Doubledragon Center West Internal Schedule
Doubledragon Center West Internal Schedule
Doubledragon Center West Internal Schedule
ID
WBS
Task Name
Duration
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
1
1.1
1.2
1.3
1.4
1.5
2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.2
2.2.1
2.2.1.1
2.2.1.2
2.2.2
2.2.2.1
2.2.2.2
2.2.2.3
2.2.2.4
2.2.2.5
2.2.2.6
2.2.2.7
2.2.2.8
2.3
2.3.1
2.3.2
2.3.3
2.3.3.1
2.3.3.2
2.3.3.3
2.3.3.4
2.3.4
2.3.4.1
2.3.4.2
2.3.4.3
2.3.4.4
2.4
2.4.1
2.4.1.1
2.4.1.1.1
2.4.1.1.2
PRECONSTRUCTION SCHEDULE
BUILDING PERMIT REQUIREMENTS
EXCAVATION PERMIT
FCD
BUILDING PERMIT APPLICATION
RELEASE OF BUILDING PERMIT +15 DAYS
DOUBLEDRAGON CORPORATE CENTER WEST
MILESTONES
DAY 1
FIRST POURING
TOP-OFF
WATERTIGHT
TESTING AND COMMISSIONING
HAND OVER
GENERAL PRELIMINARIES
INITIAL
SURVEY LAY-OUT
BONDS AND INSURANCES
RECURRING
SITE PERSONEL
QUALITY CONTROL
SUPPORT EQUIPMENT
SECURITY AND SAFETY MEASURES
OTHER PERMITS
CONTRACTORS TAX
TEMPORARY UTILITIES
TEMPORARY FACILITIES
SITEWORKS
PILE DRIVING WORKS
SLOPE PROTECTION TO PERIMETER
EXCAVATION TO SOIL DISPOSAL
BULK EXCAVATION
STRUCTURAL EXCAVATION
CUTTING AND CHIPPING OF PILES
DISPOSAL OF SOIL
PRESSURE SLAB PREPARATION
BACKFILLING
SOIL POISONING
GRAVEL BEDDING
BENTONITE PAD
STRUCTURAL WORKS
SUB-STRUCTURE
FOUNDATION
PILE CAPS (A 1-4 )
LEAN CONCRETE
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
147 days
42 days
62 days
92 days
70 days
15 days
664 days
593 days
0 days
0 days
0 days
0 days
0 days
0 days
637 days
41 days
5 days
31 days
627 days
627 days
627 days
627 days
627 days
627 days
627 days
627 days
627 days
232 days
75 days
122 days
115 days
90 days
90 days
105 days
105 days
105 days
105 days
105 days
105 days
105 days
372 days
173 days
128 days
107 days
107 days
Split
1 07 BUILDING
19 08
PERMIT REQUIREMENTS
8 06 EXCAVATION
19 08PERMIT
8 06 FCD
26 09
20 08 BUILDING PERMIT
14 11 APPLICATION
15 11 RELEASE
2 12
OF BUILDING PERMIT +15 DAYS
DAY 1
FIRST POURING
TOP-OFF
2 03
WATERTIGHT
16 05
TESTING AND COMMISSIONING
HAND OVER
1 12
3 12
4 10
10 10
15 10 BONDS
22 11
AND INSURANCES
15 10
15 10
15 10
15 10
15 10
15 10
15 10
15 10
1 09
SITE PERSONEL
QUALITY CONTROL
SUPPORT EQUIPMENT
SECURITY AND SAFETY MEASURES
OTHER PERMITS
CONTRACTORS TAX
TEMPORARY UTILITIES
TEMPORARY FACILITIES
3 12
3 12
3 12
3 12
3 12
3 12
3 12
3 12
PILE DRIVING
1 12
WORKS
15 10 SLOPE PROTECTION
17TO
03PERIMETER
29 10 BULK EXCAVATION
21 02
12 11 STRUCTURAL EXCAVATION
6 03
12 11 CUTTING AND CHIPPING
23 03 OF PILES
12 11 DISPOSAL OF SOIL
23 03
8 02
8 02
8 02
8 02
24 11
24 11
Summary
Page 1
2 12
25 11
BACKFILLING 16 06
SOIL POISONING16 06
GRAVEL BEDDING
16 06
BENTONITE PAD16 06
Critical
ID
WBS
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
Task Name
2.4.1.1.3
2.4.1.2
2.4.1.2.1
2.4.1.2.1.1
2.4.1.2.1.2
2.4.1.2.1.3
2.4.1.2.2
2.4.1.2.2.1
2.4.1.2.2.2
2.4.1.2.2.3
2.4.1.2.3
2.4.1.2.3.1
2.4.1.2.3.2
2.4.1.2.3.3
2.4.2
2.4.2.1
2.4.2.1.1
2.4.2.1.2
2.4.2.1.3
2.4.2.1.4
2.4.2.1.4.1
2.4.2.1.4.1.1
2.4.2.1.4.1.1.1
2.4.2.1.4.1.1.2
2.4.2.1.4.1.1.3
2.4.2.1.4.1.2
2.4.2.1.4.1.2.1
2.4.2.1.4.1.2.2
2.4.2.1.4.1.2.3
2.4.2.1.4.1.2.4
2.4.2.1.4.1.2.5
2.4.2.1.4.1.3
2.4.2.1.4.1.3.1
2.4.2.1.4.1.3.2
2.4.2.1.4.1.3.3
2.4.2.1.4.1.3.4
2.4.2.1.4.2
2.4.2.1.4.2.1
2.4.2.1.4.2.1.1
2.4.2.1.4.2.1.2
2.4.2.1.4.2.1.3
2.4.2.1.4.2.2
2.4.2.1.4.2.2.1
2.4.2.1.4.2.2.2
2.4.2.1.4.2.2.3
Duration
FTB(PERIMETER )
TANKS
RAINWATER COLLECTOR & CISTERN TANK
PRESSURE SLAB
WALLS
TOP SLAB
STP
PRESSURE SLAB
WALLS
TOP SLAB
FUEL TANK
PRESSURE SLAB
WALLS
TOP SLAB
SUPERSTRUCTURE
BASMENT TO PODIUM
RETAINING WALLS
BASEMENT
GROUND FLOOR
2ND FLOOR
AREA 1
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
106 days
80 days
61 days
15 days
31 days
15 days
50 days
15 days
20 days
15 days
50 days
15 days
20 days
15 days
334 days
174 days
110 days
105 days
105 days
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
21 12 FTB(PERIMETER )5 05
22 03 PRESSURE
7 04
SLAB
8 04 WALLS
18 05
19 05 TOP
5 06
SLAB
8 04 PRESSURE
28 04
SLAB
29 04 WALLS
23 05
24 05 TOP
9 06
SLAB
29 04 PRESSURE
17 05
SLAB
18 05 WALLS
9 06
10 06 TOP
29SLAB
06
14 01 RETAINING WALLS
29 05
8 02 BASEMENT
16 06
27 02 GROUND FLOOR5 07
6 07
6 07
6 07
8 07 EXTERIOR
17 07
PC WALL INSTALLATION
8 07 10 07
11 07 13 07
14 07 17 07
18 07 18 07
19 07 19 07
20 07 20 07
21 07 22 07
24 07 24 07
13 07
13 07
13 07
14 07
14 07
14 07
15 07 EXTERIOR
24 07
PC WALL INSTALLATION
15 07 17 07
18 07 20 07
Summary
Page 2
7 07
7 07
7 07
Project Summary
Critical
ID
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
WBS
Task Name
2.4.2.1.4.2.2.4
2.4.2.1.4.2.2.5
2.4.2.1.4.2.3
2.4.2.1.4.2.3.1
2.4.2.1.4.2.3.2
2.4.2.1.4.2.3.3
2.4.2.1.4.2.3.4
2.4.2.1.4.3
2.4.2.1.4.3.1
2.4.2.1.4.3.1.1
2.4.2.1.4.3.1.2
2.4.2.1.4.3.1.3
2.4.2.1.4.3.2
2.4.2.1.4.3.2.1
2.4.2.1.4.3.2.2
2.4.2.1.4.3.2.3
2.4.2.1.4.3.2.4
2.4.2.1.4.3.2.5
2.4.2.1.4.3.3
2.4.2.1.4.3.3.1
2.4.2.1.4.3.3.2
2.4.2.1.4.3.3.3
2.4.2.1.4.3.3.4
2.4.2.1.4.4
2.4.2.1.4.4.1
2.4.2.1.4.4.1.1
2.4.2.1.4.4.1.2
2.4.2.1.4.4.1.3
2.4.2.1.4.4.2
2.4.2.1.4.4.2.1
2.4.2.1.4.4.2.2
2.4.2.1.4.4.2.3
2.4.2.1.4.4.2.4
2.4.2.1.4.4.2.5
2.4.2.1.4.4.3
2.4.2.1.4.4.3.1
2.4.2.1.4.4.3.2
2.4.2.1.4.4.3.3
2.4.2.1.4.4.3.4
2.4.2.1.4.5
2.4.2.1.4.5.1
2.4.2.1.4.5.1.1
2.4.2.1.4.5.1.2
2.4.2.1.4.5.1.3
2.4.2.1.4.5.2
Duration
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 3
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 4
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
ELEVATOR AREA
SHEARWALL
REBAR
FORMWORKS CLADDING
CONCRETING
INTERIOR PC WALL INSTALLATION
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
2 days
Start
Finish
2016
2017
A M J J A S O N D J F M A M J J
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07
21 07
25 07
26 07 26 07
27 07 27 07
28 07 29 07
31 07 31 07
20 07
20 07
20 07
21 07
21 07
21 07
22 07 EXTERIOR
31 07
PC WALL INSTALLATION
22 07 24 07
25 07 27 07
28 07 31 07
1 08 1 08
2 08 2 08
3 08 3 08
4 08 5 08
7 08 7 08
27 07
27 07
27 07
28 07
28 07
28 07
29 07 EXTERIOR
7 08
PC WALL INSTALLATION
29 07 31 07
1 08 3 08
4 08 7 08
8 08 8 08
9 08 9 08
10 08 10 08
11 08 12 08
14 08 14 08
16 06 17 06
19 06 19 06
20 06 20 06
21 06 22 06
Summary
Page 3
2018
A S O N D J F M A M J J A S O N D J F M
08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
24 07
25 07
Project Summary
Critical
ID
WBS
Task Name
Duration
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
2.4.2.1.4.5.3
2.4.2.1.4.5.3.1
2.4.2.1.4.5.3.2
2.4.2.1.4.5.3.3
2.4.2.1.4.5.3.4
2.4.2.1.4.5.4
2.4.2.1.4.5.4.1
2.4.2.1.4.5.4.2
2.4.2.1.4.5.4.3
2.4.2.2
2.4.2.2.1
2.4.2.2.1.1
2.4.2.2.1.1.1
2.4.2.2.1.1.1.1
2.4.2.2.1.1.1.2
2.4.2.2.1.1.1.3
2.4.2.2.1.1.2
2.4.2.2.1.1.2.1
2.4.2.2.1.1.2.2
2.4.2.2.1.1.2.3
2.4.2.2.1.1.2.4
2.4.2.2.1.1.2.5
2.4.2.2.1.1.3
2.4.2.2.1.1.3.1
2.4.2.2.1.1.3.2
2.4.2.2.1.1.3.3
2.4.2.2.1.1.3.4
2.4.2.2.1.2
2.4.2.2.1.2.1
2.4.2.2.1.2.1.1
2.4.2.2.1.2.1.2
2.4.2.2.1.2.1.3
2.4.2.2.1.2.2
2.4.2.2.1.2.2.1
2.4.2.2.1.2.2.2
2.4.2.2.1.2.2.3
2.4.2.2.1.2.2.4
2.4.2.2.1.2.2.5
2.4.2.2.1.2.3
2.4.2.2.1.2.3.1
2.4.2.2.1.2.3.2
2.4.2.2.1.2.3.3
2.4.2.2.1.2.3.4
2.4.2.2.1.3
2.4.2.2.1.3.1
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
194 days
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
23 06 23 06
24 06 26 06
28 06 28 06
29 06 29 06
30 06 1 07
3 07 4 07
5 07 5 07
25 07
25 07
25 07
27 07
4 08
27 07 28 07
29 07 1 08
2 08 4 08
5 08 5 08
7 08 7 08
8 08 8 08
9 08 10 08
11 08 11 08
1 08
1 08
1 08
2 08
2 08
2 08
3 08
11 08
3 08 4 08
5 08 8 08
9 08 11 08
12 08 12 08
14 08 14 08
15 08 15 08
16 08 17 08
18 08 18 08
Summary
Page 4
26 07
26 07
26 07
Project Summary
Critical
ID
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
WBS
Task Name
2.4.2.2.1.3.1.1
2.4.2.2.1.3.1.2
2.4.2.2.1.3.1.3
2.4.2.2.1.3.2
2.4.2.2.1.3.2.1
2.4.2.2.1.3.2.2
2.4.2.2.1.3.2.3
2.4.2.2.1.3.2.4
2.4.2.2.1.3.2.5
2.4.2.2.1.3.3
2.4.2.2.1.3.3.1
2.4.2.2.1.3.3.2
2.4.2.2.1.3.3.3
2.4.2.2.1.3.3.4
2.4.2.2.1.4
2.4.2.2.1.4.1
2.4.2.2.1.4.1.1
2.4.2.2.1.4.1.2
2.4.2.2.1.4.1.3
2.4.2.2.1.4.2
2.4.2.2.1.4.2.1
2.4.2.2.1.4.2.2
2.4.2.2.1.4.2.3
2.4.2.2.1.4.2.4
2.4.2.2.1.4.2.5
2.4.2.2.1.4.3
2.4.2.2.1.4.3.1
2.4.2.2.1.4.3.2
2.4.2.2.1.4.3.3
2.4.2.2.1.4.3.4
2.4.2.2.1.5
2.4.2.2.1.5.1
2.4.2.2.1.5.1.1
2.4.2.2.1.5.1.2
2.4.2.2.1.5.1.3
2.4.2.2.1.5.2
2.4.2.2.1.5.3
2.4.2.2.1.5.3.1
2.4.2.2.1.5.3.2
2.4.2.2.1.5.3.3
2.4.2.2.1.5.3.4
2.4.2.2.1.5.4
2.4.2.2.1.5.4.1
2.4.2.2.1.5.4.2
2.4.2.2.1.5.4.3
Duration
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 4
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
ELEVATOR AREA
SHEARWALL
REBAR
FORMWORKS CLADDING
CONCRETING
INTERIOR PC WALL INSTALLATION
BEAMS AND GIRDERS
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
CONCRETING
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
2 days
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
8 08 9 08
8 08 9 08
8 08 9 08
10 08
18 08
10 08 11 08
12 08 15 08
16 08 18 08
19 08 19 08
22 08 22 08
23 08 23 08
24 08 25 08
26 08 26 08
15 08
15 08
15 08
17 08 EXTERIOR
26 08
PC WALL INSTALLATION
17 08 18 08
19 08 23 08
24 08 26 08
29 08 29 08
30 08 30 08
31 08 31 08
1 09 4 09
5 09 5 09
6 07 7 07
8 07 8 07
10 07 10 07
11 07 12 07
13 07 13 07
14 07 15 07
17 07 17 07
18 07 18 07
19 07 20 07
21 07 22 07
24 07 24 07
Summary
Page 5
16 08
16 08
16 08
Project Summary
Critical
ID
WBS
Task Name
Duration
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
2.4.2.2.2
2.4.2.2.2.1
2.4.2.2.2.1.1
2.4.2.2.2.1.1.1
2.4.2.2.2.1.1.2
2.4.2.2.2.1.1.3
2.4.2.2.2.1.2
2.4.2.2.2.1.2.1
2.4.2.2.2.1.2.2
2.4.2.2.2.1.2.3
2.4.2.2.2.1.2.4
2.4.2.2.2.1.2.5
2.4.2.2.2.1.3
2.4.2.2.2.1.3.1
2.4.2.2.2.1.3.2
2.4.2.2.2.1.3.3
2.4.2.2.2.1.3.4
2.4.2.2.2.2
2.4.2.2.2.2.1
2.4.2.2.2.2.1.1
2.4.2.2.2.2.1.2
2.4.2.2.2.2.1.3
2.4.2.2.2.2.2
2.4.2.2.2.2.2.1
2.4.2.2.2.2.2.2
2.4.2.2.2.2.2.3
2.4.2.2.2.2.2.4
2.4.2.2.2.2.2.5
2.4.2.2.2.2.3
2.4.2.2.2.2.3.1
2.4.2.2.2.2.3.2
2.4.2.2.2.2.3.3
2.4.2.2.2.2.3.4
2.4.2.2.2.3
2.4.2.2.2.3.1
2.4.2.2.2.3.1.1
2.4.2.2.2.3.1.2
2.4.2.2.2.3.1.3
2.4.2.2.2.3.2
2.4.2.2.2.3.2.1
2.4.2.2.2.3.2.2
2.4.2.2.2.3.2.3
2.4.2.2.2.3.2.4
2.4.2.2.2.3.2.5
2.4.2.2.2.3.3
5TH FLOOR
AREA 1
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 3
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
12 08
12 08
12 08
15 08 EXTERIOR
24 08
PC WALL INSTALLATION
15 08 16 08
17 08 19 08
22 08 24 08
25 08 25 08
26 08 26 08
29 08 29 08
30 08 31 08
1 09 1 09
19 08
19 08
19 08
22 08
22 08
22 08
23 08 EXTERIOR
1 09
PC WALL INSTALLATION
23 08 24 08
25 08 29 08
30 08 1 09
4 09 4 09
5 09 5 09
6 09 6 09
7 09 8 09
9 09 9 09
29 08
29 08
29 08
30 08
30 08
30 08
31 08 EXTERIOR
9 09
PC WALL INSTALLATION
31 08 1 09
4 09 6 09
7 09 9 09
11 09 11 09
Summary
Page 6
14 08
14 08
14 08
Project Summary
Critical
ID
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
WBS
Task Name
2.4.2.2.2.3.3.1
2.4.2.2.2.3.3.2
2.4.2.2.2.3.3.3
2.4.2.2.2.3.3.4
2.4.2.2.2.4
2.4.2.2.2.4.1
2.4.2.2.2.4.1.1
2.4.2.2.2.4.1.2
2.4.2.2.2.4.1.3
2.4.2.2.2.4.2
2.4.2.2.2.4.2.1
2.4.2.2.2.4.2.2
2.4.2.2.2.4.2.3
2.4.2.2.2.4.2.4
2.4.2.2.2.4.2.5
2.4.2.2.2.4.3
2.4.2.2.2.4.3.1
2.4.2.2.2.4.3.2
2.4.2.2.2.4.3.3
2.4.2.2.2.4.3.4
2.4.2.2.2.5
2.4.2.2.2.5.1
2.4.2.2.2.5.1.1
2.4.2.2.2.5.1.2
2.4.2.2.2.5.1.3
2.4.2.2.2.5.2
2.4.2.2.2.5.3
2.4.2.2.2.5.3.1
2.4.2.2.2.5.3.2
2.4.2.2.2.5.3.3
2.4.2.2.2.5.3.4
2.4.2.2.2.5.4
2.4.2.2.2.5.4.1
2.4.2.2.2.5.4.2
2.4.2.2.2.5.4.3
2.4.2.2.3
2.4.2.2.3.1
2.4.2.2.3.1.1
2.4.2.2.3.1.1.1
2.4.2.2.3.1.1.2
2.4.2.2.3.1.1.3
2.4.2.2.3.1.2
2.4.2.2.3.1.2.1
2.4.2.2.3.1.2.2
2.4.2.2.3.1.2.3
Duration
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 4
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
ELEVATOR AREA
SHEARWALL
REBAR
FORMWORKS CLADDING
CONCRETING
INTERIOR PC WALL INSTALLATION
BEAMS AND GIRDERS
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
CONCRETING
6TH FLOOR
AREA 1
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
2 days
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
12 09 12 09
13 09 13 09
14 09 15 09
16 09 16 09
6 09
6 09
6 09
8 09
16 09
8 09 9 09
11 09 13 09
14 09 16 09
18 09 18 09
19 09 19 09
20 09 20 09
21 09 22 09
23 09 23 09
25 07
27 07
28 07
29 07
26 07
27 07
28 07
31 07
1 08 1 08
2 08 3 08
4 08 4 08
5 08 5 08
7 08
9 08
11 08
Summary
Page 7
7 09
7 09
7 09
Project Summary
8 08
10 08
11 08
4 09
4 09
4 09
5 09
5 09
5 09
6 09
6 09
8 09
14 09
7 09
11 09
Critical
ID
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
WBS
Task Name
2.4.2.2.3.1.2.4
2.4.2.2.3.1.2.5
2.4.2.2.3.1.3
2.4.2.2.3.1.3.1
2.4.2.2.3.1.3.2
2.4.2.2.3.1.3.3
2.4.2.2.3.1.3.4
2.4.2.2.3.2
2.4.2.2.3.2.1
2.4.2.2.3.2.1.1
2.4.2.2.3.2.1.2
2.4.2.2.3.2.1.3
2.4.2.2.3.2.2
2.4.2.2.3.2.2.1
2.4.2.2.3.2.2.2
2.4.2.2.3.2.2.3
2.4.2.2.3.2.2.4
2.4.2.2.3.2.2.5
2.4.2.2.3.2.3
2.4.2.2.3.2.3.1
2.4.2.2.3.2.3.2
2.4.2.2.3.2.3.3
2.4.2.2.3.2.3.4
2.4.2.2.3.3
2.4.2.2.3.3.1
2.4.2.2.3.3.1.1
2.4.2.2.3.3.1.2
2.4.2.2.3.3.1.3
2.4.2.2.3.3.2
2.4.2.2.3.3.2.1
2.4.2.2.3.3.2.2
2.4.2.2.3.3.2.3
2.4.2.2.3.3.2.4
2.4.2.2.3.3.2.5
2.4.2.2.3.3.3
2.4.2.2.3.3.3.1
2.4.2.2.3.3.3.2
2.4.2.2.3.3.3.3
2.4.2.2.3.3.3.4
2.4.2.2.3.4
2.4.2.2.3.4.1
2.4.2.2.3.4.1.1
2.4.2.2.3.4.1.2
2.4.2.2.3.4.1.3
2.4.2.2.3.4.2
Duration
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 3
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 4
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
12 09 14 09
15 09 15 09
16 09 16 09
18 09 18 09
19 09 20 09
21 09 21 09
11 09
11 09
11 09
13 09
21 09
13 09 14 09
15 09 18 09
19 09 21 09
22 09 22 09
23 09 23 09
25 09 25 09
26 09 27 09
28 09 28 09
18 09
18 09
18 09
19 09
19 09
19 09
20 09
28 09
20 09 21 09
22 09 25 09
26 09 28 09
29 09 29 09
30 09 30 09
2 10 2 10
3 10 4 10
5 10 5 10
25 09
25 09
25 09
Summary
Page 8
12 09
12 09
12 09
Project Summary
26 09
26 09
26 09
Critical
ID
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
WBS
Task Name
2.4.2.2.3.4.2.1
2.4.2.2.3.4.2.2
2.4.2.2.3.4.2.3
2.4.2.2.3.4.2.4
2.4.2.2.3.4.2.5
2.4.2.2.3.4.3
2.4.2.2.3.4.3.1
2.4.2.2.3.4.3.2
2.4.2.2.3.4.3.3
2.4.2.2.3.4.3.4
2.4.2.2.3.5
2.4.2.2.3.5.1
2.4.2.2.3.5.1.1
2.4.2.2.3.5.1.2
2.4.2.2.3.5.1.3
2.4.2.2.3.5.2
2.4.2.2.3.5.3
2.4.2.2.3.5.3.1
2.4.2.2.3.5.3.2
2.4.2.2.3.5.3.3
2.4.2.2.3.5.3.4
2.4.2.2.3.5.4
2.4.2.2.3.5.4.1
2.4.2.2.3.5.4.2
2.4.2.2.3.5.4.3
2.4.2.2.4
2.4.2.2.4.1
2.4.2.2.4.1.1
2.4.2.2.4.1.1.1
2.4.2.2.4.1.1.2
2.4.2.2.4.1.1.3
2.4.2.2.4.1.2
2.4.2.2.4.1.2.1
2.4.2.2.4.1.2.2
2.4.2.2.4.1.2.3
2.4.2.2.4.1.2.4
2.4.2.2.4.1.2.5
2.4.2.2.4.1.3
2.4.2.2.4.1.3.1
2.4.2.2.4.1.3.2
2.4.2.2.4.1.3.3
2.4.2.2.4.1.3.4
2.4.2.2.4.2
2.4.2.2.4.2.1
2.4.2.2.4.2.1.1
Duration
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
2 days
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
Start
Finish
2016
2017
A M J J A S O N D J F M A M J J A S
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09
27 09
27 09
29 09
3 10
6 10
7 10 7 10
9 10 9 10
10 10 11 10
12 10 12 10
12 08
15 08
16 08
17 08
14 08
15 08
16 08
18 08
19 08 19 08
22 08 23 08
24 08 24 08
25 08 25 08
26 08
30 08
1 09
29 08
31 08
1 09
22 09
22 09
22 09
23 09
23 09
23 09
25 09
3 10
25 09 26 09
27 09 29 09
30 09 3 10
4 10 4 10
5 10 5 10
6 10 6 10
7 10 9 10
10 10 10 10
29 09
Summary
Page 9
2018
O N D J F M A M J J A S O N D J F M
10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
EXTERIOR
5 10
PC WALL INSTALLATION
28 09
2 10
5 10
6 10
Project Summary
30 09
Critical
ID
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
WBS
Task Name
2.4.2.2.4.2.1.2
2.4.2.2.4.2.1.3
2.4.2.2.4.2.2
2.4.2.2.4.2.2.1
2.4.2.2.4.2.2.2
2.4.2.2.4.2.2.3
2.4.2.2.4.2.2.4
2.4.2.2.4.2.2.5
2.4.2.2.4.2.3
2.4.2.2.4.2.3.1
2.4.2.2.4.2.3.2
2.4.2.2.4.2.3.3
2.4.2.2.4.2.3.4
2.4.2.2.4.3
2.4.2.2.4.3.1
2.4.2.2.4.3.1.1
2.4.2.2.4.3.1.2
2.4.2.2.4.3.1.3
2.4.2.2.4.3.2
2.4.2.2.4.3.2.1
2.4.2.2.4.3.2.2
2.4.2.2.4.3.2.3
2.4.2.2.4.3.2.4
2.4.2.2.4.3.2.5
2.4.2.2.4.3.3
2.4.2.2.4.3.3.1
2.4.2.2.4.3.3.2
2.4.2.2.4.3.3.3
2.4.2.2.4.3.3.4
2.4.2.2.4.4
2.4.2.2.4.4.1
2.4.2.2.4.4.1.1
2.4.2.2.4.4.1.2
2.4.2.2.4.4.1.3
2.4.2.2.4.4.2
2.4.2.2.4.4.2.1
2.4.2.2.4.4.2.2
2.4.2.2.4.4.2.3
2.4.2.2.4.4.2.4
2.4.2.2.4.4.2.5
2.4.2.2.4.4.3
2.4.2.2.4.4.3.1
2.4.2.2.4.4.3.2
2.4.2.2.4.4.3.3
2.4.2.2.4.4.3.4
Duration
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 3
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 4
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
Start
Finish
2016
2017
A M J J A S O N D J F M A M J J A S
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09
29 09
29 09
2 10
10 10
2 10 3 10
4 10 6 10
7 10 10 10
11 10 11 10
12 10 12 10
13 10 13 10
14 10 16 10
17 10 17 10
6 10
6 10
6 10
7 10
7 10
7 10
9 10
17 10
9 10 10 10
11 10 13 10
14 10 17 10
18 10 18 10
19 10 19 10
20 10 20 10
21 10 23 10
24 10 24 10
13 10
13 10
13 10
14 10
14 10
14 10
16 10
24 10
16 10 17 10
18 10 20 10
21 10 24 10
25 10 25 10
26 10 26 10
27 10 27 10
28 10 30 10
31 10 31 10
Summary
Page 10
2018
O N D J F M A M J J A S O N D J F M
10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
30 09
30 09
Project Summary
Critical
ID
WBS
Task Name
Duration
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
2.4.2.2.4.5
2.4.2.2.4.5.1
2.4.2.2.4.5.1.1
2.4.2.2.4.5.1.2
2.4.2.2.4.5.1.3
2.4.2.2.4.5.2
2.4.2.2.4.5.3
2.4.2.2.4.5.3.1
2.4.2.2.4.5.3.2
2.4.2.2.4.5.3.3
2.4.2.2.4.5.3.4
2.4.2.2.4.5.4
2.4.2.2.4.5.4.1
2.4.2.2.4.5.4.2
2.4.2.2.4.5.4.3
2.4.2.2.5
2.4.2.2.5.1
2.4.2.2.5.1.1
2.4.2.2.5.1.1.1
2.4.2.2.5.1.1.2
2.4.2.2.5.1.1.3
2.4.2.2.5.1.2
2.4.2.2.5.1.2.1
2.4.2.2.5.1.2.2
2.4.2.2.5.1.2.3
2.4.2.2.5.1.2.4
2.4.2.2.5.1.2.5
2.4.2.2.5.1.3
2.4.2.2.5.1.3.1
2.4.2.2.5.1.3.2
2.4.2.2.5.1.3.3
2.4.2.2.5.1.3.4
2.4.2.2.5.2
2.4.2.2.5.2.1
2.4.2.2.5.2.1.1
2.4.2.2.5.2.1.2
2.4.2.2.5.2.1.3
2.4.2.2.5.2.2
2.4.2.2.5.2.2.1
2.4.2.2.5.2.2.2
2.4.2.2.5.2.2.3
2.4.2.2.5.2.2.4
2.4.2.2.5.2.2.5
2.4.2.2.5.2.3
2.4.2.2.5.2.3.1
ELEVATOR AREA
SHEARWALL
REBAR
FORMWORKS CLADDING
CONCRETING
INTERIOR PC WALL INSTALLATION
BEAMS AND GIRDERS
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
CONCRETING
8TH FLOOR
AREA 1
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
16 days
4 days
2 days
1 day
1 day
2 days
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
4 09
6 09
7 09
8 09
11 09 11 09
12 09 13 09
14 09 14 09
15 09 15 09
16 09
19 09
21 09
18 09
20 09
21 09
11 10
11 10
11 10
12 10
12 10
12 10
13 10
21 10
13 10 14 10
16 10 18 10
19 10 21 10
23 10 23 10
24 10 24 10
25 10 25 10
26 10 27 10
28 10 28 10
18 10
18 10
18 10
19 10
19 10
19 10
20 10
28 10
20 10 21 10
23 10 25 10
26 10 28 10
30 10 30 10
31 10
Summary
Page 11
5 09
6 09
7 09
9 09
Project Summary
31 10
Critical
ID
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
WBS
Task Name
2.4.2.2.5.2.3.2
2.4.2.2.5.2.3.3
2.4.2.2.5.2.3.4
2.4.2.2.5.3
2.4.2.2.5.3.1
2.4.2.2.5.3.1.1
2.4.2.2.5.3.1.2
2.4.2.2.5.3.1.3
2.4.2.2.5.3.2
2.4.2.2.5.3.2.1
2.4.2.2.5.3.2.2
2.4.2.2.5.3.2.3
2.4.2.2.5.3.2.4
2.4.2.2.5.3.2.5
2.4.2.2.5.3.3
2.4.2.2.5.3.3.1
2.4.2.2.5.3.3.2
2.4.2.2.5.3.3.3
2.4.2.2.5.3.3.4
2.4.2.2.5.4
2.4.2.2.5.4.1
2.4.2.2.5.4.1.1
2.4.2.2.5.4.1.2
2.4.2.2.5.4.1.3
2.4.2.2.5.4.2
2.4.2.2.5.4.2.1
2.4.2.2.5.4.2.2
2.4.2.2.5.4.2.3
2.4.2.2.5.4.2.4
2.4.2.2.5.4.2.5
2.4.2.2.5.4.3
2.4.2.2.5.4.3.1
2.4.2.2.5.4.3.2
2.4.2.2.5.4.3.3
2.4.2.2.5.4.3.4
2.4.2.2.5.5
2.4.2.2.5.5.1
2.4.2.2.5.5.1.1
2.4.2.2.5.5.1.2
2.4.2.2.5.5.1.3
2.4.2.2.5.5.2
2.4.2.2.5.5.3
2.4.2.2.5.5.3.1
2.4.2.2.5.5.3.2
2.4.2.2.5.5.3.3
Duration
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
2 days
5 days
1 day
2 days
1 day
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
3 11 3 11
4 11 6 11
7 11 7 11
25 10
25 10
25 10
27 10 EXTERIOR
7 11
PC WALL INSTALLATION
27 10 28 10
30 10 3 11
4 11 7 11
8 11 8 11
9 11 9 11
10 11 10 11
11 11 13 11
14 11 14 11
3 11
3 11
3 11
4 11
4 11
4 11
6 11
14 11
6 11 7 11
8 11 10 11
11 11 14 11
15 11 15 11
16 11 16 11
17 11 17 11
18 11 20 11
21 11 21 11
22 09 23 09
25 09 25 09
26 09 26 09
27 09 28 09
29 09 29 09
30 09 2 10
3 10 3 10
Summary
Page 12
26 10
26 10
26 10
Project Summary
Critical
ID
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
WBS
Task Name
2.4.2.2.5.5.3.4
2.4.2.2.5.5.4
2.4.2.2.5.5.4.1
2.4.2.2.5.5.4.2
2.4.2.2.5.5.4.3
2.4.2.2.6
2.4.2.2.6.1
2.4.2.2.6.1.1
2.4.2.2.6.1.1.1
2.4.2.2.6.1.1.2
2.4.2.2.6.1.1.3
2.4.2.2.6.1.2
2.4.2.2.6.1.2.1
2.4.2.2.6.1.2.2
2.4.2.2.6.1.2.3
2.4.2.2.6.1.2.4
2.4.2.2.6.1.2.5
2.4.2.2.6.1.3
2.4.2.2.6.1.3.1
2.4.2.2.6.1.3.2
2.4.2.2.6.1.3.3
2.4.2.2.6.1.3.4
2.4.2.2.6.2
2.4.2.2.6.2.1
2.4.2.2.6.2.1.1
2.4.2.2.6.2.1.2
2.4.2.2.6.2.1.3
2.4.2.2.6.2.2
2.4.2.2.6.2.2.1
2.4.2.2.6.2.2.2
2.4.2.2.6.2.2.3
2.4.2.2.6.2.2.4
2.4.2.2.6.2.2.5
2.4.2.2.6.2.3
2.4.2.2.6.2.3.1
2.4.2.2.6.2.3.2
2.4.2.2.6.2.3.3
2.4.2.2.6.2.3.4
2.4.2.2.6.3
2.4.2.2.6.3.1
2.4.2.2.6.3.1.1
2.4.2.2.6.3.1.2
2.4.2.2.6.3.1.3
2.4.2.2.6.3.2
2.4.2.2.6.3.2.1
Duration
CONCRETING
SLAB
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
CONCRETING
9TH FLOOR
AREA 1
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 3
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
1 day
5 days
2 days
2 days
1 day
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
4 10 4 10
5 10 6 10
7 10 9 10
10 10 10 10
30 10
30 10
30 10
3 11
11 11
3 11 4 11
6 11 8 11
9 11 11 11
13 11 13 11
14 11 14 11
15 11 15 11
16 11 17 11
18 11 18 11
8 11
8 11
8 11
9 11
9 11
9 11
10 11
18 11
10 11 11 11
13 11 15 11
16 11 18 11
20 11 20 11
21 11 21 11
22 11 22 11
23 11 24 11
25 11 25 11
15 11
15 11
15 11
17 11
Summary
Page 13
31 10
31 10
31 10
Project Summary
16 11
16 11
16 11
25 11
Critical
ID
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
WBS
Task Name
2.4.2.2.6.3.2.2
2.4.2.2.6.3.2.3
2.4.2.2.6.3.2.4
2.4.2.2.6.3.2.5
2.4.2.2.6.3.3
2.4.2.2.6.3.3.1
2.4.2.2.6.3.3.2
2.4.2.2.6.3.3.3
2.4.2.2.6.3.3.4
2.4.2.2.6.4
2.4.2.2.6.4.1
2.4.2.2.6.4.1.1
2.4.2.2.6.4.1.2
2.4.2.2.6.4.1.3
2.4.2.2.6.4.2
2.4.2.2.6.4.2.1
2.4.2.2.6.4.2.2
2.4.2.2.6.4.2.3
2.4.2.2.6.4.2.4
2.4.2.2.6.4.2.5
2.4.2.2.6.4.3
2.4.2.2.6.4.3.1
2.4.2.2.6.4.3.2
2.4.2.2.6.4.3.3
2.4.2.2.6.4.3.4
2.4.2.2.6.5
2.4.2.2.6.5.1
2.4.2.2.6.5.1.1
2.4.2.2.6.5.1.2
2.4.2.2.6.5.1.3
2.4.2.2.6.5.2
2.4.2.2.6.5.3
2.4.2.2.6.5.3.1
2.4.2.2.6.5.3.2
2.4.2.2.6.5.3.3
2.4.2.2.6.5.3.4
2.4.2.2.6.5.4
2.4.2.2.6.5.4.1
2.4.2.2.6.5.4.2
2.4.2.2.6.5.4.3
2.4.2.2.7
2.4.2.2.7.1
2.4.2.2.7.1.1
2.4.2.2.7.1.1.1
2.4.2.2.7.1.1.2
Duration
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
2 days
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
50 days
16 days
2 days
2 days
2 days
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
17 11 18 11
20 11 22 11
23 11 25 11
27 11 27 11
28 11 28 11
29 11 29 11
1 12 2 12
4 12 4 12
22 11
22 11
22 11
24 11 EXTERIOR
4 12
PC WALL INSTALLATION
24 11 25 11
27 11 29 11
1 12 4 12
5 12 5 12
6 12 6 12
7 12 7 12
8 12 9 12
11 12 11 12
11 10 12 10
13 10 13 10
14 10 14 10
16 10 17 10
18 10 18 10
19 10 20 10
21 10 21 10
23 10 23 10
24 10
26 10
28 10
25 10
27 10
28 10
20 11
20 11
Summary
Page 14
23 11
23 11
23 11
Project Summary
21 11
21 11
Critical
ID
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
WBS
Task Name
2.4.2.2.7.1.1.3
2.4.2.2.7.1.2
2.4.2.2.7.1.2.1
2.4.2.2.7.1.2.2
2.4.2.2.7.1.2.3
2.4.2.2.7.1.2.4
2.4.2.2.7.1.2.5
2.4.2.2.7.1.3
2.4.2.2.7.1.3.1
2.4.2.2.7.1.3.2
2.4.2.2.7.1.3.3
2.4.2.2.7.1.3.4
2.4.2.2.7.2
2.4.2.2.7.2.1
2.4.2.2.7.2.1.1
2.4.2.2.7.2.1.2
2.4.2.2.7.2.1.3
2.4.2.2.7.2.2
2.4.2.2.7.2.2.1
2.4.2.2.7.2.2.2
2.4.2.2.7.2.2.3
2.4.2.2.7.2.2.4
2.4.2.2.7.2.2.5
2.4.2.2.7.2.3
2.4.2.2.7.2.3.1
2.4.2.2.7.2.3.2
2.4.2.2.7.2.3.3
2.4.2.2.7.2.3.4
2.4.2.2.7.3
2.4.2.2.7.3.1
2.4.2.2.7.3.1.1
2.4.2.2.7.3.1.2
2.4.2.2.7.3.1.3
2.4.2.2.7.3.2
2.4.2.2.7.3.2.1
2.4.2.2.7.3.2.2
2.4.2.2.7.3.2.3
2.4.2.2.7.3.2.4
2.4.2.2.7.3.2.5
2.4.2.2.7.3.3
2.4.2.2.7.3.3.1
2.4.2.2.7.3.3.2
2.4.2.2.7.3.3.3
2.4.2.2.7.3.3.4
2.4.2.2.7.4
Duration
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 3
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 4
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
20 11 21 11
22 11 EXTERIOR
1 12
PC WALL INSTALLATION
22 11 23 11
24 11 27 11
28 11 1 12
2 12 2 12
4 12 4 12
5 12 5 12
6 12 7 12
8 12 8 12
27 11
27 11
27 11
29 11 EXTERIOR
8 12
PC WALL INSTALLATION
29 11 1 12
2 12 5 12
6 12 8 12
9 12 9 12
11 12 11 12
12 12 12 12
13 12 14 12
15 12 15 12
5 12
5 12
5 12
6 12
6 12
6 12
7 12
15 12
7 12 8 12
9 12 12 12
13 12 15 12
16 12 16 12
18 12 18 12
19 12 19 12
20 12 21 12
22 12 22 12
Summary
Page 15
28 11
28 11
28 11
Project Summary
Critical
ID
WBS
Task Name
Duration
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
2.4.2.2.7.4.1
2.4.2.2.7.4.1.1
2.4.2.2.7.4.1.2
2.4.2.2.7.4.1.3
2.4.2.2.7.4.2
2.4.2.2.7.4.2.1
2.4.2.2.7.4.2.2
2.4.2.2.7.4.2.3
2.4.2.2.7.4.2.4
2.4.2.2.7.4.2.5
2.4.2.2.7.4.3
2.4.2.2.7.4.3.1
2.4.2.2.7.4.3.2
2.4.2.2.7.4.3.3
2.4.2.2.7.4.3.4
2.4.2.2.7.5
2.4.2.2.7.5.1
2.4.2.2.7.5.1.1
2.4.2.2.7.5.1.2
2.4.2.2.7.5.1.3
2.4.2.2.7.5.2
2.4.2.2.7.5.3
2.4.2.2.7.5.3.1
2.4.2.2.7.5.3.2
2.4.2.2.7.5.3.3
2.4.2.2.7.5.3.4
2.4.2.2.7.5.4
2.4.2.2.7.5.4.1
2.4.2.2.7.5.4.2
2.4.2.2.7.5.4.3
2.4.2.2.8
2.4.2.2.8.1
2.4.2.2.8.1.1
2.4.2.2.8.1.1.1
2.4.2.2.8.1.1.2
2.4.2.2.8.1.1.3
2.4.2.2.8.1.2
2.4.2.2.8.1.2.1
2.4.2.2.8.1.2.2
2.4.2.2.8.1.2.3
2.4.2.2.8.1.2.4
2.4.2.2.8.1.2.5
2.4.2.2.8.1.3
2.4.2.2.8.1.3.1
2.4.2.2.8.1.3.2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
ELEVATOR AREA
SHEARWALL
REBAR
FORMWORKS CLADDING
CONCRETING
INTERIOR PC WALL INSTALLATION
BEAMS AND GIRDERS
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
CONCRETING
11TH FLOOR
AREA 1
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
2 days
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
12 12
12 12
12 12
14 12
22 12
14 12 15 12
16 12 19 12
20 12 22 12
23 12 23 12
27 12 27 12
28 12 28 12
29 12
3 01
4 01 4 01
30 10 31 10
3 11 3 11
4 11 4 11
6 11 7 11
8 11 8 11
9 11 10 11
11 11 11 11
13 11 13 11
14 11
16 11
18 11
15 11
17 11
18 11
9 12
9 12
9 12
11 12
11 12
11 12
12 12
20 12
12 12 13 12
14 12 16 12
18 12 20 12
21 12 21 12
22 12
23 12
Summary
Page 16
13 12
13 12
13 12
Project Summary
22 12
23 12
Critical
ID
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
WBS
Task Name
2.4.2.2.8.1.3.3
2.4.2.2.8.1.3.4
2.4.2.2.8.2
2.4.2.2.8.2.1
2.4.2.2.8.2.1.1
2.4.2.2.8.2.1.2
2.4.2.2.8.2.1.3
2.4.2.2.8.2.2
2.4.2.2.8.2.2.1
2.4.2.2.8.2.2.2
2.4.2.2.8.2.2.3
2.4.2.2.8.2.2.4
2.4.2.2.8.2.2.5
2.4.2.2.8.2.3
2.4.2.2.8.2.3.1
2.4.2.2.8.2.3.2
2.4.2.2.8.2.3.3
2.4.2.2.8.2.3.4
2.4.2.2.8.3
2.4.2.2.8.3.1
2.4.2.2.8.3.1.1
2.4.2.2.8.3.1.2
2.4.2.2.8.3.1.3
2.4.2.2.8.3.2
2.4.2.2.8.3.2.1
2.4.2.2.8.3.2.2
2.4.2.2.8.3.2.3
2.4.2.2.8.3.2.4
2.4.2.2.8.3.2.5
2.4.2.2.8.3.3
2.4.2.2.8.3.3.1
2.4.2.2.8.3.3.2
2.4.2.2.8.3.3.3
2.4.2.2.8.3.3.4
2.4.2.2.8.4
2.4.2.2.8.4.1
2.4.2.2.8.4.1.1
2.4.2.2.8.4.1.2
2.4.2.2.8.4.1.3
2.4.2.2.8.4.2
2.4.2.2.8.4.2.1
2.4.2.2.8.4.2.2
2.4.2.2.8.4.2.3
2.4.2.2.8.4.2.4
2.4.2.2.8.4.2.5
Duration
REBAR INSTALLATION
CONCRETING
AREA 2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 3
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 4
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
Start
Finish
2016
2017
A M J J A S O N D J F M A M J J A S O N D
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12
27 12
29 12
16 12
16 12
16 12
18 12
18 12
18 12
19 12 EXTERIOR
29 12
PC WALL INSTALLATION
19 12 20 12
21 12 23 12
27 12 29 12
3 01 3 01
4 01 4 01
5 01 5 01
6 01 8 01
9 01 9 01
23 12
23 12
23 12
27 12
27 12
27 12
28 12 EXTERIOR
9 01
PC WALL INSTALLATION
28 12 29 12
3 01 5 01
6 01 9 01
10 01 10 01
11 01 11 01
12 01 12 01
13 01 15 01
16 01 16 01
5 01
5 01
5 01
6 01
6 01
6 01
8 01
16 01
8 01 9 01
10 01 12 01
13 01 16 01
17 01 17 01
Summary
Page 17
2018
J F M A M J J A S O N D J F M
01 02 03 04 05 06 07 08 09 10 11 12 01 02
28 12
29 12
Project Summary
Critical
ID
WBS
Task Name
Duration
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
2.4.2.2.8.4.3
2.4.2.2.8.4.3.1
2.4.2.2.8.4.3.2
2.4.2.2.8.4.3.3
2.4.2.2.8.4.3.4
2.4.2.2.8.5
2.4.2.2.8.5.1
2.4.2.2.8.5.1.1
2.4.2.2.8.5.1.2
2.4.2.2.8.5.1.3
2.4.2.2.8.5.2
2.4.2.2.8.5.3
2.4.2.2.8.5.3.1
2.4.2.2.8.5.3.2
2.4.2.2.8.5.3.3
2.4.2.2.8.5.3.4
2.4.2.2.8.5.4
2.4.2.2.8.5.4.1
2.4.2.2.8.5.4.2
2.4.2.2.8.5.4.3
2.4.2.2.9
2.4.2.2.9.1
2.4.2.2.9.1.1
2.4.2.2.9.1.1.1
2.4.2.2.9.1.1.2
2.4.2.2.9.1.1.3
2.4.2.2.9.1.2
2.4.2.2.9.1.2.1
2.4.2.2.9.1.2.2
2.4.2.2.9.1.2.3
2.4.2.2.9.1.2.4
2.4.2.2.9.1.2.5
2.4.2.2.9.1.3
2.4.2.2.9.1.3.1
2.4.2.2.9.1.3.2
2.4.2.2.9.1.3.3
2.4.2.2.9.1.3.4
2.4.2.2.9.2
2.4.2.2.9.2.1
2.4.2.2.9.2.1.1
2.4.2.2.9.2.1.2
2.4.2.2.9.2.1.3
2.4.2.2.9.2.2
2.4.2.2.9.2.2.1
2.4.2.2.9.2.2.2
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
ELEVATOR AREA
SHEARWALL
REBAR
FORMWORKS CLADDING
CONCRETING
INTERIOR PC WALL INSTALLATION
BEAMS AND GIRDERS
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
CONCRETING
RD
AREA 1
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 2
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
2 days
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
50 days
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
18 01 18 01
19 01 19 01
20 01 22 01
23 01 23 01
20 11
22 11
23 11
24 11
27 11 27 11
28 11 29 11
1 12 1 12
2 12 2 12
4 12
6 12
8 12
5 12
7 12
8 12
3 01
3 01
3 01
4 01
4 01
4 01
5 01
13 01
5 01 6 01
8 01 10 01
11 01 13 01
15 01 15 01
16 01 16 01
17 01 17 01
18 01 19 01
20 01 20 01
Summary
Page 18
21 11
22 11
23 11
25 11
Project Summary
10 01
10 01
10 01
11 01
11 01
11 01
12 01
12 01
20 01
13 01
Critical
ID
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
WBS
Task Name
2.4.2.2.9.2.2.3
2.4.2.2.9.2.2.4
2.4.2.2.9.2.2.5
2.4.2.2.9.2.3
2.4.2.2.9.2.3.1
2.4.2.2.9.2.3.2
2.4.2.2.9.2.3.3
2.4.2.2.9.2.3.4
2.4.2.2.9.3
2.4.2.2.9.3.1
2.4.2.2.9.3.1.1
2.4.2.2.9.3.1.2
2.4.2.2.9.3.1.3
2.4.2.2.9.3.2
2.4.2.2.9.3.2.1
2.4.2.2.9.3.2.2
2.4.2.2.9.3.2.3
2.4.2.2.9.3.2.4
2.4.2.2.9.3.2.5
2.4.2.2.9.3.3
2.4.2.2.9.3.3.1
2.4.2.2.9.3.3.2
2.4.2.2.9.3.3.3
2.4.2.2.9.3.3.4
2.4.2.2.9.4
2.4.2.2.9.4.1
2.4.2.2.9.4.1.1
2.4.2.2.9.4.1.2
2.4.2.2.9.4.1.3
2.4.2.2.9.4.2
2.4.2.2.9.4.2.1
2.4.2.2.9.4.2.2
2.4.2.2.9.4.2.3
2.4.2.2.9.4.2.4
2.4.2.2.9.4.2.5
2.4.2.2.9.4.3
2.4.2.2.9.4.3.1
2.4.2.2.9.4.3.2
2.4.2.2.9.4.3.3
2.4.2.2.9.4.3.4
2.4.2.2.9.5
2.4.2.2.9.5.1
2.4.2.2.9.5.1.1
2.4.2.2.9.5.1.2
2.4.2.2.9.5.1.3
Duration
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 3
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
AREA 4
COLUMN
REBAR CAGING
FORMWORKS
CONCRETING
BEAMS AND GIRDERS
EXTERIOR PC WALL INSTALLATION
BEAM SCAFFOLDING AND BOTTOM FORMS
REBAR WORKS
SIDE FORMS
CONCRETING
SLAB
SCAFFOLDING
PC HALF SLAB INSTALLATION INCL SCAFFOLDING
REBAR INSTALLATION
CONCRETING
ELEVATOR AREA
SHEARWALL
REBAR
FORMWORKS CLADDING
CONCRETING
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
2 days
2 days
2 days
2 days
9 days
8 days
2 days
3 days
3 days
1 day
5 days
1 day
1 day
2 days
1 day
16 days
4 days
2 days
1 day
1 day
Start
Finish
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
15 01 17 01
18 01 20 01
22 01 22 01
23 01 23 01
24 01 24 01
25 01 26 01
27 01 27 01
17 01
17 01
17 01
19 01
27 01
19 01 20 01
22 01 24 01
25 01 27 01
29 01 29 01
30 01 30 01
31 01 31 01
1 02 2 02
3 02 3 02
24 01
24 01
24 01
25 01
25 01
25 01
26 01
3 02
26 01 27 01
29 01 31 01
1 02 3 02
5 02 5 02
6 02 6 02
7 02 7 02
8 02 9 02
10 02 10 02
9 12
12 12
13 12
Summary
Page 19
18 01
18 01
18 01
Project Summary
11 12
12 12
13 12
Critical
ID
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
900
WBS
Task Name
Duration
2.4.2.2.9.5.2
INTERIOR PC WALL INSTALLATION
2.4.2.2.9.5.3
BEAMS AND GIRDERS
2.4.2.2.9.5.3.1
BEAM SCAFFOLDING AND BOTTOM FORMS
2.4.2.2.9.5.3.2
REBAR WORKS
2.4.2.2.9.5.3.3
SIDE FORMS
2.4.2.2.9.5.3.4
CONCRETING
2.4.2.2.9.5.4
SLAB
2.4.2.2.9.5.4.1
BEAM SCAFFOLDING AND BOTTOM FORMS
2.4.2.2.9.5.4.2
REBAR WORKS
2.4.2.2.9.5.4.3
CONCRETING
2.4.2.2.10
MR
2.4.2.3
RAMPS
2.4.2.3.1
BASEMENT
2.4.2.3.2
GROUND FLOOR
2.5
ARCHITECTURAL WORKS
2.6
MEPF WORKS
Project: DD WEST_INTERNAL SC
Date: Mon 19 Sep '16
Task
Split
2 days
5 days
1 day
2 days
1 day
1 day
5 days
2 days
2 days
1 day
16 days
60 days
30 days
30 days
552 days
536 days
Start
Finish
Milestone
2016
2017
2018
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 12 01 02
14 12 15 12
16 12 16 12
18 12 19 12
20 12 20 12
21 12 21 12
22 12 23 12
27 12 28 12
29 12 29 12
12 02 MR2 03
25 09 BASEMENT
28 10
30 10 GROUND
6 12 FLOOR
Summary
Page 20
Project Summary
Critical