Procedure - Fit-Up & Assembly
Procedure - Fit-Up & Assembly
Procedure - Fit-Up & Assembly
For
Fit-up and Assembly
Job Number
Document No
2
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Revision Number
E
00
01
02
Date
06/09/0
3
20/0
7/06
03/01/0
7
Prepared By
GR/SE
RR
RR
Department:
Checked By
CLJ
CLJ/
CPB
GR/CP
B
Location:
Jamnagar
Approved By
KR
VKS
VKS
Hard copy of this document shall be treated as uncontrolled if not signed by approver
For latest revision please check with soft copy.
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
CONTENTS
1.
INTRODUCTION
2.
PURPOSE
3.
SCOPE
4.
5.
6.
REFERENCE
7.
FLOW CHART
8.
PROCEDURE
9.
RECORDS
10.
ATTACHMENTS
2 of 7
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
1.
INTRODUCTION
Fabrication division fabricates structures for various clients. Fit up and assembly is an
important activity for fabrication of structure. In order to ensure that effective functioning of
a quality system requirements are fulfilled, there is a need to establish a quality system
involving the functions of fit up and assembly and to ensure the activities are in controlled
condition.
2.
PURPOSE
The purpose of this procedure is to establish a documented procedure for fit-up and
assembly of structural steel to ensure that the specified quality requirements are fulfilled
with international quality system and to ensure continuos process stability and to achieve
the customer need in time.
3.
SCOPE
This procedure is applicable to all the activities related to fit-up and assembly of structural
steel at structural fabrication shop
4.
5.
Area Manager
CM
Construction Manager
HOD
Head of Department
SFS
PE
Production Engineer
DCC
NCR
Non-conformance Report
NDT
Non-destructive Testing
QMD
Construction Manager
Structural fabrication division
Establishing
Fit-Up
&
Perform
Assembly Procedure and its
implementation
Verify
6.
REFERENCE
3 of 7
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
7.
FLOW CHART
Receiving
priority schedule
from planning
Receiving
drawings from
DCC
Fit-up
NOT OK
NOT OK
Not accepted
sent to scrap
area
OK
Welding & assembling
(assembling carried out
if applicable)
NOT OK
Rework carried
out as per
welding
Specification
(accepted)
OK
4 of 7
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
8.
PROCEDURE
8.1
8.2
8.3
8.4
8.5
PE (Fit & Assembly) shall co-ordinate with Engineer (CNC) for availability of semifinished material after cutting and drilling.
8.6
Normally PE (Fit & Assembly) shall receive pre fabricated material / steel from
machine shop and verify the mark number and material specification (Identification of
material specification for plates other than IS 2062 and ASTM A36 shall be done ) with
drawing number and ensure the compliance before proceeding for further work. But in
some cases & extra ordinary circumstances the under mentioned procedure shall be
followed.
a) Raw steel / painted steel shall be used directly according to machine load availability.
b) Raw steel / painted steel shall be used directly in order to minimize the scrap percentage
and utilization of material.
c) Raw steel / painted steel shall be used directly if the available material is less than 2.5
meters ( less than 2.5 meters length can not be processed in cnc machines for drilling.
d) For identification and Traceability refer Departmental Procedure no. 2SF QSP GE 007.
8.7
PE (Fit & Assembly) shall responsible for allocating the pre fabricated material for
FIT-UP to sub-contractors and inspect the fit-up material for dimensions with respect to
drawings/tolerances. If found acceptable shall transfer the item part no/ mark number,
drawing number on the item by hard punching for identification.
8.8
In case the dimensions are not acceptable, PE (Fit & Assembly) shall make decision
for rework and identified as Rejected by permanent marker.
8.9
Acceptable material shall be processed for weld preparation and fit-up of the parts as
per the drawing requirements. Fit-up of the parts shall be done sequentially so as to ensure
welding accessibility
8.10
PE (Fit & Assembly) shall check the fit-up dimensions and orientation with
drawing. Full penetration joints shall be provided with notch cutting as required by
Procedure for fit-up and assembly
Doc. No.: 2 SFQSP GE 006 Rev. 02 Dt:03-01-2007
5 of 7
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
In case the fit-up is not found to be acceptable, it shall be rectified and re-inspected
8.12
PE (Fit & Assembly) shall co-ordinate with contractor for getting welding
equipment/machine and welding consumable
if it is not under the scope of sub
contractor. Arranging Qualified welder as per the applicable qualified WPS is under sub
contractors scope.
8.13
Control of welding process activities shall be taken by Welding engineer as per
procedure No. 2 SF QSP GE011. Weld visual inspection, NDT examination shall be
conducted by QMD Engineer as per the requirements of Inspection and test plan and shall
release the structural members, if there is no final assembly of the members involved.
8.14
In case of final assembly of the parts is required to be done as per the production
plan/drawings, PE (Fit-up & Assembly) shall review the Assembly drawing and list out all
member required for assembly and check-up the Inspection and test status of the members
with QMD. Only accepted structural steel members shall be taken-up for assembly.
8.15
PE (Fit-up & Assembly) shall ensure that the parts are properly leveled and aligned
as per the drawing requirements and shall then verify the assembly dimensions using
standard measuring instrument. Assembly dimensions shall be recorded in a dimensional
protocol of assembly.
8.16
In case there welding involvement in final assembly, fit-up shall be inspected by PE
(Fit-up & Assembly) and Points 8.10 to 8.13 shall be followed. Assembly dimensions shall
be rechecked after welding and it shall be recorded in the protocol duly.
8.17
In case of final assembly, PE (Fit-up & Assembly) shall verify if holes are matching
and are within the acceptable limit. In case it is found that holes are not matching rework
shall be carried out and same shall be registered in rework / Rejection log note.
8.18
Rectification shall verified as per the Inspection and test plan by QMD. Final
assembly dimension shall be recorded in protocol format by PE ( Fit-up and assembly )
8.19
Delivery of fabricated structure / material shall be taken care by production
engineer, for external job in co-ordination with stores. If packing is specified by client
the following Procedure for Packing 2SF QSP GE 008 shall be followed by production
engineer.
6 of 7
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
9.
RECORDS
10. ATTACHMENTS
NOT-APPLICABLE
7 of 7
CONTRACTOR:
SHEET: 1 OF 1
REPORT NO:
DATE:
Sl.
No.
Drawing No.
Rev
.No Mark No.
.
Mat.
grade
WPS No Qty
Material /Fit up /
Preheat Weld Visual inspection
Dimensional verification
temp
Contractor
RPL
Contractor
RPL
NDT Report
No
Date
Touch up
painting
Remarks :
Note: Welding Inspection shall be certified after completion of all the weld joints against particular mark no.