0% found this document useful (0 votes)
108 views1 page

Stock Transfer From Refinery To Depot

This document outlines the process for transferring stock from an oil refinery to a depot using tanker trucks. It involves creating a stock transfer order and purchase requisition in SAP, then generating a loading token with assigned tanker truck numbers. The tanker trucks are filled at the refinery gantry, weighed, and their departure reduces the stock in transit. Upon arrival at the depot, the goods receipt completes the transfer and increases stock levels.

Uploaded by

Shahnawaz Baig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views1 page

Stock Transfer From Refinery To Depot

This document outlines the process for transferring stock from an oil refinery to a depot using tanker trucks. It involves creating a stock transfer order and purchase requisition in SAP, then generating a loading token with assigned tanker truck numbers. The tanker trucks are filled at the refinery gantry, weighed, and their departure reduces the stock in transit. Upon arrival at the depot, the goods receipt completes the transfer and increases stock levels.

Uploaded by

Shahnawaz Baig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Stock Transfer From Refinery to Depot

Finance

IPD

Start
Creation of Stock
Transfer Order.
(STO)

Creation of
Purchase
Requisition

Creation of Lorry
wise Loading
Token in SAP
T-CODE : VL10D

If PR is
Released

Yes

Assigning Tank
Lorry # in Loading
Token
T-CODE : VL02N

ORC1 Gantry
Operations

User will execute


the Tank Lorry
report of Product
Issuance at Gantry

ORC1- Issuing
Storage Location

Tank
Lorry will
go to
Weight
Bridge
to record
Gross
Weight

Tank Lorry will be


entered on
Loading Token

Tank
Lorry will
go to
Weight
Bridge

Tank
Lorry will
go to
Gantry
Filling
Point

Post Goods Issue


will be Posted
Movement Type
641
T-CODE : VL02N

Goods Receiving
Storage Location

Goods Receipt will


take Place with
Movement tyoe
101

Stock will be
Reduced from
STOCK IN
TRANSIT

End

Stock will go to
STOCK IN
TRANSIT

You might also like