So Use Pipe of Diameter 50 in and Slope 0.8 %o

This document provides design parameters and calculations for a wastewater treatment plant (WWTP). It determines: 1. The maximum served capacity of the plant is 38,571 cubic meters per day based on the organic loading rate and dimensions of the aeration tanks. 2. The daily flow is then used to design the following units for the WWTP: - Activated sludge units with final sedimentation tanks - High rate trickling filter (HRT) units without final sedimentation tanks The calculations assume a primary treatment efficiency of 30% and a post-treatment BOD of 350 ppm. Dimensions and loading rates are provided for the grit removal chambers and aeration tanks to calculate
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views

So Use Pipe of Diameter 50 in and Slope 0.8 %o

This document provides design parameters and calculations for a wastewater treatment plant (WWTP). It determines: 1. The maximum served capacity of the plant is 38,571 cubic meters per day based on the organic loading rate and dimensions of the aeration tanks. 2. The daily flow is then used to design the following units for the WWTP: - Activated sludge units with final sedimentation tanks - High rate trickling filter (HRT) units without final sedimentation tanks The calculations assume a primary treatment efficiency of 30% and a post-treatment BOD of 350 ppm. Dimensions and loading rates are provided for the grit removal chambers and aeration tanks to calculate
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

, , . .

. = 750 / . = 250 /

.
250

= 940 = .27

= .67
= 0.8 = 940 /

= .85

= 0.6 / sec

= .7 /


= 50 , = .5 %
1

= () = 50 25 = 8 104 = .8 103 = .8% > .5


= 0.8 % = 50
= 1200 / sec

, = .9 /

250

= 1200 = .2

= 1.1 1 / < 1.5

= .72 .64 / > .6

So use pipe of diameter 50 in and slope 0.8 %o

750

= 1200 = .625

Page

36 .08 %

. . . .
= 200 //

= 36 & = 0.8 %0 = 460 /


3

.
=

= 0.92 = 423.2 /
4

= . .
5
1/6

= 423.2

= 98,166

Page

0.8 200

= (24 60 60) (. ) ( 1000)()

. . .

= 18 , = 1 , = 0.85

= 50 , = 12

, =5

. :

= 300

= 30

. = 30 %

= 450 /3 /

= 0.2

. .. = 60 sec

.. = 1200 3 /2 /

1 = . 1 = . =

3 18 1 .85
1
60 24

= 66,096

3 /
3 /

2 = . 2 = 1200 (3 18 1) = 64,800
2
1 = . =

6 50 12 5
6

= 3000

= 3000 24 = 72,000 3 /
= + = 1.2

3 = 60,000

3 /

2
. = .7 = 210

4 =

450 (6 50 12 5)
210

= 38,571 3 /

. . = 38,571 3 /

Page

. . . = 60,000 3 = 500
. = 600

1 .
2 . . . .

. = 30 %
= 0.7 = .7 500 = 350


1
. = 20 50 % 25 %

= + = 1.25 = 1.25 60,000 = 75,000 3 /


. = 8
75,000
8 = 25,000 3
24
. + .
=
,

.
60,000 350

=
=
= 840 /3 /

25,000
= . =

= . . . = 25,000

= 10

, = 6 , = 10 = 42

2 .
= = 75,000 3 /
75,000
1.5 = 4687.5 3
24

Page

= . =

. = 1.5

= 30 3 /2 /
=
=

=
4687.5
2500

4687.5
2

75,000
30

= 1.89

= 2500 2
=2

= 2344 2
4

= 35

= 2.43

= 3

= 31.6

1 =

2 =

75,000
3

31.62

75,000
3 31.6

= 31.9 < 45
= 251.8

> 200

.5
= (. 5 + .5) = 30.6
= 3 ( 31.6 + 30.6) = 586.22
586.22

3 = =

= 128 < 200 .

75,000
24 60
31.6
3

= 0.17 / min < .3

75,000

Page

. . .
= 75: 85 % 80 %
100 = 80 %

= 70

350
350

= 0.8

= (. 75 4.5 ) 2
1+

= (1+0.1)2 = 2.083

= 314.6 = 655.24 /3

= 80

100

1 + 0.0085 2.75

. . = . . + . .
/

= 60,000 350 + 2 60,000 70 = 29.4 106


= 44,870 3

29.4 10 6
655.24

..

. = 29,912 2

= 35 . . 2 = 8736 = 31
4
= 31 = 35
= 1.5

< 30

+ (1 + 2) 60,000
=
=6

.
31. . 352
4

S.S
BOD

6
Page

Notes on sheet 6 :
= 100 //
/

1 = 60,000

= 100 60,000 = 6 106

) (

= 250 //

= 12,000 3 /

250
1000

= 500

= 0.8 60,000
6 106
12,000


& & .
= +

= +

. +

Activated sludge BODfinal


Combined efficiency Over all Efficiency
3- Design of conventional aeration or step aeration or extended aeration
Activated sludge
( ) ( & BOD & D.T
)Qr

7
Page

Page