer
12,106.30
2,100.00
465.00
276.00
80.00
23.40
6.90
140.63
225.00
300.00
3,616.93
6,450.00
4,520.00
276.00
80.00
23.40
6.90
225.00
225.00
300.00
Basic rate
900 x 450 mm Stainless steel sink with bottle trap, rubber plug and
Chromium plate chain waste carried on iron brackets painted and fixed to
walls. (Water supply and waste water connection measured separately)(N)
Materials Per Nr.
1 sink 900 x 450 mm
2 L iron brackets
1 bottle trap
0.90 Kg cement
4 wooden plug
6 - 38.5 mm brass screws
1,270.00
276.00
325.00
6.90
80.00
23.40
BSR
Page 75
DESCRIPTION
Item No.
Labour
3/8 day plumber
1/2 day mason
1/2 day U / Sk labourer
168.75
225.00
150.00
2,525.05
900 x 450 mm Stainless steel sink with bottle trap, rubber plug and
Chromium plate chain waste carried on iron brackets painted and fixed to
walls. (Water supply and waste water connection measured separately)(M)
Materials - Per Nr.
1 sink 900 x 450 mm
2 L iron brackets
1 bottle trap
0.90 Kg cement
4 wooden plug
6 - 38.5 mm brass screws
1,780.00
276.00
980.00
6.90
80.00
23.40
Labour
1/2 day plumber
1/2 day mason
1/2 day U / Sk labourer
225.00
225.00
150.00
3,746.30
900 x 450 mm Stainless steel sink with bottle trap, rubber plug and
Chromium plate chain waste carried on iron brackets painted and fixed to
walls. (Water supply and waste water connection measured separately)(L)
Per Nr.
Materials
1 sink 900 x 450 mm
2 L iron brackets
1 bottle trap
0.90 Kg cement
4 wooden plug
6 - 38.5 mm brass screws
3,200.00
276.00
2,100.00
6.90
80.00
23.40
Labour
1/2 day plumber
1/2 day mason
1/2 day U / Sk labourer
162A
Basic rate
225.00
225.00
150.00
6,286.30
Closet pedestal type with L/L flushing cistern, flush pipe double plastic
seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working
order(N)
Per Nr.
Materials
1 low level suite complete
1Nr. - 20 mm dia angle valve.
0.90 Kg cement
0.008m3 sand
2 Nr. 38 mm brass screws
2,200.00
220.00
6.90
6.20
7.80
BSR
Page 76
DESCRIPTION
Item No.
Labour
1/4 day mason
1 day plumber
1 day U/Sk labourer
112.50
450.00
300.00
3,303.40
Closet pedestal type with L/L flushing cistern, flush pipe double plastic
seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working
order(M)
Per Nr.
Materials
1 low level suite complete
1 Nr. - 20 mm dia angle valve.
0.90 Kg cement
0.008m3 sand
2 Nr. 38 mm brass screws
7,200.00
530.00
6.90
6.20
7.80
Labour
1/4 day mason
1 day plumber
1 day U/Sk labourer
Basic rate
112.50
450.00
300.00
8,613.40
16,250.00
1,470.00
6.90
6.20
7.80
Labour
1/4 day mason
1 .25day plumber
1 day U/Sk labourer
112.50
562.50
300.00
18,715.90
BSR
Page 77
DESCRIPTION
Item No.
163A
Closet squatting type with trap including high level cistern fixed complete
with flush pipe and 20 mm dia stop cock, all complete to work order (N)
Per Nr.
Materials
1 squatting pan with trap
80 liters plastic/ceramic cistern with flush
pipe, chain and overflow pipe
1 clip
4 wooden plug
4 Nr. 38.5 mm brass screws
1Nr. - 20 mm dia angle valve.
1/4 Bag cement (50 Kg)
0.015 m3 metal
0.008 m3 sand
565.00
380.00
9.50
80.00
15.60
220.00
86.25
21.75
6.20
Labour
1/2 day mason
1 day plumber
1 day U / Sk labourer
225.00
450.00
300.00
2,359.30
Basic rate
Closet squatting type with trap including high level cistern fixed complete
with flush pipe and 20 mm dia stop cock, all complete to work order (m)
Per Nr.
Materials
1 squatting pan with trap
8 liters plastic/ceramic cistern with flush
pipe, chain and overflow pipe
1 clip
4 wooden plug
4 Nr. 38.5 mm brass screws
1 Nr. - 20 mm dia angle valve.
1/4 Bag cement (50 Kg)
0.015 m3 metal
0.008 m3 metal
Labour
1/2 day mason
1 day plumber
1 day U / Sk labourer
650.00
650.00
9.50
80.00
15.60
530.00
86.25
21.75
6.20
225.00
450.00
300.00
3,024.30
BSR
Page 78
DESCRIPTION
Item No.
C
Closet squatting type with trap including high level cistern fixed complete
with flush pipe and 20 mm dia stop cock, all complete to work order (L)
Per Nr.
Materials
1 squatting pan with trap
80 liters plastic/ceramic cistern with flush
pipe, chain and overflow pipe
1 clip
4 wooden plug
4 Nr. 38.5 mm brass screws
1Nr. - 20 mm dia angle valve.
1/4 Bag cement (50 Kg)
0.015 m3 metal
0.008 m3 sand
Labour
1/2 day mason
1 day plumber
1 day U / Sk labourer
5,400.00
2,250.00
450.00
300.00
8,400.00
165
9.50
80.00
15.60
1,470.00
86.25
21.75
6.20
5,314.30
Materials
1 bidet
1 Nr. - 20 mm Spray tap
Labour
1 day plumber
1 day U / Sk labourer
1,800.00
850.00
225.00
450.00
300.00
Basic rate
8,500.00
6,500.00
675.00
450.00
16,125.00
Acrylic type bath tub with 102.5mm thick brick wall and complete to
working orders
Per Nr.
Materials
1Nr. Bath Tub
3 M2 102.5 mm thick walls
0.6 M3 of sand (including for fill hollow areas )
10 Kg. Cement
20,800.00
1,310.85
465.00
69.00
BSR
Page 79
DESCRIPTION
Item No.
Labour
1 day mason
1.5 day plumber
2 day U / Sk labourer
450.00
675.00
600.00
24,369.85
465.00
35.00
Labour
1/4 day plumber
112.50
612.50
940.00
60.00
Labour
1/4 day plumber
112.50
1,112.50
1,450.00
80.00
Labour
3/8 day plumber
168.75
1,698.75
280.00
20.00
56.25
356.25
Basic rate
BSR
960.00
30.00
Page 80
DESCRIPTION
Item No.
Labour
1/8 day plumber
56.25
1,046.25
168
A
85.50
1,685.50
3,035.00
3,340.00
80.00
281.25
3,701.25
2,750.00
60.00
225.00
169
1,560.00
40.00
Labour
1.5/8 day plumber
Labour
1/2 day plumber
Basic rate
4,750.00
75.00
337.50
5,162.50
BSR
Page 81
DESCRIPTION
Item No.
B
9,850.00
525.00
35.00
Labour
2 Hr. plumber
112.50
672.50
675.00
50.00
Labour
2 Hr. plumber
112.50
837.50
1,470.00
75.00
112.50
1,657.50
9,300.00
100.00
450.00
Basic rate
125.00
20.00
56.25
201.25
Page 82
DESCRIPTION
Item No.
B
1,051.25
1,350.00
60.00
56.25
1,466.25
138.00
6.00
Labour
1 Hr. plumber
56.25
200.25
550.00
6.00
Labour
1 Hr. plumber
960.00
35.00
56.25
Labour
1.5 Hr. plumber
172
Basic rate
56.25
612.25
760.00
6.00
Labour
1 Hr. plumber
56.25
822.25
BSR
Page 83
DESCRIPTION
Item No.
173
A
225.00
12.00
Labour
1 Hr. plumber
56.25
293.25
950.00
12.00
Labour
1 Hr. plumber
56.25
1,018.25
1,650.00
12.00
Labour
1 Hr. plumber
56.25
1,718.25
120.00
6.00
Labour
1 Hr. plumber
56.25
182.25
700.00
6.00
Labour
1 Hr. plumber
56.25
762.25
Basic rate
BSR
Page 84
DESCRIPTION
Item No.
Materials
1 Towel ring with screw nails
2 Nr. Of Rawl plug.
1,120.00
6.00
Labour
1 Hr. plumber
56.25
1,182.25
80.00
6.00
Labour
1 Hr. plumber
56.25
142.25
875.00
6.00
Labour
1 Hr. plumber
56.25
937.25
1,440.00
6.00
Labour
1 Hr. plumber
56.25
1,502.25
Basic rate
140.00
6.00
Labour
1 Hr. plumber
56.25
202.25
BSR
Page 85
DESCRIPTION
Item No.
B
980.00
6.00
Labour
1 Hr. plumber
56.25
1,042.25
1,340.00
6.00
Labour
1 Hr. plumber
56.25
1,402.25
Materials
1 Mirror with hanging screw nails
2 Nr. Of Rawl plug.
375.00
6.00
Labour
1/2 Hr. S. Labour
21.88
402.88
1,600.00
6.00
Labour
1/2 Hr. skilled labour.
21.88
1,627.88
Basic rate
2,215.00
6.00
43.75
218.75
Labour
1 Hr. skilled labour.
2,483.50
Page 86
DESCRIPTION
Item No.
178
A
230.00
6.00
Labour
1 Hr. skilled labour
43.75
279.75
640.00
6.00
Labour
1 Hr. skilled labour
43.75
689.75
1,250.00
6.00
Labour
1 Hr. skilled labour
43.75
1,299.75
195.00
35.00
56.25
286.25
Basic rate
265.00
35.00
56.25
356.25
BSR
Page 87
DESCRIPTION
Item No.
C
471.25
625.00
50.00
Labour
1 .5Hr. plumber
Basic rate per Nr.
84.38
759.38
180
A
875.00
50.00
84.38
1,009.38
220.00
20.00
56.25
296.25
380.00
35.00
56.25
Basic rate
530.00
20.00
56.25
606.25
BSR
Page 88
DESCRIPTION
Item No.
C
1,551.25
115.00
Labour
1 Hr. Plumber
56.25
171.25
160.00
Labour
1 Hr. Plumber
56.25
216.25
1,470.00
25.00
56.25
Basic rate
240.00
Labour
1 Hr. Plumber
56.25
296.25
150 mm dia half round PVC eaves gutter fixed to timber valance board
including gutter joiner and brackets fixed at 450 mm centers. (Other
specials paid separately)
Consider 7.30m
Materials
7.30 m. - 150 mm dia. eaves gutter
1 joiner
17 gutter brackets
34 Nr. - 19mm brass screws
20 grams solvent cement
1,116.90
47.00
161.50
62.90
13.90
BSR
Page 89
DESCRIPTION
Item No.
Labour
1/2 day plumber
1/2 day U / Sk labourer
225.00
150.00
18.75
Scaffolding - Add 5%
1,795.95
246.02
85.00
94.00
19.00
8.34
7.40
Labour
1/8 day plumber
1/8 day U / Sk labourer
56.25
37.50
4.69
Scaffolding - Add 5%
312.18
184
Basic rate
75.00
94.00
19.00
8.34
7.40
Labour
1/8 day plumber
1/8 day U / Sk labourer
56.25
37.50
4.69
Scaffolding - Add 5%
302.18
BSR
Page 90
DESCRIPTION
Item No.
185
Basic rate
29.00
10.56
Labour
1 / 16 day plumber
1 / 16 day U / Sk labourer
28.13
18.75
2.34
Scaffolding - Add 5%
88.78
90 mm dia PVC rain water down pipes fixed to brick wall with wooden
plugs buried in wall. (Specials measured separately)
Consider 7.30 m pipe length
Materials
7.30 m. - 90 mm dia down pipe
1 - 90 mm joiner
4 PVC straps
8 brass screws 25 mm
30 grms solvent cement
642.40
36.00
21.20
21.60
20.85
Labour
1/3 day plumber
1/3 day U / Sk labourer
148.50
99.00
Scaffolding - Add 5%
12.38
1,001.93
137.25
62.00
22.24
Labour
1/16 day plumber
1/16 day U / Sk labourer
28.13
18.75
2.34
Scaffolding - Add 5%
133.46
BSR
Page 91
DESCRIPTION
Item No.
188
Basic rate
65.00
10.43
Labour
1/16 day plumber
1/16 day U / Sk labourer
28.13
18.75
122.30
BSR