EE529 Mark 2008 Sample
EE529 Mark 2008 Sample
Dr N.C. Cheung
SOLUTION
MARKS
Q4
a)
b)
P2
P1
P2
P1
S2, 07-08
cos 2
cos 1
= 2Vin 2 I o cos 1
= 2Vin1 I o cos 2
QUESTION
NO. ( )
SOLUTION
S2, 07-08
MARKS
QUESTION
NO. ( )
SOLUTION
MARKS
c)
d)
S2, 07-08
QUESTION
NO. ( )
SOLUTION
MARKS
Q5
a)
Vo
N
= 2
Vin N1
DC rectified
H-bridge Vo/Vin
Vo
N2/N1
Leakage Ind
Po
Io=
Ip average
overlap time
fs
S2, 07-08
15499.781
0.75
2.50E+06
215
2.00E-05
5.00E+06
5.00
430.11
1.11E-06
1.20E+04
V
V
(answer b)
H
W
A
A
s
Hz
(answer c)
QUESTION
NO. ( )
SOLUTION
period
loss in duty ratio
revised phase angle
MARKS
8.33E-05
0.027
0.777
4.5
3957
2.439883
(rad)
V
W
25
250
3971
V
W
W
Transformer eff
Transformer loss
0.985
75000
Total loss
79207
Efficiency
0.984
(answer d)
(answer e)
Q3
c)
(any 4 above)
d)
It consists of a rectifier, and an inverter. The ac voltage generated from the inverter is
connected to the power line using an isolation transformer.
S2, 07-08
QUESTION
NO. ( )
SOLUTION
MARKS
The power transformer can be replaced by a high frequency isolated DC-Dc converter.
The transformer turns ratio and the voltage conversion ratio of the DC/Dc converter
can be designed to replace the original transformer. It also has the additional feature
of fast voltage response for any voltage dip.
An UPD should be used. A UPS is to handle the total power. It will replace the
source using the energy storage. Therefore the power level of the UPS is usually
higher than DVR
S2, 07-08